View the file

Other files

File Type Posted
AMD0002.pdf PDF
20T0408 PPI Form-r2.pdf PDF
014_J_07ELINs-15-D-0414-A0001-r2.xls XLS spreadsheet
20T0408-0001.pdf PDF
20T0408A_RFQ(2).pdf PDF
20T0408B_SOW.pdf PDF
20T0408 PPI Form.docx DOCX document
20T0408C_NOTICE.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1502000 – Facility Investment Spec Item

Title Description

2 Management and Administration

2.1 Definitions and

Acronyms

Definitions and Acronyms are listed in J-1502000-01.

2.2 Personnel The Contractor shall provide personnel with the qualifications, technical knowledge, experience and skills required for efficient operations within the FI function.

2.2.1 Certification, Training, and Licensing

a. Non regulated Waste, exception of cooking oil.

The Contractor or his Sub-contractor shall have a valid licenses by a governing authority for collection, transportation (“SANGYOU HAIKIBUTU SYUUSYUU UNPAN”, Hai-yu, Odei) and disposal (“SANGYOU HAIKIBUTU SYORI”, Hai-yu, Odei) of applicable industrial waste.

b. Cleaning Service for the Kitchen Exhaust Hood / Duct System and OS Duct Systems: The Contractor or his Sub-contractor shall have the certification of completed for the school “Director of Duct Cleaning”

b. Electrical Work: Personnel working with or on electrical or electronic equipment shall be trained and certified per NAVFAC MO-200, or the electricians who have license of first grade electrician, "Dai-1-syu Denki Kohjishi", or second grade electrician, "Dai-2-syu Denki Kohjishi", shall perform electrical work.

The Contractor shall submit proof of all certification, training, and licensing requirements per Section F.

2.3 Special

Requirements

2.3.1 Workmanship

and Material Standards

The Contractor shall be responsible for maintaining all facilities, systems, and equipment, identified in this technical sub-annex, to a standard that prevents deterioration beyond that which results from normal wear and tear and corrects deficiencies in a timely manner to assure full life expectancy of the facilities, systems, and equipment. Best commercial practices shall be applied in the performance of work. All work shall be completed per approved and accepted industry and equipment manufacturers’ standards and shall comply with building and safety codes, applicable activity, local, state, and federal regulations, and other technical requirements identified within this technical sub-annex.

Workmanship for maintenance and repair shall include all work necessary to complete facility and system restoration, including touch-up painting and operational checks.

Upon completion of work, the Contractor shall ensure all facilities, systems, and equipment are free of missing components or defects which would affect the safety, appearance, or habitability of the facilities and structures or would prevent any electrical, mechanical, plumbing or structural system from functioning in accordance with design intent. Repairs shall be made in accordance with the manufacturers’ specifications and guidelines, and standard building codes. The quality of repairs shall meet the applicable standards and shall prevent any malfunction reoccurrences caused by poor workmanship or other contractor inadequacies. The quality of the repaired areas shall be fully compatible with adjacent surfaces or equipment. Except where otherwise specified, replacements shall match existing in dimensions, finish, color, design, and functionality and shall have an appearance similar to the original finished appearance with only minor unobjectionable deterioration resulting from normal use.

The Contractor shall not allow debris to spread unnecessarily into adjacent areas nor accumulate in the work area. All such debris, excess material, and parts shall be

Item

Title Description cleaned up and removed at the completion of the job and at the end of each day work is in progress. Upon completion of work, any stains and other unsightly marks shall be removed.

2.3.2 Historical

Preservation

Buildings and facilities designated as historical sites shall be maintained in accordance with Federal, state, and local historical policies and regulations.

2.4 References and

Technical Documents

References and Technical Documents are listed in J-1502000-02.

Item

Title Performance Objective

Related Information Performance Standard

3 Recurring Work The Contractor shall maintain, repair, and alter Building Systems to ensure they are fully functional and in normal working condition.

The Contractor shall develop, implement, and execute a Service Order and Preventive Maintenance (PM) Program including removal and disposal service to maintain and repair Building Systems.

Building and Facility maps by each area are provided in Attachment J-1502000-03.

The Contractor shall provide all necessary test instruments, equipment, and tools required to perform maintenance and repair.

The Contractor shall perform any repairs including replacement work discovered during scheduled Preventive Maintenance (PM) work and each service order up to a total of ¥300,000 per occurrence of one (1) system and per occurrence of one (1) service order in total cost under Recurring Work portion of the contract at no additional cost to the Government. Incidental repair work performed under maintenance is not considered a service order.

The Contractor shall notify the KO upon identification that the service order will exceed the liability limits specified below in accordance with reporting requirements in Annex 2.

If the repair work is over the Recurring Work limits, the Government will issue the Non-recurring Work task order to the Contractor after obtaining Non-recurring Work proposal and proposal.

The Contractor shall submit the Non-recurring Work Proposal

Building Systems are in normal working condition and function properly in accordance with specified standards.

Submittals shall be submitted within the time frame.

Item

Title Performance Objective

Related Information Performance Standard and proposal cost per Section F.

The following items are exception of the Contractor’s responsibilities of Recurring Work limits for equipment and systems.

1. Loss or damage caused by the fault or negligence of the Government.

2. Loss or damage caused by natural disaster.

3. The work for modification, improvement and providing new equipment and repair concrete construction for the Building Systems shall not be responded in this contract. Only the deficiency report for the damaged portion shall be submitted per Section F.

Note:

1) Submit the Non-recurring

Work proposal with reasons and proposal cost per Section F, if the damaged caused by inflicted matters.

Historical minor repair (under Recurring liability limits) record is provided in Attachment J-1502000-04.

Historical major repair record is provided in Attachment J- 1502000-05.

The Contractor shall provide all necessary test instruments, equipment, and tools required to perform maintenance and repair.

The Contractor shall submit PM work schedule by each building system per Section F.

The Contractor shall submit the result of PM work report by each building system per

Item

Title Performance Objective

Related Information Performance Standard

Section F. Report shall be clearly visible photographs showing the before and after conditions for PM work.

Note:

1) Visible photos for the cleaning work shall be specified for the conditions of before and after performing cleaning work.

The Contractor shall submit actual accumulated minor repair record and major repair record by each building system per section F.

3.1 Service Orders The Contractor shall

perform service order work in a timely manner and ensure Building Systems are restored to a safe, normal working condition and function properly.

The Contractor shall receive service orders in accordance with the work reception requirements in Annex 2.

The Contractor shall schedule and perform service orders in a way that minimizes disruptions to customers and Government operations.

The Government may issue service orders for work requirements at any location within the defined boundaries of this contract for any reason at the discretion of the KO.

Service order work may include repairs to existing facility assets and equipment as well as newly installed facility assets and equipment, work to facilities and structures located on the installation but not listed in the facilities listing, facilities and equipment that are not maintained through a recurring work schedule or program, labor hour support for non-contract projects, and any work requirements typical to the annexes and sub-annexes contained in this PWS.

Historical service order work

The Contractor shall respond and commence work within 24 hours after receipt of service order.

Building Systems are restored to normal working condition, including recertification if applicable.

When repair is complete the Building Systems does not present danger to personnel or equipment.

Item

Title Performance Objective

Related Information Performance Standard load are provided in Attachment J-1502000-06.

Historical data and supporting information provided is intended to illustrate the volume of service orders issued and examples of work that has been performed in the past and is not to be construed as a limiting factor to services ordered and performed in the future.

Descriptions of the classifications of service orders (emergency, urgent, and routine) are provided in the Definitions and Acronyms in Attachment J-1502000-01.

These descriptions are provided for reference and the Contractor shall perform service orders per the requirements below based on the classification assigned by the Government.

The Contractor shall maintain sufficient materials and equipment on hand to support service order work requirements. Lack of availability of material or equipment will not relieve the Contractor from the requirement to complete service order work within the time limits specified.

The Government may combine multiple repair requirements received for the same trade in the same building or structure at the same time into one service order as long as the service order threshold is not exceeded.

The Contractor shall notify the KO upon identification that the service order will exceed the liability limits specified below in accordance with reporting requirements in Annex 2.

Item

Title Performance Objective

Related Information Performance Standard

The Contractor shall submit a monthly summary of completed service orders per Section F.

The Contractor shall submit actual accumulated service order work record per section F.

3.1.1 Emergency

Service Orders

The Contractor shall respond to emergency service orders and resolve emergent conditions to minimize and mitigate damage to Building Systems, and danger to personnel.

The Contractor shall respond to emergency service orders with the appropriate service personnel and equipment to commence work immediately.

The Contractor shall remain at the work site until the emergency has been resolved.

The emergency service order is complete once the emergency has been resolved. The Government may issue an urgent or routine service order or Non-recurring task order for the follow-on work required to repair/restore the equipment and systems of Building Systems.

Emergency service orders responded to and commence work within eight (8) hours receipt of call.

Work is continued without interruption until emergent condition is resolved.

3.1.2 Urgent Service

Orders

The Contractor shall complete urgent service orders in a timely manner and ensure Building Systems are restored to a safe, normal working condition and function properly.

The Contractor shall perform urgent service orders to repair deficiencies without extended delay, therefore preventing further damage to Building Systems.

Urgent service orders are completed within seven (7) working days.

3.1.3 Routine Service

Orders

The Contractor shall complete routine service orders in a timely manner and ensure Building Systems are restored to a safe, normal working condition and function properly.

The Contractor shall perform routine service orders to repair deficiencies and return Building Systems to normal working condition.

Routine service orders are completed within 30 calendar days.

3.2 Preventive

Maintenance (PM) Program

The Contractor shall develop and implement a PM program for f Building Systems to ensure proper operation, to

The Contractor shall develop and submit a PM program per Section F.

The PM program shall provide an economical approach

Maintenance is accomplished in accordance with the Contractor’s PM program and work schedule.

Item

Title Performance Objective

Related Information Performance Standard minimize breakdowns, and to maximize useful life.

manufacturers’ recommended procedures, and maintenance required to satisfy equipment warranties and keep Building Systems in normal working condition in accordance with certified, trained and licensed specified in Spec Item 2.2.1 in this annex.

Excessive or repeated system or equipment breakdowns or deficiencies may indicate the need to adjust or modify the Contractor’s PM program.

These changes will be made at no additional cost to the Government.

PM is performed in accordance with manufacturers’ recommended procedures and OEM standards.

3.2.1 Kitchen Exhaust

Hoods / Ducts and OA Ducts

The Contractor shall perform cleaning and maintain kitchen exhaust hoods / ducts and OA ducts to ensure they are clean, minimize breakdowns, and to maximize useful life.

The Contractor shall perform cleaning and maintain kitchen exhaust hood / duct systems and OA ducts in accordance with National Fire Protection Association (NFPA).

The purpose of the cleaning work is to reduce the amount of grease built up in the ducts to minimize the risk of fire caused by sticking cooking oil.

The Contractor shall perform cleaning and maintain OA duct systems.

The cleaning and maintenance work shall include 1) a full length of kitchen exhaust ducts, plenums, exhaust fans, dampers, exhaust grilles, canvas joints, exhaust hoods, grease filters, and hood drain pipes, 2) OA ducts including louvers, filters and OA fans.

Note:

Cleaning and maintenance work for all vertical ducts equipped at duct shafts and running exterior wall are excluded. Those portions shall be cleaned up to the maximum equipment safe reach.

Cleaning and maintenance is performed in accordance with the Contractor's PM program and work schedule.

Cleaning work for the kitchen exhaust hood / duct systems are performed in accordance with NFPA requirement.

Item

Title Performance Objective

Related Information Performance Standard

The Contractor shall issue cleaning record showing the date of cleaning, name of the Contractor and Project Manager, and telephone number within seven (7) calendar days after completion of cleaning and maintenance.

The cleaning records shall be attached to the walls or hoods nearby each exhaust duct system, and the old cleaning records shall be removed. .

Attachment list for kitchen exhaust hood / duct systems and OA duct systems are provided in Attachment J- 1502000-07.

Note: Inventory and site plans are for informational purposes only. Even through the above inventories and site plans may differ from the exact figure of exhaust kitchen hood / duct systems and OA duct systems, the cleaning and maintenance shall be provided at no additional cost to the Government.

3.2.2 Grease Trap The Contractor shall

perform collecting, cleaning, disposing and maintain grease traps including relating equipment to ensure they are clean, minimize breakdowns, and to maximize useful life.

The Contractor shall collect the debris in the grease trap and related equipment and dispose the correcting debris at off base as non-regulated waste.

All disposed debris shall be done in accordance with all applicable local / prefectural/national laws and regulations.

Attachment list for grease traps including relating equipment are provided in Attachment J- 1502000-08.

The Contractor shall submit the disposal manifest per Section F.

The work is in accordance with the Contractor's PM program and work schedule.

All disposed debris shall be complied with all applicable local/prefectural/nation al laws and regulations.

3.2.3 Cooking Oil The Contractor shall

correcting the cooking

The Contractor shall collect the cooking oil and carry the

The work is in accordance with the

Item

Title Performance Objective

Related Information Performance Standard oil collected cooking oil to Recycle Yard (YSK-4863).

Attachment list for cooking oil is provided in Attachment J- 1502000-08.

Note: The Government will recycle the cooking oil at no additional cost to the Contractor.

Contractor's PM program and work schedule.

All disposed debris shall be complied with all applicable local/prefectural/nation al laws and regulations.

3.2.4 Oil Water

Separator and Waste oil Tank

The Contractor shall maintain and perform collecting, cleaning, disposing oil water in the oil water separators and waste oil tank including relating equipment to ensure they are clean, minimize breakdowns, and to maximize useful life.

The corrected oil water shall be disposed at off base as non-regulated waste.

All disposed debris shall be done in accordance with all applicable local / prefectural/national laws and regulations.

Attachment list for oil water separators including relating equipment are provided in Attachment J-1502000-09.

The Contractor shall submit the disposal manifest per Section F.

The work is in accordance with the Contractor's PM program and work schedule.

3.2.4.1 Laboratory

Analysis

The Contractor shall take a sample of the oil in the oil water separator and perform the laboratory analysis before collecting, cleaning, disposing of oil at YSK-1822.

The required analysis items are provided in Attachment J- 1502000-09.

The Contractor shall submit the result of the laboratory analysis per section F.

The sample result of the laboratory analysis report in Attachment J-1502000-09.

Note:

1) If the hazardous items are found out in the result of analysis, the collecting oil is categorized as regulated waste

2) The Contractor shall fill out the blank “CFAY PWD Hazardous Waste Disposal Request” and carry to the funding customer specified in the Exhibit Line Item Number of Attachment J-

The work is in accordance with the Contractor's PM program and work schedule.

The submittal shall be submitted in the time frame.

Item

Title Performance Objective

Related Information Performance Standard

0200000-07, and obtain the signature, and submit the sign-up the document per Section F.

Note:

a) The blank document for

CFAY PWD Hazardous Waste Disposal Request is provided in Attachment J-1502000- 09.

b) Sample sign-up document for CFAY PWD Hazardous Waste Disposal Request is provided in Attachment J- 1502000-09.

c) COA will inform the key personnel of sign-up point to the Contractor.

3) The Government will vacuum, correct and dispose the regulated waste at no additional cost to the Contractor after the sign up document.

Item

Title Performance Objective

Related Information Performance Standard

4 Non-Recurring Work

Non-recurring work may be ordered utilizing Fed-Mall or Government Purchase Card (GPC) in accordance with Section H or on a task order in accordance with the

PROCEDURES FOR

ISSUING ORDERS

clause in Section G.

The order will specify the exact locations and types of work to be accomplished. The period of performance will be specified in each order.

Refer to Non-recurring work ELINs for task listings, descriptions and related requirements. All periods of performance are measured from issue date of order to acceptance of the work. Performance Standards for Non-recurring work will be the same as those in Spec Item 3 where applicable.

Provide Prices For Facility Investment Services - Recurring - In Accordance With Section C, Spec Item 3

ELIN /Sub ELIN Description Frequency Quantity Unit of Issue Unit Price Total CAC

A001 CFAY SRM PORTION

A001A

A001A-001 YSK-3816 (Grease Trap) Q 4 TM ¥ ¥ A001A-002 YSK-3816 (Kitchen Pipe Cleaning) A 1 TM ¥ ¥

A001A-003 AZU-8600376 SA 2 TM ¥ ¥

A001B

A001B-001 YSK-1071 SA 2 TM ¥ ¥

A001B-002 YSK-1281 SA 2 TM ¥ ¥

A001B-003 YSK-1288 (Oil Water Separator) SA 2 TM ¥ ¥ A001B-004 YSK-1288 (Piping) SA 2 TM ¥ ¥ A001B-005 YSK-1288 (Pit) SA 2 TM ¥ ¥

A001B-006 YSK-1311 Q 4 TM ¥ ¥

A001B-007 YSK-1314 M 12 TM ¥ ¥

A001B-008 YSK-1390 SA 2 TM ¥ ¥

A001B-009 YSK-1398 SA 2 TM ¥ ¥

A001B-010 YSK-1663 SA 2 TM ¥ ¥

A001B-011 YSK-1822 Q 4 TM ¥ ¥

A001B-011-01 Laboratory Analysis (Spec Item 3.2.3.1) Q 4 TM ¥ ¥

A001B-012 YSK-1829 M 12 TM ¥ ¥

A001B-013 YSK-4813, 1139 and J249 Area A 1 TM ¥ ¥

A001B-014 YSK-1851 SA 2 TM ¥ ¥

A001B-015 YSK-1854 SA 2 TM ¥ ¥

A001B-016 YSK-1939 SA 2 TM ¥ ¥

A001B-017 YSK-3154 SA 2 TM ¥ ¥

A001B-018 YSK-3313 SA 1 2 TM ¥ ¥

A001B-019 YSK-3816 Q 4 TM ¥ ¥

ATTACHMENT J-0200000-07

EXHIBIT LINE ITEM NUMBERS

SOLICITATION/CONTRACT #

EXHIBIT A - CLIN 9000

Line Item 0001 Recurring - Base Period

ELINs A001 through A006

Cleaning & Removal SVC of Oil Water Separator and Relating Equipment (Spec Item 3.2.3) A001A Sub-Total

Collection & Cleaning SVC of Grease Trap and Relating Equipment (Spec Item 3.2.2)

ELIN /Sub ELIN Description Frequency Quantity Unit of Issue Unit Price Total CAC

A001B-020 YSK-4306 A 1 TM ¥ ¥

A001B-021 YSK-4849 SA 2 TM ¥ ¥

A001B-022 YSK-4858 (Oil Water Separator & Ditch) Q 4 TM ¥ ¥ A001B-023 YSK-4858 (Pipe, Ditch and Catch Basin) SA 2 TM ¥ ¥ A001B-024 YSK-4858 (Ditch) A 1 TM ¥ ¥

A001B-025 YSK-5004 SM 24 TM ¥ ¥

A001B-026 YSK-5229 Q 4 TM ¥ ¥

A001B-027 YSK-A37 M 1 12 TM ¥ ¥

A001B-028 YSK-A43 SA 2 TM ¥ ¥

A001B-029 YSK-G31 SA 2 TM ¥ ¥

A001B-030 YSK-J209 SA 2 TM ¥ ¥

A001B-031 YSK-J6 SA 2 TM ¥ ¥

A001B-032 IKE-675 (Oil Water Separator) SA 2 TM ¥ ¥ A001B-033 IKE-675 (Gutter) SA 2 TM ¥ ¥

A001B-034 IKE-730 A 1 TM ¥ ¥

A001B-035 IKE-608 SA 2 TM ¥ ¥

A001B-036 IKE-690 SA 2 TM ¥ ¥

A001B-037 IKE-691 SA 2 TM ¥ ¥

A001B-038 AZU-8600376 SA 2 TM ¥ ¥

A001B-039 URA-19 SA 2 TM ¥ ¥

A001B-040 NDK-100137 A 1 TM ¥ ¥

A001B-041 NDK-S124 SA 2 TM ¥ ¥

A001B-042 IKE-611 A 1 TM ¥ ¥

A002 A002A

A002A-001 YSK-4803 A 1 TM ¥ ¥

A002A-002 YSK-4831 M 12 TM ¥ ¥

A001B Sub-Total A001 CFAY SRM Portion Total

DLA Portion

A002A SUB-TOTAL

A002 DLA Portion Total

Cleanining & Removal SVC of Oil Water Separator (Spec Item 3.2.3)

A003 A003A

A003A-001 YSK-1400 BM 6 TM ¥ ¥

A003B

A003B-001 YSK-1400 SM 24 TM ¥ ¥

A003B-002 1400 (Pipe Cleaning) BM 6 TM ¥ ¥

A004 A004A

A004A-001 YSK-1312 Q 4 TM ¥ ¥

A004A-002 YSK-1493 BM 6 TM ¥ ¥

A004A-003 YSK-1495 BM 6 TM ¥ ¥

A004A-004 YSK-3008 Q 4 TM ¥ ¥

A004A-005 YSK-4300 SA 2 TM ¥ ¥

A004A-006 YSK-B39 M 12 TM ¥ ¥

A004A-007 IKE-672 BM 6 TM ¥ ¥

A004A-008 IKE-673 (CDC MWR) SA 2 TM ¥ ¥

A004B

A004B-001 YSK-1312 (Outside) M 12 TM ¥ ¥ A004B-002 YSK-1312 (Inside) M 12 TM ¥ ¥ A004B-003 YSK-1312 (Pipe Cleaning) A 1 TM ¥ ¥

A004B-004 YSK-1493 M 12 TM ¥ ¥

A004B-005 YSK-1495 M 12 TM ¥ ¥

A004B-006 YSK-3008 SM 24 TM ¥ ¥

A004B-007 YSK-3008 (Pipe Cleaning) A 1 TM ¥ ¥

A004B-008 YSK-4300 M 12 TM ¥ ¥

A004B-009 YSK-B39 W 52 TM ¥ ¥

A004B-010 IKE-672 SM 24 TM ¥ ¥

A004B-011 IKE-672 (Pipe Cleaning) A 1 TM ¥ ¥

A004B-012 IKE-673 M 12 TM ¥ ¥

A004B-013 IKE-673 (Pipe Cleaning) A 1 TM ¥ ¥

A003B SUB-TOTAL

USNH Portion

A003A SUB-TOTAL

Collection & Cleaning SVC of Grease Trap (Spec Item 3.2.2)

A004A SUB-TOTAL

Collection & Cleaning SVC of Grease Trap (Spec Item 3.2.2)

Cleaning SVC of Exhaust Hoods & Ducts (Spec Item 3.2.1)

Cleaning SVC of Exhaust Hoods & Ducts (Spec Item 3.2.1)

A003 USNH Portion Total

A004B SUB-TOTAL

CNRJ-N9 MWR Portion

A006 CNRJ-N9 MWR Portion Total

A005 A005A Cleaning SVC of Exhaust Hoods & Ducts (Spec Item 3.2.1)

A005A-001 YSK-1557 (RM119) SA 2 TM ¥ ¥

A005A-002 YSK-1557 (RM121) BM 6 TM ¥ ¥

A005A-003 YSK-1557 (RM131 & 134) SA 2 TM ¥ ¥

A005B

A005B-001 YSK-1557 SM 2 24 TM ¥ ¥

A005C

A005C-001 YSK-1557 3W 156 TM ¥ ¥

A006 A006A

A006A-001 YSK-1292 SA 2 TM ¥ ¥

A006A-002 YSK-4372 Q 4 TM ¥ ¥

A006B

A006B-001 YSK-1292 M 12 TM ¥ ¥

A006B-002 YSK-4372 M 12 TM ¥ ¥

A006B-003 IKE-824 M 12 TM ¥ ¥

TOTAL RECURRING LINE ITEMS ¥

A005A SUB-TOTAL

DODDS Portion Cleaning SVC of Exhaust Hoods & Ducts (Spec Item 3.2.1)

CNRJ-N9 MWR-GALLEY Portion

A006 DODDS Portion Total

Collection & Cleaning SVC of Grease Trap (Spec Item 3.2.2)

Collection SVC of Cooking Oil (Spec Item 3.2.2.1)

A005B SUB-TOTAL

A005B SUB-TOTAL

A006A Sub-Total

A006B Sub-Total

A005 CNRJ-N9 MWR-GALLEY Portion Total

Provide Prices For Facility Investment Services - Recurring - In Accordance With Section C, Spec Item 3

ELIN /Sub ELIN Description Frequency Quantity Unit of Issue Unit Price Total CAC

B001 CFAY SRM PORTION

B001A

B001A-001 YSK-3816 (Grease Trap) Q 4 TM ¥ ¥ B001A-002 YSK-3816 (Kitchen Pipe Cleaning) A 1 TM ¥ ¥

B001A-003 AZU-8600376 SA 2 TM ¥ ¥

B001B

B001B-001 YSK-1071 SA 2 TM ¥ ¥

B001B-002 YSK-1281 SA 2 TM ¥ ¥

B001B-003 YSK-1288 (Oil Water Separator) SA 2 TM ¥ ¥ B001B-004 YSK-1288 (Piping) SA 2 TM ¥ ¥ B001B-005 YSK-1288 (Pit) SA 2 TM ¥ ¥

B001B-006 YSK-1311 Q 4 TM ¥ ¥

B001B-007 YSK-1314 M 12 TM ¥ ¥

B001B-008 YSK-1390 SA 2 TM ¥ ¥

B001B-009 YSK-1398 SA 2 TM ¥ ¥

B001B-010 YSK-1663 SA 2 TM ¥ ¥

B001B-011 YSK-1822 Q 4 TM ¥ ¥

B001B-011-01 Laboratory Analysis (Spec Item 3.2.3.1) Q 4 TM ¥ ¥

B001B-012 YSK-1829 M 12 TM ¥ ¥

B001B-013 YSK-4813, 1139 and J249 Area A 1 TM ¥ ¥

B001B-014 YSK-1851 SA 2 TM ¥ ¥

B001B-015 YSK-1854 SA 2 TM ¥ ¥

B001B-016 YSK-1939 SA 2 TM ¥ ¥

B001B-017 YSK-3154 SA 2 TM ¥ ¥

B001B-018 YSK-3313 SA 1 2 TM ¥ ¥

B001B-019 YSK-3816 Q 4 TM ¥ ¥

Collection & Cleaning SVC of Grease Trap and Relating Equipment (Spec Item 3.2.2)

B001A Sub-Total Cleaning & Removal SVC of Oil Water Separator and Relating Equipment (Spec Item 3.2.3)

ATTACHMENT J-0200000-07

EXHIBIT LINE ITEM NUMBERS

SOLICITATION/CONTRACT #

EXHIBIT B - CLIN 9001

Line Item 0003 Recurring - First Option Period

ELINs B001 through B006

B001B-020 YSK-4306 A 1 TM ¥ ¥

B001B-021 YSK-4849 SA 2 TM ¥ ¥

B001B-022 YSK-4858 (Oil Water Separator & Ditch) Q 4 TM ¥ ¥ B001B-023 YSK-4858 (Pipe, Ditch and Catch Basin) SA 2 TM ¥ ¥ B001B-024 YSK-4858 (Ditch) A 1 TM ¥ ¥

B001B-025 YSK-5004 SM 24 TM ¥ ¥

B001B-026 YSK-5229 Q 4 TM ¥ ¥

B001B-027 YSK-A37 M 1 12 TM ¥ ¥

B001B-028 YSK-A43 SA 2 TM ¥ ¥

B001B-029 YSK-G31 SA 2 TM ¥ ¥

B001B-030 YSK-J209 SA 2 TM ¥ ¥

B001B-031 YSK-J6 SA 2 TM ¥ ¥

B001B-032 IKE-675 (Oil Water Separator) SA 2 TM ¥ ¥ B001B-033 IKE-675 (Gutter) SA 2 TM ¥ ¥

B001B-034 IKE-730 A 1 TM ¥ ¥

B001B-035 IKE-608 SA 2 TM ¥ ¥

B001B-036 IKE-690 SA 2 TM ¥ ¥

B001B-037 IKE-691 SA 2 TM ¥ ¥

B001B-038 AZU-8600376 SA 2 TM ¥ ¥

B001B-039 URA-19 SA 2 TM ¥ ¥

B001B-040 NDK-100137 A 1 TM ¥ ¥

B001B-041 NDK-S124 SA 2 TM ¥ ¥

B001B-042 IKE-611 A 1 TM ¥ ¥

B002 B002A

B002A-001 YSK-4803 A 1 TM ¥ ¥

B002A-002 YSK-4831 M 12 TM ¥ ¥

DLA Portion Cleanining & Removal SVC of Oil Water Separator (Spec Item 3.2.3)

B002A SUB-TOTAL

B002 DLA Portion Total

B001B Sub-Total B001 CFAY SRM Portion Total

B003 B003A

B003A-001 YSK-1400 BM 6 TM ¥ ¥

B003B

B003B-001 YSK-1400 SM 24 TM ¥ ¥

B003B-002 1400 (Pipe Cleaning) BM 6 TM ¥ ¥

B004 B004A

B004A-001 YSK-1312 Q 4 TM ¥ ¥

B004A-002 YSK-1493 BM 6 TM ¥ ¥

B004A-003 YSK-1495 BM 6 TM ¥ ¥

B004A-004 YSK-3008 Q 4 TM ¥ ¥

B004A-005 YSK-4300 SA 2 TM ¥ ¥

B004A-006 YSK-B39 M 12 TM ¥ ¥

B004A-007 IKE-672 BM 6 TM ¥ ¥

B004A-008 IKE-673 (CDC MWR) SA 2 TM ¥ ¥

B004B

B004B-001 YSK-1312 (Outside) M 12 TM ¥ ¥ B004B-002 YSK-1312 (Inside) M 12 TM ¥ ¥ B004B-003 YSK-1312 (Pipe Cleaning) A 1 TM ¥ ¥

B004B-004 YSK-1493 M 12 TM ¥ ¥

B004B-005 YSK-1495 M 12 TM ¥ ¥

B004B-006 YSK-3008 SM 24 TM ¥ ¥

B004B-007 YSK-3008 (Pipe Cleaning) A 1 TM ¥ ¥

B004B-008 YSK-4300 M 12 TM ¥ ¥

B004B-009 YSK-B39 W 52 TM ¥ ¥

B004B-010 IKE-672 SM 24 TM ¥ ¥

B004B-011 IKE-672 (Pipe Cleaning) A 1 TM ¥ ¥

B004B-012 IKE-673 M 12 TM ¥ ¥

B004B-013 IKE-673 (Pipe Cleaning) A 1 TM ¥ ¥

B004A SUB-TOTAL

Collection & Cleaning SVC of Grease Trap (Spec Item 3.2.2)

B004B SUB-TOTAL

B006 CNRJ-N9 MWR Portion Total

B003A SUB-TOTAL

Collection & Cleaning SVC of Grease Trap (Spec Item 3.2.2)

B003B SUB-TOTAL

B003 USNH Portion Total

CNRJ-N9 MWR Portion Cleaning SVC of Exhaust Hoods & Ducts (Spec Item 3.2.1)

USNH Portion Cleaning SVC of Exhaust Hoods & Ducts (Spec Item 3.2.1)

B005 B005A Cleaning SVC of Exhaust Hoods & Ducts (Spec Item 3.2.1)

B005A-001 YSK-1557 (RM119) SA 2 TM ¥ ¥

B005A-002 YSK-1557 (RM121) BM 6 TM ¥ ¥

B005A-003 YSK-1557 (RM131 & 134) SA 2 TM ¥ ¥

B005B

B005B-001 YSK-1557 SM 2 24 TM ¥ ¥

B005C

B005C-001 YSK-1557 3W 156 TM ¥ ¥

B006 B006A

B006A-001 YSK-1292 SA 2 TM ¥ ¥

B006A-002 YSK-4372 Q 4 TM ¥ ¥

B006B

B006B-001 YSK-1292 M 12 TM ¥ ¥

B006B-002 YSK-4372 M 12 TM ¥ ¥

B006B-003 IKE-824 M 12 TM ¥ ¥

TOTAL RECURRING LINE ITEMS ¥

Cleaning SVC of Exhaust Hoods & Ducts (Spec Item 3.2.1)

B006A Sub-Total

B006B Sub-Total B006 DODDS Portion Total

Collection & Cleaning SVC of Grease Trap (Spec Item 3.2.2)

B005B SUB-TOTAL

Collection SVC of Cooking Oil (Spec Item 3.2.2.1)

B005B SUB-TOTAL

B005 CNRJ-N9 MWR-GALLEY Portion Total

DODDS Portion

CNRJ-N9 MWR-GALLEY Portion

B005A SUB-TOTAL

Provide Prices For Facility Investment Services - Recurring - In Accordance With Section C, Spec Item 3

ELIN /Sub ELIN Description Frequency Quantity Unit of Issue Unit Price Total CAC

C001 CFAY SRM PORTION

C001A

C001A-001 YSK-3816 (Grease Trap) Q 4 TM ¥ ¥ C001A-002 YSK-3816 (Kitchen Pipe Cleaning) A 1 TM ¥ ¥

C001A-003 AZU-8600376 SA 2 TM ¥ ¥

C001B

C001B-001 YSK-1071 SA 2 TM ¥ ¥

C001B-002 YSK-1281 SA 2 TM ¥ ¥

C001B-003 YSK-1288 (Oil Water Separator) SA 2 TM ¥ ¥ C001B-004 YSK-1288 (Piping) SA 2 TM ¥ ¥ C001B-005 YSK-1288 (Pit) SA 2 TM ¥ ¥

C001B-006 YSK-1311 Q 4 TM ¥ ¥

C001B-007 YSK-1314 M 12 TM ¥ ¥

C001B-008 YSK-1390 SA 2 TM ¥ ¥

C001B-009 YSK-1398 SA 2 TM ¥ ¥

C001B-010 YSK-1663 SA 2 TM ¥ ¥

C001B-011 YSK-1822 Q 4 TM ¥ ¥

C001B-011-01 Laboratory Analysis (Spec Item 3.2.3.1) Q 4 TM ¥ ¥

C001B-012 YSK-1829 M 12 TM ¥ ¥

C001B-013 YSK-4813, 1139 and J249 Area A 1 TM ¥ ¥

C001B-014 YSK-1851 SA 2 TM ¥ ¥

C001B-015 YSK-1854 SA 2 TM ¥ ¥

C001B-016 YSK-1939 SA 2 TM ¥ ¥

C001B-017 YSK-3154 SA 2 TM ¥ ¥

C001B-018 YSK-3313 SA 1 2 TM ¥ ¥

C001B-019 YSK-3816 Q 4 TM ¥ ¥

Collection & Cleaning SVC of Grease Trap and Relating Equipment (Spec Item 3.2.2)

C001A Sub-Total Cleaning & Removal SVC of Oil Water Separator and Relating Equipment (Spec Item 3.2.3)

ATTACHMENT J-0200000-07

EXHIBIT LINE ITEM NUMBERS

SOLICITATION/CONTRACT #

EXHIBIT B - CLIN 9002

Line Item 0005 Recurring - Second Option Period

ELINs C001 through C006

C001B-020 YSK-4306 A 1 TM ¥ ¥

C001B-021 YSK-4849 SA 2 TM ¥ ¥

C001B-022 YSK-4858 (Oil Water Separator & Ditch) Q 4 TM ¥ ¥ C001B-023 YSK-4858 (Pipe, Ditch and Catch Basin) SA 2 TM ¥ ¥ C001B-024 YSK-4858 (Ditch) A 1 TM ¥ ¥

C001B-025 YSK-5004 SM 24 TM ¥ ¥

C001B-026 YSK-5229 Q 4 TM ¥ ¥

C001B-027 YSK-A37 M 1 12 TM ¥ ¥

C001B-028 YSK-A43 SA 2 TM ¥ ¥

C001B-029 YSK-G31 SA 2 TM ¥ ¥

C001B-030 YSK-J209 SA 2 TM ¥ ¥

C001B-031 YSK-J6 SA 2 TM ¥ ¥

C001B-032 IKE-675 (Oil Water Separator) SA 2 TM ¥ ¥ C001B-033 IKE-675 (Gutter) SA 2 TM ¥ ¥

C001B-034 IKE-730 A 1 TM ¥ ¥

C001B-035 IKE-608 SA 2 TM ¥ ¥

C001B-036 IKE-690 SA 2 TM ¥ ¥

C001B-037 IKE-691 SA 2 TM ¥ ¥

C001B-038 AZU-8600376 SA 2 TM ¥ ¥

C001B-039 URA-19 SA 2 TM ¥ ¥

C001B-040 NDK-100137 A 1 TM ¥ ¥

C001B-041 NDK-S124 SA 2 TM ¥ ¥

C001B-042 IKE-611 A 1 TM ¥ ¥

C002 C002A

C002A-001 YSK-4803 A 1 TM ¥ ¥

C002A-002 YSK-4831 M 12 TM ¥ ¥

DLA Portion Cleanining & Removal SVC of Oil Water Separator (Spec Item 3.2.3)

C002A SUB-TOTAL

C002 DLA Portion Total

C001B Sub-Total C001 CFAY SRM Portion Total

C003 C003A

C003A-001 YSK-1400 BM 6 TM ¥ ¥

C003B

C003B-001 YSK-1400 SM 24 TM ¥ ¥

C003B-002 1400 (Pipe Cleaning) BM 6 TM ¥ ¥

C004 C004A

C004A-001 YSK-1312 Q 4 TM ¥ ¥

C004A-002 YSK-1493 BM 6 TM ¥ ¥

C004A-003 YSK-1495 BM 6 TM ¥ ¥

C004A-004 YSK-3008 Q 4 TM ¥ ¥

C004A-005 YSK-4300 SA 2 TM ¥ ¥

C004A-006 YSK-B39 M 12 TM ¥ ¥

C004A-007 IKE-672 BM 6 TM ¥ ¥

C004A-008 IKE-673 (CDC MWR) SA 2 TM ¥ ¥

C004B

C004B-001 YSK-1312 (Outside) M 12 TM ¥ ¥ C004B-002 YSK-1312 (Inside) M 12 TM ¥ ¥ C004B-003 YSK-1312 (Pipe Cleaning) A 1 TM ¥ ¥

C004B-004 YSK-1493 M 12 TM ¥ ¥

C004B-005 YSK-1495 M 12 TM ¥ ¥

C004B-006 YSK-3008 SM 24 TM ¥ ¥

C004B-007 YSK-3008 (Pipe Cleaning) A 1 TM ¥ ¥

C004B-008 YSK-4300 M 12 TM ¥ ¥

C004B-009 YSK-B39 W 52 TM ¥ ¥

C004B-010 IKE-672 SM 24 TM ¥ ¥

C004B-011 IKE-672 (Pipe Cleaning) A 1 TM ¥ ¥

C004B-012 IKE-673 M 12 TM ¥ ¥

C004B-013 IKE-673 (Pipe Cleaning) A 1 TM ¥ ¥

C004A SUB-TOTAL

Collection & Cleaning SVC of Grease Trap (Spec Item 3.2.2)

C004B SUB-TOTAL

C006 CNRJ-N9 MWR Portion Total

C003A SUB-TOTAL

Collection & Cleaning SVC of Grease Trap (Spec Item 3.2.2)

C003B SUB-TOTAL

C003 USNH Portion Total

CNRJ-N9 MWR Portion Cleaning SVC of Exhaust Hoods & Ducts (Spec Item 3.2.1)

C005 C005A Cleaning SVC of Exhaust Hoods & Ducts (Spec Item 3.2.1)

C005A-001 YSK-1557 (RM119) SA 2 TM ¥ ¥

C005A-002 YSK-1557 (RM121) BM 6 TM ¥ ¥

C005A-003 YSK-1557 (RM131 & 134) SA 2 TM ¥ ¥

C005B

C005B-001 YSK-1557 SM 2 24 TM ¥ ¥

C005C

C005C-001 YSK-1557 3W 156 TM ¥ ¥

C006 C006A

C006A-001 YSK-1292 SA 2 TM ¥ ¥

C006A-002 YSK-4372 Q 4 TM ¥ ¥

C006B

C006B-001 YSK-1292 M 12 TM ¥ ¥

C006B-002 YSK-4372 M 12 TM ¥ ¥

C006B-003 IKE-824 M 12 TM ¥ ¥

TOTAL RECURRING LINE ITEMS ¥

Cleaning SVC of Exhaust Hoods & Ducts (Spec Item 3.2.1)

C006A Sub-Total

C006B Sub-Total C006 DODDS Portion Total

Collection & Cleaning SVC of Grease Trap (Spec Item 3.2.2)

C005B SUB-TOTAL

Collection SVC of Cooking Oil (Spec Item 3.2.2.1)

C005B SUB-TOTAL

C005 CNRJ-N9 MWR-GALLEY Portion Total

DODDS Portion

C005A SUB-TOTAL

Provide Prices For Facility Investment Services - Recurring - In Accordance With Section C, Spec Item 3

ELIN /Sub ELIN Description Frequency Quantity Unit of Issue Unit Price Total CAC

D001 CFAY SRM PORTION

D001A

D001A-001 YSK-3816 (Grease Trap) Q 4 TM ¥ ¥ D001A-002 YSK-3816 (Kitchen Pipe Cleaning) A 1 TM ¥ ¥

D001A-003 AZU-8600376 SA 2 TM ¥ ¥

D001B

D001B-001 YSK-1071 SA 2 TM ¥ ¥

D001B-002 YSK-1281 SA 2 TM ¥ ¥

D001B-003 YSK-1288 (Oil Water Separator) SA 2 TM ¥ ¥ D001B-004 YSK-1288 (Piping) SA 2 TM ¥ ¥ D001B-005 YSK-1288 (Pit) SA 2 TM ¥ ¥

D001B-006 YSK-1311 Q 4 TM ¥ ¥

D001B-007 YSK-1314 M 12 TM ¥ ¥

D001B-008 YSK-1390 SA 2 TM ¥ ¥

D001B-009 YSK-1398 SA 2 TM ¥ ¥

D001B-010 YSK-1663 SA 2 TM ¥ ¥

D001B-011 YSK-1822 Q 4 TM ¥ ¥

D001B-011-01 Laboratory Analysis (Spec Item 3.2.3.1) Q 4 TM ¥ ¥

D001B-012 YSK-1829 M 12 TM ¥ ¥

D001B-013 YSK-4813, 1139 and J249 Area A 1 TM ¥ ¥

D001B-014 YSK-1851 SA 2 TM ¥ ¥

D001B-015 YSK-1854 SA 2 TM ¥ ¥

D001B-016 YSK-1939 SA 2 TM ¥ ¥

D001B-017 YSK-3154 SA 2 TM ¥ ¥

D001B-018 YSK-3313 SA 1 2 TM ¥ ¥

D001B-019 YSK-3816 Q 4 TM ¥ ¥

Collection & Cleaning SVC of Grease Trap and Relating Equipment (Spec Item 3.2.2)

D001A Sub-Total Cleaning & Removal SVC of Oil Water Separator and Relating Equipment (Spec Item 3.2.3)

ATTACHMENT J-0200000-07

EXHIBIT LINE ITEM NUMBERS

SOLICITATION/CONTRACT #

EXHIBIT B - CLIN 9003

Line Item 0007 Recurring - Third Option Period

ELINs D001 through D006

D001B-020 YSK-4306 A 1 TM ¥ ¥

D001B-021 YSK-4849 SA 2 TM ¥ ¥

D001B-022 YSK-4858 (Oil Water Separator & Ditch) Q 4 TM ¥ ¥ D001B-023 YSK-4858 (Pipe, Ditch and Catch Basin) SA 2 TM ¥ ¥ D001B-024 YSK-4858 (Ditch) A 1 TM ¥ ¥

D001B-025 YSK-5004 SM 24 TM ¥ ¥

D001B-026 YSK-5229 Q 4 TM ¥ ¥

D001B-027 YSK-A37 M 1 12 TM ¥ ¥

D001B-028 YSK-A43 SA 2 TM ¥ ¥

D001B-029 YSK-G31 SA 2 TM ¥ ¥

D001B-030 YSK-J209 SA 2 TM ¥ ¥

D001B-031 YSK-J6 SA 2 TM ¥ ¥

D001B-032 IKE-675 (Oil Water Separator) SA 2 TM ¥ ¥ D001B-033 IKE-675 (Gutter) SA 2 TM ¥ ¥

D001B-034 IKE-730 A 1 TM ¥ ¥

D001B-035 IKE-608 SA 2 TM ¥ ¥

D001B-036 IKE-690 SA 2 TM ¥ ¥

D001B-037 IKE-691 SA 2 TM ¥ ¥

D001B-038 AZU-8600376 SA 2 TM ¥ ¥

D001B-039 URA-19 SA 2 TM ¥ ¥

D001B-040 NDK-100137 A 1 TM ¥ ¥

D001B-041 NDK-S124 SA 2 TM ¥ ¥

D001B-042 IKE-611 A 1 TM ¥ ¥

D002 D002A

D002A-001 YSK-4803 A 1 TM ¥ ¥

D002A-002 YSK-4831 M 12 TM ¥ ¥

DLA Portion Cleanining & Removal SVC of Oil Water Separator (Spec Item 3.2.3)

D002A SUB-TOTAL

D002 DLA Portion Total

D001B Sub-Total D001 CFAY SRM Portion Total

D003 D003A

D003A-001 YSK-1400 BM 6 TM ¥ ¥

D003B

D003B-001 YSK-1400 SM 24 TM ¥ ¥

D003B-002 1400 (Pipe Cleaning) BM 6 TM ¥ ¥

D004 D004A

D004A-001 YSK-1312 Q 4 TM ¥ ¥

D004A-002 YSK-1493 BM 6 TM ¥ ¥

D004A-003 YSK-1495 BM 6 TM ¥ ¥

D004A-004 YSK-3008 Q 4 TM ¥ ¥

D004A-005 YSK-4300 SA 2 TM ¥ ¥

D004A-006 YSK-B39 M 12 TM ¥ ¥

D004A-007 IKE-672 BM 6 TM ¥ ¥

D004A-008 IKE-673 (CDC MWR) SA 2 TM ¥ ¥

D004B

D004B-001 YSK-1312 (Outside) M 12 TM ¥ ¥ D004B-002 YSK-1312 (Inside) M 12 TM ¥ ¥ D004B-003 YSK-1312 (Pipe Cleaning) A 1 TM ¥ ¥

D004B-004 YSK-1493 M 12 TM ¥ ¥

D004B-005 YSK-1495 M 12 TM ¥ ¥

D004B-006 YSK-3008 SM 24 TM ¥ ¥

D004B-007 YSK-3008 (Pipe Cleaning) A 1 TM ¥ ¥

D004B-008 YSK-4300 M 12 TM ¥ ¥

D004B-009 YSK-B39 W 52 TM ¥ ¥

D004B-010 IKE-672 SM 24 TM ¥ ¥

D004B-011 IKE-672 (Pipe Cleaning) A 1 TM ¥ ¥

D004B-012 IKE-673 M 12 TM ¥ ¥

D004B-013 IKE-673 (Pipe Cleaning) A 1 TM ¥ ¥

D004A SUB-TOTAL

Collection & Cleaning SVC of Grease Trap (Spec Item 3.2.2)

D004B SUB-TOTAL

D006 CNRJ-N9 MWR Portion Total

D003A SUB-TOTAL

Collection & Cleaning SVC of Grease Trap (Spec Item 3.2.2)

D003B SUB-TOTAL

D003 USNH Portion Total

CNRJ-N9 MWR Portion Cleaning SVC of Exhaust Hoods & Ducts (Spec Item 3.2.1)

D005 D005A Cleaning SVC of Exhaust Hoods & Ducts (Spec Item 3.2.1)

D005A-001 YSK-1557 (RM119) SA 2 TM ¥ ¥

D005A-002 YSK-1557 (RM121) BM 6 TM ¥ ¥

D005A-003 YSK-1557 (RM131 & 134) SA 2 TM ¥ ¥

D005B

D005B-001 YSK-1557 SM 2 24 TM ¥ ¥

D005C

D005C-001 YSK-1557 3W 156 TM ¥ ¥

D006 D006A

D006A-001 YSK-1292 SA 2 TM ¥ ¥

D006A-002 YSK-4372 Q 4 TM ¥ ¥

D006B

D006B-001 YSK-1292 M 12 TM ¥ ¥

D006B-002 YSK-4372 M 12 TM ¥ ¥

D006B-003 IKE-824 M 12 TM ¥ ¥

TOTAL RECURRING LINE ITEMS ¥

Cleaning SVC of Exhaust Hoods & Ducts (Spec Item 3.2.1)

D006A Sub-Total

D006B Sub-Total D006 DODDS Portion Total

Collection & Cleaning SVC of Grease Trap (Spec Item 3.2.2)

D005B SUB-TOTAL

Collection SVC of Cooking Oil (Spec Item 3.2.2.1)

D005B SUB-TOTAL

D005 CNRJ-N9 MWR-GALLEY Portion Total

DODDS Portion

D005A SUB-TOTAL

Provide Prices For Facility Investment Services - Recurring - In Accordance With Section C, Spec Item 3

ELIN /Sub ELIN Description Frequency Quantity Unit of Issue Unit Price Total CAC

E001 CFAY SRM PORTION

E001A

E001A-001 YSK-3816 (Grease Trap) Q 4 TM ¥ ¥ E001A-002 YSK-3816 (Kitchen Pipe Cleaning) A 1 TM ¥ ¥

E001A-003 AZU-8600376 SA 2 TM ¥ ¥

E001B

E001B-001 YSK-1071 SA 2 TM ¥ ¥

E001B-002 YSK-1281 SA 2 TM ¥ ¥

E001B-003 YSK-1288 (Oil Water Separator) SA 2 TM ¥ ¥ E001B-004 YSK-1288 (Piping) SA 2 TM ¥ ¥ E001B-005 YSK-1288 (Pit) SA 2 TM ¥ ¥

E001B-006 YSK-1311 Q 4 TM ¥ ¥

E001B-007 YSK-1314 M 12 TM ¥ ¥

E001B-008 YSK-1390 SA 2 TM ¥ ¥

E001B-009 YSK-1398 SA 2 TM ¥ ¥

E001B-010 YSK-1663 SA 2 TM ¥ ¥

E001B-011 YSK-1822 Q 4 TM ¥ ¥

E001B-011-01 Laboratory Analysis (Spec Item 3.2.3.1) Q 4 TM ¥ ¥

E001B-012 YSK-1829 M 12 TM ¥ ¥

E001B-013 YSK-4813, 1139 and J249 Area A 1 TM ¥ ¥

E001B-014 YSK-1851 SA 2 TM ¥ ¥

E001B-015 YSK-1854 SA 2 TM ¥ ¥

E001B-016 YSK-1939 SA 2 TM ¥ ¥

E001B-017 YSK-3154 SA 2 TM ¥ ¥

E001B-018 YSK-3313 SA 1 2 TM ¥ ¥

E001B-019 YSK-3816 Q 4 TM ¥ ¥

Collection & Cleaning SVC of Grease Trap and Relating Equipment (Spec Item 3.2.2)

E001A Sub-Total Cleaning & Removal SVC of Oil Water Separator and Relating Equipment (Spec Item 3.2.3)

ATTACHMENT J-0200000-07

EXHIBIT LINE ITEM NUMBERS

SOLICITATION/CONTRACT #

EXHIBIT B - CLIN 9005

Line Item 0009 Recurring - Forth Option Period

ELINs E001 through E006

E001B-020 YSK-4306 A 1 TM ¥ ¥

E001B-021 YSK-4849 SA 2 TM ¥ ¥

E001B-022 YSK-4858 (Oil Water Separator & Ditch) Q 4 TM ¥ ¥ E001B-023 YSK-4858 (Pipe, Ditch and Catch Basin) SA 2 TM ¥ ¥ E001B-024 YSK-4858 (Ditch) A 1 TM ¥ ¥

E001B-025 YSK-5004 SM 24 TM ¥ ¥

E001B-026 YSK-5229 Q 4 TM ¥ ¥

E001B-027 YSK-A37 M 1 12 TM ¥ ¥

E001B-028 YSK-A43 SA 2 TM ¥ ¥

E001B-029 YSK-G31 SA 2 TM ¥ ¥

E001B-030 YSK-J209 SA 2 TM ¥ ¥

E001B-031 YSK-J6 SA 2 TM ¥ ¥

E001B-032 IKE-675 (Oil Water Separator) SA 2 TM ¥ ¥ E001B-033 IKE-675 (Gutter) SA 2 TM ¥ ¥

E001B-034 IKE-730 A 1 TM ¥ ¥

E001B-035 IKE-608 SA 2 TM ¥ ¥

E001B-036 IKE-690 SA 2 TM ¥ ¥

E001B-037 IKE-691 SA 2 TM ¥ ¥

E001B-038 AZU-8600376 SA 2 TM ¥ ¥

E001B-039 URA-19 SA 2 TM ¥ ¥

E001B-040 NDK-100137 A 1 TM ¥ ¥

E001B-041 NDK-S124 SA 2 TM ¥ ¥

E001B-042 IKE-611 A 1 TM ¥ ¥

E002 E002A

E002A-001 YSK-4803 A 1 TM ¥ ¥

E002A-002 YSK-4831 M 12 TM ¥ ¥

DLA Portion Cleanining & Removal SVC of Oil Water Separator (Spec Item 3.2.3)

E002A SUB-TOTAL

E002 DLA Portion Total

E001B Sub-Total E001 CFAY SRM Portion Total

E003 E003A

E003A-001 YSK-1400 BM 6 TM ¥ ¥

E003B

E003B-001 YSK-1400 SM 24 TM ¥ ¥

E003B-002 1400 (Pipe Cleaning) BM 6 TM ¥ ¥

E004 E004A

E004A-001 YSK-1312 Q 4 TM ¥ ¥

E004A-002 YSK-1493 BM 6 TM ¥ ¥

E004A-003 YSK-1495 BM 6 TM ¥ ¥

E004A-004 YSK-3008 Q 4 TM ¥ ¥

E004A-005 YSK-4300 SA 2 TM ¥ ¥

E004A-006 YSK-B39 M 12 TM ¥ ¥

E004A-007 IKE-672 BM 6 TM ¥ ¥

E004A-008 IKE-673 (CDC MWR) SA 2 TM ¥ ¥

E004B

E004B-001 YSK-1312 (Outside) M 12 TM ¥ ¥ E004B-002 YSK-1312 (Inside) M 12 TM ¥ ¥ E004B-003 YSK-1312 (Pipe Cleaning) A 1 TM ¥ ¥

E004B-004 YSK-1493 M 12 TM ¥ ¥

E004B-005 YSK-1495 M 12 TM ¥ ¥

E004B-006 YSK-3008 SM 24 TM ¥ ¥

E004B-007 YSK-3008 (Pipe Cleaning) A 1 TM ¥ ¥

E004B-008 YSK-4300 M 12 TM ¥ ¥

E004B-009 YSK-B39 W 52 TM ¥ ¥

E004B-010 IKE-672 SM 24 TM ¥ ¥

E004B-011 IKE-672 (Pipe Cleaning) A 1 TM ¥ ¥

E004B-012 IKE-673 M 12 TM ¥ ¥

E004B-013 IKE-673 (Pipe Cleaning) A 1 TM ¥ ¥

E004A SUB-TOTAL

Collection & Cleaning SVC of Grease Trap (Spec Item 3.2.2)

E004B SUB-TOTAL

E006 CNRJ-N9 MWR Portion Total

E003A SUB-TOTAL

Collection & Cleaning SVC of Grease Trap (Spec Item 3.2.2)

E003B SUB-TOTAL

E003 USNH Portion Total

CNRJ-N9 MWR Portion Cleaning SVC of Exhaust Hoods & Ducts (Spec Item 3.2.1)

E005 E005A Cleaning SVC of Exhaust Hoods & Ducts (Spec Item 3.2.1)

E005A-001 YSK-1557 (RM119) SA 2 TM ¥ ¥

E005A-002 YSK-1557 (RM121) BM 6 TM ¥ ¥

E005A-003 YSK-1557 (RM131 & 134) SA 2 TM ¥ ¥

E005B

E005B-001 YSK-1557 SM 2 24 TM ¥ ¥

E005C

E005C-001 YSK-1557 3W 156 TM ¥ ¥

E006 E006A

E006A-001 YSK-1292 SA 2 TM ¥ ¥

E006A-002 YSK-4372 Q 4 TM ¥ ¥

E006B

E006B-001 YSK-1292 M 12 TM ¥ ¥

E006B-002 YSK-4372 M 12 TM ¥ ¥

E006B-003 IKE-824 M 12 TM ¥ ¥

TOTAL RECURRING LINE ITEMS ¥

Cleaning SVC of Exhaust Hoods & Ducts (Spec Item 3.2.1)

E006A Sub-Total

E006B Sub-Total E006 DODDS Portion Total

Collection & Cleaning SVC of Grease Trap (Spec Item 3.2.2)

E005B SUB-TOTAL

Collection SVC of Cooking Oil (Spec Item 3.2.2.1)

E005B SUB-TOTAL

E005 CNRJ-N9 MWR-GALLEY Portion Total

DODDS Portion

E005A SUB-TOTAL

GREASE TRAP:

1. Current Inventories for Grease Trap:

Attachment No. Attachment Title J-1502000-08-01 CURRENT INVENTORIES FOR GREASE TRAP AND COLLECTING COOKING OIL VOLUME

2. Site plans for Grease Trap:

a. CFAY SRM PORTION (Exhibit Line Item No: 001A):

Bldg. No. Attachment No. Attachment Title YSK-3816 J-1502000-08-001A-01 SITE PLAN FOR GREASE TRAP AND LITCHES AT YSK-3816 (CFAY Portion) YSK-3816 (Kitchen Pipe Cleaning) AZU-8600376 J-1502000-08-001A-02 SITE PLAN FOR GREASE TRAP AT AZU-8600376 (CFAY Portion)

b. USNH Portion (Exhibit Line Item No: 003B):

YSK-1400

J-1502000-08-003B-01 SITE PLAN FOR GREASE TRAP AND PIPE CLEANING PLAN AT YSK-1400 (USNH Portion)

YSK-1400 (Pipe Cleaning) Note: Special Conditions and requirement for cleaning work of kitchen drain piping at YSK-1400 is provided in Attachment J-1502000-08-003B-02.

c. CNRJ-N9 MWR Portion (Exhibit Line Item No: 004B):

YSK-1312 (Outside) J-1502000-08-004B-01

SITE PLAN FOR GREASE TRAPS AND PIPE CLEANING PLAN AT YSK-1312

(CNRJ-N9 MWR Portion) YSK-1312 (Inside)

YSK-1312 (Pipe Cleaning) YSK-1493 J-1502000-08-004B-02 SITE PLAN FOR GREASE TRAP AT YSK-1493 (CNRJ-N9 MWR Portion) YSK-1495 J-1502000-08-004B-03 SITE PLAN FOR GREASE TRAP AT YSK-1495 (CNRJ-N9 MWR Portion) YSK-3008 J-1502000-08-004B-04 SITE PLAN FOR GREASE TRAP AND PIPE CLEANING PLAN AT YSK-3008

(CNRJ-N9 MWR Portion) YSK-3008 (Pipe Cleaning) YSK-4300 J-1502000-08-004B-05 SITE PLAN FOR GREASE TRAP AT YSK-4300 (CNRJ-N9 MWR Portion)

ATTACHMENT J-1502000-08

ATTACHMENT LIST FOR GREASE TRAPS INCLUDING RELATING EQUIPMENT AND COOKING OIL

UNCLASSIFIED / FOR OFFICIAL USE ONLY

YSK-B39 J-1502000-08-004B-06 SITE PLAN FOR GREASE TRAP AT YSK-B39 (CNRJ-N9 MWR Portion) IKE-672 J-1502000-08-004B-07 SITE PLAN FOR GREASE TRAP AND PIPE CLEANING PLAN AT IKE-672 (CNRJ-

N9 MWR Portion) IKE-672 (Pipe Cleaning) IKE-673 J-1502000-08-004B-08 SITE PLAN FOR GREASE TRAP AND PIPE CLEANING PLAN AT IKE-673 (CNRJ-

N9 MWR Portion) IKE-673 (Pipe Cleaning)

d. CNRJ-N9 MWR-GALLEY Portion (Exhibit Line Item No: 005B):

YSK-1557 J-1502000-08-005B-01 SITE PLAN FOR GREASE TRAP AT YSK-1557 (CNRJ-N9 MWR-GALLEY Portion)

e. DODDS Portion (Exhibit Line Item No: 006B):

YSK-1292 J-1502000-08-006B-01 SITE PLAN FOR GREASE TRAP AT YSK-1292 (DODDS Portion) YSK-4372 J-1502000-08-006B-02 SITE PLAN FOR GREASE TRAP AT YSK-4372 (DODDS Portion) IKE-824 J-1502000-08-006B-02 SITE PLAN FOR GREASE TRAP AT IKE-824 (DODDS Portion)

3. Historical Cleaning Frequency for Grease Trap and Relating Equipment (Reference, Information Purpose Only)

J-1502000-08-03 HISTORICAL CLEANING FREQUENCY AND ONSITE WORKING HOURS FOR KITCHEN EXHAUST HOOD

AND DUCT SYSTEMS AND OA DUCT SYSTEMS

COOKING OIL:

1. Current Correcting Capacity for Cooking Oil:

J-1502000-08-01 CURRENT COLLECTING CAPACITY FOR COOKING OIL

2. List of the Site Plans for Cooking Oil:

f. CNRJ-N9 MWR-GALLEY Portion (Exhibit Line Item No: 005C):

YSK-1557 J-1502000-08-04-005C-001 SITE PLAN FOR COOKING OIL AT YSK-1557

ATTACHMENT J-1502000-08

ATTACHMENT LIST FOR GREASE TRAPS INCLUDING RELATING EQUIPMENT AND COOKING OIL

GREASE TRAP

ATTACHMENT J-1502000-08-001A-02

SITE PLAN FOR GREASE TRAP AT AZU-8600376 (CFAY Portion)

KITCHEN DRAIN PING

CLEANING AREA

Tsutomu.Toriyama.JA Rectangle

Tsutomu.Toriyama.JA Line

Tsutomu.Toriyama.JA Rectangle

Tsutomu.Toriyama.JA Line

Tsutomu.Toriyama.JA Line

WORK AREA

ATTACHMENT J-1502000-08-004B-04

SITE PLAN FOR GREASE TRAP AND PIPE CLEANING PLAN AT YSK-3008 (CNRJ-N9 MWR Portion)

: KITCHEN DRAIN PIPING

CLEANING AREA

Tsutomu.Toriyama.JA Line

Tsutomu.Toriyama.JA Rectangle

Tsutomu.Toriyama.JA Rectangle

GREASE

TRAP

ATTACHMENT J-1502000-08-004B-07

SITE PLAN FOR GREASE TRAP AND PIPE CLEANING PLAN AT IKE-672 (CNRJ-N9 MWR Portion)

KITCHEN DRAIN PIPING

CLEANING AREA

Tsutomu.Toriyama.JA Rectangle

Tsutomu.Toriyama.JA Line

Tsutomu.Toriyama.JA Line

Tsutomu.Toriyama.JA Line

Tsutomu.Toriyama.JA Line

Tsutomu.Toriyama.JA Line

Tsutomu.Toriyama.JA Line

Tsutomu.Toriyama.JA Line

Tsutomu.Toriyama.JA Line

Tsutomu.Toriyama.JA Line

Tsutomu.Toriyama.JA Line

Tsutomu.Toriyama.JA Line

Tsutomu.Toriyama.JA Line

Tsutomu.Toriyama.JA Line

Tsutomu.Toriyama.JA Line

Tsutomu.Toriyama.JA Line

Tsutomu.Toriyama.JA Line

Tsutomu.Toriyama.JA Line

Tsutomu.Toriyama.JA Line

Tsutomu.Toriyama.JA Line

Tsutomu.Toriyama.JA Line

Tsutomu.Toriyama.JA Line

Tsutomu.Toriyama.JA Line

Tsutomu.Toriyama.JA Line

Tsutomu.Toriyama.JA Line

Tsutomu.Toriyama.JA Line

Tsutomu.Toriyama.JA Line

Tsutomu.Toriyama.JA Line

Tsutomu.Toriyama.JA Line

Tsutomu.Toriyama.JA Line

Tsutomu.Toriyama.JA Line

Tsutomu.Toriyama.JA Line

Tsutomu.Toriyama.JA Line

Tsutomu.Toriyama.JA Line

Tsutomu.Toriyama.JA Line

Tsutomu.Toriyama.JA Line

Tsutomu.Toriyama.JA Line

Tsutomu.Toriyama.JA Line

Tsutomu.Toriyama.JA Line

Tsutomu.Toriyama.JA Line

Tsutomu.Toriyama.JA Line

Tsutomu.Toriyama.JA Line

Tsutomu.Toriyama.JA Line

Tsutomu.Toriyama.JA Line

Tsutomu.Toriyama.JA Line

Tsutomu.Toriyama.JA Line

Tsutomu.Toriyama.JA Line

Tsutomu.Toriyama.JA Line

Tsutomu.Toriyama.JA Line

Tsutomu.Toriyama.JA Line

Tsutomu.Toriyama.JA Rectangle

Tsutomu.Toriyama.JA Line

GREASE TRAP

ATTACHMENT J-1502000-08-004B-08

SITE PLAN FOR GREASE TRAP AND PIPE CLEANING PLAN AT IKE-673 (CNRJ-N9 MWR Portion)

KITCHEN DRAIN PIPING

CLEANING AREA

Tsutomu.Toriyama.JA Rectangle

Tsutomu.Toriyama.JA Line

Tsutomu.Toriyama.JA Line

Tsutomu.Toriyama.JA Line

Tsutomu.Toriyama.JA Line

Tsutomu.Toriyama.JA Line

Tsutomu.Toriyama.JA Line

Tsutomu.Toriyama.JA Line

Tsutomu.Toriyama.JA Line

Tsutomu.Toriyama.JA Line

Tsutomu.Toriyama.JA Line

Tsutomu.Toriyama.JA Line

Tsutomu.Toriyama.JA Line

Tsutomu.Toriyama.JA Line

Tsutomu.Toriyama.JA Line

Tsutomu.Toriyama.JA Line

Tsutomu.Toriyama.JA Line

Tsutomu.Toriyama.JA Line

Tsutomu.Toriyama.JA Line

Tsutomu.Toriyama.JA Line

Tsutomu.Toriyama.JA Line

Tsutomu.Toriyama.JA Line

Tsutomu.Toriyama.JA Line

Tsutomu.Toriyama.JA Line

Tsutomu.Toriyama.JA Line

Tsutomu.Toriyama.JA Line

Tsutomu.Toriyama.JA Line

Tsutomu.Toriyama.JA Line

Tsutomu.Toriyama.JA Line

Tsutomu.Toriyama.JA Line

Tsutomu.Toriyama.JA Line

Tsutomu.Toriyama.JA Line

Tsutomu.Toriyama.JA Line

Tsutomu.Toriyama.JA Line

Tsutomu.Toriyama.JA Line

Tsutomu.Toriyama.JA Rectangle

Tsutomu.Toriyama.JA Line

Tsutomu.Toriyama.JA Line

1. SPECIAL CONDITION FOR THE KITCHEN DRAIN PIPING TO BE CLEAN-UP:

a. The existing kitchen drain piping (Cast iron) specified in Attachment J-1502000-08-003B-01to be clean up was installed at 40 years ago or more.

b. So some portions of original cast iron piping were replaced with vinyl piping (VP).

2. SPECIAL REQUIREMENT FOR PERFORMING CLEANING WORK OF KITCHEN DRAIN PIPING:

a. The cleaning work shall be performed carefully so as not to leaking the kitchen drain piping by extra high pressure water.

b. After performing cleaning work, the Contractor shall confirm to no leaking for the kitchen drain piping running at pits of basement floor.

ATTACHMENT J-1502000-08-003B-02

SPECIAL CONDITIONS AND REQUREMENT FOR CLEANING WORK OF KITCHEN DRAIN PIPING AT YSK-1400 (USNH PORTION)

UNCLASSIFIED / FOR OFFICIAL USE ONLY

1. Current Inventories for Oil Water Separator:

J-1502000-09-01 CURRENT INVENTORIES FOR OIL WATER SEPARATOR AND RELATED EQUIPMENT / HISTORICAL

CLEANING SCHEDULE

2. List of the Site Plans for Oil Water Separator:

a. CFAY SRM PORTION (Exhibit Line Item No: 001):

YSK-1071 J-1502000-09-001B-01 SITE PLAN FOR OILWATER SEPARATOR AT YSK-1071

YSK-1281 J-1502000-09-001B-02 SITE PLAN FOR OILWATER SEPARATOR AT YSK-1281

YSK-1288 J-1502000-09-001B-03 / 04 / 05 SITE PLAN FOR OILWATER SEPARATOR, PIPE & PIT AT YSK-1288

YSK-1311 J-1502000-09-001B-06 SITE PLAN FOR OILWATER SEPARATOR AT YSK-1311

YSK-1314 J-1502000-09-001B-07 SITE PLAN FOR OILWATER SEPARATOR AT YSK-1314

YSK-1390 J-1502000-09-001B-08 SITE PLAN FOR OILWATER SEPARATOR AT YSK-1390

YSK-1398 J-1502000-09-001B-09 SITE PLAN FOR OILWATER SEPARATOR AT YSK-1398

YSK-1663 J-1502000-09-001B-10 SITE PLAN FOR OILWATER SEPARATOR AT YSK-1663

YSK-1822 J-1502000-09-001B-11 SITE PLAN FOR OILWATER SEPARATOR AT YSK-1822

YSK-1829 J-1502000-09-001B-12 SITE PLAN FOR OILWATER SEPARATOR AT YSK-1829

YSK-4813, 1139 and J249 Area

J-1502000-09-001B-13 SITE PLAN FOR OILWATER SEPARATOR AT YSK-4813, 1139 AND J249

AREA (FIRE FIGHTING SCHOOL)

YSK-1851 / 1854 J-1502000-09-001B-14 / 15 SITE PLAN FOR OILWATER SEPARATOR AT YSK-1851 & 1854

YSK-1939 J-1502000-09-001B-16 SITE PLAN FOR OILWATER SEPARATOR AT YSK-1939

YSK-3154 J-1502000-09-001B-17 SITE PLAN FOR OILWATER SEPARATOR AT YSK-3154

YSK-3313 J-1502000-09-001B-18 SITE PLAN FOR OILWATER SEPARATOR AT YSK-3313

YSK-3816 J-1502000-09-001B-19 SITE PLAN FOR OILWATER SEPARATOR AT YSK-3316

YSK-4306 J-1502000-09-001B-20 SITE PLAN FOR OILWATER SEPARATOR AT YSK-4306

YSK-4849 J-1502000-09-001B-21 SITE PLAN FOR OILWATER SEPARATOR AT YSK-4849

YSK-4858 J-1502000-09-001B-22 / 23 / 24 SITE PLAN FOR OIL WATER SEPARATOR, PIPE AND CATCH BASEN AT

YSK-4858

YSK-5004 J-1502000-09-001B-25 SITE PLAN FOR OILWATER SEPARATOR AT YSK-5004

YSK-5229 J-1502000-09-001B-26 SITE PLAN FOR OILWATER SEPARATOR AT YSK-5229

YSK-A37 J-1502000-09-001B-27 SITE PLAN FOR WASTE OIL TANK AT YSK-A37

YSK-A43 J-1502000-09-001B-28 SITE PLAN FOR OILWATER SEPARATOR AT YSK-A43

YSK-G31 J-1502000-09-001B-29 SITE PLAN FOR OILWATER SEPARATOR AT YSK-G31

A…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .