20T0408 PPI Form-r2.pdf
PDF 166 KB Posted
- Solicitation number
- N4008420T0408
View the file
Other files
| File | Type | Posted |
|---|---|---|
| AMD0002.pdf | ||
| A0001-SD-r2.pdf | ||
| 014_J_07ELINs-15-D-0414-A0001-r2.xls | XLS spreadsheet | |
| 20T0408-0001.pdf | ||
| 20T0408A_RFQ(2).pdf | ||
| 20T0408B_SOW.pdf | ||
| 20T0408 PPI Form.docx | DOCX document | |
| 20T0408C_NOTICE.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PRE-QUOTATION INQUIRIES
FOR
N40084-20-T-0408, PREVENTIVE MAINTENANCE, INSPECTION AND CLEANING SERVICE ORDERS FOR KITCHEN
EA HOODS AND DUCTS, OA DUCTS, GREASE TRAPS AND OIL WATER SEPARATORS
No. Questions (Should include Specification Section or Drawing Reference)
Answers
1 1502000-2.2.1 Certification, Training, and Licensing:
1502000-3.2.3 Cooking Oil:
Industrial Waste Disposal License (Shori-Hai-Yu) is required, even, collected waste cooking oil is carried to Recycle Yard (on Base), So, I think that, its disposal license (Hai-Yu) is not necessary on this project.
If there is another reason, I would like to ask why its license is required.
"Hai-Yu is not necessarily needed for cooking oil".
Added the term “exception of cooking oil” in this amendment.
2 1502000-2.2.1 Certification, Training, and Licensing:
I think that, there is no works (may be for PM of exhaust hood and its related equipment) which, 1st or 2nd grade electrician must be engaged.
If there is another reason, I would like to ask why its license is required.
Electrical certification is needed for non-recurring work.
No changed.
3 SF1449 Page 3 of 49
Base period is written 2019 through 2020. Is this 2020 through 2021?
It is 2020 through 2021.
Correction is made in Amendment 0001.
4 SF1449 Page 45 of 49
How many numbers of original and copy for Price Factor (RFQ Submittal Requirements) are required?
Is digital copy (ex. CDR) of Price Factor required?
If you hand-carry it, one (1) original and digital copy is required. You may be able to submit it via e-mail if it’s possible.
5 Attachment J-0200000-07
Would you provide excel format of J-0200000-07 for us?
We’ll provide Attachment J- 0200000-07 in excel format. It’s in Amendment 0001.
6 Attachment J-0200000-07 (Non-Recurring Price)
I would like to ask a mean of “Extended Price”.
The meaning of “Extended Price” is available to issue total amount of No-recurring projects that is allowed to the Contractor in the period.
So input the same of Unit Price at the portion by the Contractor is required.
7 Attachment J-0200000-07
I would like to ask which is correct “Frequency” and “Quantity” on following Sub ELIN.
A~E
001B-018 (YSK-3313),
001B-027 (YSK-A37),
005B-001 (YSK-1557)
Revised Quantity for the pointed out portions in this amendment.
File details come from the government source that posted it. Updated .