This document is a Facility Investment specification for a federal contract opportunity. It outlines the requirements for the Contractor to perform maintenance, repair, alteration, demolition and minor construction work on HVAC systems, refrigeration systems, and icemaker systems at various locations.
The key requirements include: 1) Recurring Work - The Contractor shall perform Emergency, Urgent, and Routine service orders, as well as develop and implement a Preventive Maintenance program, to ensure the HVAC and icemaker systems are fully functional and in normal working condition. 2) Non-Recurring Work - The Contractor may be issued task orders to accomplish any identified work within the installation boundary, whether or not the HVAC and icemaker systems are specifically listed. The Contractor must comply with various workmanship, material, and safety standards. The work will be ordered through DoD FEDMALL or task orders.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| A0002-S.pdf | ||
| N4008425B04090001.pdf | ||
| Amend 0001.pdf | ||
| N4008425B0409_Attachment (2) SOP and J-2000000-13 ELINs.xlsx | XLSX spreadsheet | |
| N4008425B0409_Attachment (1) Performance Work Statement.pdf | ||
| N4008425B0409_Attachment (3) PreBid Inquiry Form.xlsx | XLSX spreadsheet | |
| N4008425B0409.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1502000 – Facility Investment Table of Contents
Spec Item Title 1 General Information
1.1 Outline of Services
2 Management and Administration
2.1 Definitions and Acronyms
2.2 Personnel
2.2.1 Certification, Training, and Licensing
2.3 Special Requirements
2.3.1 Workmanship and Material Standards
2.3.2 Historical Preservation
2.3.3 Business Permits
2.4 References and Technical Documents
3 Recurring Work
3.1 Emergency, Urgent, and Routine (E/U/R) Work
3.1.1 Emergency
3.1.2 Urgent
3.1.3 Routine
3.2 Projects
3.2.1 Minor
3.2.2 Major
3.3 Preventive Maintenance (PM) Program
3.3.1 HVAC and Refrigeration Systems
3.3.2 Icemaker Systems
4 Non-Recurring Work
Spec Item Title Description 1 General
Information
1.1 Outline of
Services
The intent of 1502000 Facility Investment is to specify the requirements for Sustainment, Restoration, and Modernization (SRM) sub-functions only. The Facility Investment requirements within this sub-annex primarily consist of infrastructure sustainment and minimal restoration and modernization work.
Sustainment is the maintenance and repair necessary to keep an inventory of facilities and other assets in good working order. Restoration and modernization normally consist of major rehabilitation and capital improvements that is accomplished through other Navy programs. Some major repair, minor construction and stand-alone demolition may be accomplished as part of Facility Investment.
The Contractor shall perform maintenance, repair, alteration, demolition and minor construction for the following:
Building Systems
− Heating, Ventilation and Air Conditioning (HVAC) Systems, and Refrigeration Systems
Miscellaneous − Icemaker Systems
2 Management and
Administration
2.1 Definitions and
Acronyms
Definitions and Acronyms are listed in J-1502000-01.
2.2 Personnel In addition to the Employee Requirements specified in Annex 2, the Contractor shall provide personnel with the qualifications specified below.
2.2.1 Certification, Training, and Licensing
All maintenance and repair work at the site shall be performed by personnel trained and certified by the Original Equipment manufacturer (OEM) and by personnel who possess appropriate license or certification as follows.
Personnel working on systems, equipment or components containing chlorofluorocarbons (CFCs) and/or hydro-chlorofluorocarbons (HCFCs) must be certified under an Environmental Protection Agency (EPA) approved technical certification program per OPNAVINST 5090.1 Chapter 6 or registered as “Dai-1-syu -Furonrui- Kaishuugyousha.
Electric Work: Personnel working with or on electrical or electronic equipment, exception of electric wiring and control boards equipped at equipment, must be trained and certified per NAVFAC MO-200, or the electricians who have license of first grade electrician, "Dai-1-syu Denki Kohjishi", or second grade electrician, "Dai-2-syu Denki Kohjishi".
All maintenance trade personnel certifying or inspecting repair or maintenance work that does not require an inspector certified by a governing directive shall be qualified at the journeyman level.
The Contractor shall submit proof of all certification, training, and licensing requirements per Section F.
2.3 Special
Requirements
2.3.1 Workmanship
and Material Standards
The Contractor shall be responsible for maintaining all facilities, systems, and equipment, identified in this technical sub-annex, to a standard that prevents deterioration beyond that which results from normal wear and tear and corrects deficiencies in a timely manner to assure full life expectancy of the facilities, systems, and equipment. Best commercial practices shall be applied in the performance of work. All work shall be completed per approved and accepted industry and equipment manufacturers’ standards and shall comply with building and safety codes, applicable activity, local, state, and federal regulations, and other technical requirements identified within this technical sub-annex.
Workmanship for maintenance and repair shall include all work necessary to complete facility and system restoration, including touch-up painting and operational checks. Upon completion of work, the Contractor shall ensure all facilities, systems, and equipment are free of missing components or defects which would affect the safety, appearance, or habitability of the facilities and structures or would prevent any electrical, mechanical, plumbing or structural system from functioning in accordance with design intent. Repairs shall be made in accordance with the manufacturers’ specifications and guidelines, and standard building codes. The quality of repairs shall meet the applicable standards and shall prevent any malfunction reoccurrences caused by poor workmanship or other contractor inadequacies. The quality of the repaired areas shall be fully compatible with adjacent surfaces or equipment. Except where otherwise specified, replacements shall match existing in dimensions, finish, color, design, and functionality and shall have an appearance similar to the original finished appearance with only minor unobjectionable deterioration resulting from normal use.
The Contractor shall not allow debris to spread unnecessarily into adjacent areas nor accumulate in the work area. All such debris, excess material, and parts shall be cleaned up and removed at the completion of the job and at the end of each day work is in progress. Upon completion of work, any stains and other unsightly marks shall be removed.
2.3.2 Historical
Preservation
Buildings and facilities designated as historical sites shall be maintained in accordance with Federal, state, and local historical policies and regulations.
2.3.3 Business Permits The Prime Contractor and/or Sub-contractor shall have business permits of specific construction permit (Tokutei-Kensetsu-Gyou) or common construction permit (Ittupan- Kensetsu-Gyou), under GOJ construction industry law article 3, section 1 (Dai-3-jou, Dai-1-kou) for proper to contract with maintenance repair and replacement services, and disposal of generated industrial waste, under this contract.
The Contractor's specific construction permit or common construction permit shall include the following minimum required types of construction work.
• Machine appliance setting construction business
• Steel structure construction (Kou-Kouzoubutsu-Kouji)
• Paving work (Hosou-Kouji)
• Sheet metal work (Bankin-Kouji)
• Paint work (Tosou-Kouji)
• Telecommunications work (Denki-Tsuushinn-Kouji)
• Water supply facility work (Suidou-Shisetsu-Kouji)
• Construction work (Kenchiku-Kouji)
• Electrical construction (Denki-Kouji)
• General construction business (Ittspan-Kenchiku-Kouji)
• Plumbing work (Kan-Kouji)
• Scaffolding, Earthwork and Concrete work (Tobi-Dokou, Konkurihto-
Kouji)
The copy of specified permits above shall be submitted per Section F, for proof of prime Contractor and/or Sub-contractor ownership.
2.4 References and
Technical Documents
References and Technical Documents are listed in J-1502000-02.
Spec Item Title Performance
Objective Related Information Performance
Standard 3 Recurring Work The Contractor shall maintain, repair, and alter HVAC systems and Refrigeration Systems, and Icemaker Systems to ensure they are fully functional and in normal working condition.
The Contractor shall develop, implement, and execute an Emergency, Urgent, and Routine (E/U/R) Work, Maintenance Program, Inspection, Testing, and Certification Program, and Other Recurring Service Program to maintain and repair HVAC systems and refrigeration stems, and icemaker systems.
The Contractor shall provide all necessary test instruments, equipment, and tools required to perform maintenance and repair.
Building map is provided in J- 1502000-03.
HVAC systems and Refrigeration Systems, and Icemaker Systems are in normal working condition and function properly in accordance with specified standards.
3.1 Emergency, Urgent, and Routine (E/U/R) Work
The Contractor shall perform service order work in a timely manner and ensure HVAC systems and Refrigeration Systems, and Icemaker Systems are restored to a safe, in normal working condition and function properly.
The Contractor shall receive E/U/R work in accordance with the work reception requirements in Annex 2.
The Contractor shall schedule and perform E/U/R work in a way that minimizes disruptions to customers and Government operations.
E/U/R work will include a wide variety of work. Samples of required work and historical E/U/R work order data is provided in J-1502000-04.
Historical E/U/R work data associated with contracts prior to this solicitation may present data that may not be representative of requirements specified. The Government makes no warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of the historical E/U/R work order data.
The Contractor shall maintain sufficient materials and equipment on hand to support
E/U/R work is responded to and completed within the specified time.
HVAC systems and Refrigeration Systems, and Icemaker Systems are fully functional, in normal working condition and function properly in accordance with OEM specifications, including recertification if applicable.
When a work order is complete the HVAC systems and Refrigeration Systems, and Icemaker Systems do not present danger to personnel or equipment.
Objective Related Information Performance
Standard E/U/R work requirements.
Lack of availability of material or equipment will not relieve the Contractor from the requirement to complete E/U/R work within the time limits specified.
The Government may combine multiple requirements received for the same facility, system, ground structure or other asset at the same time into one work order.
Unless otherwise specified, the Contractor has full responsibility for any work up to the work order limit of liability of ¥200,000 in direct labor and direct material cost per work order. The Government will only pay for the portion of direct labor and/or direct material that exceeds the E/U/R work order limits of liability.
The Contractor shall notify the KO and COR upon identification that the work order will exceed the specified limits of liability in accordance with reporting requirements in Annex 2. If a non-recurring work is issued for the portion exceeding the specified E/U/R work order limits of liability, the Government will only pay for the portion of direct labor and/or direct material that exceeds the work order limits.
Examples of work exceeding the E/U/R Work Order limits of liability:
• If a work order requires
¥210,000 in direct labor and direct material cost, the Government may issue a task order in accordance with the Non-recurring Work portion of the contract
Objective Related Information Performance
Standard for the ¥10,000 in direct labor and direct material cost that exceeds the work limit of liability.
The Contractor may invoice for completed E/U/R work orders.
The Contractor shall not invoice for incomplete work orders and work orders not issued. A modification will be processed at the end of each period of performance to deduct for work orders not issued and incomplete work orders. Deduction will be based on the unit prices specified in Attachment J- 0200000-13 ELINs.
The Contractor shall submit a monthly summary of completed E/U/R work order reports and per Section F.
The Contractor shall submit an accumulated summary list of completed E/U/R work orders and per Section F.
3.1.1 Emergency The Contractor shall
perform emergency work orders in a timely manner to ensure HVAC systems and Refrigeration Systems, and Icemaker Systems are fully functional, in normal working condition and function properly in accordance with specified standards.
The Contractor shall perform emergency work orders 24 hours a day, seven days a week throughout the contract period.
The Contractor shall respond to emergency work orders with the appropriate service personnel and equipment to commence work immediately.
The Contractor shall remain at the work site until the emergency has been arrested.
If follow-up work is required (after the emergency condition is arrested) to complete the restoration and ensure facilities, systems, ground structures and other assets are fully functional and in normal working condition, the Contractor may request time extension equal to
Emergency work orders responded to within one hour of receipt of call.
Work continues without interruption until emergent condition is arrested and damage to HVAC systems and Refrigeration Systems, and Icemaker Systems are mitigated.
Objective Related Information Performance
Standard a Routine Work Order. The emergency mitigation and follow-up work shall be considered part of the original work order.
Informational Note:
Historically, approximately two emergency work orders originate after normal working hours during four years.
3.1.2 Urgent The Contractor shall
perform urgent work orders in a timely manner to ensure HVAC systems and Refrigeration Systems, and Icemaker Systems are fully functional, in normal working condition and function properly in accordance with specified standards.
The Contractor shall perform urgent work orders without extended delay.
Urgent work orders are completed within five working days.
3.1.3 Routine The Contractor shall
perform routine work orders in a timely manner to ensure HVAC systems and Refrigeration Systems, and Icemaker Systems are restored to a safe, in normal working condition and function properly.
Performance of routine work orders is not required outside of Government regular working hours.
Routine work orders are completed within 30 calendar days.
3.2 Projects The Contractor shall
perform Project Work Orders in a timely manner to ensure requested work is complete in accordance with specified standards.
The Contractor shall receive Project Work Orders in accordance with the work reception requirements in Annex 02.
Project work will include a wide variety of work. Sample of historical Project Work Order data is provided in J- 1502000-05.
The Contractor shall schedule project work in a way that minimizes disruptions to Government operations.
Project order work responded to and completed within the 30 calendar days.
HVAC systems and Refrigeration Systems, and Icemaker Systems are fully functional, in normal working condition, and function properly in accordance with the specified, manufacturers’, workmanship and material standards, including recertification if applicable.
Objective Related Information Performance
Standard Project orders will be ordered to accomplish any work identified within the entire boundary of the installation, whether or not, HVAC systems and Refrigeration Systems, and Icemaker Systems are identified in Section J.
The Government may combine multiple requirements into one Project Work Order.
The Contractor shall maintain sufficient personnel, materials, and equipment on hand to support Project Work Order.
Lack of availability of personnel, material, or equipment will not relieve the Contractor from the requirement to complete Project Work Order within the time specified.
The Contractor shall submit a summary completion report of completed Project Work Orders per Section F.
When project order is complete the HVAC systems and refrigeration systems, and icemaker systems do not present danger to personnel or equipment.
3.2.1 Minor The Contractor shall
perform Project Work Orders in a timely manner to ensure requested work is complete in accordance with specified standards.
Minor Project Work Orders are limited to a maximum of ¥300,000 in direct labor and direct material cost per Project Work Order. Each Project Order shall be approved by the
KO.
Historical Project Work Order is estimated at 50 projects average per year.
When project order is complete the HVAC systems and refrigeration systems, and icemaker systems do not present danger to personnel or equipment.
3.2.2 Major The Contractor shall
perform Project Work Orders in a timely manner to ensure requested work is complete in accordance with specified standards.
Major Project Work Orders are limited to a maximum of ¥600,000 in direct labor and direct material cost per Project Work Order. Each Project Order shall be approved by the
KO.
Historical Project Work Order is estimated at 30 projects average per year.
When project order is complete the HVAC systems and refrigeration systems, and icemaker systems do not present danger to personnel or equipment.
Objective Related Information Performance
Standard
3.3 Preventive
Maintenance (PM) Program
The Contractor shall develop and implement a PM program for HVAC systems and Refrigeration Systems, and Icemaker Systems to ensure proper operation, to minimize breakdowns, and to maximize useful life.
The Contractor shall develop and submit a PM program by each building system per Section F. At a minimum, the PM program shall include:
• PM management and technical approach
• Procedures to evaluate equipment reliability and corrective actions.
• Job plans tailored to the OEM technical documentation.
• Qualification requirements of the maintenance personnel.
The Contractor is fully responsible for and shall perform any incidental repairs, including replacement, discovered during scheduled maintenance work up to a total of ¥300,000 per occurrence in direct labor and direct material cost under the recurring work portion of the Contract.
Incidental repairs performed under maintenance are not considered E/U/R work
Notification of repair work exceeding the incidental repairs limit shall be submitted to the KO within two hours of identification. The Government may issue E/U/R work or non-recurring work for the portion of the repairs exceeding the incidental repairs limit. The Government will only pay for the portion of direct labor and/or direct material that exceeds the specified limits of liability.
Example: If an individual occurrence of incidental repair requires ¥310,000 in direct labor and/or direct material cost, the Government may issue E/U/R work or non-recurring work in accordance with the
Maintenance is accomplished in accordance with the Contractor’s PM program and work schedule.
PM is performed in accordance with manufacturers’ recommended procedures and OEM standards.
Objective Related Information Performance
Standard non-recurring work provisions of the contract for the ¥10,000 in direct labor and/or direct material cost that exceeds the specified incidental repair limit of liability.
The Contractor shall not use breakdown maintenance as part of the PM program.
The PM program shall provide an economical approach manufacturers’ recommended procedures, OEM standards, and maintenance required to satisfy equipment warranties and keep f HVAC systems and Icemaker Systems in normal working condition.
Excessive or repeated system or equipment breakdowns or deficiencies may indicate the need to adjust or modify the Contractor’s PM program.
These changes will be made at no additional cost to the Government.
The Contractor shall submit a monthly PM work schedule by each building system per Section F.
The Contractor shall submit a monthly summary of completed PM work report by each building system per Section F.
The Contractor shall submit actual monthly workload under the limit of liability by each system per Section F.
The Contractor shall submit accumulated workload under the limit of liability by each system per Section F.
3.3.1 HVAC and
Refrigeration Systems
The Contractor shall maintain HVAC and refrigeration systems
Temperature setting for HVAC and refrigeration systems are provided in J-1502000-06.
Conditioned spaces are continuously maintained at the
Objective Related Information Performance
Standard to ensure proper operation, to minimize breakdowns, and to maximize useful life.
Descriptions for HVAC and refrigeration systems are provided in J-1502000-07.
The reference PM work requirements for HVAC and refrigeration systems are provided in J-1502000-08.
The site plans for HVAC and refrigeration systems are provided in J-1502000-09.
The Contractor shall not vent or otherwise dispose of any ozone-depleting substances in a manner that will permit its release into the environment.
Refrigerants shall be captured and recycled per Annex 02 ODS Requirements for Refrigerant Recycling.
temperature(s) specified.
Air quality in conditioned space meet EPA and ASHREA air quality standards.
HVAC and refrigeration systems comply with environmental regulations.
3.3.2 Icemaker
Systems
The Contractor shall maintain icemaker systems to ensure proper operation, to minimize breakdowns, and to maximize useful life.
PM work shall be performed in accordance with OEM maintenance manual and recommended procedure.
Descriptions for icemaker systems are provided in J- 1502000-10.
The reference PM work requirements for Icemaker Systems are provided in J- 1502000-11.
The site plans for icemaker systems are provided in J- 1502000-12.
Maintenance is performed in accordance with Contractor's PM program and work schedule.
Spec Item Title Performance Objective Related Information Performance
Standard 4 Non-Recurring
Work Non-recurring work may be ordered utilizing DoD FEDMALL in accordance with Section H or on a task order in accordance with the
PROCEDURES FOR
ISSUING ORDERS clause in Section G. The order will specify the exact locations and types of work to be accomplished. The period of performance will be specified in each order.
Refer to non-recurring work ELINs for task listings, descriptions and related requirements. All periods of performance are measured from issue date of order to acceptance of the work. Performance Standards for non-recurring work will be the same as those in Spec Item 3 where applicable.
Attachment J-1502000-07 Systems Descriptions for HVAC and Refrigeration Systems
CNIC FUNDING PORTION
1. NDK-100134:
Mechanical Equipment:
I.D No. TYPE MODEL No. MANUFACTURER LOCATION QTY AC-1W Air Cooled Heat Pump Unit SHYGJ80G Daikin Co., Ltd 1st FL Office 1 AC-1E Air Cooled Heat Pump Unit SZRG80BV Daikin Co., Ltd 1st FL Office 1 AC-2 Air Cooled Heat Pump Unit SZRG56BV Daikin Co., Ltd 1st FL Break RM 2 AC-3 Air Cooled Heat Pump Unit SYA56CAV Daikin Co., Ltd 1st FL Office 1 EH-1 Panel Heater PXS-750 Inter Central Co., Ltd 1st FL Toilet 2 SF-1 Supply Air Duct Fan JF-30CSD Mitsubishi Denki Co., Ltd 1st FL Fire Hydrant Pump
RM
SF-2 Supply Air Duct Fan JF-40FTD Mitsubishi Denki Co., Ltd 1st FL Electric RM 1 SF-3 Supply Air Sirocco Fan EG-60ETB Mitsubishi Denki Co., Ltd 1st FL Storage RM 4 SF-4 Supply Air Sirocco Fan BFS-45KT-50 Mitsubishi Denki Co., Ltd 1st FL Storage RM 2 SF-5 Supply Air Static Pressure Fan EG-60ETB Mitsubishi Denki Co., Ltd 2nd FL Storage RM 8 SF-6 Supply Air Static Pressure Fan EG-60ETB Mitsubishi Denki Co., Ltd 2nd FL Storage RM 4 SF-7 Supply Air Static Pressure Fan EG-60ETB (7 EA)
Mitsubishi Denki Co., Ltd 3rd FL Storage RM 7
EG-60ETA-Q (1 EA) 1
SF-8 Supply Air Static Pressure Fan EG-60ETB Mitsubishi Denki Co., Ltd 3rd FL Storage RM 4
SF-9W Supply Air Static Pressure Fan EG-60ETB Mitsubishi Denki Co., Ltd RF FL Elevator Machine
RM
SF-9E Supply Air Static Pressure Fan EG-60ETB Mitsubishi Denki Co., Ltd RF FL Elevator Machine
RM
SF-10 Supply Air Static Pressure Fan EG-60ETB Mitsubishi Denki Co., Ltd RF FL Elevator Machine
RM
EF-1 Exhaust Duct Fan JF-30CSD Mitsubishi Denki Co., Ltd 1st FL Fire Hydrant Pump
RM
EF-2 Exhaust Duct Fan JF-40FTD Mitsubishi Denki Co., Ltd 1st FL Electric RM 1 EF-3 Exhaust Air Static Pressure Fan EG-60ETB Mitsubishi Denki Co., Ltd 1st FL Storage RM 8 EF-4 Exhaust Air Static Pressure Fan JF-50GTD Mitsubishi Denki Co., Ltd 1st FL Storage RM 2 EF-5 Exhaust Air Static Pressure Fan EG-60ETB Mitsubishi Denki Co., Ltd 1st FL Storage RM 8 EF-6 Exhaust Duct Fan JF-50GTD Mitsubishi Denki Co., Ltd 2ND FL Storage RM 2 EF-7 Exhaust Air Static Pressure Fan EG-60ETB Mitsubishi Denki Co., Ltd 3rd FL Storage RM 8 EF-8 Exhaust Air Static Pressure Fan EG-60ETB Mitsubishi Denki Co., Ltd 3rd FL Storage RM 2
EF-9 Exhaust Air Static Pressure Fan EG-60ETB w/ Thermos Switch (FS-10B)
Mitsubishi Denki Co., Ltd Roof FL Elevator Machine
RM
EF-10 Exhaust Air Static Pressure Fan EG-60ETB w/ Thermos Switch (FS-10B)
Mitsubishi Denki Co., Ltd Roof FL Elevator Machine
RM
EF-11 Exhaust Ceiling Mounted Fan VD-18ZB4 Mitsubishi Denki Co., Ltd Janitor’s CloLS at 1st, 2nd and 3rd FL
EF-12 Exhaust Ceiling Mounted Fan VD-10Z4 Mitsubishi Denki Co., Ltd 1st FL Hot Water Heater
RM
EF-13 Exhaust Ceiling Mounted Fan VD-10Z4 Mitsubishi Denki Co., Ltd 1st FL Shower RM 2 EF-14 Exhaust Ceiling Mounted Fan VD-15ZP4 Mitsubishi Denki Co., Ltd 1st FL Toilet RM 2 EF-15 Range Hood Fan VL-60 Takara Standard Co., Ltd 1st FL Kitchen 2 EF-16 Exhaust Sirocco PVC Fan #3POSV-RHCT Hitachi Co., Ltd 2nd FL Battery RM 2 EF-17 Exhaust Ceiling Mounted Fan VD-18ZB4 Mitsubishi Denki Co., Ltd 1st FL Office 1 HF-1 Heat Recovery Ventilation Fan LGH-35CST Mitsubishi Denki Co., Ltd 1st FL Office 2 HF-2 Heat Recovery Ventilation Fan LGH-25CST Mitsubishi Denki Co., Ltd 1st FL Office 2
2. NDK-100137
ID No. Name Specification Model No. Serial No/ OEM QTY
RC-1-1
RC-1-2
Freezing Unit w/ Condensing Unit (Freezing Unit Integrated type)
40,850 kcal / h, R410A, Connecting Center Monitoring System 3Phase, 200V, 50Hz
• Spring Isolation Vibration Pad
• Solenoid Valve
ECOV-D150MA-
BSG
2XW00131 Mitsubishi Electric Co., Ltd
RC-1-3 Unit Cooler Blade Fin Tube Type, 120m³ / h 3Phase, 200V, 0.78kw
UCH-D15VNA 2ZW02139
2ZW02176
Mitsubishi Electric Co., Ltd
RC-2-1
RC-2-2
Freezing Unit w/ Condensing Unit (Freezing Unit Integrated type)
40,850 kcal / h, R410A, Connecting Center Monitoring System 3Phase, 200V, 50Hz
• Spring Isolation Vibration Pad
• Solenoid Valve
ECOV-D150MA-
BSG
2XW00130 Mitsubishi Electric
RC-2-3 Unit Cooler Blade Fin Tube Type, 120m³ / h 3Phase, 200V, 0.78kw
UCH-D15VNA 2ZW02140
2ZW02177
RC-3-1 Freezing Unit 67,800 kcal / h, R410A, Connecting Center Monitoring System 3Phase, 200V, 50Hz
• Spring Isolation Vibration Pad
• Solenoid Valve
• Electric Expansion Valve
• Capillary Tube
ECV-EN260A1 26W00488 Mitsubishi Electric Co., Ltd
RC-3-2 Condensing Unit Refrigerant: R410A, Fan: Ø 400 Power: 1Phase, 200V, 50Hz, 7.2A Air Volume: 308m3/min
RM-N165A-BSG 12W00160
26W00210
Mitsubishi Electric Co., Ltd
RC-3-3 Unit Cooler Refrigerant: R410A, Fan: Ø 400 Power: 3Phase, 200V, 50Hz, 23.5kW Air Volume: 241m3/min
UCL-D15VHA 25W01501
25W01491 25W01498
RC-4-1 Freezing Unit 67,800 kcal / h, R410A, Connecting Center Monitoring System 3Phase, 200V, 50Hz
• Spring Isolation Vibration Pad
• Solenoid Valve
• Electric Expansion Valve
• Capillary Tube
ECV-EN260A1 24W00472 Mitsubishi Electric Co., Ltd
RC-4-2 Condensing Unit Refrigerant: R410A, Fan: Ø 400 Power: 1Phase, 200V, 50Hz, 7.2A Air Volume: 308m3/min
RM-N165A-BSG 26W00199
26W00196
Mitsubishi Electric Co., Ltd
RC-4-3 Unit Cooler Refrigerant: R410A, Fan: Ø 400 Power: 3Phase, 200V, 50Hz, 23.5kW Air Volume: 241m3/min
UCL-D15VHA 25W01496
2XW01650
2XW01651
Mitsubishi Electric
RC-5-1 Freezing Unit 67,800 kcal / h, R410A, Connecting Center Monitoring System 3Phase, 200V, 50Hz
• Spring Isolation Vibration Pad
• Solenoid Valve
• Electric Expansion Valve
• Capillary Tube
ECV-EN260A1 26W00489 Mitsubishi Electric Co., Ltd
RC-5-2 Condensing Unit Refrigerant: R410A, Fan: Ø 400 Power: 1Phase, 200V, 50Hz, 7.2A Air Volume: 308m3/min
RM-N165A-BSG 26W00198
1YW00148
Mitsubishi Electric Co., Ltd
RC-5-3 Unit Cooler Refrigerant: R410A, Fan: Ø 400 Power: 3Phase, 200V, 50Hz, 23.5kW Air Volume: 241m3/min
UCL-D15VHA 25W01495
2XW01652
25W01497
Mitsubishi Electric Co., Ltd
RC-6-1 Freezing Unit 4,085 kcal / h, R410A, Connecting Center Monitoring System 3Phase, 200V, 50Hz
• Spring Isolation Vibration Pad
• Solenoid Valve
• Electric Expansion Valve
• Capillary Tube
ECV-EN45DCA 28W00744 Mitsubishi Electric Co., Ltd
RC-6-2 Condensing Unit Refrigerant: R410A, Fan: Ø 490 Power: 1Phase, 200V, 50Hz, 2.4A Air Volume: 308m3/min
RM-N55A-BSG 2ZW00031 Mitsubishi Electric Co., Ltd
RC-6-3 Unit Cooler Refrigerant: R410A, Fan: Ø 400 Power: 3Phase, 200V, 50Hz,15.9kW Air Volume: 175m3/min
UCL-D10VHA 2ZW02140 Mitsubishi Electric Co., Ltd
RC-7-1 Freezing Unit 67,800 kcal / h, R410A, Connecting Center Monitoring System 3Phase, 200V, 50Hz
• Spring Isolation Vibration Pad
• Solenoid Valve
• Electric Expansion Valve
• Capillary Tube
ECV-EN260A1 24W00477 Mitsubishi Electric
RC-7-2 Condensing Unit Refrigerant: R410A, Fan: Ø 400 Power: 1Phase, 200V, 50Hz, 7.2A Air Volume: 308m3/min
RM-N165A-BSG 26W00195
26W00205
Mitsubishi Electric Co., Ltd
RC-7-3 Unit Cooler Refrigerant: R410A, Fan: Ø 400 Power: 3Phase, 200V, 50Hz, 23.5kW Air Volume: 241m3/min
UCL-D15VHA 2ZW01184
2ZW01212
Mitsubishi Electric Co., Ltd
RC-8-1 Freezing Unit 67,800 kcal / h, R410A, Connecting Center Monitoring System 3Phase, 200V, 50Hz
• Spring Isolation Vibration Pad
• Solenoid Valve
• Electric Expansion Valve
• Capillary Tube
ECV-EN260A1 26W00485 Mitsubishi Electric Co., Ltd
RC-8-2 Condensing Unit Refrigerant: R410A, Fan: Ø 400 Power: 1Phase, 200V, 50Hz, 7.2A Air Volume: 308m3/min
RM-N165A-BSG 26W00209
26W00200
Mitsubishi Electric Co., Ltd
RC-8-3 Unit Cooler Refrigerant: R410A, Fan: Ø 400 Power: 3Phase, 200V, 50Hz, 23.5kW Air Volume: 241m3/min
UCL-D15VHA 28W01098
2ZW01215
Mitsubishi Electric Co., Ltd
RC-9-1 Freezing Unit 4,085 kcal / h, R410A, Connecting Center Monitoring System 3Phase, 200V, 50Hz
• Spring Isolation Vibration Pad
• Solenoid Valve
• Electric Expansion Valve
• Capillary Tube
ECV-EN45DCA 28W00743 Mitsubishi Electric Co., Ltd
RC-9-2 Condensing Unit Refrigerant: R410A, Fan: Ø 490 Power: 1Phase, 200V, 50Hz, 2.4A Air Volume: 308m3/min
RM-N55A-BSG 2ZW00030 Mitsubishi Electric Co., Ltd
RC-9-3
Unit Cooler Refrigerant: R410A, Fan: Ø 400 Power: 3Phase, 200V, 50Hz,15.9kW Air Volume: 175m3/min
UCL-D10VHA 2ZW02139 Mitsubishi Electric
AC-1 Air Curtain Static Pressure Type, Size: 1,000 m / m, 3Ø, 200V, 0.12kw
MK-3512T Mitsubishi Electric Co., Ltd
AC-2 Air Curtain Static Pressure Type, Size: 1,200 m / m, 3Ø, 200V, 0.21kw
MK-3575T Mitsubishi Electric Co., Ltd
AC-2 Air Curtain Static Pressure Type, Size: 750 m / m, 3Ø, 200V, 0.1kw
MK-3510T Mitsubishi Electric
Center Monitoring System:
ID No. Name Specification Model No. Serial No/ OEM QTY N/W
Central Monitoring System
Unknown AE200J Unknown
3. YSK-5229:
ID No. Name Specification Model No. Serial No/ OEM QTY AC-01 Air Cooled Heat Pump
Unit (Outside Unit)
Cooling Capacity: 2.5kw Heating Capacity: 2.8kw 1Ø, 100V, 50Hz
R25LESE2 COOO220 Daikin Co., Ltd. 1
Inside Unit F25LTES-W C503120 1
4. YSK-2046:
ID No. Name Specification Model No. Serial No/ OEM QTY RA-1 Absorption Cooling
Chiller Unit
310RT
Accessary:
• Control Valve
• Three (3) Way Motor Valve
MDS-31B Mitsubishi Jukou Co., Ltd.
CT-1 Cooling Tower
(RF)
Double Effect Absorption Type, Low Noise, Anti Harvey Corrosive Salt
• Cooling Capacity: 1,520,000 kcal/h
SDW-U250ASC 515552C Ebara Shinwa Co., Ltd.
• Cater Capacity: 4,610 L/min
• 3Ǿ, 200V, 5.5kw x 2, 50Hz.
PCD-1 Cooling Water (CW) Pump
(1FL MECH RM)
Single Suction Centrifugal Type,
• 150A, 4,610 L/min, 26m, 3 Ǿ, 200V, 50Hz, 37kw.
• Spring Vibration Isolation Pad
Note: Interlocking with RA-1
150x125FS4L-537 Ebara Co., Ltd 1
PC-1 Child Water Pump
(1FL MECH RM)
Single Suction Centrifugal Type,
• 100A, 1,375 L/min, 15m, 3 Ǿ, 200V, 50Hz, 7.5kw.
Note: Interlocking with RA-1
100x80FS4-J57.5 Ebara Co., Ltd 2
PH-1 Hot Water (HW) Pump (1FL
MECH RM)
Single Suction Centrifugal Type, Automatic Alternating Operation
• 100A, 1,530 L/min, 12m, 3 Ǿ, 200V, 50Hz, 7.5kw.
Note: Interlocking with Relay-1
125x100FS4J-57.5 Ebara Co., Ltd 1
ACP-1 Air Cooled (A/C) Heat Pump Outside Unit
Multi-Operation Type, Anti Harvey Corrosive Salt
• Cooling Capacity: 23.9kw
• Heating Capacity: 19.9kw
RXYP280FCH A000227 Daikin Kogyo Co., Ltd. 1
ACP-1A
Rm101
Air Cooled (A/C) Heat Pump Inside Unit
(RM101)
Ceiling CasLSte Type, Two (2) Way Blow, Built in Drain-up Pump
• Cooling Capacity: 2.2kw,
• Heating Capacity: 2.9kw
• Power: 1Ø, 200V, 0.015kw, 50Hz With Control Switch
FXYCP28EB E006379 Daikin Kogyo Co., Ltd. 1
ACP-1B
Rm103
Air Cooled (A/C) Heat Pump Inside Unit
(RM103)
Ceiling CasLSte Type, Two (2) Way Blow, Built in Drain-up Pump
• Cooling Capacity: 2.3kw, FXYCP28EB E005460 Daikin Kogyo Co., Ltd. 1
• Heating Capacity: 1.5kw
• Power: 1Ø, 200V, 0.015kw, 50Hz With Control Switch
ACP-1C
Rm104
Air Cooled (A/C) Heat Pump Inside Unit
(RM104)
Ceiling CasLSte Type, Two (2) Way Blow, Built in Drain-up Pump
• Cooling Capacity: 1.4kw,
• Heating Capacity: 0.4kw
• Power: 1Ø, 200V, 0.01kw, 50Hz With Control Switch
FXYCP22EB E006941 Daikin Kogyo Co., Ltd. 1
ACP-1D
Rm105
Air Cooled (A/C) Heat Pump Inside Unit
(RM105)
Ceiling CasLSte Type, Two (2) Way Blow, Built in Drain-up Pump
• Cooling Capacity: 1.6kw,
• Heating Capacity: 1.3kw
• Power: 1Ø, 200V, 0.01kw, 50Hz With Control Switch
FXYCP22EB E006796 Daikin Kogyo Co., Ltd. 1
ACP-1E
Rm106
Air Cooled (A/C) Heat Pump Inside Unit
(RM106)
Ceiling CasLSte Type, Two (2) Way Blow, Built in Drain-up Pump
• Cooling Capacity: 2.9kw,
• Heating Capacity: 2.1kw
• Power: 1Ø, 200V, 0.015kw, 50Hz With Control Switch
FXYCP36EB E005861 Daikin Kogyo Co., Ltd. 1
ACP-1F
Rm107
Air Cooled (A/C) Heat Pump Inside Unit
(RM106)
Ceiling CasLSte Type, Two (2) Way Blow, Built in Drain-up Pump
• Cooling Capacity: 0.3kw,
• Heating Capacity: 0.2kw
• Power: 1Ø, 200V, 0.01kw, 50Hz With Control Switch
FXYCP22EB E006939 Daikin Kogyo Co., Ltd.
ACP-1G
Rm108
Air Cooled (A/C) Heat Pump Inside Unit
(RM108)
Ceiling CasLSte Type, Two (2) Way Blow, Built in Drain-up Pump
• Cooling Capacity: 0.4kw,
• Heating Capacity: 0.3kw
• Power: 1Ø, 200V, 0.01kw, 50Hz With Control Switch
FXYCP22EB E006985 Daikin Kogyo Co., Ltd. 1
ACP-1H
Rm111
Air Cooled (A/C) Heat Pump Inside Unit
(RM111)
Ceiling CasLSte Type, Two (2) Way Blow, Built in Drain-up Pump
• Cooling Capacity: 4.1kw,
• Heating Capacity: 3.8kw
• Power: 1Ø, 200V, 0.02kw, 50Hz With Control Switch
FXYCP45EB E006775 Daikin Kogyo Co., Ltd. 1
ACP-1I
Rm112
Air Cooled (A/C) Heat Pump Inside Unit
(RM112)
Ceiling CasLSte Type, Two (2) Way Blow, Built in Drain-up Pump
• Cooling Capacity: 1.6kw,
• Heating Capacity: 1.1kw
• Power: 1Ø, 200V, 0.01kw, 50Hz With Control Switch
FXYCP22EB E006801 Daikin Kogyo Co., Ltd. 1
ACP-2 Air Cooled (A/C) Heat Pump Outside Unit
Multi-Operation Type, Anti Harvey Corrosive Salt
• Cooling Capacity: 8.2kw
• Heating Capacity: 18.5kw
RXYP160DDH A000119 Daikin Kogyo Co., Ltd. 1
ACP-2A Air Cooled (A/C) Heat Pump Inside Unit
(RM306)
Ceiling CasLSte Type, Two (2) Way Blow, Built in Drain-up Pump
• Cooling Capacity: 3.1kw,
• Heating Capacity: 5.7kw
• Power: 1Ø, 200V, 0.02kw, 50Hz With Control Switch
FXYCP56EB E006894
E006728
Daikin Kogyo Co., Ltd. 2
ACP-2B Air Cooled (A/C) Heat Pump Inside Unit
(RM503)
Ceiling CasLSte Type, Two (2) Way Blow, Built in Drain-up Pump
• Cooling Capacity: 3.6kw,
• Heating Capacity: 4.1kw
• Power: 1Ø, 200V, 0.02kw, 50Hz With Control Switch
MPL-RP50LA 74W00868 Mitsubishi Denki 1
ACP-3 Air Cooled (A/C) Heat Pump Outside Unit (RM301, Computer
RM)
All Year Cooling Type, Built-in Electric Heater, Anti Harvey Corrosive Salt
• Cooling Capacity: 15.2kw
• Heating Capacity: 3.2kw
• Air Blow Capacity: 4,080m³/h
CRP224AAKH A000290
A000292
Daikin Kogyo Co., Ltd.
• Outside Unit: 3Ø, 200V, 5.5kw, 50Hz
Note: One (1) unit is spare.
Air Cooled (A/C) Heat Pump Inside Unit
Floor Mounted Type,
• Inside Unit: 3Ø, 200V, 0.75kw, 50Hz
• Electric Heater: 3Ø, 200V, 0.34kw, 50Hz
FRP224BK A000379
A000382
ACP-4 Air Cooled (A/C) Heat Pump Outside Unit (RM302, Computer
RM)
All Year Cooling Type, Built-in Electric Heater, Anti Harvey Corrosive Salt
• Cooling Capacity: 10.0kw
• Heating Capacity: 1.7kw
• Air Blow Capacity: 2,880m³/h
• Outside Unit: 3Ø, 200V, 7.5kw x 2, CRP224AAKH A000274
A000294
Daikin Kogyo Co., Ltd. 2
Air Cooled (A/C) Heat Pump Inside Unit
Floor Mounted Type,
• Inside Unit: 3Ø, 200V, 0.75kw, 50Hz
• Electric Heater: 3Ø, 200V, 1.7kw, 50Hz
FRP224BK A000383
A000384
ACP-5 Air Cooled (A/C) Heat Pump Outside Unit (RM401, Computer
RM)
All Year Cooling Type, Built-in Electric Heater, Anti Harvey Corrosive Salt
• Cooling Capacity: 49.6kw
• Heating Capacity: 5.0kw
• Air Blow Capacity: 8,100m³/h
• Outside Unit: 3Ø, 200V, 7.5kw x 2, No.1
CRP300AAKH
No.2
CRJ300AAKH
No.3
CRP300AAKH
No.1 A000374 A000376 No.2 A000380 A000386 No.3 A000382 A000375
Daikin Kogyo Co., Ltd. 3
Heat Pump Inside Unit
Floor Mounted Type,
• Inside Unit: 3Ø, 200V, 0.75kw, 50Hz
• Electric Heater: 3Ø, 200V, 1.7kw, 50Hz
FRP600BK A000698
A000699 A000
RF-1 Return Fan
(1FL MECH RM)
Single Suction Sirocco Type, Ceiling Hanging
• #3, 14,850m³/h, 31mmAq, 755rpm.
• 3Ø, 200V, 5.5kw, 50Hz With Spring Vibration Isolation Pad and Earth Quake Proof Steel Fame
Note: Interlocking with AHU-1
No3 ½ -SRM3 PX781555 Ebara Co. Ltd. 3
RF-2 Return Fan
(3FL MECH RM)
Single Suction Sirocco Type, Ceiling Hanging
• #3, 8,590m³/h, 30mmAq, 800rpm.
• 3Ø, 200V, 2.2kw, 50Hz With Spring Vibration Isolation Pad and Earth Quake Proof Steel Fame
Note: Interlocking with AHU-5
No3-SRM3 PY714026 Ebara Co. Ltd. 1
FCV-2-13 Fan Convector (RM- 109)
Ceiling Mounted Type, Hot Water, Left Connecting
• Heating Capacity: 1,380kcal
• 1Ø, 100V, 41w, 50Hz
DSRD-21W Showa Tekkou Co., Ltd.
FCV-2-1 Fan Convector
(RM-110)
Ceiling Mounted Type, Hot Water, Right Connecting
• Heating Capacity: 1,020kcal
• 1Ø, 100V, 41w, 50Hz
DSRD-21W Showa Tekkou Co., Ltd.
FCV-2-2 Fan Convector
(RM-113)
Ceiling Mounted Type, Hot Water, Left Connecting
• Heating Capacity: 1,140kcal
• 1Ø, 100V, 41w, 50Hz
DSRD-21W Showa Tekkou Co., Ltd.
FCV-2-3 Fan Convector
(RM-117)
Ceiling Mounted Type, Hot Water, Left Connecting
• Heating Capacity: 1,180kcal
• 1Ø, 100V, 41w, 50Hz
DSR-D 31WK Showa Tekkou Co., Ltd.
FCV-3-2 Fan Convector
(RM-118)
Ceiling Mounted Type, Hot Water, Left DSR-D 31WK Showa Tekkou Co., Connecting
• Heating Capacity: 1,780kcal
• 1Ø, 100V, 41w, 50Hz
FCV-2-4 Fan Convector (1FL HW Supply
RM)
Ceiling Mounted Type, Hot Water, Right Connecting
• Heating Capacity: 1,190kcal
• 1Ø, 100V, 41w, 50Hz
DSR-D 21WT Showa Tekkou Co., Ltd.
FCV-3-3 Fan Convector
(RM-212)
Ceiling Mounted Type, Hot Water, Left Connecting
• Heating Capacity: 1,840kcal
• 1Ø, 100V, 41w, 50Hz
DSR-D 31WK Showa Tekkou Co., Ltd.
FCV-2-5 Fan Convector
(RM-222)
Ceiling Mounted Type, Hot Water, Left Connecting
• Heating Capacity: 1,540kcal
• 1Ø, 100V, 41w, 50Hz
DSR-D 21WK Showa Tekkou Co., Ltd.
FCV-2-6 Fan Convector (2FL HW Supply
RM)
Ceiling Mounted Type, Hot Water, Right Connecting
• Heating Capacity: 1,090kcal
• 1Ø, 100V, 41w, 50Hz
DSR-D 21WK Showa Tekkou Co., Ltd.
FCV-2-7 Fan Convector
(RM-304)
Ceiling Mounted Type, Hot Water, Left Connecting
• Heating Capacity: 800kcal
• 1Ø, 100V, 41w, 50Hz
DSR-D 21WK Showa Tekkou Co., Ltd.
FCV-3-4 Fan Convector
(RM-309)
Ceiling Mounted Type, Hot Water, Left Connecting
• Heating Capacity: 1,850kcal
• 1Ø, 100V, 41w, 50Hz
DSR-D 31WK Showa Tekkou Co., Ltd.
FCV-2-8 Fan Convector (3FL HW Supply
RM)
Ceiling Mounted Type, Hot Water, Right Connecting
• Heating Capacity: 1,090kcal
• 1Ø, 100V, 41w, 50Hz
DSR-D 21WK Showa Tekkou Co., Ltd.
FCV-4-1 Fan Convector
(RM-407)
Ceiling Mounted Type, Hot Water, Left Connecting
DSR-D 41WK Showa Tekkou Co.,
• Heating Capacity: 2,830kcal
• 1Ø, 100V, 82w, 50Hz
FCV-2-9 Fan Convector
(RM-409)
Ceiling Mounted Type, Hot Water, Left Connecting
• Heating Capacity: 1,460kcal
• 1Ø, 100V, 41w, 50Hz
DSR-D 21WK Showa Tekkou Co., FCV-2-10 Fan Convector (4FL HW Supply
RM)
Ceiling Mounted Type, Hot Water, Right Connecting
• Heating Capacity: 1,090kcal
• 1Ø, 100V, 41w, 50Hz
DSR-D 21WK Showa Tekkou Co., Ltd.
FCV-2-11 Fan Convector
(RM-506)
Ceiling Mounted Type, Hot Water, Left Connecting
• Heating Capacity: 1,420kcal
• 1Ø, 100V, 41w, 50Hz
DSR-D 31WK Showa Tekkou Co., Ltd.
FCV-3-5 Fan Convector
(RM-507)
Ceiling Mounted Type, Hot Water, Left Connecting
• Heating Capacity: 2,240kcal
• 1Ø, 100V, 41w, 50Hz
DSR-D 21WK Showa Tekkou Co., Ltd.
FCV-2-12 Fan Convector (5FL HW Supply
RM)
Ceiling Mounted Type, Hot Water, Right Connecting
• Heating Capacity: 1,140kcal
• 1Ø, 100V, 41w, 50Hz
DSR-D 21WK Showa Tekkou Co., Ltd.
CW-1 Convector (1FL Women Bath
RM)
Wall Mounted Type, Hot Water
• Heating Capacity: 2,030kcal
CW-1 9903-602 Showa Tekkou Co., Ltd.
CW-2 Convector (1FL Men Bath RM)
Wall Mounted Type, Hot Water
• Heating Capacity: 1,630kcal
CW-2 9903-602 Showa Tekkou Co., Ltd.
CW-5 Convector (2FL Student Men Bath RM)
Wall Mounted Type, Hot Water
• Heating Capacity: 1,630kcal
CW-5 9903-602 Showa Tekkou Co., Ltd.
CW-6 Convector (2FL Women Bath
RM)
Wall Mounted Type, Hot Water
• Heating Capacity: 1,840kcal
CW-6 9903-602 Showa Tekkou Co., CW-9 Convector (2FL Men Bath RM)
Wall Mounted Type, Hot Water
• Heating Capacity: 1,480kcal
CW-9 9903-602 Showa Tekkou Co., Ltd.
CW-10 Convector (3FL Women Bath
RM)
Wall Mounted Type, Hot Water
• Heating Capacity: 1,840kcal
CW-10 9903-602 Showa Tekkou Co., Ltd.
CW-11 Convector (3FL Men Bath RM)
Wall Mounted Type, Hot Water
• Heating Capacity: 1,480kcal
CW-11 Showa Tekkou Co., Ltd.
CW-14 Convector (4FL Women Bath
RM)
Wall Mounted Type, Hot Water
• Heating Capacity: 1,840kcal
CW-14 9903-602 Showa Tekkou Co., Ltd.
CW-15 Convector (4FL Men Bath RM)
Wall Mounted Type, Hot Water
• Heating Capacity: 1,480kcal
CW-15 Showa Tekkou Co., Ltd.
CW-18 Convector (5FL Women Bath
RM)
Wall Mounted Type, Hot Water
• Heating Capacity: 1,990kcal
CW-18 Showa Tekkou Co., Ltd.
CW-19 Convector (5FL Men Bath RM)
Wall Mounted Type, Hot Water
• Heating Capacity: 1,620kcal
CW-19 Showa Tekkou Co., Ltd.
PW-1 Panel Heater (5FL HW Supply
RM)
Wall Mounted Type, Hot Water
• Heating Capacity: 720kcal
• 1Ø, 200V, 1.0kw, 50Hz
81-17641 447185 Tokyo Denki Kogyo Co., Ltd.
PW-2 Panel Heater (5FL Bath RM)
Wall Mounted Type, Hot Water
• Heating Capacity: 720kcal
• 1Ø, 200V, 1.0kw, 50Hz
81-17641 447185 Tokyo Denki Kogyo Co., Ltd.
HEA-1 Ventilation Fan (RM- 101)
Ceiling CasLSte Type,
• 60m³/h, 6mmAq
• 1Ǿ, 100V, 46w, 50Hz With Control Switch (P-100SL)
VL-140ZS 9901 Mitsubishi Denki Co., Ltd.
HEA-2 Ventilation Fan
(RM-103)
Ceiling CasLSte Type,
• 90m³/h, 3mmAq
• 1Ǿ, 100V, 42w, 50Hz With
• Control Switch: P-100SL
VL-160ZS 9711 Mitsubishi Denki Co.,
• Deep Hood (SUS) with Grill: PZ-
10VS2
HEA-3 Ventilation Fan
(RM-104)
Ceiling CasLSte Type,
• 90m³/h, 3mmAq
• 1Ǿ, 100V, 42w, 50Hz With
• Control Switch: P-100SL
• Deep Hood (SUS) with Grill: PZ-
10VS2
VL-120Z 9810 Mitsubishi Denki Co., Ltd.
HEA-4 Ventilation Fan
(RM-105)
Ceiling CasLSte Type,
• 60m³/h, 3mmAq
• 1Ǿ, 100V, 42w, 50Hz With
• Control Switch: P-100SL
• Deep Hood (SUS) with Grill: PZ-
10VS2
VL-140ZS 9901 Mitsubishi Denki Co., Ltd.
HEA-5 Ventilation Fan
(RM-106)
Ceiling CasLSte Type,
• 240m³/h, 5mmAq
• 1Ǿ, 100V, 156w, 50Hz With
• Control Switch: PZ-05SLB2
• Interior Panel: PZ235CP3
LGH-35CS2 9812 Mitsubishi Denki Co., Ltd.
HEA-6 Ventilation Fan
(RM-107)
Ceiling CasLSte Type,
• 30m³/h, 3mmAq
• 1Ǿ, 100V, 42w, 50Hz With
• Control Switch: P-100SL
• Deep Hood (SUS) with Grill: PZ-
10VS2
VL-120Z 9810 Mitsubishi Denki Co., Ltd.
HEA-7 Ventilation Fan
(RM-108)
Ceiling CasLSte Type,
• 30m³/h, 5mmAq
• 1Ǿ, 100V, 42w, 50Hz With Control Switch (P-100SL)
VL-120Z 9812 Mitsubishi Denki Co., HEA-8 Ventilation Fan
(RM-111)
Ceiling CasLSte Type,
• 120m³/h, 4mmAq
• 1Ǿ, 100V, 97w, 50Hz With
• Control Switch: PZ-05SLB2
• Interior Panel: PZ15CP3
LGH-15CS2 9812 Mitsubishi Denki Co., Ltd.
HEA-9 Ventilation Fan
(RM-113)
Ceiling CasLSte Type,
• 30m³/h, 3mmAq
• 1Ǿ, 100V, 42w, 50Hz With Control Switch (P-100SL)
VL-120Z 9812 Mitsubishi Denki Co., Ltd.
HEA-11 Ventilation Fan
(RM-301 & 302)
Ceiling CasLSte Type,
• 120m³/h, 4mmAq
• 1Ǿ, 100V, 97w, 50Hz With
• Control Switch: PZ-05SLB2
• Interior Panel: PZ15CP3
• Deep Hood (SUS) with Grill: PZ- 15VS2 x 2EA
LGH-15CS2 9901
Mitsubishi Denki Co., Ltd.
HEA-12 Ventilation Fan
(RM-306)
Ceiling CasLSte Type,
• 150m³/h, 5mmAq
• 1Ǿ, 100V, 119w, 50Hz With
• Control Switch: PZ-05SLB2
• Interior Panel: PZ15CP3
• Deep Hood (SUS) with Grill: PZ-
15VS2
LGH-25RS2 9901 Mitsubishi Denki Co., Ltd.
HEA-13 Ventilation Fan
(RM-401)
Ceiling CasLSte Type,
• 60m³/h, 2mmAq
• 1Ǿ, 100V, 42w, 50Hz With
• Control Switch: P-100SL
• Deep Hood (SUS) with Grill: PZ-
VL-120Z 9904
Mitsubishi Denki Co., 10VS2
HEA-14 Ventilation Fan
(RM-503, 501C &
501A)
Ceiling CasLSte Type,
• 60m³/h, 2mmAq
• 1Ǿ, 100V, 42w, 50Hz With
• Control Switch: P-100SL
• Deep Hood (SUS) with Grill: PZ-
10VS2
VL-120Z Mitsubishi Denki Co., Ltd.
FS-1 Supply Air Fan
(1FL MECH RM)
Single Suction Sirocco Type, Ceiling Hanging Type
• #3, 7,000m³/h, 18mmAq, 585rpm.
• 3Ǿ, 200V, 1.5kw, 50Hz With Spring Vibration Isolation Pad and Earth Quake Proof Steel Fame Note: Thermostat Operation
No3-SRM3 P14714484 Ebara Co. Ltd. 1
FS-2 Supply Air Fan
(1FL ELECT RM)
Single Suction Sirocco Type, Ceiling Hanging Type
• #4½, 17,100m³/h, 11mmAq, 355rpm.
• 3Ǿ, 200V, 2.2kw, 50Hz With Spring Vibration Isolation Pad and Earth Quake Proof Steel Fame Note: Thermostat Operation
No4½-SRM3 PX781557 Ebara Co. Ltd. 1
FS-3 Supply Air Fan
(1~ 5FL ELECT RM)
Straight Sirocco Type, Ceiling Hanging Type
• #1¼, 400³/h, 5mmAq
• 1Ǿ, 100V, 57w, 50Hz With Deep Hood (SUS) with Grill: PZ-
20VS2
Note: Thermostat Operation
BFS-40S 1F 9903
2F 9902 3F 9901 4F 9903 5F 9903
Mitsubishi Denki Co., Ltd.
FS-4 Supply Air Fan
(EV MECH RM)
Static Pressure Propeller Type, Wall Mounted
• 350 Dia., 820³/h, 5mmAq
• 1Ǿ, 100V, 100w, 50Hz
EWF-35CSA-Q 1902 Mitsubishi Denki Co., With
• Electric Shutter: PS-35SM
• Safety Guard: G-35EB
• SUS Weather Hood: W-50SL
FE-1 Exhaust Air Fan
(1FL MECH RM)
Static Pressure Propeller Type, Wall Mounted
• 350 Dia., 820³/h, 5mmAq
• 1Ǿ, 100V, 100w, 50Hz With
• Electric Shutter: PS-40SMT
• Safety Guard: G-40EB Note: Interlocking with FS-1
EF-40ETB22 8901 Mitsubishi Denki Co., Ltd.
FE-2 Exhaust Air Fan
(1FL MECH RM)
Single Suction Sirocco Type, Ceiling Hanging
• #4, 17,100³/h, 21mmAq, 575rpm.
• 3Ǿ, 200V, 5.5kw, 50Hz With Spring Vibration Isolation Pad and Earth Quake Proof Steel Fame Note: Interlocking with FS-2
No4-SRM3 PX781558 Ebara Co. Ltd. 1
FE-3 Exhaust Air Fan
(1~ 5FL ELECT RM)
Static Pressure Propeller Type, Wall Mounted
• 250 Dia., 400³/h, 4mmAq
• 1Ǿ, 100V, 25w, 50Hz With
• Electric Shutter: PS-25SM
• Safety Guard: G-25EB
• SUS Weather Hood: W-35SL
• Bard Screen: LB-35
EF-25ASB14 1F 9904
2F 9903 3F 9901 4F 9904 5F 9903
Mitsubishi Denki Co., Ltd.
FE-4 Exhaust Air Fan
(1~ 5FL MECH T
RM)
Static Pressure Propeller Type, Wall Mounted
• 350 Dia., 1,500³/h, 5mmAq
• 3Ǿ, 200V, 1.0kw, 50Hz With
EF-35CTB07 1F 9903
2F 9901 3F 9904 4F 9903 5F 9904
Mitsubishi Denki Co.,
• Electric Shutter: PS-35SMT
• Safety Guard: G-35EB
• SUS Weather Hood: W-50SL
• Bard Screen: LB-50
FE-5 Exhaust Air Fan (1~ 5FL Women Bath
RM)
Straight Sirocco Type, Ceiling Hanging
• #1¼, 570³/h, 7mmAq
• 1Ǿ, 100V, 65w, 50Hz With Deep Hood (SUS) with Grill: PZ-
20VS2
BFS-65S
5F BFS-50S
1F 9811 2F 9902 3F Unknown 4F 9902 5F 9903
Mitsubishi Denki Co., Ltd.
FE-6 Exhaust Air Fan (1~ 5FL Men Bath
RM)
Straight Sirocco Type, Ceiling Mounted
• #1¼, 520³/h, 7mmAq
• 1Ǿ, 100V, 45w, 50Hz With Deep Hood (SUS) with Grill: PZ-
20VS2
BFS-50S
3F, 5F BFS-65S
1F 9811 2F 9902 3F 9902 4F 9903 5F 9902
Mitsubishi Denki Co., Ltd.
FE-7 Exhaust Air Fan (1FL Storage RM)
Straight Sirocco Type, Ceiling Hanging
• #1¼, 290³/h, 6mmAq
• 1Ǿ, 100V, 20w, 50Hz With Deep Hood (SUS) with Grill: PZ-
15VS2
BFS-40SC 806 Mitsubishi Denki Co., Ltd.
FE-8 Ventilation Fan (1~5FL Janitor RM)
Ceiling Mounted Type,
• 50m³/h, 3mmAq
• 1Ǿ, 100V, 9.4w, 50Hz With Deep Hood (SUS) with Grill: PZ-
10VS2
1F VD-10ZJ9
2F VD-10ZVC4
3F VD-13Z9
4F VD-10ZJ7
5F VD-10Z9
1F 2G24A4 2F A4191125 3F 4G07A4 4F 9902 5F Unknown
Mitsubishi Denki Co., Ltd.
FE-9 Ventilation Fan (Shower RM)
Ceiling Mounted Type,
• 80m³/h, 8mmAq
• 1Ǿ, 100V, 16w, 50Hz
With
• Deep Hood (SUS) with Grill: PZ-
10VS2
• FD Deep Hood (SUS) with Grill: PZ-
5F VD-13Z9
VD-13ZT2
4F VD-13Z9
VD-13ZC10
3F VD-13ZT6
VD-13ZT9
2F VD-13ZT7
VD-13ZT6
1F VD-15Z7
5F Unknown Unknown
4F VD-13Z9
A5180522 3F 7A20A5 A5151225
2F VD-13ZT7
VD-13ZT6
1F 8E26A3
Mitsubishi Denki Co., 10VSD2
• Safety Guard: G-35EB
• SUS Weather Hood: W-50SL
• Bard Screen: LB-50
VD-13ZT6 7A23A5
FE-10 Ventilation Fan
(RM-117)
Ceiling Mounted Type,
• 100m³/h, 4mmAq
• 1Ǿ, 100V, 16w, 50Hz With SD Deep Hood (SUS) with Grill:
PZ-10VSD2
VD-13ZT6 7A23A5 Mitsubishi Denki Co., Ltd.
FE-11 Ventilation Fan
(RM-118)
Ceiling Mounted Type,
• 230m³/h, 3mmAq
• 1Ǿ, 100V, 25w, 50Hz With SD Deep Hood (SUS) with Grill:
PZ-15VSD2
VD-18ZB4 9812 Mitsubishi Denki Co., Ltd.
FE-12 Ventilation Fan
(RM-102)
Straight Sirocco Type, Ceiling CasLSte
• 140³/h, 9mmAq
• 1Ǿ, 100V, 16w, 50Hz With Interior Panel: BPS-15PK
FY-32BK7HBL2 443 Mitsubishi Denki Co., Ltd.
FE-13 Ventilation Fan
(RM-109)
Ceiling Mounted Type,
• 160m³/h, 4mmAq
• 1Ǿ, 100V, 25w, 50Hz With SD Deep Hood (SUS) with Grill:
PZ-15VSD2
VD-18ZB4 9812 Mitsubishi Denki Co., Ltd.
FE-14 Ventilation Fan
(RM-109)
Ceiling Mounted Type,
• 60m³/h, 8mmAq
• 1Ǿ, 100V, 14w, 50Hz
VD-13BZ8 Mitsubishi Denki Co., Ltd.
FE-15 Ventilation Fan (1FL Women Locker
RM)
Ceiling Mounted Type,
• 160m³/h, 8mmAq
• 1Ǿ, 100V, 25w, 50Hz
VD-18ZB4 9812 Mitsubishi Denki Co., Ltd.
FE-16 Ventilation Fan (1FL Petty Officer Bath RM)
Ceiling Mounted Type,
• 160m³/h, 8mmAq
• 1Ǿ, 100V, 25w, 50Hz
VD-18ZB4 Mitsubishi Denki Co., FE-17 Ventilation Fan
(RM-113)
Ceiling Mounted Type,
• 130m³/h, 7mmAq
• 1Ǿ, 100V, 22w, 50Hz
VD-15ZP4 Mitsubishi Denki Co., Ltd.
FE-18 Ventilation Fan (1FL Officer Bath
RM)
Ceiling Mounted Type,
• 130m³/h, 7mmAq
• 1Ǿ, 100V, 22w, 50Hz
VD-15ZP4 Mitsubishi Denki Co., Ltd.
FE-20 Ventilation Fan (1~5FL Kitchenette
RM)
Range Hood Type,
• 400m³/h, 4mmAq
• 1Ǿ, 100V, 77w, 50Hz With
• Deep Hood (SUS) with Grill: PZ-
15VS2
• Side Panel: P3220KP
V-604K-2
1F 9903 2F 9903
Mitsubishi Denki Co., FE-21 Ventilation Fan
(RM-212)
Ceiling Mounted Type,
• 330m³/h, 6mmAq
• 1Ǿ, 100V, 42w, 50Hz With Deep Hood (SUS) with Grill: PZ-
15VS2
VD-20ZB4 9902 Mitsubishi Denki Co., Ltd.
FE-22 Ventilation Fan (2FL Student Bath
RM)
Straight Sirocco Type, Ceiling Mounted
• #1¼, 450³/h, 7mmAq
• 1Ǿ, 100V, 45w, 50Hz With Deep Hood (SUS) with Grill: PZ-
20VS2
BFS-50S 9902 Mitsubishi Denki Co., Ltd.
FE-23 Ventilation Fan (2~5FL Storage RM)
Straight Sirocco Type, Ceiling Hanging
• #1¼, 280³/h, 6mmAq
• 1Ǿ, 100V, 20w, 50Hz With Deep Hood (SUS) with Grill: PZ-
15VS2
BFS-40S
5F BFS-40SA
2F 9901 3F 9901 4F 9903 5F 407
Mitsubishi Denki Co., Ltd.
FE-25 Ventilation Fan
(RM-221)
Ceiling Mounted Type,
• 310³/h, 12mmAq
• 1Ǿ, 100V, 74w, 50Hz
VD-23ZB4 9902 Mitsubishi Denki Co., FE-26 Ventilation Fan (2~4FL Women Locker RM)
Ceiling Mounted Type,
• 220³/h, 5mmAq
• 1Ǿ, 100V, 42w, 50Hz With Deep Hood (SUS) with Grill: PZ-
15VS2
VD-20ZB4 2F 9902
3F 9902 4F 9902
Mitsubishi Denki Co., Ltd.
FE-27 Ventilation Fan
(RM-309)
Ceiling Mounted Type,
• 340³/h, 8mmAq
• 1Ǿ, 100V, 74w, 50Hz With Deep Hood (SUS) with Grill: PZ-
15VS2
VD-23ZB10-IN A3180109 Mitsubishi Denki Co., Ltd.
FE-28 Ventilation Fan
(RM-407)
Straight Sirocco Type, Ceiling Mounted
• #1, 520³/h, 9mmAq
• 1Ǿ, 100V, 65w, 50Hz With Deep Hood (SUS) with Grill: PZ-
20VS2
BFS-65S 9811 Mitsubishi Denki Co., Ltd.
FE-29 Ventilation Fan
(RM-506)
Ceiling…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .