Attachment 3_FINAL Revised ELINS dated 14 July 2020.xlsx

XLSX spreadsheet 155 KB Posted

Attached to
NAVFAC Far East Base Operation Support Contract at Okinawa, Japan
Solicitation number
N4008420R0052
Issued by

About this file

This is a solicitation for base operation and support services at Commander Fleet Activities Okinawa, Japan. The Naval Facilities Engineering Command Far East is seeking these services through an indefinite delivery, indefinite quantity contract with both recurring and non-recurring work. Offerors must be authorized to operate in Japan and comply with all Japanese laws and regulations. The services required include port operations, facility management, facility investment, pest control, utility management, electrical, waste water, water, and facility management services. The solicitation also includes templates for pricing recurring and non-recurring work over multiple option periods and details the required exhibit line items for offers.

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CLIN SUMMARY SHEET

SCHEDULE OF WORK
(TO BE COMPLETED AND SUBMITTED WITH THE OFFER)
ITEM NO.SUPPLIES/SERVICESAMOUNT
0001RECURRING WORK (Base Period)
Price to perform Recurring work, for the 10-month Base Period, in accordance with all the terms of this contract.¥-
0002NON-RECURRING (Base Period)
Price to perform non-recurring work, for the 10-month Base Period, in accordance with all the terms of this contract.EST¥-
0003RECURRING WORK (Option Period One)
Price to perform Recurring work, for the 12-month Option Period One, in accordance with all the terms of this contract.¥-
0004NON-RECURRING (Option Period One)
Price to perform non-recurring work, for the 12-month Option Period One, in accordance with all the terms of this contract.EST¥-
0005RECURRING WORK (Option Period Two)
Price to perform Recurring work, for the 12-month Option Period Two, in accordance with all the terms of this contract.¥-
0006NON-RECURRING (Option Period Two)
Price to perform non-recurring work, for the 12-month Option Period Two, in accordance with all the terms of this contract.EST¥-
0007RECURRING WORK (Option Period Three)
Price to perform Recurring work, for the 12-month Option Period Three, in accordance with all the terms of this contract.¥-
0008NON-RECURRING (Option Period Three)
Price to perform non-recurring work, for the 12-month Option Period Three, in accordance with all the terms of this contract.EST¥-
0009RECURRING WORK (Option Period Four)
Price to perform Recurring work, for the 12-month Option Period Four, in accordance with all the terms of this contract.¥-
0010NON-RECURRING (Option Period Four)
Price to perform non-recurring work, for the 12-month Option Period Four, in accordance with all the terms of this contract.EST¥-
0011RECURRING WORK (Option Period Five)
Price to perform Recurring work, for the 12-month Option Period Five, in accordance with all the terms of this contract.¥-
0012NON-RECURRING (Option Period Five)
Price to perform non-recurring work, for the 12-month Option Period Five, in accordance with all the terms of this contract.EST¥-
0013RECURRING WORK (Option Period Six)
Price to perform Recurring work, for the 12-month Option Period Six, in accordance with all the terms of this contract.¥-
0014NON-RECURRING (Option Period Six)
Price to perform non-recurring work, for the 12-month Option Period Six, in accordance with all the terms of this contract.EST¥-
0015RECURRING WORK (Option Period Seven)
Price to perform Recurring work, for the 12-month Option Period Four, in accordance with all the terms of this contract.¥-
0016NON-RECURRING (Option Period Seven)
Price to perform non-recurring work, for the 12-month Option Period Four, in accordance with all the terms of this contract.EST¥-

TOTAL (CLINS 0001 THROUGH 0016) ¥ -

SCHEDULE OF WORK
(TO BE COMPLETED AND SUBMITTED WITH THE OFFER)
ITEM NO.SUPPLIES/SERVICESAMOUNT
9000Exhibit Line Items (ELINS) Base Period
See Attachment J-0200000-16, Exhibit Line Item Numbers, Recurring and Non-Recurring Work¥-
9001Exhibit Line Items (ELINS) Option Period One
See Attachment J-0200000-16, Exhibit Line Item Numbers, Recurring and Non-Recurring Work¥-
9002Exhibit Line Items (ELINS) Option Period Two
See Attachment J-0200000-16, Exhibit Line Item Numbers, Recurring and Non-Recurring Work¥-
9003Exhibit Line Items (ELINS) Option Period Three
See Attachment J-0200000-16, Exhibit Line Item Numbers, Recurring and Non-Recurring Work¥-
9004Exhibit Line Items (ELINS) Option Period Four
See Attachment J-0200000-16, Exhibit Line Item Numbers, Recurring and Non-Recurring Work¥-
9005Exhibit Line Items (ELINS) Option Period Five
See Attachment J-0200000-16, Exhibit Line Item Numbers, Recurring and Non-Recurring Work¥-
9006Exhibit Line Items (ELINS) Option Period Six
See Attachment J-0200000-16, Exhibit Line Item Numbers, Recurring and Non-Recurring Work¥-
9007Exhibit Line Items (ELINS) Option Period Seven
See Attachment J-0200000-16, Exhibit Line Item Numbers, Recurring and Non-Recurring Work¥-

TOTAL PRICE FOR CONTRACT LINE ITEMS 0001 THROUGH 0016 ¥ -

BASE Recurring

ATTACHMENT J-0200000-16

EXHIBIT LINE ITEM NUMBERS

SOLICITATION/CONTRACT # N40084-20-R-0052

EXHIBIT A - CLIN 9000 Offeror Proposed Unit Price Enter proposed unit price (JPY (¥) only) in this column. Price will automatically copy to the unit price cell.

Line Item 0001 Recurring Work - BASE Period PROVIDE PRICES FOR RECURRING WORK - IN ACCORDANCE WITH SECTION C, SPEC ITEM 3 ELINs A001 through A012

ELIN /
Sub ELINDescriptionQuantityUnit of IssueUnit PriceTotal
0600000 - Port Operations
A001 - REGION Spec Item 3
A001AAUtility Hook-up and Disconnects at White Beach10MO¥ -¥ -
Region Port Operations SUB TOTAL¥ -
1501000 Facility Management
A002 - REGION Spec Item 3
A002AAWork Control10MO¥ -¥ -
A002ABInfrastructure Condition Assessment Program (ICAP) Services10MO¥ -¥ -
Region Facility Management SUB TOTAL¥ -
A003 - USMC (MWLK) Spec Item 3
A003AAWork Control0MO¥ -¥ -
A003AAInfrastructure Condition Assessment Program (ICAP) Services0MO¥ -¥ -
USMC Facility Management SUB TOTAL¥ -
1502000 Facility Investment
A004 - REGION Spec Item 3
Service Orders
A004AAEmergency Service Orders10MO¥ -¥ -
A004ABUrgent Service Orders10MO¥ -¥ -
A004ACRoutine Service Orders10MO¥ -¥ -
Preventive Maintenance (PM) Program
A004ADSecurity System and Equipment ( (J-1502000-05)10MO¥ -¥ -
A004AEVehicle Barrier Systems ( (J-1502000-06)10MO¥ -¥ -
A004AFRadon Mitigation Systems (J-1502000-08)10MO¥ -¥ -
A004AGCathodic Protection System (J-1502000-10)10MO¥ -¥ -
A004AHLightning Arrestors and Grounding Devices (J-1502000-11)10MO¥ -¥ -
A004AJFire Protection Systems (J-1502000-23)10MO¥ -¥ -
A004AKRoll-Up Doors (J-1502000-15.1)10MO¥ -¥ -
A004ALHangar Doors (J-1502000-15.2)10MO¥ -¥ -
A004AMMetal Sliding Doors (J-1502000-15.3)10MO¥ -¥ -
A004ANAutomatic Doors (J-1502000-15.4)10MO¥ -¥ -
A004APCompressed Air Systems (J-1502000-30)10MO¥ -¥ -
A004AQFuel Tanks and Systems (J-1502000-17)10MO¥ -¥ -
A004ARRooftop Ventilation/ Exhaust Ventilation Systems (J-1502000-18)10MO¥ -¥ -
A004ASMagazines (Explosion-Proof Ventilation Systems) (J-1502000-19)10MO¥ -¥ -
A004ATEye Wash Stations (J-1502000-20)10MO¥ -¥ -
A004AUWater Coolers (J-1502000-21)10MO¥ -¥ -
A004AVHVAC and Refrigeration Systems (J-1502000-22)10MO¥ -¥ -
A004AWUninterruptible Power Systems (UPS) (J-1502000-12)10MO¥ -¥ -
A004AXVertical Transportation Equipment (VTE) (J-1502000-24.1)10MO¥ -¥ -
A004AYBoilers and UPVs (J-1502000-25.1)10MO¥ -¥ -
A004AZAuxiliary Generators (J-1502000-31)10MO¥ -¥ -
A004BAElectrical Panels (J-1502000-39)10MO¥ -¥ -
Inspection, Testing and Certification Program
A004BBVertical Transportation Equipment (VTE) (J-1502000-24.1)10MO¥ -¥ -
A004BCBoilers and UPVs (J-1502000-25.1)10MO¥ -¥ -
Other Recurring Services Program
A004BDGrease Traps (J-1502000-26)10MO¥ -¥ -
A004BEExhaust Hoods and Ducts (J-1502000-27)10MO¥ -¥ -
A004BFHVAC Seasonal Start-Up and Shutdown (J-1502000-22)10MO¥ -¥ -
A004BGHVAC Water Testing and Treatment Services (J-1502000-22)10MO¥ -¥ -
A004BHBoiler Water Testing and Treatment Services (J-1502000-25.1)10MO¥ -¥ -
A004BJOil/Water Separators (J-1502000-28.1)10MO¥ -¥ -
A004BKVehicle Fume Extractors (J-1502000-34)10MO¥ -¥ -
A004BLGas Detection Systems (J-1502000-35)10MO¥ -¥ -
A004BMPetroleum, Oils, and Lubricants (POL) Equipment (J-1502000-37)10MO¥ -¥ -
A004BNGalley Equipment (J-1502000-38)10MO¥ -¥ -
Region Facility Investment SUB TOTAL¥ -
A005 - USMC (MWLK) Spec Item 3
Service Orders
A005AAEmergency Service Orders0MO¥ -¥ -
A005ABUrgent Service Orders0MO¥ -¥ -
A005ACRoutine Service Orders0MO¥ -¥ -
Preventive Maintenance (PM) Program
A005ADSecurity System and Equipment ( (J-1502000-05)0MO¥ -¥ -
A005AEVehicle Barrier Systems ( (J-1502000-06)0MO¥ -¥ -
A005AFRadon Mitigation Systems (J-1502000-08)0MO¥ -¥ -
A005AGCathodic Protection System (J-1502000-10)0MO¥ -¥ -
A005AHLightning Arrestors and Grounding Devices (J-1502000-11)0MO¥ -¥ -
A005AJFire Protection Systems (J-1502000-23)0MO¥ -¥ -
A005AKRoll-Up Doors (J-1502000-15.1)0MO¥ -¥ -
A005ALHangar Doors (J-1502000-15.2)0MO¥ -¥ -
A005AMMetal Sliding Doors (J-1502000-15.3)0MO¥ -¥ -
A005ANCompressed Air Systems (J-1502000-30)0MO¥ -¥ -
A005APFuel Tanks and Systems (J-1502000-17)0MO¥ -¥ -
A005AQRooftop Ventilation/ Exhaust Ventilation Systems (J-1502000-18)0MO¥ -¥ -
A005ARMagazines (Explosion-Proof Ventilation Systems) (J-1502000-19)0MO¥ -¥ -
A005ASEye Wash Stations (J-1502000-20)0MO¥ -¥ -
A005ATWater Coolers (J-1502000-21)0MO¥ -¥ -
A005AUHVAC and Refrigeration Systems (J-1502000-22)0MO¥ -¥ -
A005AVUninterruptible Power Systems (UPS) (J-1502000-12)0MO¥ -¥ -
A005AWAuxiliary Generators (J-1502000-31)0MO¥ -¥ -
A005AXElectrical Panels (J-1502000-39)0MO¥ -¥ -
Other Recurring Services Program
A005AYHVAC Seasonal Start-Up and Shutdown (J-1502000-22)0MO¥ -¥ -
A005AZHVAC Water Testing and Treatment Services (J-1502000-22)0MO¥ -¥ -
A005BAOil/Water Separators (J-1502000-28.1)0MO¥ -¥ -
A005BBGrease Traps (J-1502000-26)0MO¥ -¥ -
A005BCExhaust Hoods and Ducts (J-1502000-27)0MO¥ -¥ -
USMC Facility Investment SUB TOTAL¥ -
1503020 Pest Control
A006 - REGION Spec Item 3
A006AAScheduled Pest Control10MO¥ -¥ -
A006ABUnscheduled Services10MO¥ -¥ -
A006ACPest Management Reporting10MO¥ -¥ -
Region Pest Control SUB TOTAL¥ -
A007 - USMC (MWLK) Spec Item 3
A007AAScheduled Pest Control0MO¥ -¥ -
A007ABUnscheduled Services0MO¥ -¥ -
A007ACPest Management Reporting0MO¥ -¥ -
USMC Pest Control SUB TOTAL¥ -
1601000 Utility Management
A008 - REGION Spec Item 3
Service Orders
A008AAEmergency Service Orders10MO¥ -¥ -
A008ABUrgent Service Orders10MO¥ -¥ -
A008ACRoutine Service Orders10MO¥ -¥ -
Utilities Operations Management
A008ADUtilities Mapping (J-1601000-04)10MO¥ -¥ -
A008AEUtility Outage Scheduling and Coordination10MO¥ -¥ -
A008AFMeter Reads (J-1601000-07)10MO¥ -¥ -
A008AGExcavation Permit Issuance10MO¥ -¥ -
A008AHUtility Location Services10MO¥ -¥ -
Utility Infrastructure Condition Assessment (UICAP) Support
A008AJInventory Management10MO¥ -¥ -
A008AKCondition Assessment10MO¥ -¥ -
Utility Management SUB TOTAL¥ -
1602000 Electrical
A009 - REGION Spec Item 3
A009AAOperation of Electrical Power Distribution Systems (J-1602000-03)10MO¥ -¥ -
Preventive Maintenance (PM) Program
A009ABElectrical Power Distribution Systems (J-1602000-03)10MO¥ -¥ -
A009ACStreet Lighting Systems (J-1602000-04)10MO¥ -¥ -
A009ADPhotovoltaic (PV) Systems (J-1602000-07)10MO¥ -¥ -
Other Recurring Services Program
A009AESupporting Work10MO¥ -¥ -
Electrical SUB TOTAL¥ -
1604000 Waste Water
A010 - REGION Spec Item 3
A010AAOperation of Waste Water Systems (J-1604000-06)10MO¥ -¥ -
Preventive Maintenance (PM) Program
A010ABWaste Water Systems (J-1604000-05)10MO¥ -¥ -
Waste Water SUB TOTAL¥ -
1606000 Water
A011 - REGION Spec Item 3
A011AAOperation of Water Distribution System (J-1606000-03)10MO¥ -¥ -
Preventive Maintenance (PM) Program
A011ABWater Distribution Systems (J-1606000-03)10MO¥ -¥ -
Other Recurring Services Program
A011ACSupporting Work10MO¥ -¥ -
Inspection, Testing and Certification Program
A011ADBackflow Prevention (BFP) (J-1606000-03.4)10MO¥ -¥ -
Water SUB TOTAL¥ -
1800000 Facility Management
A012 - REGION Spec Item 3
A012AAOil and Hazardous Substance Spill Response and Cleanup Services10MO¥ -¥ -
Environmental SUB TOTAL¥ -
TOTAL COST LINE ITEM 0001 RECURRING WORK (A001 through A012)
(Enter this amount into Schedule of Work, Item No. 0001 RECURRING WORK, Net Amount)¥ -
A0130600000 - Mobilization Port Operations
A013AAMobilization - Port Operations1LS¥ -¥ -
1401000 SUB TOTAL¥ -
A0141501000 Mobilization Facility Management
A014AAMobilization - Work Control1LS¥ -¥ -
A014ABMobilization - Infrastructure Condition Assessment Program (ICAP)1LS¥ -¥ -
Region Facility Management SUB TOTAL¥ -
A0151502000 Mobilization Facility Investment
Preventive Maintenance (PM) Program
A015AAMobilization - Security System and Equipment ( (J-1502000-05)1LS¥ -¥ -
A015ABMobilization - Vehicle Barrier Systems ( (J-1502000-06)1LS¥ -¥ -
A015ACMobilization - Radon Mitigation Systems (J-1502000-08)1LS¥ -¥ -
A015ADMobilization - Cathodic Protection System (J-1502000-10)1LS¥ -¥ -
A015AEMobilization - Lightning Arrestors and Grounding Devices
(J-1502000-11)1LS¥ -¥ -
A015AFMobilization - Fire Protection Systems (J-1502000-23)1LS¥ -¥ -
A015AGMobilization - Roll-Up Doors (J-1502000-13)1LS¥ -¥ -
A015AHMobilization - Hangar Doors (J-1502000-14)1LS¥ -¥ -
A015AJMobilization - Metal Sliding Doors (J-1502000-15)1LS¥ -¥ -
A015AKMobilization - Automatic Doors (J-1502000-16)1LS¥ -¥ -
A015ALMobilization - Compressed Air Systems (J-1502000-30)1LS¥ -¥ -
A015AMMobilization - Fuel Tanks and Systems (J-1502000-17)1LS¥ -¥ -
A015ANMobilization - Rooftop Ventilation/ Exhaust Ventilation Systems
(J-1502000-18)1LS¥ -¥ -
A015APMobilization - Magazines (Explosion-Proof Ventilation Systems)
(J-1502000-19)1LS¥ -¥ -
A015AQMobilization - Eye Wash Stations (J-1502000-20)1LS¥ -¥ -
A015ARMobilization - Water Coolers (J-1502000-21)1LS¥ -¥ -
A015ASMobilization - HVAC and Refrigeration Systems (J-1502000-22)1LS¥ -¥ -
A015ATMobilization - Uninterruptible Power Systems (UPS) (J-1502000-12)1LS¥ -¥ -
A015AUMobilization - Vertical Transportation Equipment (VTE)
(J-1502000-24.1)1LS¥ -¥ -
A015AVMobilization - Boilers and UPVs (J-1502000-25)1LS¥ -¥ -
A015AWMobilization - Auxiliary Generators (J-1502000-31)1LS¥ -¥ -
A015AXMobilization - Electrical Panels1LS¥ -¥ -
Inspection, Testing and Certification Program
A015AYMobilization - Vertical Transportation Equipment (VTE)
(J-1502000-24.1)1LS¥ -¥ -
A015AZMobilization - Boilers and UPVs (J-1502000-25)1LS¥ -¥ -
Other Recurring Services Program
A015BAMobilization - Grease Traps (J-1502000-26)1LS¥ -¥ -
A015BBMobilization - Exhaust Hoods and Ducts (J-1502000-27)1LS¥ -¥ -
A015BCMobilization - HVAC Seasonal Start-Up and Shutdown (J-1502000-22)1LS¥ -¥ -
A015BDMobilization - HVAC Water Testing and Treatment Services
(J-1502000-22)1LS¥ -¥ -
A015BEMobilization - Boiler Water Testing and Treatment Services
(J-1502000-25)1LS¥ -¥ -
A015BFMobilization - Oil/Water Separators (J-1502000-28.1)1LS¥ -¥ -
A015BGMobilization - Vehicle Fume Extractors (J-1502000-34)1LS¥ -¥ -
A015BHMobilization - Gas Detection Systems (J-1502000-35)1LS¥ -¥ -
A015BJMobilization - Petroleum, Oils, and Lubricants (POL) Equipment (J-1502000-37)1LS¥ -¥ -
A015BKMobilization - Galley Equipment (J-1502000-38)1LS¥ -¥ -
Region Facility Investment SUB TOTAL¥ -
A0161503020 Mobilization Pest Control
A016AAMobilization - Scheduled Pest Control1LS¥ -¥ -
A016ABMobilization - Pest Management Reporting1LS¥ -¥ -
Region Pest Control SUB TOTAL¥ -
A0171601000 Mobilization Utility Management
Utilities Operations Management
A017AAMobilization - Utilities Mapping1LS¥ -¥ -
A017ABMobilization - Utility Outage Scheduling and Coordination1LS¥ -¥ -
A017ACMobilization - Meter Reads (J-1601000-07)1LS¥ -¥ -
A017AGMobilization - Excavation Permit Issuance1LS¥ -¥ -
A017AHMobilization - Utility Location Services1LS¥ -¥ -
Utility Infrastructure Condition Assessment (UICAP) Support
A017AJMobilization - Inventory Management1LS¥ -¥ -
A017AKMobilization - Condition Assessment1LS¥ -¥ -
Utility Management SUB TOTAL¥ -
A0181602000 Mobilization Electrical
A018AAMobilization - Operation of Electrical Power Distribution Systems
(J-1602000-03)1LS¥ -¥ -
Preventive Maintenance (PM) Program
A018ABMobilization - Electrical Power Distribution Systems (J-1602000-03)1LS¥ -¥ -
A018ACMobilization - Street Lighting Systems (J-1602000-04)1LS¥ -¥ -
A018ADMobilization - Photovoltaic (PV) Systems (J-1602000-07)1LS¥ -¥ -
Other Recurring Services Program
A018AEMobilization - Supporting Work1LS¥ -¥ -
Electrical SUB TOTAL¥ -
A0191604000 Waste Water
A019AAMobilization - Operation of the Waste Water Collection & Treatment Systems1LS¥ -¥ -
Preventive Maintenance (PM) Program
A019ABMobilization - Preventive Maintenance (PM) Program (J-1604000-05)1LS¥ -¥ -
Waste Water SUB TOTAL¥ -
A0201606000 Water
A020AAMobilization - Operation of Water Distribution System (J-1606000-03)1LS¥ -¥ -
Preventive Maintenance (PM) Program
A020ABMobilization - Water Distribution Systems (J-1606000-03)1LS¥ -¥ -
Other Recurring Services Program
A020ACMobilization - Supporting Work1LS¥ -¥ -
Inspection, Testing and Certification Program
A020ADMobilization - Backflow Prevention (BFP) (J-1606000-03.4)1LS¥ -¥ -
Water SUB TOTAL¥ -
A0211800000 Facility Management
A021AAMobilization - OHS Spill Response and Cleanup Services1LS¥ -¥ -
Environmental SUB TOTAL¥ -
TOTAL COST LINE ITEM 0001 MOBILIZATION (A013 through A021)
(Enter this amount into Schedule of Work, Item No. 0001 MOBILIZATION, Net Amount)¥ -
TOTAL COST LINE ITEM 0001 RECURRING WORK / MOBILIZATION (A001 through A021)
¥ -

Base Non-recurring

ATTACHMENT J-0200000-16

EXHIBIT LINE ITEM NUMBERS SOLICITATION/ CONTRACT # N40084-20-R-0052

EXHIBIT A - CLIN 9000

Offeror Proposed Unit Price Enter proposed unit price (JPY (¥) only) in this column. Price will automatically copy to the unit price cell.

Line Item 0002 Non-Recurring Work - BASE PERIOD PROVIDE PRICES FOR - NON-RECURRING WORK PRICE - IN ACCORDANCE WITH SECTION C, SPEC ITEM 4 ELINs A700 through A730

ELINProduct Name (120 Characters)Description ExtendedEstimated QuantityUnit of IssueUnit PriceExtended Price
A700Unit Priced Labor Work for 1502000- MUST BE NEGOTIATED BY KO.Performance of CFAO requirements that exceeds recurring work limitations of 1502000. Each task order labor cost will be negotiated.HR(Estimated Maximum
Labor Cost)¥0
A701Material Costs for 1502000- MUST BE NEGOTIATED BY KO.Performance of CFAO requirements that exceeds recurring work limitations of 1502000. Each task order material cost will be negotiated. Use with ELIN A700.LS(Estimated Maximum
Material Cost)¥0
A702Equipment Costs for 1502000- MUST BE NEGOTIATED BY KO.Performance of CFAO requirements that exceeds recurring work limitations of 1502000. Each task order equipment cost will be negotiated. Use with ELIN A700.LS(Estimated Maximum Equipment Cost)¥0
A703Spec Item 4.1 of 1502000. Provide Temporary Power (Auxiliary Generator)15DAY¥0¥0
A704Unit Priced Labor Work for 1503020- MUST BE NEGOTIATED BY KO.Performance of CFAO requirements that exceeds recurring work limitations of 1503020. Each task order labor cost will be negotiated.HR(Estimated Maximum Labor Cost)¥0
A705Material Costs for 1503020- MUST BE NEGOTIATED BY KO.Performance of CFAO requirements that exceeds recurring work limitations of 1503020. Each task order material cost will be negotiated. Use with ELIN A704.LS(Estimated Maximum Material Cost)¥0
A706Equipment Costs for 1503020- MUST BE NEGOTIATED BY KO.Performance of CFAO requirements that exceeds recurring work limitations of 1503020. Each task order equipment cost will be negotiated. Use with ELIN A704.LS(Estimated Maximum Equipment Cost)¥0
A707Unit Priced Labor Work for 1601000- MUST BE NEGOTIATED BY KO.Performance of CFAO requirements that exceeds recurring work limitations of 1601000. Each task order labor cost will be negotiated.HR(Estimated Maximum
Labor Cost)¥0
A708Material Costs for 1601000- MUST BE NEGOTIATED BY KO.Performance of CFAO requirements that exceeds recurring work limitations of 1601000. Each task order material cost will be negotiated. Use with ELIN A707.LS(Estimated Maximum
Material Cost)¥0
A709Equipment Costs for 1601000- MUST BE NEGOTIATED BY KO.Performance of CFAO requirements that exceeds recurring work limitations of 1601000. Each task order equipment cost will be negotiated. Use with ELIN A707.LS(Estimated Maximum Equipment Cost)¥0
A710Spec Item 4.1 of 1601000. Provide Potable Toilet120DAY¥0¥0
A711Spec Item 4.1 of 1601000. Provide Portable Wash Station120DAY¥0¥0
A712Spec Item 4.1 of 1601000. Cleaning Portable Toilet and Portable Wash Station240EA¥0¥0
A713Unit Priced Labor Work for 1602000- MUST BE NEGOTIATED BY KO.Performance of CFAO requirements that exceeds recurring work limitations of 1602000. Each task order labor cost will be negotiated.HR(Estimated Maximum
Labor Cost)¥0
A714Material Costs for 1602000- MUST BE NEGOTIATED BY KO.Performance of CFAO requirements that exceeds recurring work limitations of 1602000. Each task order material cost will be negotiated. Use with ELIN A713.LS(Estimated Maximum
Material Cost)¥0
A715Equipment Costs for 1602000- MUST BE NEGOTIATED BY KO.Performance of CFAO requirements that exceeds recurring work limitations of 1602000. Each task order equipment cost will be negotiated. Use with ELIN A713.LS(Estimated Maximum Equipment Cost)¥0
A716Spec Item 4.1 of 1602000. Install New Electric Meter25EA¥0¥0
A717Spec Item 4.2 of 1602000. Provide Install Energy Efficient Street Lights28EA¥0¥0
A718Unit Priced Labor Work for 1604000- MUST BE NEGOTIATED BY KO.Performance of CFAO requirements that exceeds recurring work limitations of 1604000. Each task order labor cost will be negotiated.HR(Estimated Maximum
Labor Cost)¥0
A719Material Costs for 1604000- MUST BE NEGOTIATED BY KO.Performance of CFAO requirements that exceeds recurring work limitations of 1604000. Each task order material cost will be negotiated. Use with ELIN A718.LS(Estimated Maximum
Material Cost)¥0
A720Equipment Costs for 1604000- MUST BE NEGOTIATED BY KO.Performance of CFAO requirements that exceeds recurring work limitations of 1604000. Each task order equipment cost will be negotiated. Use with ELIN A718.LS(Estimated Maximum Equipment Cost)¥0
A721Unit Priced Labor Work for 1606000- MUST BE NEGOTIATED BY KO.Performance of CFAO requirements that exceeds recurring work limitations of 1606000. Each task order labor cost will be negotiated.HR(Estimated Maximum
Labor Cost)¥0
A722Material Costs for 1606000- MUST BE NEGOTIATED BY KO.Performance of CFAO requirements that exceeds recurring work limitations of 1606000. Each task order material cost will be negotiated. Use with ELIN A721.LS(Estimated Maximum
Material Cost)¥0
A723Equipment Costs for 1606000- MUST BE NEGOTIATED BY KO.Performance of CFAO requirements that exceeds recurring work limitations of 1606000. Each task order equipment cost will be negotiated. Use with ELIN A721.LS(Estimated Maximum Equipment Cost)¥
A724Spec Item 4.1 of 1606000. Install New Water Meter25EA¥0¥0
A725Spec Item 4.2 of 1606000. Install New Backflow Prevention (BFP)60EA¥0¥0
A726Spec Item 4.3 of 1606000. Provide Potable Water within 24 hours of request
(Water Buffalo Tank minimum capacity 1,500 Liters)25EA¥0¥0
A727Spec Item 4.3 of 1606000. Provide Potable Water REFILL within 8 hours of request
(Water Buffalo Tank minimum capacity 1,500 Liters)25EA¥0¥0
A728Bulk sampling of materials suspected of containing lead (1800000)20EA¥0¥0
A729Bulk sampling of materials suspected of containing asbestos (1800000)20EA¥0¥0
A730Laboratory services for bulk sampling analysis (1800000)180EA¥0¥0

TOTAL NON-RECURRING WORK PRICE - A700 THROUGH A730 ¥ 0

OPT1 Recurring

ATTACHMENT J-0200000-16

EXHIBIT LINE ITEM NUMBERS

SOLICITATION/CONTRACT # N40084-20-R-0052

EXHIBIT B - CLIN 9001 Offeror Proposed Unit Price Enter proposed unit price (JPY (¥) only) in this column. Price will automatically copy to the unit price cell.

Line Item 0003 Recurring Work - OPTION PERIOD ONE PROVIDE PRICES FOR RECURRING WORK - IN ACCORDANCE WITH SECTION C, SPEC ITEM 3 ELINs B001 through B012

ELIN /
Sub ELINDescriptionQuantityUnit of IssueUnit PriceTotal
0600000 - Port Operations
B001 - REGION Spec Item 3
B001AAUtility Hook-up and Disconnects at White Beach12MO¥ -¥ -
Region Port Operations SUB TOTAL¥ -
1501000 Facility Management
B002 - REGION Spec Item 3
B002AAWork Control12MO¥ -¥ -
B002ABInfrastructure Condition Assessment Program (ICAP) Services12MO¥ -¥ -
Region Facility Management SUB TOTAL¥ -
B003 - USMC (MWLK) Spec Item 3
B003AAWork Control0MO¥ -¥ -
B003AAInfrastructure Condition Assessment Program (ICAP) Services0MO¥ -¥ -
USMC Facility Management SUB TOTAL¥ -
1502000 Facility Investment
B004 - REGION Spec Item 3
Service Orders
B004AAEmergency Service Orders12MO¥ -¥ -
B004ABUrgent Service Orders12MO¥ -¥ -
B004ACRoutine Service Orders12MO¥ -¥ -
Preventive Maintenance (PM) Program
B004ADSecurity System and Equipment ( (J-1502000-05)12MO¥ -¥ -
B004AEVehicle Barrier Systems ( (J-1502000-06)12MO¥ -¥ -
B004AFRadon Mitigation Systems (J-1502000-08)12MO¥ -¥ -
B004AGCathodic Protection System (J-1502000-10)12MO¥ -¥ -
B004AHLightning Arrestors and Grounding Devices (J-1502000-11)12MO¥ -¥ -
B004AJFire Protection Systems (J-1502000-23)12MO¥ -¥ -
B004AKRoll-Up Doors (J-1502000-15.1)12MO¥ -¥ -
B004ALHangar Doors (J-1502000-15.2)12MO¥ -¥ -
B004AMMetal Sliding Doors (J-1502000-15.3)12MO¥ -¥ -
B004ANAutomatic Doors (J-1502000-15.4)12MO¥ -¥ -
B004APCompressed Air Systems (J-1502000-30)12MO¥ -¥ -
B004AQFuel Tanks and Systems (J-1502000-17)12MO¥ -¥ -
B004ARRooftop Ventilation/ Exhaust Ventilation Systems (J-1502000-18)12MO¥ -¥ -
B004ASMagazines (Explosion-Proof Ventilation Systems) (J-1502000-19)12MO¥ -¥ -
B004ATEye Wash Stations (J-1502000-20)12MO¥ -¥ -
B004AUWater Coolers (J-1502000-21)12MO¥ -¥ -
B004AVHVAC and Refrigeration Systems (J-1502000-22)12MO¥ -¥ -
B004AWUninterruptible Power Systems (UPS) (J-1502000-12)12MO¥ -¥ -
B004AXVertical Transportation Equipment (VTE) (J-1502000-24.1)12MO¥ -¥ -
B004AYBoilers and UPVs (J-1502000-25.1)12MO¥ -¥ -
B004AZAuxiliary Generators (J-1502000-31)12MO¥ -¥ -
B004BAElectrical Panels (J-1502000-39)12MO¥ -¥ -
Inspection, Testing and Certification Program
B004BBVertical Transportation Equipment (VTE) (J-1502000-24.1)12MO¥ -¥ -
B004BCBoilers and UPVs (J-1502000-25.1)12MO¥ -¥ -
Other Recurring Services Program
B004BDGrease Traps (J-1502000-26)12MO¥ -¥ -
B004BEExhaust Hoods and Ducts (J-1502000-27)12MO¥ -¥ -
B004BFHVAC Seasonal Start-Up and Shutdown (J-1502000-22)12MO¥ -¥ -
B004BGHVAC Water Testing and Treatment Services (J-1502000-22)12MO¥ -¥ -
B004BHBoiler Water Testing and Treatment Services (J-1502000-25.1)12MO¥ -¥ -
B004BJOil/Water Separators (J-1502000-28.1)12MO¥ -¥ -
B004BKVehicle Fume Extractors (J-1502000-34)12MO¥ -¥ -
B004BLGas Detection Systems (J-1502000-35)12MO¥ -¥ -
B004BMPetroleum, Oils, and Lubricants (POL) Equipment (J-1502000-37)12MO¥ -¥ -
B004BNGalley Equipment (J-1502000-38)12MO¥ -¥ -
Region Facility Investment SUB TOTAL¥ -
B005 - USMC (MWLK) Spec Item 3
Service Orders
B005AAEmergency Service Orders0MO¥ -¥ -
B005ABUrgent Service Orders0MO¥ -¥ -
B005ACRoutine Service Orders0MO¥ -¥ -
Preventive Maintenance (PM) Program
B005ADSecurity System and Equipment ( (J-1502000-05)0MO¥ -¥ -
B005AEVehicle Barrier Systems ( (J-1502000-06)0MO¥ -¥ -
B005AFRadon Mitigation Systems (J-1502000-08)0MO¥ -¥ -
B005AGCathodic Protection System (J-1502000-10)0MO¥ -¥ -
B005AHLightning Arrestors and Grounding Devices (J-1502000-11)0MO¥ -¥ -
B005AJFire Protection Systems (J-1502000-23)0MO¥ -¥ -
B005AKRoll-Up Doors (J-1502000-15.1)0MO¥ -¥ -
B005ALHangar Doors (J-1502000-15.2)0MO¥ -¥ -
B005AMMetal Sliding Doors (J-1502000-15.3)0MO¥ -¥ -
B005ANAir Compressors Systems (J-1502000-16)0MO¥ -¥ -
B005APFuel Tanks and Systems (J-1502000-17)0MO¥ -¥ -
B005AQRooftop Ventilation/ Exhaust Ventilation Systems (J-1502000-18)0MO¥ -¥ -
B005ARMagazines (Explosion-Proof Ventilation Systems) (J-1502000-19)0MO¥ -¥ -
B005ASEye Wash Stations (J-1502000-20)0MO¥ -¥ -
B005ATWater Coolers (J-1502000-21)0MO¥ -¥ -
B005AUHVAC and Refrigeration Systems (J-1502000-22)0MO¥ -¥ -
B005AVUninterruptible Power Systems (UPS) (J-1502000-12)0MO¥ -¥ -
B005AWAuxiliary Generators (J-1502000-31)0MO¥ -¥ -
B005AXElectrical Panels (J-1502000-39)0MO¥ -¥ -
Other Recurring Services Program
B005AYHVAC Seasonal Start-Up and Shutdown (J-1502000-22)0MO¥ -¥ -
B005AZHVAC Water Testing and Treatment Services (J-1502000-22)0MO¥ -¥ -
B005BAOil/Water Separators (J-1502000-28.1)0MO¥ -¥ -
B005BBGrease Traps (J-1502000-26)0MO¥ -¥ -
B005BCExhaust Hoods and Ducts (J-1502000-27)0MO¥ -¥ -
USMC Facility Investment SUB TOTAL¥ -
1503020 Pest Control
B006 - REGION Spec Item 3
B006AAScheduled Pest Control12MO¥ -¥ -
B006ABPest Control Service Orders12MO¥ -¥ -
B006ACPest Management Reporting12MO¥ -¥ -
Region Pest Control SUB TOTAL¥ -
B007 - USMC (MWLK) Spec Item 3
B007AAScheduled Pest Control0MO¥ -¥ -
B007ABPest Control Service Orders0MO¥ -¥ -
B007ACPest Management Reporting0MO¥ -¥ -
USMC Pest Control SUB TOTAL¥ -
1601000 Utility Management
B008 - REGION Spec Item 3
Service Orders
B008AAEmergency Service Orders12MO¥ -¥ -
B008ABUrgent Service Orders12MO¥ -¥ -
B008ACRoutine Service Orders12MO¥ -¥ -
Utilities Operations Management
B008ADUtilities Mapping (J-1601000-04)12MO¥ -¥ -
B008AEUtility Outage Scheduling and Coordination12MO¥ -¥ -
B008AFMeter Reads (J-1601000-07)12MO¥ -¥ -
B008AGExcavation Permit Issuance12MO¥ -¥ -
B008AHUtility Location Services12MO¥ -¥ -
Utility Infrastructure Condition Assessment (UICAP) Support
B008AJInventory Management12MO¥ -¥ -
B008AKCondition Assessment12MO¥ -¥ -
Utility Management SUB TOTAL¥ -
1602000 Electrical
B009 - REGION Spec Item 3
B009AAOperation of Electrical Power Distribution Systems (J-1602000-03)12MO¥ -¥ -
Preventive Maintenance (PM) Program
B009ABElectrical Power Distribution Systems (J-1602000-03)12MO¥ -¥ -
B009ACStreet Lighting Systems (J-1602000-04)12MO¥ -¥ -
B009ADPhotovoltaic (PV) Systems (J-1602000-07)12MO¥ -¥ -
Other Recurring Services Program
B009AESupporting Work12MO¥ -¥ -
Electrical SUB TOTAL¥ -
1604000 Waste Water
B010 - REGION Spec Item 3
B010AAOperation of Waste Water Systems (J-1604000-06)12MO¥ -¥ -
Preventive Maintenance (PM) Program
B010ABWaste Water Systems (J-1604000-05)12MO¥ -¥ -
Waste Water SUB TOTAL¥ -
1606000 Water
B011 - REGION Spec Item 3
B011AAOperation of Water Distribution System (J-1606000-03)12MO¥ -¥ -
Preventive Maintenance (PM) Program
B011ABWater Distribution Systems (J-1606000-03)12MO¥ -¥ -
Other Recurring Services Program
B011ACSupporting Work12MO¥ -¥ -
Inspection, Testing and Certification Program
B011ADBackflow Prevention (BFP) (J-1606000-03.4)12MO¥ -¥ -
Water SUB TOTAL¥ -
1800000 Facility Management
B012 - REGION Spec Item 3
B012AAOil and Hazardous Substance Spill Response and Cleanup Services12MO¥ -¥ -
Environmental SUB TOTAL¥ -
TOTAL COST LINE ITEM 0003 RECURRING WORK (B001 through B012)
(Enter this amount into Schedule of Work, Item No. 0003 RECURRING WORK, Net Amount)¥ -

OPT1 Non-recurring

ATTACHMENT J-0200000-16

EXHIBIT LINE ITEM NUMBERS SOLICITATION/ CONTRACT # N40084-20-R-0052

EXHIBIT B - CLIN 9001

Offeror Proposed Unit Price Enter proposed unit price (JPY (¥) only) in this column. Price will automatically copy to the unit price cell.

Line Item 0004 Non-Recurring Work - OPTION PERIOD ONE PROVIDE PRICES FOR - NON-RECURRING WORK PRICE - IN ACCORDANCE WITH SECTION C, SPEC ITEM 4 ELINs B700 through B730

ELINProduct Name (120 Characters)Description ExtendedEstimated QuantityUnit of IssueUnit PriceExtended Price
B700Unit Priced Labor Work for 1502000- MUST BE NEGOTIATED BY KO.Performance of CFAO requirements that exceeds recurring work limitations of 1502000. Each task order labor cost will be negotiated.HR(Estimated Maximum
Labor Cost)¥0
B701Material Costs for 1502000- MUST BE NEGOTIATED BY KO.Performance of CFAO requirements that exceeds recurring work limitations of 1502000. Each task order material cost will be negotiated. Use with ELIN B700.LS(Estimated Maximum
Material Cost)¥0
B702Equipment Costs for 1502000- MUST BE NEGOTIATED BY KO.Performance of CFAO requirements that exceeds recurring work limitations of 1502000. Each task order equipment cost will be negotiated. Use with ELIN B700.LS(Estimated Maximum Equipment Cost)¥0
B703Spec Item 4.1 of 1502000. Provide Temporary Power (Auxiliary Generator)15DAY¥0¥0
B704Unit Priced Labor Work for 1503020- MUST BE NEGOTIATED BY KO.Performance of CFAO requirements that exceeds recurring work limitations of 1503020. Each task order labor cost will be negotiated.HR(Estimated Maximum Labor Cost)¥0
B705Material Costs for 1503020- MUST BE NEGOTIATED BY KO.Performance of CFAO requirements that exceeds recurring work limitations of 1503020. Each task order material cost will be negotiated. Use with ELIN B704.LS(Estimated Maximum Material Cost)¥0
B706Equipment Costs for 1503020- MUST BE NEGOTIATED BY KO.Performance of CFAO requirements that exceeds recurring work limitations of 1503020. Each task order equipment cost will be negotiated. Use with ELIN B704.LS(Estimated Maximum Equipment Cost)¥0
B707Unit Priced Labor Work for 1601000- MUST BE NEGOTIATED BY KO.Performance of CFAO requirements that exceeds recurring work limitations of 1601000. Each task order labor cost will be negotiated.HR(Estimated Maximum
Labor Cost)¥0
B708Material Costs for 1601000- MUST BE NEGOTIATED BY KO.Performance of CFAO requirements that exceeds recurring work limitations of 1601000. Each task order material cost will be negotiated. Use with ELIN B707.LS(Estimated Maximum
Material Cost)¥0
B709Equipment Costs for 1601000- MUST BE NEGOTIATED BY KO.Performance of CFAO requirements that exceeds recurring work limitations of 1601000. Each task order equipment cost will be negotiated. Use with ELIN B707.LS(Estimated Maximum Equipment Cost)¥0
B710Spec Item 4.1 of 1601000. Provide Potable Toilet120DAY¥0¥0
B711Spec Item 4.1 of 1601000. Provide Portable wash station120DAY¥0¥0
B712Spec Item 4.1 of 1601000. Cleaning Portable Toilet and portable wash station240EA¥0¥0
B713Unit Priced Labor Work for 1602000- MUST BE NEGOTIATED BY KO.Performance of CFAO requirements that exceeds recurring work limitations of 1602000. Each task order labor cost will be negotiated.HR(Estimated Maximum
Labor Cost)¥0
B714Material Costs for 1602000- MUST BE NEGOTIATED BY KO.Performance of CFAO requirements that exceeds recurring work limitations of 1602000. Each task order material cost will be negotiated. Use with ELIN B713.LS(Estimated Maximum
Material Cost)¥0
B715Equipment Costs for 1602000- MUST BE NEGOTIATED BY KO.Performance of CFAO requirements that exceeds recurring work limitations of 1602000. Each task order equipment cost will be negotiated. Use with ELIN B713.LS(Estimated Maximum Equipment Cost)¥0
B716Spec Item 4.1 of 1602000. Install New Electric Meter25EA¥0¥0
B717Spec Item 4.2 of 1602000. Provide Install Energy Efficient Street Lights28EA¥0¥0
B718Unit Priced Labor Work for 1604000- MUST BE NEGOTIATED BY KO.Performance of CFAO requirements that exceeds recurring work limitations of 1604000. Each task order labor cost will be negotiated.HR(Estimated Maximum
Labor Cost)¥0
B719Material Costs for 1604000- MUST BE NEGOTIATED BY KO.Performance of CFAO requirements that exceeds recurring work limitations of 1604000. Each task order material cost will be negotiated. Use with ELIN B718.LS(Estimated Maximum
Material Cost)¥0
B720Equipment Costs for 1604000- MUST BE NEGOTIATED BY KO.Performance of CFAO requirements that exceeds recurring work limitations of 1604000. Each task order equipment cost will be negotiated. Use with ELIN B718.LS(Estimated Maximum Equipment Cost)¥0
B721Unit Priced Labor Work for 1606000- MUST BE NEGOTIATED BY KO.Performance of CFAO requirements that exceeds recurring work limitations of 1606000. Each task order labor cost will be negotiated.HR(Estimated Maximum
Labor Cost)¥0
B722Material Costs for 1606000- MUST BE NEGOTIATED BY KO.Performance of CFAO requirements that exceeds recurring work limitations of 1606000. Each task order material cost will be negotiated. Use with ELIN B721.LS(Estimated Maximum
Material Cost)¥0
B723Equipment Costs for 1606000- MUST BE NEGOTIATED BY KO.Performance of CFAO requirements that exceeds recurring work limitations of 1606000. Each task order equipment cost will be negotiated. Use with ELIN B721.LS(Estimated Maximum Equipment Cost)¥0
B724Spec Item 4.1 of 1606000. Install New Water Meter25EA¥0¥0
B725Spec Item 4.2 of 1606000. Install New Backflow Prevention (BFP)60EA¥0¥0
B726Spec Item 4.3 of 1606000. Provide Potable Water within 24 hours of request
(Water Buffalo Tank minimum capacity 1,500 Liters)25EA¥0¥0
B727Spec Item 4.3 of 1606000. Provide Potable Water REFILL within 8 hours of request
(Water Buffalo Tank minimum capacity 1,500 Liters)25EA¥0¥0
B728Bulk sampling of materials suspected of containing lead (1800000)20EA¥0¥0
B729Bulk sampling of materials suspected of containing asbestos (1800000)20EA¥0¥0
B730Laboratory services for bulk sampling analysis (1800000)180EA¥0¥0

TOTAL NON-RECURRING WORK PRICE - B700 THROUGH B730 ¥ 0

OPT2 Recurring

ATTACHMENT J-0200000-16

EXHIBIT LINE ITEM NUMBERS

SOLICITATION/CONTRACT # N40084-20-R-0052

EXHIBIT C - CLIN 9002 Offeror Proposed Unit Price Enter proposed unit price (JPY (¥) only) in this column. Price will automatically copy to the unit price cell.

Line Item 0005 Recurring Work - OPTION PERIOD TWO PROVIDE PRICES FOR RECURRING WORK - IN ACCORDANCE WITH SECTION C, SPEC ITEM 3 ELINs C001 through C012

ELIN /
Sub ELINDescriptionQuantityUnit of IssueUnit PriceTotal
0600000 - Port Operations
C001 - REGION Spec Item 3
C001AAUtility Hook-up and Disconnects at White Beach12MO¥ -¥ -
Region Port Operations SUB TOTAL¥ -
1501000 Facility Management
C002 - REGION Spec Item 3
C002AAWork Control12MO¥ -¥ -
C002ABInfrastructure Condition Assessment Program (ICAP) Services12MO¥ -¥ -
Region Facility Management SUB TOTAL¥ -
C003 - USMC (MWLK) Spec Item 3
C003AAWork Control0MO¥ -¥ -
C003AAInfrastructure Condition Assessment Program (ICAP) Services0MO¥ -¥ -
USMC Facility Management SUB TOTAL¥ -
1502000 Facility Investment
C004 - REGION Spec Item 3
Service Orders
C004AAEmergency Service Orders12MO¥ -¥ -
C004ABUrgent Service Orders12MO¥ -¥ -
C004ACRoutine Service Orders12MO¥ -¥ -
Preventive Maintenance (PM) Program
C004ADSecurity System and Equipment ( (J-1502000-05)12MO¥ -¥ -
C004AEVehicle Barrier Systems ( (J-1502000-06)12MO¥ -¥ -
C004AFRadon Mitigation Systems (J-1502000-08)12MO¥ -¥ -
C004AGCathodic Protection System (J-1502000-10)12MO¥ -¥ -
C004AHLightning Arrestors and Grounding Devices (J-1502000-11)12MO¥ -¥ -
C004AJFire Protection Systems (J-1502000-23)12MO¥ -¥ -
C004AKRoll-Up Doors (J-1502000-15.1)12MO¥ -¥ -
C004ALHangar Doors (J-1502000-15.2)12MO¥ -¥ -
C004AMMetal Sliding Doors (J-1502000-15.3)12MO¥ -¥ -
C004ANAutomatic Doors (J-1502000-15.4)12MO¥ -¥ -
C004APCompressed Air Systems (J-1502000-30)12MO¥ -¥ -
C004AQFuel Tanks and Systems (J-1502000-17)12MO¥ -¥ -
C004ARRooftop Ventilation/ Exhaust Ventilation Systems (J-1502000-18)12MO¥ -¥ -
C004ASMagazines (Explosion-Proof Ventilation Systems) (J-1502000-19)12MO¥ -¥ -
C004ATEye Wash Stations (J-1502000-20)12MO¥ -¥ -
C004AUWater Coolers (J-1502000-21)12MO¥ -¥ -
C004AVHVAC and Refrigeration Systems (J-1502000-22)12MO¥ -¥ -
C004AWUninterruptible Power Systems (UPS) (J-1502000-12)12MO¥ -¥ -
C004AXVertical Transportation Equipment (VTE) (J-1502000-24.1)12MO¥ -¥ -
C004AYBoilers and UPVs (J-1502000-25.1)12MO¥ -¥ -
C004AZAuxiliary Generators (J-1502000-31)12MO¥ -¥ -
C004BAElectrical Panels (J-1502000-39)12MO¥ -¥ -
Inspection, Testing and Certification Program
C004BBVertical Transportation Equipment (VTE) (J-1502000-24.1)12MO¥ -¥ -
C004BCBoilers and UPVs (J-1502000-25.1)12MO¥ -¥ -
Other Recurring Services Program
C004BDGrease Traps (J-1502000-26)12MO¥ -¥ -
C004BEExhaust Hoods and Ducts (J-1502000-27)12MO¥ -¥ -
C004BFHVAC Seasonal Start-Up and Shutdown (J-1502000-22)12MO¥ -¥ -
C004BGHVAC Water Testing and Treatment Services (J-1502000-22)12MO¥ -¥ -
C004BHBoiler Water Testing and Treatment Services (J-1502000-25.1)12MO¥ -¥ -
C004BJOil/Water Separators (J-1502000-28.1)12MO¥ -¥ -
C004BKVehicle Fume Extractors (J-1502000-34)12MO¥ -¥ -
C004BLGas Detection Systems (J-1502000-35)12MO¥ -¥ -
C004BMPetroleum, Oils, and Lubricants (POL) Equipment (J-1502000-37)12MO¥ -¥ -
C004BNGalley Equipment (J-1502000-38)12MO¥ -¥ -
Region Facility Investment SUB TOTAL¥ -
C005 - USMC (MWLK) Spec Item 3
Service Orders
C005AAEmergency Service Orders0MO¥ -¥ -
C005ABUrgent Service Orders0MO¥ -¥ -
C005ACRoutine Service Orders0MO¥ -¥ -
Preventive Maintenance (PM) Program
C005ADSecurity System and Equipment ( (J-1502000-05)0MO¥ -¥ -
C005AEVehicle Barrier Systems ( (J-1502000-06)0MO¥ -¥ -
C005AFRadon Mitigation Systems (J-1502000-08)0MO¥ -¥ -
C005AGCathodic Protection System (J-1502000-10)0MO¥ -¥ -
C005AHLightning Arrestors and Grounding Devices (J-1502000-11)0MO¥ -¥ -
C005AJFire Protection Systems (J-1502000-23)0MO¥ -¥ -
C005AKRoll-Up Doors (J-1502000-15.1)0MO¥ -¥ -
C005ALHangar Doors (J-1502000-15.2)0MO¥ -¥ -
C005AMMetal Sliding Doors (J-1502000-15.3)0MO¥ -¥ -
C005ANCompressed Air Systems (J-1502000-30)0MO¥ -¥ -
C005APFuel Tanks and Systems (J-1502000-17)0MO¥ -¥ -
C005AQRooftop Ventilation/ Exhaust Ventilation Systems (J-1502000-18)0MO¥ -¥ -
C005ARMagazines (Explosion-Proof Ventilation Systems) (J-1502000-19)0MO¥ -¥ -
C005ASEye Wash Stations (J-1502000-20)0MO¥ -¥ -
C005ATWater Coolers (J-1502000-21)0MO¥ -¥ -
C005AUHVAC and Refrigeration Systems (J-1502000-22)0MO¥ -¥ -
C005AVUninterruptible Power Systems (UPS) (J-1502000-12)0MO¥ -¥ -
C005AWAuxiliary Generators (J-1502000-31)0MO¥ -¥ -
C005AXElectrical Panels (J-1502000-39)0MO¥ -¥ -
Other Recurring Services Program
C005AYHVAC Seasonal Start-Up and Shutdown (J-1502000-22)0MO¥ -¥ -
C005AZHVAC Water Testing and Treatment Services (J-1502000-22)0MO¥ -¥ -
C005BAOil/Water Separators (J-1502000-28.1)0MO¥ -¥ -
C005BBGrease Traps (J-1502000-26)0MO¥ -¥ -
C005BCExhaust Hoods and Ducts (J-1502000-27)0MO¥ -¥ -
USMC Facility Investment SUB TOTAL¥ -
1503020 Pest Control
C006 - REGION Spec Item 3
C006AAScheduled Pest Control12MO¥ -¥ -
C006ABPest Control Service Orders12MO¥ -¥ -
C006ACPest Management Reporting12MO¥ -¥ -
Region Pest Control SUB TOTAL¥ -
C007 - USMC (MWLK) Spec Item 3
C007AAScheduled Pest Control0MO¥ -¥ -
C007ABPest Control Service Orders0MO¥ -¥ -
C007ACPest Management Reporting0MO¥ -¥ -
USMC Pest Control¥ -
1601000 Utility Management
C008 - REGION Spec Item 3
Service Orders
C008AAEmergency Service Orders12MO¥ -¥ -
C008ABUrgent Service Orders12MO¥ -¥ -
C008ACRoutine Service Orders12MO¥ -¥ -
Utilities Operations Management
C008ADUtilities Mapping (J-1601000-04)12MO¥ -¥ -
C008AEUtility Outage Scheduling and Coordination12MO¥ -¥ -
C008AFMeter Reads (J-1601000-07)12MO¥ -¥ -
C008AGExcavation Permit Issuance12MO¥ -¥ -
C008AHUtility Location Services12MO¥ -¥ -
Utility Infrastructure Condition Assessment (UICAP) Support
C008AJInventory Management12MO¥ -¥ -
C008AKCondition Assessment12MO¥ -¥ -
Utility Management SUB TOTAL¥ -
1602000 Electrical
C009 - REGION Spec Item 3
C009AAOperation of Electrical Power Distribution Systems (J-1602000-03)12MO¥ -¥ -
Preventive Maintenance (PM) Program
C009ABElectrical Power Distribution Systems (J-1602000-03)12MO¥ -¥ -
C009ACStreet Lighting Systems (J-1602000-04)12MO¥ -¥ -
C009ADPhotovoltaic (PV) Systems (J-1602000-07)12MO¥ -¥ -
Other Recurring Services Program
C009AESupporting Work12MO¥ -¥ -
Electrical SUB TOTAL¥ -
1604000 Waste Water
C010 - REGION Spec Item 3
C010AAOperation of Waste Water Systems (J-1604000-06)12MO¥ -¥ -
Preventive Maintenance (PM) Program
C010ABWaste Water Systems (J-1604000-05)12MO¥ -¥ -
Waste Water SUB TOTAL¥ -
1606000 Water
C011 - REGION Spec Item 3
C011AAOperation of Water Distribution System (J-1606000-03)12MO¥ -¥ -
Preventive Maintenance (PM) Program
C011ABWater Distribution Systems (J-1606000-03)12MO¥ -¥ -
Other Recurring Services Program
C011ACSupporting Work12MO¥ -¥ -
Inspection, Testing and Certification Program
C011ADBackflow Prevention (BFP) (J-1606000-03.4)12MO¥ -¥ -
Water SUB TOTAL¥ -
1800000 Facility Management
C012 - REGION Spec Item 3
C012AAOil and Hazardous Substance Spill Response and Cleanup Services12MO¥ -¥ -
Environmental SUB TOTAL¥ -
TOTAL COST LINE ITEM 0005 RECURRING WORK (C001 through C012)
(Enter this amount into Schedule of Work, Item No. 0005 RECURRING WORK, Net Amount)¥ -

OPT2 Non-recurring

ATTACHMENT J-0200000-16

EXHIBIT LINE ITEM NUMBERS SOLICITATION/ CONTRACT # N40084-20-R-0052

EXHIBIT C - CLIN 9002

Offeror Proposed Unit Price Enter proposed unit price (JPY (¥) only) in this column. Price will automatically copy to the unit price cell.

Line Item 0006 Non-Recurring Work - OPTION PERIOD TWO PROVIDE PRICES FOR - NON-RECURRING WORK PRICE - IN ACCORDANCE WITH SECTION C, SPEC ITEM 4 ELINs C700 through C730

ELINProduct Name (120 Characters)Description ExtendedEstimated QuantityUnit of IssueUnit PriceExtended Price
C700Unit Priced Labor Work for 1502000- MUST BE NEGOTIATED BY KO.Performance of CFAO requirements that exceeds recurring work limitations of 1502000. Each task order labor cost will be negotiated.HR(Estimated Maximum
Labor Cost)¥0
C701Material Costs for 1502000- MUST BE NEGOTIATED BY KO.Performance of CFAO requirements that exceeds recurring work limitations of 1502000. Each task order material cost will be negotiated. Use with ELIN C700.LS(Estimated Maximum
Material Cost)¥0
C702Equipment Costs for 1502000- MUST BE NEGOTIATED BY KO.Performance of CFAO requirements that exceeds recurring work limitations of 1502000. Each task order equipment cost will be negotiated. Use with ELIN C700.LS(Estimated Maximum Equipment Cost)¥0
C703Spec Item 4.1 of 1502000. Provide Temporary Power (Auxiliary Generator)15DAY¥0¥0
C704Unit Priced Labor Work for 1503020- MUST BE NEGOTIATED BY KO.Performance of CFAO requirements that exceeds recurring work limitations of 1503020. Each task order labor cost will be negotiated.HR(Estimated Maximum Labor Cost)¥0
C705Material Costs for 1503020- MUST BE NEGOTIATED BY KO.Performance of CFAO requirements that exceeds recurring work limitations of 1503020. Each task order material cost will be negotiated. Use with ELIN C704.LS(Estimated Maximum Material Cost)¥0
C706Equipment Costs for 1503020- MUST BE NEGOTIATED BY KO.Performance of CFAO requirements that exceeds recurring work limitations of 1503020. Each task order equipment cost will be negotiated. Use with ELIN C704.LS(Estimated Maximum Equipment Cost)¥0
C707Unit Priced Labor Work for 1601000- MUST BE NEGOTIATED BY KO.Performance of CFAO requirements that exceeds recurring work limitations of 1601000. Each task order labor cost will be negotiated.HR(Estimated Maximum
Labor Cost)¥0
C708Material Costs for 1601000- MUST BE NEGOTIATED BY KO.Performance of CFAO requirements that exceeds recurring work limitations of 1601000. Each task order material cost will be negotiated. Use with ELIN C707.LS(Estimated Maximum
Material Cost)¥0

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .