SECTION F

DELIVERIES OR PERFORMANCE

1502000 – Facility Investment

1502000/ 2.2.1

N/A Certification, Training and Licensing

As a part of the QM plan.

KO via

COR

1 Once after contract award.

1502000/

N/A PM Work Schedule by Each System

Within 15 calendar days before next month.

KO via

COR

1 Monthly or as required.

1502000/ 3.1

N/A Monthly Summary of Completed Service Orders Report

Within 15 calendar days after completion of service order work, during the previous month.

KO via

COR

1 Monthly or as required.

1502000/ 3.2

N/A Preventive Maintenance (PM) Program Plan

As a part of QM plan. KO via

COR

1 Once after award, when changed, and when requested by

KO.

1502000/ 3.2

N/A Notification of repair work exceeding the incidental repairs limit

Within 15 calendar days of identification.

KO via

COR

1 When notified, or as required.

1502000/ 3.2

N/A The Plan and Proposal Cost Estimate for the Improvement, Modified and Alteration of High Quality Water (HQW) Plant Systems

Within 45 calendar days of identification.

KO via

COR

1 When notified, or as required.

1502000/ 3.2

N/A PM Work Schedule. Within five (5) calendar days following the end of month.

KO via

COR

1 Monthly or as required.

1502000/ 3.2

N/A Completed PM Work Report

Within 15 calendar days after completion of PM work, following the end of month.

KO via

COR

1 Once after completed or as required.

1502000/ 3.3

Actual Accumulated Records

Within five (5) calendar days after required.

KO via

COR

1 As required.

1502000/ 3.4

J-1502000-

Detailed Breakdown Within 30 calendar days after award, and within seven (7) calendar days of any change.

KO 1 Once after award and when changed.

1) All Contractor’s deliverables shall be submitted via email and each data file size shall be less than 10M bytes

2) The Contractor shall submit additional deliverables if required by the Government at no additional cost to the Government.

3) The Government owns deliverables submittal from the Contractor and it’s not limited to the list in Section F, List of

Attachment J-0200000 / 1502000 – Management and Administration under this contract is the Government.

4) All relating Contractors including relating OEM, agency and personnel shall not claim ownership of the submittal to the Government.

CUI // FEDCON

CUI // FEDCON

Tsutomu.Toriyama.JA Line

ATTACHMENT J-0200000-07

EXHIBIT LINE ITEM NUMBERS

SOURCE SELECTION SENSITIVE--See FAR 2.101 and 3.104

Provide Prices For Facility Investment Services - Recurring - In Accordance With Section C, Spec Item 3

ELIN /Sub ELIN Description Quantity Unit of Issue Unit Price Total CAC

A001 SRF Portion Spec Item 3 A001A HQW System

A001A-01 Annual PM Work for Ultraviolet Oxidation Package 1 TM -¥ -¥ A001A-02 Service Orders & FFP Limit Work 12 MO -¥ -¥

HQW System Sub Total -¥ A001B EDG System

A001B-01 PM Work for EDG A001B-01-01 Quarterly Analysis of Lubrication Oil Quality 4 TM -¥ -¥ A001B-01-02 Annual PM Work for EDG 1 TM -¥ -¥

A001B-02 PM Work for Fuel Supply System A001B-02-01 Annual Analysis for Fuel Oil Quality 1 TM -¥ -¥ A001B-02-02 Annual Leak Test 1 TM -¥ -¥ A001B-02-03 Annual Function Test 1 TM -¥ -¥

A001B-03 Service Orders & FFP Limit Work 12 MO -¥ -¥ EDG System Sub Total -¥

A001C N2 System A001C-01 Semiannual PM Work 2 TM -¥ -¥ A001C-02 Annual PM Work 1 TM -¥ -¥ A001C-03 Service Orders & FFP Limit Work 12 MO -¥ -¥

N2 System Sub Total -¥ A001D FSA System

A001D-01 Compressor A001D-01-01 Quarterly PM Work (2,000 Hour Working) 4 TM -¥ -¥ A001D-01-02 Semiannual PM Work (4,000 Hour Working) 2 TM -¥ -¥ A001D-01-03 Biennial PM Work (16,000 Hour Working) 1 TM -¥ -¥ A001D-01-04 Initial Repair Work 1 TM -¥ -¥

A001D-02 Desiccant Air Dryer A001D-02-01 Annual PM Work 1 TM -¥ -¥ A001D-02-02 Replace No.1 Activated Alumina 1 TM -¥ -¥

Line Item 0001 Recurring - Base Period

ELINs A001 through A002

SOLICITATION/CONTRACT #

EXHIBIT A - CLIN 9000

CUI // FEDCON

SOURCE SELECTION SENSITIVE--See FAR 2.101 and 3.104

ELIN /Sub ELIN Description Quantity Unit of Issue Unit Price Total CAC A001D-03 After Cooler System A001D-03-01 Annual PM Work 1 TM -¥ -¥

A001D-04 Piping A001D-04-01 Annual PM Work 1 TM -¥ -¥

A001D-05 Instrument A001D-05-01 Annual PM Work 1 TM -¥ -¥

A001D-06 Service Orders & FFP Limit Work 12 MO -¥ -¥ FSA System Sub Total -¥

A001E HPA System A001E-01 Annual PM Work 1 TM -¥ -¥ A001E-02 Service Orders & FFP Limit Work 12 MO -¥ -¥

HPA System Sub Total -¥ A001F Electrical Control Systems

A001F-01 MCC

A001F-01-01 Annual PM Work 1 TM -¥ -¥

A001F-02 PLC-1 & 2

A001F-02-01 Annual PM Work 1 TM -¥ -¥

A001F-03 HMI

A001F-03-01 Annual PM Work 1 TM -¥ -¥ A001F-03-02 Scheduled Replacement Work 1 TM -¥ -¥

A001F-04 Unit Control Panel for UCP-100, 200, 400, 500, 600 A001F-04-01 Annual PM Work 1 TM -¥ -¥ A001F-04-02 Biennial PM Work 1 TM -¥ -¥

A001F-05 Unit Control Panel for Booster Pump A001F-05-01 Annual PM Work 1 TM -¥ -¥

A001F-06 Unit Control Panel for UCP-1101, 1102 A001F-06-01 Annual PM Work 1 TM -¥ -¥ A001F-06-02 Biennial PM Work 1 TM -¥ -¥

A001F-07 Unit Control Panel for UCP-1501, 1502 A001F-07-01 Annual PM Work 1 TM -¥ -¥

A001F-08 Service Orders & FFP Limit Work 12 MO -¥ -¥ Electrical Control Systems Sub Total -¥

SRF Portion Subtotal -¥

SOURCE SELECTION SENSITIVE--See FAR 2.101 and 3.104

ELIN /Sub ELIN Description Quantity Unit of Issue Unit Price Total CAC A002 CFAY Portion Spec Item 3

A002A Potable Water System A002A-01 Annual PM Work for Booster Pump and Backflow Preventer 1 TM -¥ -¥ A002A-02 Service Orders & FFP Limit Work 12 MO -¥ -¥

HQW System Sub Total -¥ A002B HVAC Systems

A002B-01 Semiannual PM Work for Ventilation Fan 2 TM -¥ -¥ A002B-02 Annual PM Work for Total Operation Test for HVAC Systems 1 TM -¥ -¥ A002B-03 Annual PM Work for Steam Heating System 1 TM -¥ -¥ A002B-04 Annual PM Work for Low Compressed Air Supply System 1 TM -¥ -¥ A002B-05 Annual Replacement work for Ventilation Fans 1 TM -¥ -¥ A002B-06 Initial Repair Work 1 LS -¥ -¥ A002B-07 Service Orders & FFP Limit Work 12 MO -¥ -¥

HVAC System Sub Total -¥ CFAY Portion Subtotal -¥

TOTAL RECURRING LINE ITEMS ¥

MO = Monthly SA = Semi-Annual

Q = Quarterly A = Annual

SOURCE SELECTION SENSITIVE--See FAR 2.101 and 3.104

ELIN Product Name (120 Characters)

Description Extended Estimated Quantity

Unit of Issue

Unit Price Extended Price IMAP

CAC

A700 Major Repair Work (Negotiated)

Major Repair Work is consist of direct labor cost, direct material cost, and indirect cost such as transportion, disposal, report and overhed profit used in IDIQ work.

Performance of specific maintenance, repair, and alteration work that exceeds the FFP limitations of a service order or PM repair work. Task order completion times will be specified in task order.

1 LS ¥ 40,000,000 -¥

A701 Respond to 24 hour service call

Respond to 24 hours emergency service calls to FSA system with EDG to supply freeze sealed air to ship, and provide solution strategy to arrest urgent condition to the Government within 24 hours after emergency service call is issued. If the Contractor is unable to find determination within the time frame, notify the difficult situation(s) immediately to the Government, and submit outline progressing report with outline utilizing electric media (E-mail is available) to the Government within 24 hours after notification of the difficult situation upon the Government required. Submit detail report to the Government and KO within 14 calendar days after completion of 24 hours service call work. (Detail report shall be same requirements as emergency service call report). Note: 1) Responding of 24 hours emergency service call is not exceeded over 31 calendar days in total at each period. 2) The Government will inform to the Contractor of its duration three calendar days in advance every operation event.

45 DAY -¥ -¥

TOTAL NON-RECUURRING PRICE ¥

HR = Hour LS = Lump Sum EA = Each

SOLICITATION/CONTRACT #

EXHIBIT A - CLIN 9000

ELINs A700 through A701 Provide Prices For Provide Prices For Facility Investment Services - Non-Recurring - In Accordance With Section C, Spec Item 4 Line Item 0002 Non-Recurring Price - Base Period

SOURCE SELECTION SENSITIVE--See FAR 2.101 and 3.104

Provide Prices For Facility Investment Services - Recurring - In Accordance With Section C, Spec Item 3

ELIN /Sub ELIN Description Quantity Unit of Issue Unit Price Total CAC

B001 SRF Portion Spec Item 3 B001A HQW System

B001A-01 Annual PM Work for Ultraviolet Oxidation Package 1 TM -¥ -¥ B001A-02 Service Orders & FFP Limit Work 12 MO -¥ -¥

HQW System Sub Total -¥ B001B EDG System 1

B001B-01 PM Work for EDG 1 B001B-01-01 Quarterly Analysis of Lubrication Oil Quality 4 TM -¥ -¥ B001B-01-02 Annual PM Work for EDG 1 TM -¥ -¥ B001B-01-03 Scheduled Replacement Work for EDG 1 1 -¥ -¥

B001B-02 PM Work for Fuel Supply System B001B-02-01 Annual Analysis for Fuel Oil Quality 1 TM -¥ -¥ B001B-02-02 Annual Leak Test 1 TM -¥ -¥ B001B-02-03 Annual Function Test 1 1 -¥ -¥

B001B-03 Service Orders & FFP Limit Work 12 1 -¥ -¥ EDG System Sub Total -¥

B001C N2 System B001C-01 Semiannual PM Work 2 1 -¥ -¥ B001C-02 Annual PM Work 1 1 -¥ -¥ B001C-03 Biennial PM work 1 TM -¥ -¥ B001C-04 Service Orders & FFP Limit Work 12 MO -¥ -¥

N2 System Sub Total -¥ B001D FSA System

B001D-01 Compressor B001D-01-01 Quarterly PM Work (2,000 Hour Working) 4 TM -¥ -¥ B001D-01-02 Semiannual PM Work (4,000 Hour Working) 2 TM -¥ -¥ B001D-01-03 Biennial PM Work (8,000 Hour Working) 1 TM -¥ -¥

SOLICITATION/CONTRACT #

EXHIBIT B - CLIN 9001

Line Item 0003 Recurring - First Option Period

ELINs B001 through B002

SOURCE SELECTION SENSITIVE--See FAR 2.101 and 3.104

ELIN /Sub ELIN Description Quantity Unit of Issue Unit Price Total CAC B001D-02 Desiccant Air Dryer B001D-02-01 Annual PM Work 1 1 -¥ -¥ B001D-02-02 Biennial PM Work 1 1 -¥ -¥ B001D-02-03 Replace No.2 Activated Alumina 1 1 -¥ -¥ B001D-02-04 Once Every Three (3) Years PM Work 1 TM -¥ -¥

B001D-03 After Cooler System B001D-03-01 Annual PM Work 1 TM -¥ -¥ B001D-03-02 Scheduled Replacement Work 1 TM -¥ -¥

B001D-04 Piping B001D-04-01 Annual PM Work 1 TM -¥ -¥

B001D-05 Instrument B001D-05-01 Annual PM Work 1 TM -¥ -¥

B001D-06 Service Orders & FFP Limit Work 12 1 -¥ -¥ FSA System Sub Total -¥

B001E HPA System B001E-01 Annual PM Work 1 TM -¥ -¥ B001E-02 Service Orders & FFP Limit Work 12 1 -¥ -¥

HPA System Sub Total -¥ B001F Electrical Control Systems

B001F-01 MCC

B001F-01-01 Annual PM Work 1 TM -¥ -¥

B001F-02 PLC-1 & 2

B001F-02-01 Annual PM Work 1 TM -¥ -¥ B001F-02-02 Biennial PM Work 1 TM -¥ -¥ B001F-02-03 Scheduled Replacement Work 1 TM -¥ -¥

B001F-03 HMI

B001F-03-01 Annual PM Work 1 TM -¥ -¥

B001F-04 Unit Control Panel for UCP-100, 200, 400, 500, 600 B001F-04-01 Annual PM Work 1 TM -¥ -¥

B001F-05 Unit Control Panel for Booster Pump B001F-05-01 Annual PM Work 1 TM -¥ -¥

B001F-06 Unit Control Panel for UCP-1101, 1102 B001F-06-01 Annual PM Work 1 TM -¥ -¥

B001F-07 Unit Control Panel for UCP-1501, 1502 B001F-07-01 Annual PM Work 1 TM -¥ -¥

B001F-08 Service Orders & FFP Limit Work 12 MO -¥ -¥ Electrical Control Systems Sub Total -¥

SRF Portion Subtotal -¥

SOURCE SELECTION SENSITIVE--See FAR 2.101 and 3.104

ELIN /Sub ELIN Description Quantity Unit of Issue Unit Price Total CAC B002 CFAY Portion Spec Item 3

B002A Potable Water System B002A-01 Annual PM Work for Booster Pump and Backflow Preventer 1 TM -¥ -¥ B002A-02 Service Orders & FFP Limit Work 12 MO -¥ -¥

HQW System Sub Total -¥ B002B HVAC Systems

B002B-01 Semiannual PM Work for Ventilation Fan 2 TM -¥ -¥ B002B-02 Annual PM Work for Total Operation Test for HVAC Systems 1 TM -¥ -¥ B002B-03 Annual PM Work for Steam Heating System 1 TM -¥ -¥ B002B-04 Annual PM Work for Low Compressed Air Supply System 1 TM -¥ -¥ B002B-05 Annual Replacement work for Ventilation Fans 1 TM -¥ -¥ B002B-06 Service Orders & FFP Limit Work 12 MO -¥ -¥

HVAC System Sub Total -¥ CFAY Portion Subtotal -¥

TOTAL RECURRING LINE ITEMS ¥

MO = Monthly SA = Semi-Annual

Q = Quarterly A = Annual

SOURCE SELECTION SENSITIVE--See FAR 2.101 and 3.104

ELIN Product Name (120 Characters)

Description Extended Estimated Quantity

Unit of Issue

Unit Price Extended Price IMAP

CAC

B700 Major Repair Work (Negotiated)

Major Repair Work is consist of direct labor cost, direct material cost, and indirect cost such as transportion, disposal, report and overhed profit used in IDIQ work.

Performance of specific maintenance, repair, and alteration work that exceeds the FFP limitations of a service order or PM repair work. Task order completion times will be specified in task order.

1 LS ¥ 40,000,000 -¥

B701 Respond to 24 hour service call

Respond to 24 hours emergency service calls to FSA system with EDG to supply freeze sealed air to ship, and provide solution strategy to arrest urgent condition to the Government within 24 hours after emergency service call is issued. If the Contractor is unable to find determination within the time frame, notify the difficult situation(s) immediately to the Government, and submit outline progressing report with outline utilizing electric media (E-mail is available) to the Government within 24 hours after notification of the difficult situation upon the Government required. Submit detail report to the Government and KO within 14 calendar days after completion of 24 hours service call work. (Detail report shall be same requirements as emergency service call report). Note: 1) Responding of 24 hours emergency service call is not exceeded over 31 calendar days in total at each period. 2) The Government will inform to the Contractor of its duration three calendar days in advance every operation event.

45 DAY -¥ -¥

TOTAL NON-RECUURRING PRICE ¥

HR = Hour LS = Lump Sum EA = Each

Provide Prices For Provide Prices For Facility Investment Services - Non-Recurring - In Accordance With Section C, Spec Item 4 ELINs B700 through B701

SOLICITATION/CONTRACT #

EXHIBIT B - CLIN 9001

Line Item 0004 Non-Recurring Price - First Option Period

SOURCE SELECTION SENSITIVE--See FAR 2.101 and 3.104

Provide Prices For Facility Investment Services - Recurring - In Accordance With Section C, Spec Item 3

ELIN /Sub ELIN Description Quantity Unit of Issue Unit Price Total CAC

C001 SRF Portion Spec Item 3 C001A HQW System

C001A-01 Annual PM Work for Ultraviolet Oxidation Package 1 TM -¥ -¥ C001A-02 Service Orders & FFP Limit Work 12 MO -¥ -¥

HQW System Sub Total -¥ C001B EDG System 1

C001B-01 PM Work for EDG 1 C001B-01-01 Quarterly Analysis of Lubrication Oil Quality 4 TM -¥ -¥ C001B-01-02 Annual PM Work for EDG 1 TM -¥ -¥

C001B-02 PM Work for Fuel Supply System 1 C001B-02-01 Annual Analysis for Fuel Oil Quality 1 TM -¥ -¥ C001B-02-02 Annual Leak Test 1 TM -¥ -¥ C001B-02-03 Annual Function Test 1 TM -¥ -¥

C001B-03 Service Orders & FFP Limit Work 12 1 -¥ -¥ 1 G System Sub Total -¥

C001C N2 System C001C-01 Semiannual PM Work 2 TM -¥ -¥ C001C-02 Annual PM Work 1 1 -¥ -¥ C001C-03 Service Orders & FFP Limit Work 12 1 -¥ -¥

N2 System Sub Total -¥ C001D FSA System

C001D-01 Compressor C001D-01-01 Quarterly PM Work (2,000 Hour Working) 4 TM -¥ -¥ C001D-01-02 Semiannual PM Work (4,000 Hour Working) 2 TM -¥ -¥ C001D-01-03 Biennial PM Work (16,000 Hour Working) 1 TM -¥ -¥

C001D-02 Desiccant Air Dryer C001D-02-01 Annual PM Work 1 TM -¥ -¥ C001D-02-02 Replace No.1 Activated Alumina 1 TM -¥ -¥

SOLICITATION/CONTRACT #

EXHIBIT C - CLIN 9002

Line Item 0005 Recurring - Second Option Period

ELINs C001 through C002

SOURCE SELECTION SENSITIVE--See FAR 2.101 and 3.104

ELIN /Sub ELIN Description Quantity Unit of Issue Unit Price Total CAC C001D-03 After Cooler System 1 C001D-03-01 Annual PM Work 1 1 -¥ -¥

C001D-04 Piping 1 C001D-04-01 Annual PM Work 1 TM -¥ -¥

C001D-05 Instrument C001D-05-01 Annual PM Work 1 TM -¥ -¥

C001D-06 Service Orders & FFP Limit Work 12 MO -¥ -¥ FSA System Sub Total -¥

C001E HPA System C001E-01 Annual PM Work 1 TM -¥ -¥ C001E-02 Service Orders & FFP Limit Work 12 MO -¥ -¥

1 A System Sub Total -¥ C001F Electrical Control Systems

C001F-01 MCC

C001F-01-01 Annual PM Work 1 TM -¥ -¥

C001F-02 PLC-1 & 2 1

C001F-02-01 Annual PM Work 1 TM -¥ -¥

C001F-03 HMI

C001F-03-01 Annual PM Work 1 TM -¥ -¥

C001F-04 Unit Control Panel for UCP-100, 200, 400, 500, 600 C001F-04-01 Annual PM Work 1 TM -¥ -¥ C001F-04-02 Biennial PM Work 1 TM -¥ -¥

C001F-05 Unit Control Panel for Booster Pump C001F-05-01 Annual PM Work 1 TM -¥ -¥

C001F-06 Unit Control Panel for UCP-1101, 1102 C001F-06-01 Annual PM Work 1 TM -¥ -¥ C001F-06-02 Biennial PM Work 1 TM -¥ -¥

C001F-07 Unit Control Panel for UCP-1501, 1502 C001F-07-01 Annual PM Work 1 TM -¥ -¥

C001F-08 Service Orders & FFP Limit Work 12 MO -¥ -¥ Electrical Control Systems Sub Total -¥

SRF Portion Subtotal -¥

SOURCE SELECTION SENSITIVE--See FAR 2.101 and 3.104

ELIN /Sub ELIN Description Quantity Unit of Issue Unit Price Total CAC C002 CFAY Portion Spec Item 3

C002A Potable Water System C002A-01 Annual PM Work for Booster Pump and Backflow Preventer 1 TM -¥ -¥ C002A-02 Service Orders & FFP Limit Work 12 MO -¥ -¥

HQW System Sub Total -¥ C002B HVAC Systems

C002B-01 Semiannual PM Work for Ventilation Fan 2 TM -¥ -¥ C002B-02 Annual PM Work for Total Operation Test for HVAC Systems 1 TM -¥ -¥ C002B-03 Annual PM Work for Steam Heating System 1 TM -¥ -¥ C002B-04 Annual PM Work for Low Compressed Air Supply System 1 TM -¥ -¥ C002B-05 Annual Replacement work for Ventilation Fans 1 TM -¥ -¥ C002B-06 Service Orders & FFP Limit Work 12 MO -¥ -¥

HVAC System Sub Total -¥ CFAY Portion Subtotal -¥

TOTAL RECURRING LINE ITEMS ¥

MO = Monthly SA = Semi-Annual

Q = Quarterly A = Annual

SOURCE SELECTION SENSITIVE--See FAR 2.101 and 3.104

ELIN Product Name (120 Characters)

Description Extended Estimated Quantity

Unit of Issue

Unit Price Extended Price IMAP

CAC

C700 Major Repair Work (Negotiated)

Major Repair Work is consist of direct labor cost, direct material cost, and indirect cost such as transportion, disposal, report and overhed profit used in IDIQ work.

Performance of specific maintenance, repair, and alteration work that exceeds the FFP limitations of a service order or PM repair work. Task order completion times will be specified in task order.

1 LS ¥ 40,000,000 -¥

C701 Respond to 24 hour service call

Respond to 24 hours emergency service calls to FSA system with EDG to supply freeze sealed air to ship, and provide solution strategy to arrest urgent condition to the Government within 24 hours after emergency service call is issued. If the Contractor is unable to find determination within the time frame, notify the difficult situation(s) immediately to the Government, and submit outline progressing report with outline utilizing electric media (E-mail is available) to the Government within 24 hours after notification of the difficult situation upon the Government required. Submit detail report to the Government and KO within 14 calendar days after completion of 24 hours service call work. (Detail report shall be same requirements as emergency service call report). Note: 1) Responding of 24 hours emergency service call is not exceeded over 31 calendar days in total at each period. 2) The Government will inform to the Contractor of its duration three calendar days in advance every operation event.

45 DAY -¥ -¥

TOTAL NON-RECUURRING PRICE ¥

HR = Hour LS = Lump Sum EA = Each

Provide Prices For Provide Prices For Facility Investment Services - Non-Recurring - In Accordance With Section C, Spec Item 4 ELINs C700 through C701

SOLICITATION/CONTRACT #

EXHIBIT C - CLIN 9002

Line Item 0006 Non-Recurring Price - Second Option Period

SOURCE SELECTION SENSITIVE--See FAR 2.101 and 3.104

Provide Prices For Facility Investment Services - Recurring - In Accordance With Section C, Spec Item 3

ELIN /Sub ELIN Description Quantity Unit of Issue Unit Price Total CAC

D001 SRF Portion Spec Item 3 D001A HQW System

D001A-01 Annual PM Work for Ultraviolet Oxidation Package 1 TM -¥ -¥ D001A-02 Service Orders & FFP Limit Work 12 MO -¥ -¥

HQW System Sub Total -¥ D001B EDG System 1

D001B-01 PM Work for EDG 1 D001B-01-01 Quarterly Analysis of Lubrication Oil Quality 4 TM -¥ -¥ D001B-01-02 Annual PM Work for EDG 1 TM -¥ -¥ D001B-01-03 Scheduled Replacement Work for EDG 1 1 -¥ -¥

D001B-02 PM Work for Fuel Supply System D001B-02-01 Annual Analysis for Fuel Oil Quality 1 TM -¥ -¥ D001B-02-02 Annual Leak Test 1 TM -¥ -¥ D001B-02-03 Annual Function Test 1 1 -¥ -¥

D001B-03 Service Orders & FFP Limit Work 12 1 -¥ -¥ EDG System Sub Total -¥

D001C N2 System D001C-01 Semiannual PM Work 2 1 -¥ -¥ D001C-02 Annual PM Work 1 1 -¥ -¥ D001C-03 Biennial PM work 1 TM -¥ -¥ D001C-04 Service Orders & FFP Limit Work 12 MO -¥ -¥

N2 System Sub Total -¥ D001D FSA System

D001D-01 Compressor D001D-01-01 Quarterly PM Work (2,000 Hour Working) 4 TM -¥ -¥ D001D-01-02 Semiannual PM Work (4,000 Hour Working) 2 TM -¥ -¥ D001D-01-03 Biennial PM Work (8,000 Hour Working) 1 TM -¥ -¥ D001D-01-04 40,000, 48,000 and 64,000 hours PM Work 1 TM -¥ -¥

SOLICITATION/CONTRACT #

EXHIBIT D - CLIN 9003

Line Item 0007 Recurring - Third Option Period

ELINs D001 through D002

SOURCE SELECTION SENSITIVE--See FAR 2.101 and 3.104

ELIN /Sub ELIN Description Quantity Unit of Issue Unit Price Total CAC D001D-02 Desiccant Air Dryer 1 D001D-02-01 Annual PM Work 1 1 -¥ -¥ D001D-02-02 Biennial PM Work 1 1 -¥ -¥ D001D-02-03 Biennial PM Work for Activated Alumina of No.2 1 TM -¥ -¥

D001D-03 After Cooler System D001D-03-01 Annual PM Work 1 TM -¥ -¥ D001D-03-02 Scheduled Replacement Work 1 TM -¥ -¥

D001D-04 Piping D001D-04-01 Annual PM Work 1 TM -¥ -¥

D001D-05 Instrument D001D-05-01 Annual PM Work 1 TM -¥ -¥

D001D-06 Service Orders & FFP Limit Work 12 1 -¥ -¥ FSA System Sub Total -¥

D001E HPA System D001E-01 Annual PM Work 1 TM -¥ -¥ D001E-02 Service Orders & FFP Limit Work 12 1 -¥ -¥

HPA System Sub Total -¥ D001F Electrical Control Systems

D001F-01 MCC

D001F-01-01 Annual PM Work 1 TM -¥ -¥

D001F-02 PLC-1 & 2

D001F-02-01 Annual PM Work 1 TM -¥ -¥ D001F-02-02 Biennial PM Work 1 TM -¥ -¥

D001F-03 HMI

D001F-03-01 Annual PM Work 1 TM -¥ -¥ D001F-03-02 Scheduled Replacement Work 1 TM -¥ -¥

D001F-04 Unit Control Panel for UCP-100, 200, 400, 500, 600 D001F-04-01 Annual PM Work 1 TM -¥ -¥

D001F-05 Unit Control Panel for Booster Pump D001F-05-01 Annual PM Work 1 TM -¥ -¥

D001F-06 Unit Control Panel for UCP-1101, 1102 D001F-06-01 Annual PM Work 1 TM -¥ -¥

D001F-07 Unit Control Panel for UCP-1501, 1502 D001F-07-01 Annual PM Work 1 TM -¥ -¥

D001F-08 Service Orders & FFP Limit Work 12 MO -¥ -¥ Electrical Control Systems Sub Total -¥

SRF Portion Subtotal -¥

SOURCE SELECTION SENSITIVE--See FAR 2.101 and 3.104

ELIN /Sub ELIN Description Quantity Unit of Issue Unit Price Total CAC D002 CFAY Portion Spec Item 3 D002A Potable Water System

D002A-01 Annual PM Work for Booster Pump and Backflow Preventer 1 TM -¥ -¥ D002A-02 Service Orders & FFP Limit Work 12 MO -¥ -¥

HQW System Sub Total -¥ D002B HVAC Systems

D002B-01 Semiannual PM Work for Ventilation Fan 2 TM -¥ -¥ D002B-02 Annual PM Work for Total Operation Test for HVAC Systems 1 TM -¥ -¥ D002B-03 Annual PM Work for Steam Heating System 1 TM -¥ -¥ D002B-04 Annual PM Work for Low Compressed Air Supply System 1 TM -¥ -¥ D002B-05 Annual Replacement work for Ventilation Fans 1 TM -¥ -¥ D002B-06 Service Orders & FFP Limit Work 12 MO -¥ -¥

HVAC System Sub Total -¥ CFAY Portion Subtotal -¥

TOTAL RECURRING LINE ITEMS ¥

MO = Monthly SA = Semi-Annual

Q = Quarterly A = Annual

SOURCE SELECTION SENSITIVE--See FAR 2.101 and 3.104

ELIN Product Name (120 Characters)

Description Extended Estimated Quantity

Unit of Issue

Unit Price Extended Price IMAP

CAC

D700 Major Repair Work (Negotiated)

Major Repair Work is consist of direct labor cost, direct material cost, and indirect cost such as transportion, disposal, report and overhed profit used in IDIQ work.

Performance of specific maintenance, repair, and alteration work that exceeds the FFP limitations of a service order or PM repair work. Task order completion times will be specified in task order.

1 LS ¥ 40,000,000 -¥

D701 Respond to 24 hour service call

Respond to 24 hours emergency service calls to FSA system with EDG to supply freeze sealed air to ship, and provide solution strategy to arrest urgent condition to the Government within 24 hours after emergency service call is issued. If the Contractor is unable to find determination within the time frame, notify the difficult situation(s) immediately to the Government, and submit outline progressing report with outline utilizing electric media (E-mail is available) to the Government within 24 hours after notification of the difficult situation upon the Government required. Submit detail report to the Government and KO within 14 calendar days after completion of 24 hours service call work. (Detail report shall be same requirements as emergency service call report). Note: 1) Responding of 24 hours emergency service call is not exceeded over 31 calendar days in total at each period. 2) The Government will inform to the Contractor of its duration three calendar days in advance every operation event.

45 DAY -¥ -¥

TOTAL NON-RECUURRING PRICE ¥

HR = Hour LS = Lump Sum EA = Each

Provide Prices For Provide Prices For Facility Investment Services - Non-Recurring - In Accordance With Section C, Spec Item 4 ELINs D700 through D701

SOLICITATION/CONTRACT #

EXHIBIT D - CLIN 9003

Line Item 0008 Non-Recurring Price - Third Option Period

SOURCE SELECTION SENSITIVE--See FAR 2.101 and 3.104

Provide Prices For Facility Investment Services - Recurring - In Accordance With Section C, Spec Item 3

ELIN /Sub ELIN Description Quantity Unit of Issue Unit Price Total CAC

E001 SRF Portion Spec Item 3 E001A HQW System

E001A-01 Annual PM Work for Ultraviolet Oxidation Package 1 TM -¥ -¥ E001A-02 Service Orders & FFP Limit Work 12 MO -¥ -¥

HQW System Sub Total -¥ E001B EDG System 1

E001B-01 PM Work for EDG 1 E001B-01-01 Quarterly Analysis of Lubrication Oil Quality 4 TM -¥ -¥ E001B-01-02 Annual PM Work for EDG 1 TM -¥ -¥

E001B-02 PM Work for Fuel Supply System 1 E001B-02-01 Annual Analysis for Fuel Oil Quality 1 TM -¥ -¥ E001B-02-02 Annual Leak Test 1 TM -¥ -¥ E001B-02-03 Annual Function Test 1 TM -¥ -¥

E001B-03 Service Orders & FFP Limit Work 12 1 -¥ -¥ 1 G System Sub Total -¥

E001C N2 System E001C-01 Semiannual PM Work 2 TM -¥ -¥ E001C-02 Annual PM Work 1 1 -¥ -¥ E001C-03 Service Orders & FFP Limit Work 12 1 -¥ -¥

N2 System Sub Total -¥ E001D FSA System

E001D-01 Compressor E001D-01-01 Quarterly PM Work (2,000 Hour Working) 4 TM -¥ -¥ E001D-01-02 Semiannual PM Work (4,000 Hour Working) 2 TM -¥ -¥ E001D-01-03 Biennial PM Work (16,000 Hour Working) 1 TM -¥ -¥

E001D-02 Desiccant Air Dryer E001D-02-01 Annual PM Work 1 TM -¥ -¥ E001D-02-02 Replace No.1 Activated Alumina 1 TM -¥ -¥ E001D-02-03 Once Every Three (3) Years PM Work 1 1 -¥ -¥

E001D-03 After Cooler System 1 E001D-03-01 Annual PM Work 1 1 -¥ -¥

E001D-04 Piping

SOLICITATION/CONTRACT #

EXHIBIT E - CLIN 9004

Line Item 0009 Recurring - Fourth Option Period

ELINs E001 through E002

SOURCE SELECTION SENSITIVE--See FAR 2.101 and 3.104

ELIN /Sub ELIN Description Quantity Unit of Issue Unit Price Total CAC E001D-04-01 Annual PM Work 1 TM -¥ -¥

E001D-05 Instrument E001D-05-01 Annual PM Work 1 TM -¥ -¥

E001D-06 Service Orders & FFP Limit Work 12 MO -¥ -¥ FSA System Sub Total -¥

E001E HPA System E001E-01 Annual PM Work 1 TM -¥ -¥ E001E-02 Service Orders & FFP Limit Work 12 1 -¥ -¥

HPA System Sub Total -¥ E001F Electrical Control Systems

E001F-01 MCC

E001F-01-01 Annual PM Work 1 1 -¥ -¥

E001F-02 PLC-1 & 2

E001F-02-01 Annual PM Work 1 TM -¥ -¥ E001F-02-02 Scheduled Replacement Work 1 TM -¥ -¥

E001F-03 HMI

E001F-03-01 Annual PM Work 1 TM -¥ -¥

E001F-04 Unit Control Panel for UCP-100, 200, 400, 500, 600 E001F-04-01 Annual PM Work 1 TM -¥ -¥ E001F-04-02 Biennial PM Work 1 TM -¥ -¥

E001F-05 Unit Control Panel for Booster Pump E001F-05-01 Annual PM Work 1 TM -¥ -¥

E001F-06 Unit Control Panel for UCP-1101, 1102 E001F-06-01 Annual PM Work 1 TM -¥ -¥ E001F-06-02 Biennial PM Work 1 TM -¥ -¥

E001F-07 Unit Control Panel for UCP-1501, 1502 E001F-07-01 Annual PM Work 1 TM -¥ -¥

E001F-08 Service Orders & FFP Limit Work 12 MO -¥ -¥ Electrical Control Systems Sub Total -¥

SRF Portion Subtotal -¥

SOURCE SELECTION SENSITIVE--See FAR 2.101 and 3.104

ELIN /Sub ELIN Description Quantity Unit of Issue Unit Price Total CAC E002 CFAY Portion Spec Item 3 E002A Potable Water System

E002A-01 Annual PM Work for Booster Pump and Backflow Preventer 1 TM -¥ -¥ E002A-02 Service Orders & FFP Limit Work 12 MO -¥ -¥

HQW System Sub Total -¥ E002B HVAC Systems

E002B-01 Semiannual PM Work for Ventilation Fan 2 TM -¥ -¥ E002B-02 Annual PM Work for Total Operation Test for HVAC Systems 1 TM -¥ -¥ E002B-03 Annual PM Work for Steam Heating System 1 TM -¥ -¥ E002B-04 Annual PM Work for Low Compressed Air Supply System 1 TM -¥ -¥ E002B-05 Annual Replacement work for Ventilation Fans 1 TM -¥ -¥ E002B-06 Service Orders & FFP Limit Work 12 MO -¥ -¥

HVAC System Sub Total -¥ CFAY Portion Subtotal -¥

TOTAL RECURRING LINE ITEMS ¥

MO = Monthly SA = Semi-Annual

Q = Quarterly A = Annual

SOURCE SELECTION SENSITIVE--See FAR 2.101 and 3.104

ELIN Product Name (120 Characters)

Description Extended Estimated Quantity

Unit of Issue

Unit Price Extended Price IMAP

CAC

E700 Major Repair Work (Negotiated)

Major Repair Work is consist of direct labor cost, direct material cost, and indirect cost such as transportion, disposal, report and overhed profit used in IDIQ work.

Performance of specific maintenance, repair, and alteration work that exceeds the FFP limitations of a service order or PM repair work. Task order completion times will be specified in task order.

1 LS ¥ 40,000,000 -¥

E701 Respond to 24 hour service call

Respond to 24 hours emergency service calls to FSA system with EDG to supply freeze sealed air to ship, and provide solution strategy to arrest urgent condition to the Government within 24 hours after emergency service call is issued. If the Contractor is unable to find determination within the time frame, notify the difficult situation(s) immediately to the Government, and submit outline progressing report with outline utilizing electric media (E-mail is available) to the Government within 24 hours after notification of the difficult situation upon the Government required. Submit detail report to the Government and KO within 14 calendar days after completion of 24 hours service call work. (Detail report shall be same requirements as emergency service call report). Note: 1) Responding of 24 hours emergency service call is not exceeded over 31 calendar days in total at each period. 2) The Government will inform to the Contractor of its duration three calendar days in advance every operation event.

45 DAY -¥ -¥

TOTAL NON-RECUURRING PRICE ¥

HR = Hour LS = Lump Sum EA = Each

Provide Prices For Provide Prices For Facility Investment Services - Non-Recurring - In Accordance With Section C, Spec Item 4 ELINs E700 through E701

SOLICITATION/CONTRACT #

EXHIBIT E - CLIN 9004

Line Item 0010 Non-Recurring Price - Fourth Option Period

ATTACHMENT J-1502000-09

DETAIL ATTACHMENT LIST FOR FSA SYSTEM

Detail Attachment Title Attachment No.

CURRENT INVENTORIES FOR FSA SYSTEM ATTACHMENT J-1502000-09-01

SYSTEM DIAGRAM FOR FSA SYSTEM ATTACHMENT J-1502000-09-02

REFERENCE OEM RECOMMENDED DETAIL PM WORK FREQUENCY FOR FSA SYSTEM ATTACHMENT J-1502000-09-03 REFERENCE OEM RECOMMENDED DETAIL PM WORK REQUIREMENT FOR FSA SYSTEM ATTACHMENT J-1502000-09-04 GOVERNMENT FURNISHED MATERIAL (GFM) INVENTORY FOR FSA SYSTEM ATTACHMENT J-1502000-09-05

INITIAL REPAIR WORK REQUIREMENT FOR FSA SYSTEM ATTACHMENT J-1502000-09-06

Contents

1. CONCEPT

2. OUTLINE

3. NEW PLAN

ATTACHMENT J-1502000-09-06

INITIAL REPAIR WORK REQUIREMENT FOR FSA SYSTEM

CUI // FEDCON

CUI // FEDCON

Install new auto air drain system for FSA supply line.

(REFERENCE)

(REFERENCE)

(REFERENCE)

© Hitachi Plant Services Co., Ltd. 2020. All rights reserved. 1

1. CONCEPT

Existing

Constant speed air cooled oil free air compressor

Model No. ZT250-10.4-60/E

Capacity 31.4 ㎥/min

Pressure 0.98MPa

Note 2 sets (1 set is spare)

Problem Compressor unloaded while using air Manually drain the air to prevent

Air drainage is performed by an automatic valve according to the pressure in the receiver tank

New

Air drainage system with automatic valves and pressure sensors

Auto Valve Solenoid, SUS, oil proof

Pressure Transmitter Reuse the existing one

Digital Indication Controller

Instrumentation system

Automatic Control Panel Indoor type, floor mounted (AC200V-DC24V Tr installed)

ATTACHMENT J-1502000-09-06

INITIAL REPAIR WORK REQUIREMENT FOR FSA SYSTEM

2. OUTLINE

COP-03

COP-04

New Auto Valves

Relocate the existing Pressure Transmitter

New CP-R-1 (600W×800H×200D)

Modify PLC-2

Exist PNL-2 panel Provide power from reserved breaker in CP-R-1

ATTACHMENT J-1502000-09-06

INITIAL REPAIR WORK REQUIREMENT FOR FSA SYSTEM

3. NEW PLAN

(1) Existing

REC-03

COP-03,-04

圧縮機より

Use point

BERTH 12

減圧弁装置(未使用)

仮設サイレンサー

Control Diagram

Visually check the pressure of the REC-03 and pressure adjustment by opening and closing the HV-1 (manual valve) to keep the compressor from shutting down.

PLC-2

DC

PIC

PEW

HV-1

エアードレン

ATTACHMENT J-1502000-09-06

INITIAL REPAIR WORK REQUIREMENT FOR FSA SYSTEM

(2) New

REC-03

New silencer 80A (Outside)

Measure the pressure of the REC-03 and

A digital indicating controller (PIC) can be used to control two electric two-way valves (MV-1).

Pressure control by proportional control

When the pressure becomes high, open the solenoid valve (BV-3).

Solenoid valve (BV-2) is closed when the pressure drops.

HV-1

PLC-2

DC

PIC

PEW

I/I

MV-1×2ea

CP-R-1

New Panel

RN

PIC

SP

(0.95MPa)

0 圧力

Valve opening

Symbol Equipment Note

BV-2 Solenoid valve 80A

BV-3 Solenoid valve 15A

I/I Isolator

R Auxiliary relay

Use point

BERTH 12

An isolator (I/I) is added to the PLC-2.

Bifurcated pressure signal

BV-2

BV-3

Pressure reducing valve

(No use)

R

R

RN

Symbol Equipment Note

PEW Pressure transmitter Existing

PIC

Digital indication controller

RN Motor driver

MV-1 2-way motor 40A×2ea

(0.98MPa)

MV-1

MV-1×2ea open / close at same time

BV-3

From COP-03,-04

Air drain

Manual bypass valve 80A

Manual bypass valve 80A

ATTACHMENT J-1502000-09-06

INITIAL REPAIR WORK REQUIREMENT FOR FSA SYSTEM

Silencer on roof

Control valve

Use point BERTH 12

PLC-2

DC

PIC

PEW

I/I New CP-R-1

PIC

Silencer (Out side)

Connected to the existing piping

Manual Bypass valve

ATTACHMENT J-1502000-09-06

INITIAL REPAIR WORK REQUIREMENT FOR FSA SYSTEM

ATTACHMENT J-1502000-12-04

INITIAL REPAIR WORK REQUIREMENT FOR HVAC SYSTEM

1. Replace the existing Air Cylinders (64 EA) and Speed Controllers (128 EA) of louvers with new ones.

Replacement Point QTY of Point QTY of Air Cylinder QTY of Speed Controller SOV-01 8 Points 8 EA 16 EA SOV-02 8 Points 8 EA 16 EA SOV-03 4 Points 4 EA 8 EA SOV-04 12 Points 12 EA 24 EA SOV-05 16 Points 16 EA 32 EA SOV-06 16 Points 16 EA 32 EA

Total 64 EA 128 EA

Note:

Applicable parts to be replaced are as follows.

Parts Name Model No.

Air Cylinder CM2B20-50Z Speed Controller AS2200-R01

2. Replace the existing four (4) roof ventilation fans and relating parts with new ones.

Note:

1) It is acceptable to install the new for (4) roof ventilation fans having the same capacity as existing ones, if the OEM of the new for (4) roof ventilation fans is changed from the existing one.

013_J_07ELINs_RENEW-HQW-A0001
B-R
B-IQ
1-R
1-IQ
2-R
2-IQ
3-R
3-IQ
4-R
4-IQ
0xx-A-J-1502-09-00-FSA-List-A0001
0xx-A-J-1502-09-06-Initial-A0001
0xx-A-J-1502-12-04-InitialRepair-01-A0001