Amendment 0003.pdf
PDF 933 KB Posted
- Solicitation number
- N4008421B0402
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment 0002.pdf | ||
| Amendment 0001.pdf | ||
| A0001-SD.pdf | ||
| 21B0402 PPI Form.docx | DOCX document | |
| 21B0402A_SF1449.pdf | ||
| 21B0402C_NOTICE.pdf | ||
| 21B0402B_PWS.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ACQR5817431
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
PREVENTIVE MAINTENANCE AND SERVICE ORDERS FOR VARIOUS SYSTEMS OF HIGH QUALITY WATER (HQW) PLANT AT BLDG 5229.
Purpose of Amendment is to provide Q&A as attached. No other changes.
The Bid Date, 30 Nov 2020 is not changed w ith this Amendment.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 2
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 20-Nov-2020
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N4008421B0402
X 9B. DATED (SEE ITEM 11)
20-Oct-2020
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
20-Nov-2020
CODE
NAVFAC FAR EAST
FEAD YOKOSUKA
PSC 473 BOX 13
FPO AP 96349-0013
N40084 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
PRE-QUOTATION INQUIRIES
FOR
N40084-21-B-0402, PREVENTIVE MAINTENANCE AND SERVICE ORDER FOR VARIOUS SYSTEMS OF HIGH
QUALITY WATER (HQW) PLANT AB BLDG. 5229 YOKOSUKA
No. Offeror Date Questions (Should include
Specification Section or Drawing Reference)
Answers
1 Mitomo Cp., Ltd.
20 Nov., 2020 As described in the Attachment J- 1502000-05-03, KTR shall replace activated carbon for Activated Carbon Filter Package System in 4th option period. But there is no description about the requirement of carbon replacement work in Attachment J-1502000-05-04. And we cannot find the ELIN against the subject work in Attachment J- 0200000-07.
May we understand that activated carbon replacement work will not be necessary?
Activated carbon replacement work is not necessary.
The replacement of activated carbon for Activated Carbon Filter Package System in 4th option period specified in Attachment J-15020000-05-03 will be removed in this Amendment 0003.
Note: Submit this worksheet as an e-mail attachment.
PMI Schedule (Period) PMI Detail Indication Pages Base 1st 2nd 3rd 4th Attachement J-1502000-05-04
Replace Lubrication GOV. GOV. GOV. GOV. GOV.
Annual Inspection ○ ○ ○ ○ ○ Overhaul --- --- --- --- --- Replace --- --- --- --- ---
N/A BACKFLOW PREVENTER
(CFAY Portion) Annual Inspection ○ ○ ○ ○ ○ Page 1
Annual Inspection GOV. GOV. GOV. GOV. GOV.
Replace --- --- --- --- ---
PMI Schedule (Period) PMI Detail Indication Pages Base 1st 2nd 3rd 4th NA
Vessel Annual Inspection GOV. GOV. GOV. GOV. GOV. NA Annual Inspection GOV. GOV. GOV. GOV. GOV.
Media Sampling & Analysis GOV. GOV. GOV. GOV. GOV.
Replace Filter Equipment --- --- --- --- ---
PMI Schedule (Period) PMI Detail Indication Pages Base 1st 2nd 3rd 4th NA
Vessel Annual Inspection GOV. GOV. GOV. GOV. GOV. NA Annual Inspection GOV. GOV. GOV. GOV. GOV.
Media Sampling & Analysis GOV. GOV. GOV. GOV. GOV.
Replace Activated Carbon --- --- --- --- ○ ---
PMI Schedule (Period) PM Work Detail Indication Pages Base 1st 2nd 3rd 4th NA
Unit Annual Inspection ○ ○ ○ ○ ○ Quartz Sleeve Replace Quartz Sleeve --- --- --- --- --- UV Lamp Replace UV Lamp ○ ○ ○ ○ ○ Ballast Replace Ballast --- --- --- --- ---
Multimedia Filter
Work item
ULTRAVIOLET OXIDATION PACKAGE
ME-0301 NA
Page 1 to 2UCP-300 UV Oxidation Equipment
Ultraviolet Oxidation Main Body & Local Panel Annual Inspection
Work itemTAG No.
GOV. GOV.
NA
T-0201 T-0202
BOOSTER PUMP
(CFAY Portion)
T-0101 T-0102
Equipment/Component
Work item
GOV. GOV.
NA
TAG No.
Active Carbon
Equipment/Component
GOV.
Equipment/Component
NA SURGE TANK
TAG No. Equipment/Component
Media
○: Contractor's FFP and/or IDIQ responsibility, and performed period. GOV: PMI performed by the Government responsibility and/or IDIQ performed by the Contractor.
---: Contractor's FFP and/or IDIQ responsibility, and no performance period.
Active Carbon Filter
POTABLE WATER DISTRIBUTION SYSTEM
MULTIMEDIA FILTER PACKAGE
ACTIVATED CARBON FILTER PACKAGE
Work item
NA
TAG No.
NA
ATTACHMENT J-1502000-05-03
REFERENCE OEM RECOMMENDED PM WORK FREQUENCY FOR HQW SYSTEM
CUI // FEDCON
PMI Schedule (Period) PM Work Detail Indication Pages Base 1st 2nd 3rd 4th (Attachment J-1502000-05-04)
Housing Annual Inspection GOV. GOV. GOV. GOV. GOV. NA Filter Replace Filter GOV GOV GOV GOV GOV NA
Replace Lubrication (3,000hr) GOV. GOV. GOV. GOV. GOV.
Annual Inspection GOV. GOV. GOV. GOV. GOV.
Overhaul(15,000hr) --- GOV. --- --- --- Replace --- --- --- --- ---
Vessel Annual Inspection GOV. GOV. GOV. GOV. GOV. NA Membrane Replace Membrane --- GOV. --- GOV. --- NA
PMI Schedule (Period) PM Work Detail Indication Pages Base 1st 2nd 3rd 4th NA
Vessel Annual Inspection GOV. GOV. GOV. GOV. GOV. NA Media Annual Inspection GOV. GOV. GOV. GOV. GOV. NA
Replace Lubrication (3000hr) GOV. GOV. GOV. GOV. GOV.
Annual Inspection GOV. GOV. GOV. GOV. GOV.
Overhaul --- --- --- --- --- Replace --- --- --- --- --- Annual Inspection GOV. GOV. GOV. GOV. GOV.
Overhaul --- --- --- --- --- Replace --- --- --- --- --- Replace Lubrication (3,600hr) GOV. GOV. GOV. GOV. GOV.
Coupling Alignment GOV. GOV. GOV. GOV. GOV.
Annual Inspection GOV. GOV. GOV. GOV. GOV.
Overhaul --- GOV. --- --- --- Replace --- --- --- --- ---
Work item
NA
NAP-0503
P-0504
P-0502
NA
Vacuum Pump
Cartridge Filter
RO Membrane Vessels
P-0501 Vacuum Pump
NA
Work item
P-0401 P-0402 RO Pump
TAG No.
NA
REVERSE OSMOSIS PACKAGE
F-0401
TAG No. Equipment/Component
T-0501
Press. Pump
Equipment/Component
Vacuum Degasifier
VACUUM DEGASIFIER PACKAGE
ATTACHMENT J-1502000-05-03
REFERENCE OEM RECOMMENDED PM WORK FREQUENCY FOR HQW SYSTEM
PMI Schedule (Period) PM Work Detail Indication Pages Base 1st 2nd 3rd 4th NA
NA Entire System GOV. GOV. GOV. GOV. GOV.
NA Manual Operation Valves Quarterly Inspection GOV. GOV. GOV. GOV. GOV. NA NA Relief Valves Annual Inspection &Test GOV. GOV. GOV. GOV. GOV. NA NA Strainer Cleaning GOV. GOV. GOV. GOV. GOV. NA
Quarterly Inspection GOV. GOV. GOV. GOV. GOV. NA Annual Inspection GOV. GOV. GOV. GOV. GOV.
Overhaul --- --- --- --- ---
NA Pressure Indicator Function Check GOV. GOV. GOV. GOV. GOV. NA NA Temp Indicator Function Check GOV. GOV. GOV. GOV. GOV. NA NA Magnetic Flow Meter Function Check GOV. GOV. GOV. GOV. GOV. NA NA Pressure Switch Function Check GOV. GOV. GOV. GOV. GOV. NA NA Conductivity Indicator Calibration GOV. GOV. GOV. GOV. GOV. NA NA SDI Calibration GOV. GOV. GOV. GOV. GOV. NA
Work itemEquipment/ComponentTAG No.
NA
Pneumatic Operation ValvesNA
COMMON MATERIALS
ATTACHMENT J-1502000-05-03
REFERENCE OEM RECOMMENDED PM WORK FREQUENCY FOR HQW SYSTEM
| PPI_21B0402.pdf |