J-0200000-07_ELINs_BLANK.xls
XLS spreadsheet 845 KB Posted
- Attached to
- INSPECTION, TESTING, AND MAINTENANCE OF ABOVE STORAGE TANK AND UNDER STORAGE TANK AT U. S. NAF ATSUGI, JAPAN
- Solicitation number
- N40084-14-T-8708
About this file
J-0200000-07 ELINs Blank
View the file
Other files
| File | Type | Posted |
|---|---|---|
| BP1-C_(Day_Tank).pdf | ||
| NAFA_UST__Inventory_FY14_Maintenance_Contract.pdf | ||
| drawing_of_AST_1600.pdf | ||
| AST_Inventory_FY2014_w__photos.pdf | ||
| 226-1 226-2(Fuel_Tank).pdf | ||
| drawing_of_AST_226.pdf | ||
| 14T8708_0003.pdf | ||
| 14T8708_inquiries_and_answers.pdf | ||
| BP1-D_(JP-5_Tank).pdf | ||
| drawing_of_AST_226-1 2.pdf | ||
| drawing_of_AST_2100.pdf | ||
| NAF_Atsugi_UST_Testing__FINAL_10Apr2012.pdf | ||
| 14T870_0002.PDF | ||
| 14T8708_0001.pdf | ||
| 14T8708_C.pdf | ||
| 14T8708_SV_LIST.xls | XLS spreadsheet | |
| 14T8708_B.pdf | ||
| 14T8708_A.pdf |
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
IGES
| GOVERNMENT ESTIMATE | |||||||
| EXHIBIT LINE ITEM NUMBERS | |||||||
| ITEM | ITEM | Q'TY | UNIT | AMOUNT | total amount | SIOH | |
| NO. | (Dollars) | (4%) | |||||
| Tightness Testing of Above Storage Tank and Under Storage Tank | |||||||
| $0 | |||||||
| CLIN 0001 | FFP, Base Period | 1 | LS | ¥ | 0 | 0 | |
| $0 | |||||||
| CLIN 0002 | IDIQ, Base Period | 1 | NTE | ¥ | |||
| $0 | |||||||
| CLIN 0003 | FFP, First Option Period | 1 | LS | ¥ | 0 | 0 | |
| $0 | |||||||
| CLIN 0004 | IDIQ, First Option Period | 1 | NTE | ¥ | |||
| $0 | |||||||
| CLIN 0005 | FFP, Second Option Period | 1 | LS | ¥ | 0 | 0 | |
| $0 | |||||||
| CLIN 0006 | IDIQ, Second Option Period | 1 | NTE | ¥ | |||
| $0 | |||||||
| CLIN 0007 | FFP, Third Option Period | 1 | LS | ¥ | 0 | 0 | |
| $0 | |||||||
| CLIN 0008 | IDIQ, Third Option Period | 1 | NTE | ¥ | |||
| From 1 Jan 2017 through 31 Dec 2017 | $0 | ||||||
| CLIN 0009 | FFP, Fourth Option Period | 1 | LS | ¥ | 0 | 0 | |
| $0 | |||||||
| CLIN 0010 | IDIQ, Fourth Option Period | 1 | NTE | ¥ | |||
| TOTAL: (CLIN 0001 through 0010) | ¥ | 0 | $0 | 0 | |||
| NOTE: | Detail line items are specified following page. | ||||||
| Q'TY = QUANTITY NTE=NOT TO EXCEED FFP = FIRM FIXED PRICE | |||||||
| LS = LUMP SUM IDIQ = INDEFINITE DELIVERY INDEFINITE QUANTITY |
ELIN-Base Period FFP
| ATTACHMENT J-0200000-07 | ||||||
| EXHIBIT LINE ITEM NUMBERS | ||||||
| EXHIBIT A - CLIN 0001 | ||||||
| SUPPLEMENTAL PRICING INFORMATION SHEET | ||||||
| NAME OF OFFEROR OR CONTRACTOR: | ||||||
| Firm Fixed Price (FFP) - Base Period | ||||||
| PROVIDE PRICES FOR FACILITY INVESTMENT - FIRM FIXED PRICE - IN ACCORDANCE WITH SECTION C, SPEC ITEM 3 | ||||||
| ELINs A001 through A007 | ||||||
| ELIN /Sub ELIN | Description | Q'TY | Unit of Issue | Unit Price | Total | |
| A001 | Atsugi UEM Spec Item 3 (Annual Inspection) | |||||
| 1 | A001AA | AST, Jet fuel for boiler (Bldg1600) | 1 | A | ¥0 | |
| 2 | A001AB | AST, Boiler fuel-01 (Bldg.1600) | 1 | A | ¥0 | |
| 3 | A001AC | AST, Boiler fuel-02 (Bldg.1600) | 1 | A | ¥0 | |
| 4 | A001AD | AST, Boiler fuel-03 (Bldg.1600) | 1 | A | ¥0 | |
| 5 | A001AE | AST, Waste water neutralization (Bldg.1600) | 1 | A | ¥0 | |
| 6 | A001AF | AST, Boiler system (Bldg.1600) | 1 | A | ¥0 | |
| 7 | A001AG | AST, Emergency Generator (Bldg.1606) | 1 | A | ¥0 | |
| 8 | A001AH | AST, Boiler fuel-01 (Bldg.226) | 1 | A | ¥0 | |
| 9 | A001AI | AST, Boiler fuel-02 (Bldg.226) | 1 | A | ¥0 | |
| 10 | A001AJ | AST, Emergency generator-01 (Bldg.494) | 1 | A | ¥0 | |
| 11 | A001AK | AST, Emergency generator-02 (Bldg.494) | 1 | A | ¥0 | |
| 12 | A001AL | AST, Waste water treatment-01 (Bldg.940) | 1 | A | ¥0 | |
| 13 | A001AM | AST, Waste water treatment-02 (Bldg.940) | 1 | A | ¥0 | |
| 14 | A001AN | AST, Emergency generator-01 (Bldg.941) | 1 | A | ¥0 | |
| 15 | A001AO | AST, Emergency generator-02 (Bldg.941) | 1 | A | ¥0 | |
| 16 | A001AP | AST, Emergency generator-01 (Bldg.942) | 1 | A | ¥0 | |
| 17 | A001AQ | AST, Emergency generator-02 (Bldg.942) | 1 | A | ¥0 | |
| 18 | A001AR | AST, Waste water treatment(Bldg.943) | 1 | A | ¥0 | |
| 19 | A001AS | AST, Emergency generator(Bldg. 944) | 1 | A | ¥0 | |
| 20 | A001AT | AST, Waste water treatment(Bldg. 944) | 1 | A | ¥0 | |
| 21 | A001AU | AST, Emerg pump system (Bldg.947) | 1 | A | ¥0 | |
| 22 | A001AV | AST, Waste water treatment(Bldg.947) | 1 | A | ¥0 | |
| 23 | A001AW | AST, Boiler Fuel Day Tank (Bldg.1521) | 1 | A | ¥0 | |
| 24 | A001AX | AST, Boiler Fuel Day Tank (Bldg.1504) | 1 | A | ¥0 | |
| 25 | A001AY | AST, Boiler system-01 (Bldg.1504) | 1 | A | ¥0 | |
| 26 | A001AZ | AST, Boiler system-02 (Bldg.1504) | 1 | A | ¥0 | |
| 27 | A001BA | AST, Boiler system-03 (Bldg.1504) | 1 | A | ¥0 | |
| 28 | A001BB | AST, Boiler system-04 (Bldg.1504) | 1 | A | ¥0 | |
| 29 | A001BC | AST, Boiler system-05 (Bldg.1504) | 1 | A | ¥0 | |
| 30 | A001BD | AST, Boiler system-06 (Bldg.1504) | 1 | A | ¥0 | |
| 31 | A001BE | AST, Emergency generator-01 (Bldg.3014) | 1 | A | ¥0 | |
| 32 | A001BF | AST, Emergency generator-02 (Bldg.3014) | 1 | A | ¥0 | |
| 33 | A001BG | AST, Boiler fuel (Bldg.1521) | 1 | A | ¥0 | |
| 33 | UEM Total | ¥0 | ||||
| A002 | FAMILY HOUSING Spec Item 3 (Annual Inspection) | |||||
| 1 | A002AA | AST, Emergency generator (Bldg.545) | 1 | A | ¥0 | |
| 1 | FAMILY HOUSING Total | ¥0 | ||||
| A003 | BUMED Spec Item 3 (Annual Inspection) | |||||
| 1 | A003AA | AST, Emergency generator-01 (Bldg.1050) | 1 | A | ¥0 | |
| 2 | A003AB | AST, Emergency generator-02 (Bldg.1050) | 1 | A | ¥0 | |
| 1 | A003AC | UST, Emergency generator (Bldg.21) | 1 | A | ¥0 | |
| 3 | BUMED Total | ¥0 | ||||
| A004 | MWR Spec Item 3 (Annual Inspection) | |||||
| 1 | A004AA | AST, Golf course equipment-01 (Bldg.1450) | 1 | A | ¥0 | |
| 2 | A004AB | AST, Golf course equipment-02 (Bldg.1450) | 1 | A | ¥0 | |
| 3 | A004AC | AST, Swimming pool (Bldg.609) | 1 | A | ¥0 | |
| 3 | MWR Total | ¥0 | ||||
| A005 | NAFA Spec Item 3 (Annual Inspection) | |||||
| 1 | A005AA | AST, Emergency generator (BLDG.1052) | 1 | A | ¥0 | |
| 2 | A005AB | AST, Emergency generator (Bldg.67) | 1 | A | ¥0 | |
| 3 | A005AC | AST, Emergency generator (Bldg.973) | 1 | A | ¥0 | |
| 4 | A005AD | AST, Emergency generator (Bldg.467) | 1 | A | ¥0 | |
| 5 | A005AE | AST, Emerg pump fuel (Bldg.498) | 1 | A | ¥0 | |
| 6 | A005AF | AST, Emergency generator (Bldg.1445) | 1 | A | ¥0 | |
| 7 | A005AG | AST, Emergency generator (Bldg.1445) | 1 | A | ¥0 | |
| 8 | A005AH | AST, Cold Storage Warehouse (Bldg.1417) | 1 | A | ¥0 | |
| 9 | A005AI | AST, Emergency generator (Bldg.1417) | 1 | A | ¥0 | |
| 10 | A005AJ | AST, Emergency generator (Bldg.208) | 1 | A | ¥0 | |
| 11 | A005AK | AST, Emergency generator (Bldg.224) | 1 | A | ¥0 | |
| 12 | A005AL | AST, Lubrication (Bldg.471) | 1 | A | ¥0 | |
| 13 | A005AM | AST, Emergency generator (Bldg.481) | 1 | A | ¥0 | |
| 14 | A005AN | AST, Engine test cell fuel (Bldg.2100) | 1 | A | ¥0 | |
| 15 | A005AO | AST, Engine test cell preservation (Bldg.2100) | 1 | A | ¥0 | |
| 16 | A005AP | AST, Emergency generator (Bldg.2100) | 1 | A | ¥0 | |
| 17 | A005AQ | AST, Emergency generator (Bldg.1411) | 1 | A | ¥0 | |
| 1 | A005AR | UST, Emergency generator (Bldg.1445) | 1 | A | ¥0 | |
| 2 | A005AS | UST, POV Fuel dispensing-01 (Bldg.1301) | 1 | A | ¥0 | |
| 3 | A005AT | UST, POV Fuel dispensing-02 (Bldg.1301) | 1 | A | ¥0 | |
| 4 | A005AU | UST, POV Fuel dispensing-03 (Bldg.1301) | 1 | A | ¥0 | |
| 5 | A005AV | UST, POV Fuel dispensing-04 (Bldg.1301) | 1 | A | ¥0 | |
| 6 | A005AW | UST, POV Fuel dispensing-05 (Bldg.1301) | 1 | A | ¥0 | |
| 7 | A005AX | UST, POV Fuel dispensing-06 (Bldg.1301) | 1 | A | ¥0 | |
| 8 | A005AY | UST, POV waste oil storage-07 (Bldg.1301) | 1 | A | ¥0 | |
| 25 | NAFA Total | ¥0 | ||||
| A006 | DECA Spec Item 3 (Annual Inspection) | |||||
| 1 | A006AA | AST, Emergency generator-01 (Bldg.1306) | 1 | A | ¥0 | |
| 2 | A006AB | AST, Emergency generator-02 (Bldg.1306) | 1 | A | ¥0 | |
| 2 | DECA Total | ¥0 | ||||
| A007 | FRCWP Spec Item 3 (Annual Inspection) | |||||
| 1 | A007AA | AST, Equipment fuel-01 (Bldg.497) | 1 | A | ¥0 | |
| 2 | A007AB | AST, Equipment fuel-02 (Bldg.497) | 1 | A | ¥0 | |
| 3 | A007AC | AST, Equipment fuel-03 (Bldg.497) | 1 | A | ¥0 | |
| 3 | FRCWP Total | ¥0 | ||||
| 70 | TOTAL AMOUNT FOR FFP LINE ITEMS A001 THROUGH A007 | TOTAL | ¥0 |
SECTION J
EXHIBIT A
PROVIDE PRICES TO MAINTAIN GROUNDS - FIRM FIXED PRICE
IN ACCORDANCE WITH SECTION C, Items 3.1, 3.2, 3.3, and 3.4 ELIN A001 through A0015 Line Item 0001 Base Year - Firm Fixed Price ELIN A001 through A0015
SECTION J
EXHIBIT A
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Barbwire Fence.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Ornamental Steel Fence.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Wood Fence.
PROVIDE A UNIT PRICE FOR THE REMOVAL AND DISPOSAL OF FENCE COMPLETE, FENCE POSTS, BARBWIRE, BARBED TAPE.
IN ACCORDANCE WITH SECTION C, C.10.1.l
ELIN A001EW through A001FI Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence.
Including Fabric, Posts, Gates, Rails, Tension Wire, Barbwire/Barbed Tape.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence Gates including tracks (not posts).
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Removal Service for Ornamental Steel Fence. Including Posts and Gates Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Removal Service for Wood Fence. Including Posts and Gates.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Removal Service for Barbwire Fence. Including Posts and all wire.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Each to Provide Removal Service for Fence Posts. Post Cut-off Flush.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Each to Provide Removal Service for Fence Posts. Driven Post.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.
Posts Set in Concrete/Asphalt.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Square Foot to Patch and Refinish Concrete or Asphalt Surface.
Surface Depth to Match Surrounding.
Unit Price Each to Remove and Dispose of or Save and Store (for reuse) Barbwire Single Arm Support.
Unit Price Each to remove and Dispose of or Save and Store (for reuse) Barbwire Double (V) Arm Support.
Lump Sum Price for the recycling of removed materials. Based on a Percentage Added to Removal Item Ordered
SECTION J
EXHIBIT A
Lump Sum Price for the Recycling of Removed Materials. Based on a Percentage Added to Removal Item Ordered, ELIN A001EK to A001EW. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.
PROVIDE A UNIT PRICE TO PERFORM EXPEDITED SERVICES.
IN ACCORDANCE WITH SECTION C, C.10.2
ELIN A001FJ
Lump Sum Price for Expedited Maintenance and Repair Services. Based on a Percentage Added to Task Order Total. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.
SECTION J
EXHIBIT A
SECTION J
EXHIBIT A
PROVIDE A UNIT PRICE FOR THE RENTAL OF TEMPORARY CHAIN LINK FENCE.
IN ACCORDANCE WITH SECTION C, C.10.3
ELIN A001FK THROUGH A001FP
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Temporary Chain link Fence.
6' Fence Height Driven Posts Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Temporary Chain link Fence.
12' Panel, 6' Height Driven Posts Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Temporary Chain link Fence.
12' Panel, 6' Height, Free-Standing Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Temporary Chain link Fence.
Driven Posts With Barbwire, 7' Fence Height Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Temporary Chain link Fence.
12' Panel, With Barbwire, 7' Height Driven Posts Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Temporary Chain link Fence.
12' Panel, With Barbwire, 7' Height, Free-Standing Line Item 0002 Base Year - Indefinite Quantity Work ELIN A0016 through A0030
PROVIDE UNIT PRICES FOR INDEFINITE QUANTITY WORK
IN ACCORDANCE WITH SECTION C, Item 4 ELIN A0016 through A0030
ELIN-Base Period IDIQ
| ATTACHMENT J-0200000-07 | ||||||
| EXHIBIT LINE ITEM NUMBERS | ||||||
| EXHIBIT A - CLIN 0002 | ||||||
| SUPPLEMENTAL PRICING INFORMATION SHEET | ||||||
| NAME OF OFFEROR OR CONTRACTOR: | ||||||
| Indefinite Delivery/Indefinite Quantity Work (IDIQ) - Base Period | ||||||
| ELIN | Short Description | Description Extended | Estimated Quantity | Unit of Issue | Unit Price | |
| (¥) | Extended Price |
| A700 | Composite Craft Hour Bid (See Note 1 on ELIN Attachment 1) (Negotiated) | 230 | HR | |||
| A701 | Unit Priced Labor Work - MUST BE NEGOTIATED BY KO. | Provide labor to perform all Unit Priced Labor work subject to the Service Contract Act per the scope and delivery schedule specified in the order. | 200 | HR | ||
| A702 | Material Costs- MUST BE NEGOTIATED BY KO. | Provide all materials and equipment to perform Unit Priced Labor work per the scope and delivery schedule specified in the order. | LS | (Estimated Maximum Material cost) | ¥8,300,000 | |
| TOTAL AMOUNT FOR IDIQ LINE ITEMS A701 THROUGH A704 | ¥8,300,000 | |||||
| EXHIBIT LINE ITEM NUMBERS | ||||||
| SUPPLEMENTAL PRICING INFORMATION SHEET | ||||||
| NAME OF OFFEROR OR CONTRACTOR: | ||||||
| ATTACHMENT 1: The following representative amount of work is for the evaluation of bids only and not necessarily the quantity for which work will be ordered by the Government. Composite Craft Hourly rate may be determined by utilizing the following labor | ||||||
| EST CRAFT | ||||||
| TYPICAL CRAFT LABOR | HOURS | |||||
| Inspection personnel | 50 | HR | ||||
| POL System Mainatenance Mechanic | 100 | HR | ||||
| Painter | 20 | HR | ||||
| Laborer | 30 | HR | ||||
| Electrician | 30 | HR | ||||
| 230 | Hours |
ELIN-1st Opt FFP
| ATTACHMENT J-0200000-07 | ||||||
| EXHIBIT LINE ITEM NUMBERS | ||||||
| EXHIBIT B - CLIN 0003 | ||||||
| SUPPLEMENTAL PRICING INFORMATION SHEET | ||||||
| NAME OF OFFEROR OR CONTRACTOR: | ||||||
| Firm Fixed Price (FFP) - First Option Period | ||||||
| PROVIDE PRICES FOR FACILITY INVESTMENT - FIRM FIXED PRICE - IN ACCORDANCE WITH SECTION C, SPEC ITEM 3 | ||||||
| ELINs A001 through A007 | ||||||
| ELIN /Sub ELIN | Description | Q'TY | Unit of Issue | Unit Price | Total | |
| B001 | Atsugi UEM Spec Item 3 (Annual Inspection) | |||||
| 1 | B001AA | AST, Jet fuel for boiler (Bldg1600) | 1 | A | ¥0 | |
| 2 | B001AB | AST, Boiler fuel-01 (Bldg.1600) | 1 | A | ¥0 | |
| 3 | B001AC | AST, Boiler fuel-02 (Bldg.1600) | 1 | A | ¥0 | |
| 4 | B001AD | AST, Boiler fuel-03 (Bldg.1600) | 1 | A | ¥0 | |
| 5 | B001AE | AST, Waste water neutralization (Bldg.1600) | 1 | A | ¥0 | |
| 6 | B001AF | AST, Boiler system (Bldg.1600) | 1 | A | ¥0 | |
| 7 | B001AG | AST, Emergency Generator (Bldg.1606) | 1 | A | ¥0 | |
| 8 | B001AH | AST, Boiler fuel-01 (Bldg.226) | 1 | A | ¥0 | |
| 9 | B001AI | AST, Boiler fuel-02 (Bldg.226) | 1 | A | ¥0 | |
| 10 | B001AJ | AST, Emergency generator-01 (Bldg.494) | 1 | A | ¥0 | |
| 11 | B001AK | AST, Emergency generator-02 (Bldg.494) | 1 | A | ¥0 | |
| 12 | B001AL | AST, Waste water treatment-01 (Bldg.940) | 1 | A | ¥0 | |
| 13 | B001AM | AST, Waste water treatment-02 (Bldg.940) | 1 | A | ¥0 | |
| 14 | B001AN | AST, Emergency generator-01 (Bldg.941) | 1 | A | ¥0 | |
| 15 | B001AO | AST, Emergency generator-02 (Bldg.941) | 1 | A | ¥0 | |
| 16 | B001AP | AST, Emergency generator-01 (Bldg.942) | 1 | A | ¥0 | |
| 17 | B001AQ | AST, Emergency generator-02 (Bldg.942) | 1 | A | ¥0 | |
| 18 | B001AR | AST, Waste water treatment(Bldg.943) | 1 | A | ¥0 | |
| 19 | B001AS | AST, Emergency generator(Bldg. 944) | 1 | A | ¥0 | |
| 20 | B001AT | AST, Waste water treatment(Bldg. 944) | 1 | A | ¥0 | |
| 21 | B001AU | AST, Emerg pump system (Bldg.947) | 1 | A | ¥0 | |
| 22 | B001AV | AST, Waste water treatment(Bldg.947) | 1 | A | ¥0 | |
| 23 | B001AW | AST, Boiler Fuel Day Tank (Bldg.1521) | 1 | A | ¥0 | |
| 24 | B001AX | AST, Boiler Fuel Day Tank (Bldg.1504) | 1 | A | ¥0 | |
| 25 | B001AY | AST, Boiler system-01 (Bldg.1504) | 1 | A | ¥0 | |
| 26 | B001AZ | AST, Boiler system-02 (Bldg.1504) | 1 | A | ¥0 | |
| 27 | B001BA | AST, Boiler system-03 (Bldg.1504) | 1 | A | ¥0 | |
| 28 | B001BB | AST, Boiler system-04 (Bldg.1504) | 1 | A | ¥0 | |
| 29 | B001BC | AST, Boiler system-05 (Bldg.1504) | 1 | A | ¥0 | |
| 30 | B001BD | AST, Boiler system-06 (Bldg.1504) | 1 | A | ¥0 | |
| 31 | B001BE | AST, Emergency generator-01 (Bldg.3014) | 1 | A | ¥0 | |
| 32 | B001BF | AST, Emergency generator-02 (Bldg.3014) | 1 | A | ¥0 | |
| 33 | A001BG | AST, Boiler fuel (Bldg.1521) | 1 | A | ¥0 | |
| 33 | UEM Total | ¥0 | ||||
| B002 | FAMILY HOUSING Spec Item 3 (Annual Inspection) | |||||
| 1 | B002AA | AST, Emergency generator (Bldg.545) | 1 | A | ¥0 | |
| 1 | FAMILY HOUSING Total | ¥0 | ||||
| B003 | BUMED Spec Item 3 (Annual Inspection) | |||||
| 1 | B003AA | AST, Emergency generator-01 (Bldg.1050) | 1 | A | ¥0 | |
| 2 | B003AB | AST, Emergency generator-02 (Bldg.1050) | 1 | A | ¥0 | |
| 1 | B003AC | UST, Emergency generator (Bldg.21) | 1 | A | ¥0 | |
| 3 | BUMED Total | ¥0 | ||||
| B004 | MWR Spec Item 3 (Annual Inspection) | |||||
| 1 | B004AA | AST, Golf course equipment-01 (Bldg.1450) | 1 | A | ¥0 | |
| 2 | B004AB | AST, Golf course equipment-02 (Bldg.1450) | 1 | A | ¥0 | |
| 3 | A004AC | AST, Swimming pool (Bldg.609) | 1 | A | ¥0 | |
| 3 | MWR Total | ¥0 | ||||
| B005 | NAFA Spec Item 3 (Annual Inspection) | |||||
| 1 | B005AA | AST, Emergency generator (BLDG.1052) | 1 | A | ¥0 | |
| 2 | B005AB | AST, Emergency generator (Bldg.67) | 1 | A | ¥0 | |
| 3 | B005AC | AST, Emergency generator (Bldg.973) | 1 | A | ¥0 | |
| 4 | B005AD | AST, Emergency generator (Bldg.467) | 1 | A | ¥0 | |
| 5 | B005AE | AST, Emerg pump fuel (Bldg.498) | 1 | A | ¥0 | |
| 6 | B005AF | AST, Emergency generator (Bldg.1445) | 1 | A | ¥0 | |
| 7 | B005AG | AST, Emergency generator (Bldg.1445) | 1 | A | ¥0 | |
| 8 | B005AH | AST, Cold Storage Warehouse (Bldg.1417) | 1 | A | ¥0 | |
| 9 | B005AI | AST, Emergency generator (Bldg.1417) | 1 | A | ¥0 | |
| 10 | B005AJ | AST, Emergency generator (Bldg.208) | 1 | A | ¥0 | |
| 11 | B005AK | AST, Emergency generator (Bldg.224) | 1 | A | ¥0 | |
| 12 | B005AL | AST, Lubrication (Bldg.471) | 1 | A | ¥0 | |
| 13 | B005AM | AST, Emergency generator (Bldg.481) | 1 | A | ¥0 | |
| 14 | B005AN | AST, Engine test cell fuel (Bldg.2100) | 1 | A | ¥0 | |
| 15 | B005AO | AST, Engine test cell preservation (Bldg.2100) | 1 | A | ¥0 | |
| 16 | B005AP | AST, Emergency generator (Bldg.2100) | 1 | A | ¥0 | |
| 17 | B005AQ | AST, Emergency generator (Bldg.1411) | 1 | A | ¥0 | |
| 1 | B005AR | UST, Emergency generator (Bldg.1445) | 1 | A | ¥0 | |
| 2 | B005AS | UST, POV Fuel dispensing-01 (Bldg.1301) | 1 | A | ¥0 | |
| 3 | B005AT | UST, POV Fuel dispensing-02 (Bldg.1301) | 1 | A | ¥0 | |
| 4 | B005AU | UST, POV Fuel dispensing-03 (Bldg.1301) | 1 | A | ¥0 | |
| 5 | B005AV | UST, POV Fuel dispensing-04 (Bldg.1301) | 1 | A | ¥0 | |
| 6 | B005AW | UST, POV Fuel dispensing-05 (Bldg.1301) | 1 | A | ¥0 | |
| 7 | B005AX | UST, POV Fuel dispensing-06 (Bldg.1301) | 1 | A | ¥0 | |
| 8 | B005AY | UST, POV waste oil storage-07 (Bldg.1301) | 1 | A | ¥0 | |
| 25 | NAFA Total | ¥0 | ||||
| B006 | DECA Spec Item 3 (Annual Inspection) | |||||
| 1 | B006AA | AST, Emergency generator-01 (Bldg.1306) | 1 | A | ¥0 | |
| 2 | B006AB | AST, Emergency generator-02 (Bldg.1306) | 1 | A | ¥0 | |
| 2 | DECA Total | ¥0 | ||||
| B007 | FRCWP Spec Item 3 (Annual Inspection) | |||||
| 1 | B007AA | AST, Equipment fuel-01 (Bldg.497) | 1 | A | ¥0 | |
| 2 | B007AB | AST, Equipment fuel-02 (Bldg.497) | 1 | A | ¥0 | |
| 3 | B007AC | AST, Equipment fuel-03 (Bldg.497) | 1 | A | ¥0 | |
| 3 | FRCWP Total | ¥0 | ||||
| 70 | TOTAL AMOUNT FOR FFP LINE ITEMS A001 THROUGH A007 | TOTAL | ¥0 |
SECTION J
EXHIBIT A
PROVIDE PRICES TO MAINTAIN GROUNDS - FIRM FIXED PRICE
IN ACCORDANCE WITH SECTION C, Items 3.1, 3.2, 3.3, and 3.4 ELIN A001 through A0015 Line Item 0001 Base Year - Firm Fixed Price ELIN A001 through A0015
SECTION J
EXHIBIT A
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Barbwire Fence.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Ornamental Steel Fence.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Wood Fence.
PROVIDE A UNIT PRICE FOR THE REMOVAL AND DISPOSAL OF FENCE COMPLETE, FENCE POSTS, BARBWIRE, BARBED TAPE.
IN ACCORDANCE WITH SECTION C, C.10.1.l
ELIN A001EW through A001FI Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence.
Including Fabric, Posts, Gates, Rails, Tension Wire, Barbwire/Barbed Tape.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence Gates including tracks (not posts).
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Removal Service for Ornamental Steel Fence. Including Posts and Gates Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Removal Service for Wood Fence. Including Posts and Gates.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Removal Service for Barbwire Fence. Including Posts and all wire.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Each to Provide Removal Service for Fence Posts. Post Cut-off Flush.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Each to Provide Removal Service for Fence Posts. Driven Post.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.
Posts Set in Concrete/Asphalt.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Square Foot to Patch and Refinish Concrete or Asphalt Surface.
Surface Depth to Match Surrounding.
Unit Price Each to Remove and Dispose of or Save and Store (for reuse) Barbwire Single Arm Support.
Unit Price Each to remove and Dispose of or Save and Store (for reuse) Barbwire Double (V) Arm Support.
Lump Sum Price for the recycling of removed materials. Based on a Percentage Added to Removal Item Ordered
SECTION J
EXHIBIT A
Lump Sum Price for the Recycling of Removed Materials. Based on a Percentage Added to Removal Item Ordered, ELIN A001EK to A001EW. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.
PROVIDE A UNIT PRICE TO PERFORM EXPEDITED SERVICES.
IN ACCORDANCE WITH SECTION C, C.10.2
ELIN A001FJ
Lump Sum Price for Expedited Maintenance and Repair Services. Based on a Percentage Added to Task Order Total. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.
SECTION J
EXHIBIT A
SECTION J
EXHIBIT A
PROVIDE A UNIT PRICE FOR THE RENTAL OF TEMPORARY CHAIN LINK FENCE.
IN ACCORDANCE WITH SECTION C, C.10.3
ELIN A001FK THROUGH A001FP
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Temporary Chain link Fence.
6' Fence Height Driven Posts Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Temporary Chain link Fence.
12' Panel, 6' Height Driven Posts Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Temporary Chain link Fence.
12' Panel, 6' Height, Free-Standing Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Temporary Chain link Fence.
Driven Posts With Barbwire, 7' Fence Height Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Temporary Chain link Fence.
12' Panel, With Barbwire, 7' Height Driven Posts Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Temporary Chain link Fence.
12' Panel, With Barbwire, 7' Height, Free-Standing Line Item 0002 Base Year - Indefinite Quantity Work ELIN A0016 through A0030
PROVIDE UNIT PRICES FOR INDEFINITE QUANTITY WORK
IN ACCORDANCE WITH SECTION C, Item 4 ELIN A0016 through A0030
ELIN-1st Opt IDIQ
| ATTACHMENT J-0200000-07 | ||||||
| EXHIBIT LINE ITEM NUMBERS | ||||||
| EXHIBIT B - CLIN 0004 | ||||||
| SUPPLEMENTAL PRICING INFORMATION SHEET | ||||||
| NAME OF OFFEROR OR CONTRACTOR: | ||||||
| Indefinite Delivery/Indefinite Quantity Work (IDIQ) - First Option Period | ||||||
| ELIN | Short Description | Description Extended | Estimated Quantity | Unit of Issue | Unit Price | |
| (¥) | Extended Price |
| B700 | Composite Craft Hour Bid (See Note 1 on ELIN Attachment 1) (Negotiated) | 230 | HR | |||
| B701 | Unit Priced Labor Work - MUST BE NEGOTIATED BY KO. | Provide labor to perform all Unit Priced Labor work subject to the Service Contract Act per the scope and delivery schedule specified in the order. | 200 | HR | ||
| B702 | Material Costs- MUST BE NEGOTIATED BY KO. | Provide all materials and equipment to perform Unit Priced Labor work per the scope and delivery schedule specified in the order. | LS | (Estimated Maximum Material cost) | ¥8,300,000 | |
| TOTAL AMOUNT FOR IDIQ LINE ITEMS B701 THROUGH B704 | ¥8,300,000 | |||||
| EXHIBIT LINE ITEM NUMBERS | ||||||
| SUPPLEMENTAL PRICING INFORMATION SHEET | ||||||
| NAME OF OFFEROR OR CONTRACTOR: | ||||||
| ATTACHMENT 1: The following representative amount of work is for the evaluation of bids only and not necessarily the quantity for which work will be ordered by the Government. Composite Craft Hourly rate may be determined by utilizing the following labor | ||||||
| EST CRAFT | ||||||
| TYPICAL CRAFT LABOR | HOURS | |||||
| Inspection personnel | 50 | HR | ||||
| POL System Mainatenance Mechanic | 100 | HR | ||||
| Painter | 20 | HR | ||||
| Laborer | 30 | HR | ||||
| Electrician | 30 | HR | ||||
| 230 | Hours |
ELIN-2nd Opt FFP
| ATTACHMENT J-0200000-07 | ||||||
| EXHIBIT LINE ITEM NUMBERS | ||||||
| EXHIBIT C - CLIN 0005 | ||||||
| SUPPLEMENTAL PRICING INFORMATION SHEET | ||||||
| NAME OF OFFEROR OR CONTRACTOR: | ||||||
| Firm Fixed Price (FFP) - Second Option Period | ||||||
| PROVIDE PRICES FOR FACILITY INVESTMENT - FIRM FIXED PRICE - IN ACCORDANCE WITH SECTION C, SPEC ITEM 3 | ||||||
| ELINs A001 through A007 | ||||||
| ELIN /Sub ELIN | Description | Q'TY | Unit of Issue | Unit Price | Total | |
| C001 | Atsugi UEM Spec Item 3 (Annual Inspection) | |||||
| 1 | C001AA | AST, Jet fuel for boiler (Bldg1600) | 1 | A | ¥0 | |
| 2 | C001AB | AST, Boiler fuel-01 (Bldg.1600) | 1 | A | ¥0 | |
| 3 | C001AC | AST, Boiler fuel-02 (Bldg.1600) | 1 | A | ¥0 | |
| 4 | C001AD | AST, Boiler fuel-03 (Bldg.1600) | 1 | A | ¥0 | |
| 5 | C001AE | AST, Waste water neutralization (Bldg.1600) | 1 | A | ¥0 | |
| 6 | C001AF | AST, Boiler system (Bldg.1600) | 1 | A | ¥0 | |
| 7 | C001AG | AST, Emergency Generator (Bldg.1606) | 1 | A | ¥0 | |
| 8 | C001AH | AST, Boiler fuel-01 (Bldg.226) | 1 | A | ¥0 | |
| 9 | C001AI | AST, Boiler fuel-02 (Bldg.226) | 1 | A | ¥0 | |
| 10 | C001AJ | AST, Emergency generator-01 (Bldg.494) | 1 | A | ¥0 | |
| 11 | C001AK | AST, Emergency generator-02 (Bldg.494) | 1 | A | ¥0 | |
| 12 | C001AL | AST, Waste water treatment-01 (Bldg.940) | 1 | A | ¥0 | |
| 13 | C001AM | AST, Waste water treatment-02 (Bldg.940) | 1 | A | ¥0 | |
| 14 | C001AN | AST, Emergency generator-01 (Bldg.941) | 1 | A | ¥0 | |
| 15 | C001AO | AST, Emergency generator-02 (Bldg.941) | 1 | A | ¥0 | |
| 16 | C001AP | AST, Emergency generator-01 (Bldg.942) | 1 | A | ¥0 | |
| 17 | C001AQ | AST, Emergency generator-02 (Bldg.942) | 1 | A | ¥0 | |
| 18 | C001AR | AST, Waste water treatment(Bldg.943) | 1 | A | ¥0 | |
| 19 | C001AS | AST, Emergency generator(Bldg. 944) | 1 | A | ¥0 | |
| 20 | C001AT | AST, Waste water treatment(Bldg. 944) | 1 | A | ¥0 | |
| 21 | C001AU | AST, Emerg pump system (Bldg.947) | 1 | A | ¥0 | |
| 22 | C001AV | AST, Waste water treatment(Bldg.947) | 1 | A | ¥0 | |
| 23 | C001AW | AST, Boiler Fuel Day Tank (Bldg.1521) | 1 | A | ¥0 | |
| 24 | C001AX | AST, Boiler Fuel Day Tank (Bldg.1504) | 1 | A | ¥0 | |
| 25 | C001AY | AST, Boiler system-01 (Bldg.1504) | 1 | A | ¥0 | |
| 26 | C001AZ | AST, Boiler system-02 (Bldg.1504) | 1 | A | ¥0 | |
| 27 | C001BA | AST, Boiler system-03 (Bldg.1504) | 1 | A | ¥0 | |
| 28 | C001BB | AST, Boiler system-04 (Bldg.1504) | 1 | A | ¥0 | |
| 29 | C001BC | AST, Boiler system-05 (Bldg.1504) | 1 | A | ¥0 | |
| 30 | C001BD | AST, Boiler system-06 (Bldg.1504) | 1 | A | ¥0 | |
| 31 | C001BE | AST, Emergency generator-01 (Bldg.3014) | 1 | A | ¥0 | |
| 32 | C001BF | AST, Emergency generator-02 (Bldg.3014) | 1 | A | ¥0 | |
| 33 | A001BG | AST, Boiler fuel (Bldg.1521) | 1 | A | ¥0 | |
| 33 | UEM Total | ¥0 | ||||
| C002 | FAMILY HOUSING Spec Item 3 (Annual Inspection) | |||||
| 1 | C002AA | AST, Emergency generator (Bldg.545) | 1 | A | ¥0 | |
| 1 | FAMILY HOUSING Total | ¥0 | ||||
| C003 | BUMED Spec Item 3 (Annual Inspection) | |||||
| 1 | C003AA | AST, Emergency generator-01 (Bldg.1050) | 1 | A | ¥0 | |
| 2 | C003AB | AST, Emergency generator-02 (Bldg.1050) | 1 | A | ¥0 | |
| 1 | C003AC | UST, Emergency generator (Bldg.21) | 1 | A | ¥0 | |
| 3 | BUMED Total | ¥0 | ||||
| C004 | MWR Spec Item 3 (Annual Inspection) | |||||
| 1 | C004AA | AST, Golf course equipment-01 (Bldg.1450) | 1 | A | ¥0 | |
| 2 | C004AB | AST, Golf course equipment-02 (Bldg.1450) | 1 | A | ¥0 | |
| 3 | A004AC | AST, Swimming pool (Bldg.609) | 1 | A | ¥0 | |
| 3 | MWR Total | ¥0 | ||||
| C005 | NAFA Spec Item 3 (Annual Inspection) | |||||
| 1 | C005AA | AST, Emergency generator (BLDG.1052) | 1 | A | ¥0 | |
| 2 | C005AB | AST, Emergency generator (Bldg.67) | 1 | A | ¥0 | |
| 3 | C005AC | AST, Emergency generator (Bldg.973) | 1 | A | ¥0 | |
| 4 | C005AD | AST, Emergency generator (Bldg.467) | 1 | A | ¥0 | |
| 5 | C005AE | AST, Emerg pump fuel (Bldg.498) | 1 | A | ¥0 | |
| 6 | C005AF | AST, Emergency generator (Bldg.1445) | 1 | A | ¥0 | |
| 7 | C005AG | AST, Emergency generator (Bldg.1445) | 1 | A | ¥0 | |
| 8 | C005AH | AST, Cold Storage Warehouse (Bldg.1417) | 1 | A | ¥0 | |
| 9 | C005AI | AST, Emergency generator (Bldg.1417) | 1 | A | ¥0 | |
| 10 | C005AJ | AST, Emergency generator (Bldg.208) | 1 | A | ¥0 | |
| 11 | C005AK | AST, Emergency generator (Bldg.224) | 1 | A | ¥0 | |
| 12 | C005AL | AST, Lubrication (Bldg.471) | 1 | A | ¥0 | |
| 13 | C005AM | AST, Emergency generator (Bldg.481) | 1 | A | ¥0 | |
| 14 | C005AN | AST, Engine test cell fuel (Bldg.2100) | 1 | A | ¥0 | |
| 15 | C005AO | AST, Engine test cell preservation (Bldg.2100) | 1 | A | ¥0 | |
| 16 | C005AP | AST, Emergency generator (Bldg.2100) | 1 | A | ¥0 | |
| 17 | C005AQ | AST, Emergency generator (Bldg.1411) | 1 | A | ¥0 | |
| 1 | C005AR | UST, Emergency generator (Bldg.1445) | 1 | A | ¥0 | |
| 2 | C005AS | UST, POV Fuel dispensing-01 (Bldg.1301) | 1 | A | ¥0 | |
| 3 | C005AT | UST, POV Fuel dispensing-02 (Bldg.1301) | 1 | A | ¥0 | |
| 4 | C005AU | UST, POV Fuel dispensing-03 (Bldg.1301) | 1 | A | ¥0 | |
| 5 | C005AV | UST, POV Fuel dispensing-04 (Bldg.1301) | 1 | A | ¥0 | |
| 6 | C005AW | UST, POV Fuel dispensing-05 (Bldg.1301) | 1 | A | ¥0 | |
| 7 | C005AX | UST, POV Fuel dispensing-06 (Bldg.1301) | 1 | A | ¥0 | |
| 8 | C005AY | UST, POV waste oil storage-07 (Bldg.1301) | 1 | A | ¥0 | |
| 25 | NAFA Total | ¥0 | ||||
| C006 | DECA Spec Item 3 (Annual Inspection) | |||||
| 1 | C006AA | AST, Emergency generator-01 (Bldg.1306) | 1 | A | ¥0 | |
| 2 | C006AB | AST, Emergency generator-02 (Bldg.1306) | 1 | A | ¥0 | |
| 2 | DECA Total | ¥0 | ||||
| C007 | FRCWP Spec Item 3 (Annual Inspection) | |||||
| 1 | C007AA | AST, Equipment fuel-01 (Bldg.497) | 1 | A | ¥0 | |
| 2 | C007AB | AST, Equipment fuel-02 (Bldg.497) | 1 | A | ¥0 | |
| 3 | C007AC | AST, Equipment fuel-03 (Bldg.497) | 1 | A | ¥0 | |
| 3 | FRCWP Total | ¥0 | ||||
| 70 | TOTAL AMOUNT FOR FFP LINE ITEMS A001 THROUGH A007 | TOTAL | ¥0 |
SECTION J
EXHIBIT A
PROVIDE PRICES TO MAINTAIN GROUNDS - FIRM FIXED PRICE
IN ACCORDANCE WITH SECTION C, Items 3.1, 3.2, 3.3, and 3.4 ELIN A001 through A0015 Line Item 0001 Base Year - Firm Fixed Price ELIN A001 through A0015
SECTION J
EXHIBIT A
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Barbwire Fence.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Ornamental Steel Fence.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Wood Fence.
PROVIDE A UNIT PRICE FOR THE REMOVAL AND DISPOSAL OF FENCE COMPLETE, FENCE POSTS, BARBWIRE, BARBED TAPE.
IN ACCORDANCE WITH SECTION C, C.10.1.l
ELIN A001EW through A001FI Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence.
Including Fabric, Posts, Gates, Rails, Tension Wire, Barbwire/Barbed Tape.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence Gates including tracks (not posts).
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Removal Service for Ornamental Steel Fence. Including Posts and Gates Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Removal Service for Wood Fence. Including Posts and Gates.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Removal Service for Barbwire Fence. Including Posts and all wire.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Each to Provide Removal Service for Fence Posts. Post Cut-off Flush.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Each to Provide Removal Service for Fence Posts. Driven Post.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.
Posts Set in Concrete/Asphalt.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Square Foot to Patch and Refinish Concrete or Asphalt Surface.
Surface Depth to Match Surrounding.
Unit Price Each to Remove and Dispose of or Save and Store (for reuse) Barbwire Single Arm Support.
Unit Price Each to remove and Dispose of or Save and Store (for reuse) Barbwire Double (V) Arm Support.
Lump Sum Price for the recycling of removed materials. Based on a Percentage Added to Removal Item Ordered
SECTION J
EXHIBIT A
Lump Sum Price for the Recycling of Removed Materials. Based on a Percentage Added to Removal Item Ordered, ELIN A001EK to A001EW. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.
PROVIDE A UNIT PRICE TO PERFORM EXPEDITED SERVICES.
IN ACCORDANCE WITH SECTION C, C.10.2
ELIN A001FJ
Lump Sum Price for Expedited Maintenance and Repair Services. Based on a Percentage Added to Task Order Total. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.
SECTION J
EXHIBIT A
SECTION J
EXHIBIT A
PROVIDE A UNIT PRICE FOR THE RENTAL OF TEMPORARY CHAIN LINK FENCE.
IN ACCORDANCE WITH SECTION C, C.10.3
ELIN A001FK THROUGH A001FP
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Temporary Chain link Fence.
6' Fence Height Driven Posts Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Temporary Chain link Fence.
12' Panel, 6' Height Driven Posts Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Temporary Chain link Fence.
12' Panel, 6' Height, Free-Standing Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Temporary Chain link Fence.
Driven Posts With Barbwire, 7' Fence Height Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Temporary Chain link Fence.
12' Panel, With Barbwire, 7' Height Driven Posts Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Temporary Chain link Fence.
12' Panel, With Barbwire, 7' Height, Free-Standing Line Item 0002 Base Year - Indefinite Quantity Work ELIN A0016 through A0030
PROVIDE UNIT PRICES FOR INDEFINITE QUANTITY WORK
IN ACCORDANCE WITH SECTION C, Item 4 ELIN A0016 through A0030
ELIN-2nd Opt IDIQ
| ATTACHMENT J-0200000-07 | ||||||
| EXHIBIT LINE ITEM NUMBERS | ||||||
| EXHIBIT C - CLIN 0006 | ||||||
| SUPPLEMENTAL PRICING INFORMATION SHEET | ||||||
| NAME OF OFFEROR OR CONTRACTOR: | ||||||
| Indefinite Delivery/Indefinite Quantity Work (IDIQ) - Second Option Period | ||||||
| ELIN | Short Description | Description Extended | Estimated Quantity | Unit of Issue | Unit Price | |
| (¥) | Extended Price |
| C700 | Composite Craft Hour Bid (See Note 1 on ELIN Attachment 1) (Negotiated) | 230 | HR | |||
| C701 | Unit Priced Labor Work - MUST BE NEGOTIATED BY KO. | Provide labor to perform all Unit Priced Labor work subject to the Service Contract Act per the scope and delivery schedule specified in the order. | 200 | HR | ||
| C702 | Material Costs- MUST BE NEGOTIATED BY KO. | Provide all materials and equipment to perform Unit Priced Labor work per the scope and delivery schedule specified in the order. | LS | (Estimated Maximum Material cost) | ¥8,300,000 | |
| TOTAL AMOUNT FOR IDIQ LINE ITEMS C701 THROUGH C704 | ¥8,300,000 | |||||
| EXHIBIT LINE ITEM NUMBERS | ||||||
| SUPPLEMENTAL PRICING INFORMATION SHEET | ||||||
| NAME OF OFFEROR OR CONTRACTOR: | ||||||
| ATTACHMENT 1: The following representative amount of work is for the evaluation of bids only and not necessarily the quantity for which work will be ordered by the Government. Composite Craft Hourly rate may be determined by utilizing the following labor | ||||||
| EST CRAFT | ||||||
| TYPICAL CRAFT LABOR | HOURS | |||||
| Inspection personnel | 50 | HR | ||||
| POL System Mainatenance Mechanic | 100 | HR | ||||
| Painter | 20 | HR | ||||
| Laborer | 30 | HR | ||||
| Electrician | 30 | HR | ||||
| 230 | Hours |
ELIN-3rd Opt FFP
| ATTACHMENT J-0200000-07 | ||||||
| EXHIBIT LINE ITEM NUMBERS | ||||||
| EXHIBIT C - CLIN 0007 | ||||||
| SUPPLEMENTAL PRICING INFORMATION SHEET | ||||||
| NAME OF OFFEROR OR CONTRACTOR: | ||||||
| Firm Fixed Price (FFP) - Thrid Option Period | ||||||
| PROVIDE PRICES FOR FACILITY INVESTMENT - FIRM FIXED PRICE - IN ACCORDANCE WITH SECTION C, SPEC ITEM 3 | ||||||
| ELINs A001 through A007 | ||||||
| ELIN /Sub ELIN | Description | Q'TY | Unit of Issue | Unit Price | Total | |
| D001 | Atsugi UEM Spec Item 3 (Annual Inspection) | |||||
| 1 | D001AA | AST, Jet fuel for boiler (Bldg1600) | 1 | A | ¥0 | |
| 2 | D001AB | AST, Boiler fuel-01 (Bldg.1600) | 1 | A | ¥0 | |
| 3 | D001AC | AST, Boiler fuel-02 (Bldg.1600) | 1 | A | ¥0 | |
| 4 | D001AD | AST, Boiler fuel-03 (Bldg.1600) | 1 | A | ¥0 | |
| 5 | D001AE | AST, Waste water neutralization (Bldg.1600) | 1 | A | ¥0 | |
| 6 | D001AF | AST, Boiler system (Bldg.1600) | 1 | A | ¥0 | |
| 7 | D001AG | AST, Emergency Generator (Bldg.1606) | 1 | A | ¥0 | |
| 8 | D001AH | AST, Boiler fuel-01 (Bldg.226) | 1 | A | ¥0 | |
| 9 | D001AI | AST, Boiler fuel-02 (Bldg.226) | 1 | A | ¥0 | |
| 10 | D001AJ | AST, Emergency generator-01 (Bldg.494) | 1 | A | ¥0 | |
| 11 | D001AK | AST, Emergency generator-02 (Bldg.494) | 1 | A | ¥0 | |
| 12 | D001AL | AST, Waste water treatment-01 (Bldg.940) | 1 | A | ¥0 | |
| 13 | D001AM | AST, Waste water treatment-02 (Bldg.940) | 1 | A | ¥0 | |
| 14 | D001AN | AST, Emergency generator-01 (Bldg.941) | 1 | A | ¥0 | |
| 15 | D001AO | AST, Emergency generator-02 (Bldg.941) | 1 | A | ¥0 | |
| 16 | D001AP | AST, Emergency generator-01 (Bldg.942) | 1 | A | ¥0 | |
| 17 | D001AQ | AST, Emergency generator-02 (Bldg.942) | 1 | A | ¥0 | |
| 18 | D001AR | AST, Waste water treatment(Bldg.943) | 1 | A | ¥0 | |
| 19 | D001AS | AST, Emergency generator(Bldg. 944) | 1 | A | ¥0 | |
| 20 | D001AT | AST, Waste water treatment(Bldg. 944) | 1 | A | ¥0 | |
| 21 | D001AU | AST, Emerg pump system (Bldg.947) | 1 | A | ¥0 | |
| 22 | D001AV | AST, Waste water treatment(Bldg.947) | 1 | A | ¥0 | |
| 23 | D001AW | AST, Boiler Fuel Day Tank (Bldg.1521) | 1 | A | ¥0 | |
| 24 | D001AX | AST, Boiler Fuel Day Tank (Bldg.1504) | 1 | A | ¥0 | |
| 25 | D001AY | AST, Boiler system-01 (Bldg.1504) | 1 | A | ¥0 | |
| 26 | D001AZ | AST, Boiler system-02 (Bldg.1504) | 1 | A | ¥0 | |
| 27 | D001BA | AST, Boiler system-03 (Bldg.1504) | 1 | A | ¥0 | |
| 28 | D001BB | AST, Boiler system-04 (Bldg.1504) | 1 | A | ¥0 | |
| 29 | D001BC | AST, Boiler system-05 (Bldg.1504) | 1 | A | ¥0 | |
| 30 | D001BD | AST, Boiler system-06 (Bldg.1504) | 1 | A | ¥0 | |
| 31 | D001BE | AST, Emergency generator-01 (Bldg.3014) | 1 | A | ¥0 | |
| 32 | D001BF | AST, Emergency generator-02 (Bldg.3014) | 1 | A | ¥0 | |
| 33 | A001BG | AST, Boiler fuel (Bldg.1521) | 1 | A | ¥0 | |
| 33 | UEM Total | ¥0 | ||||
| D002 | FAMILY HOUSING Spec Item 3 (Annual Inspection) | |||||
| 1 | D002AA | AST, Emergency generator (Bldg.545) | 1 | A | ¥0 | |
| 1 | FAMILY HOUSING Total | ¥0 | ||||
| D003 | BUMED Spec Item 3 (Annual Inspection) | |||||
| 1 | D003AA | AST, Emergency generator-01 (Bldg.1050) | 1 | A | ¥0 | |
| 2 | D003AB | AST, Emergency generator-02 (Bldg.1050) | 1 | A | ¥0 | |
| 1 | D003AC | UST, Emergency generator (Bldg.21) | 1 | A | ¥0 | |
| 3 | BUMED Total | ¥0 | ||||
| D004 | MWR Spec Item 3 (Annual Inspection) | |||||
| 1 | D004AA | AST, Golf course equipment-01 (Bldg.1450) | 1 | A | ¥0 | |
| 2 | D004AB | AST, Golf course equipment-02 (Bldg.1450) | 1 | A | ¥0 | |
| 3 | A004AC | AST, Swimming pool (Bldg.609) | 1 | A | ¥0 | |
| 3 | MWR Total | ¥0 | ||||
| D005 | NAFA Spec Item 3 (Annual Inspection) | |||||
| 1 | D005AA | AST, Emergency generator (BLDG.1052) | 1 | A | ¥0 | |
| 2 | D005AB | AST, Emergency generator (Bldg.67) | 1 | A | ¥0 | |
| 3 | D005AC | AST, Emergency generator (Bldg.973) | 1 | A | ¥0 | |
| 4 | D005AD | AST, Emergency generator (Bldg.467) | 1 | A | ¥0 | |
| 5 | D005AE | AST, Emerg pump fuel (Bldg.498) | 1 | A | ¥0 | |
| 6 | D005AF | AST, Emergency generator (Bldg.1445) | 1 | A | ¥0 | |
| 7 | D005AG | AST, Emergency generator (Bldg.1445) | 1 | A | ¥0 | |
| 8 | D005AH | AST, Cold Storage Warehouse (Bldg.1417) | 1 | A | ¥0 | |
| 9 | D005AI | AST, Emergency generator (Bldg.1417) | 1 | A | ¥0 | |
| 10 | D005AJ | AST, Emergency generator (Bldg.208) | 1 | A | ¥0 | |
| 11 | D005AK | AST, Emergency generator (Bldg.224) | 1 | A | ¥0 | |
| 12 | D005AL | AST, Lubrication (Bldg.471) | 1 | A | ¥0 | |
| 13 | D005AM | AST, Emergency generator (Bldg.481) | 1 | A | ¥0 | |
| 14 | D005AN | AST, Engine test cell fuel (Bldg.2100) | 1 | A | ¥0 | |
| 15 | D005AO | AST, Engine test cell preservation (Bldg.2100) | 1 | A | ¥0 | |
| 16 | D005AP | AST, Emergency generator (Bldg.2100) | 1 | A | ¥0 | |
| 17 | D005AQ | AST, Emergency generator (Bldg.1411) | 1 | A | ¥0 | |
| 1 | D005AR | UST, Emergency generator (Bldg.1445) | 1 | A | ¥0 | |
| 2 | D005AS | UST, POV Fuel dispensing-01 (Bldg.1301) | 1 | A | ¥0 | |
| 3 | D005AT | UST, POV Fuel dispensing-02 (Bldg.1301) | 1 | A | ¥0 | |
| 4 | D005AU | UST, POV Fuel dispensing-03 (Bldg.1301) | 1 | A | ¥0 | |
| 5 | D005AV | UST, POV Fuel dispensing-04 (Bldg.1301) | 1 | A | ¥0 | |
| 6 | D005AW | UST, POV Fuel dispensing-05 (Bldg.1301) | 1 | A | ¥0 | |
| 7 | D005AX | UST, POV Fuel dispensing-06 (Bldg.1301) | 1 | A | ¥0 | |
| 8 | D005AY | UST, POV waste oil storage-07 (Bldg.1301) | 1 | A | ¥0 | |
| 25 | NAFA Total | ¥0 | ||||
| D006 | DECA Spec Item 3 (Annual Inspection) | |||||
| 1 | D006AA | AST, Emergency generator-01 (Bldg.1306) | 1 | A | ¥0 | |
| 2 | D006AB | AST, Emergency generator-02 (Bldg.1306) | 1 | A | ¥0 | |
| 2 | DECA Total | ¥0 | ||||
| D007 | FRCWP Spec Item 3 (Annual Inspection) | |||||
| 1 | D007AA | AST, Equipment fuel-01 (Bldg.497) | 1 | A | ¥0 | |
| 2 | D007AB | AST, Equipment fuel-02 (Bldg.497) | 1 | A | ¥0 | |
| 3 | D007AC | AST, Equipment fuel-03 (Bldg.497) | 1 | A | ¥0 | |
| 3 | FRCWP Total | ¥0 | ||||
| 70 | TOTAL AMOUNT FOR FFP LINE ITEMS A001 THROUGH A007 | TOTAL | ¥0 |
SECTION J
EXHIBIT A
PROVIDE PRICES TO MAINTAIN GROUNDS - FIRM FIXED PRICE
IN ACCORDANCE WITH SECTION C, Items 3.1, 3.2, 3.3, and 3.4 ELIN A001 through A0015 Line Item 0001 Base Year - Firm Fixed Price ELIN A001 through A0015
SECTION J
EXHIBIT A
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Barbwire Fence.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Ornamental Steel Fence.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Wood Fence.
PROVIDE A UNIT PRICE FOR THE REMOVAL AND DISPOSAL OF FENCE COMPLETE, FENCE POSTS, BARBWIRE, BARBED TAPE.
IN ACCORDANCE WITH SECTION C, C.10.1.l
ELIN A001EW through A001FI Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence.
Including Fabric, Posts, Gates, Rails, Tension Wire, Barbwire/Barbed Tape.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence Gates including tracks (not posts).
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Removal Service for Ornamental Steel Fence. Including Posts and Gates Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Removal Service for Wood Fence. Including Posts and Gates.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Removal Service for Barbwire Fence. Including Posts and all wire.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Each to Provide Removal Service for Fence Posts. Post Cut-off Flush.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Each to Provide Removal Service for Fence Posts. Driven Post.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.
Posts Set in Concrete/Asphalt.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Square Foot to Patch and Refinish Concrete or Asphalt Surface.
Surface Depth to Match Surrounding.
Unit Price Each to Remove and Dispose of or Save and Store (for reuse) Barbwire Single Arm Support.
Unit Price Each to remove and Dispose of or Save and Store (for reuse) Barbwire Double (V) Arm Support.
Lump Sum Price for the recycling of removed materials. Based on a Percentage Added to Removal Item Ordered
SECTION J
EXHIBIT A
Lump Sum Price for the Recycling of Removed Materials. Based on a Percentage Added to Removal Item Ordered, ELIN A001EK to A001EW. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.
PROVIDE A UNIT PRICE TO PERFORM EXPEDITED SERVICES.
IN ACCORDANCE WITH SECTION C, C.10.2
ELIN A001FJ
Lump Sum Price for Expedited Maintenance and Repair Services. Based on a Percentage Added to Task Order Total. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.
SECTION J
EXHIBIT A
SECTION J
EXHIBIT A
PROVIDE A UNIT PRICE FOR THE RENTAL OF TEMPORARY CHAIN LINK FENCE.
IN ACCORDANCE WITH SECTION C, C.10.3
ELIN A001FK THROUGH A001FP
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Temporary Chain link Fence.
6' Fence Height Driven Posts Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards,…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .