Sextion J

GROUNDS MAINTENANCE SERVICES AT U. S. MARINE CORPS AIR STATION (MCAS) IWAKUNI, JAPAN N40084-14-R-5400

ATTACHMENT J-1503050-09 - ROUGH DRAWINGS FOR EDGING Annex 15

Section J of Annex 15: J-1503050-09 - Page 1 of 33 StationS Funded Grounds Area - Service Level II

N40084-14-R-5400

ATTACHMENT J-1503050-09 - ROUGH DRAWINGS FOR EDGING Annex 15

Section J of Annex 15: J-1503050-09 - Page 2 of 33

N40084-14-R-5400

ATTACHMENT J-1503050-09 - ROUGH DRAWINGS FOR EDGING Annex 15

Section J of Annex 15: J-1503050-09 - Page 3 of 33

N40084-14-R-5400

ATTACHMENT J-1503050-09 - ROUGH DRAWINGS FOR EDGING Annex 15

Section J of Annex 15: J-1503050-09 - Page 4 of 33

N40084-14-R-5400

ATTACHMENT J-1503050-09 - ROUGH DRAWINGS FOR EDGING Annex 15

Section J of Annex 15: J-1503050-09 - Page 5 of 33

N40084-14-R-5400

ATTACHMENT J-1503050-09 - ROUGH DRAWINGS FOR EDGING Annex 15

Section J of Annex 15: J-1503050-09 - Page 6 of 33

N40084-14-R-5400

ATTACHMENT J-1503050-09 - ROUGH DRAWINGS FOR EDGING Annex 15

Section J of Annex 15: J-1503050-09 - Page 7 of 33

N40084-14-R-5400

ATTACHMENT J-1503050-09 - ROUGH DRAWINGS FOR EDGING Annex 15

Section J of Annex 15: J-1503050-09 - Page 8 of 33

N40084-14-R-5400

ATTACHMENT J-1503050-09 - ROUGH DRAWINGS FOR EDGING Annex 15

Section J of Annex 15: J-1503050-09 - Page 9 of 33

N40084-14-R-5400

ATTACHMENT J-1503050-09 - ROUGH DRAWINGS FOR EDGING Annex 15

Section J of Annex 15: J-1503050-09 - Page 10 of 33 Station Funded Grounds Area - Service Level IV

N40084-14-R-5400

ATTACHMENT J-1503050-09 - ROUGH DRAWINGS FOR EDGING Annex 15

Section J of Annex 15: J-1503050-09 - Page 11 of 33

N40084-14-R-5400

ATTACHMENT J-1503050-09 - ROUGH DRAWINGS FOR EDGING Annex 15

Section J of Annex 15: J-1503050-09 - Page 12 of 33

N40084-14-R-5400

ATTACHMENT J-1503050-09 - ROUGH DRAWINGS FOR EDGING Annex 15

Section J of Annex 15: J-1503050-09 - Page 13 of 33

N40084-14-R-5400

ATTACHMENT J-1503050-09 - ROUGH DRAWINGS FOR EDGING Annex 15

Section J of Annex 15: J-1503050-09 - Page 14 of 33

N40084-14-R-5400

ATTACHMENT J-1503050-09 - ROUGH DRAWINGS FOR EDGING Annex 15

Section J of Annex 15: J-1503050-09 - Page 15 of 33

N40084-14-R-5400

ATTACHMENT J-1503050-09 - ROUGH DRAWINGS FOR EDGING Annex 15

Section J of Annex 15: J-1503050-09 - Page 16 of 33

N40084-14-R-5400

ATTACHMENT J-1503050-09 - ROUGH DRAWINGS FOR EDGING Annex 15

Section J of Annex 15: J-1503050-09 - Page 17 of 33

N40084-14-R-5400

ATTACHMENT J-1503050-09 - ROUGH DRAWINGS FOR EDGING Annex 15

Section J of Annex 15: J-1503050-09 - Page 18 of 33

N40084-14-R-5400

ATTACHMENT J-1503050-09 - ROUGH DRAWINGS FOR EDGING Annex 15

Section J of Annex 15: J-1503050-09 - Page 19 of 33

N40084-14-R-5400

ATTACHMENT J-1503050-09 - ROUGH DRAWINGS FOR EDGING Annex 15

Section J of Annex 15: J-1503050-09 - Page 20 of 33

N40084-14-R-5400

ATTACHMENT J-1503050-09 - ROUGH DRAWINGS FOR EDGING Annex 15

Section J of Annex 15: J-1503050-09 - Page 21 of 33

N40084-14-R-5400

ATTACHMENT J-1503050-09 - ROUGH DRAWINGS FOR EDGING Annex 15

Section J of Annex 15: J-1503050-09 - Page 22 of 33

N40084-14-R-5400

ATTACHMENT J-1503050-09 - ROUGH DRAWINGS FOR EDGING Annex 15

Section J of Annex 15: J-1503050-09 - Page 23 of 33

N40084-14-R-5400

ATTACHMENT J-1503050-09 - ROUGH DRAWINGS FOR EDGING Annex 15

Section J of Annex 15: J-1503050-09 - Page 24 of 33

N40084-14-R-5400

ATTACHMENT J-1503050-09 - ROUGH DRAWINGS FOR EDGING Annex 15

Section J of Annex 15: J-1503050-09 - Page 25 of 33

N40084-14-R-5400

ATTACHMENT J-1503050-09 - ROUGH DRAWINGS FOR EDGING Annex 15

Section J of Annex 15: J-1503050-09 - Page 26 of 33

N40084-14-R-5400

ATTACHMENT J-1503050-09 - ROUGH DRAWINGS FOR EDGING Annex 15

Section J of Annex 15: J-1503050-09 - Page 27 of 33 DoDDS Funded Grounds Area - Service Level II

N40084-14-R-5400

ATTACHMENT J-1503050-09 - ROUGH DRAWINGS FOR EDGING Annex 15

Section J of Annex 15: J-1503050-09 - Page 28 of 33 DoDDS Funded Grounds Area - Service Level III

N40084-14-R-5400

ATTACHMENT J-1503050-09 - ROUGH DRAWINGS FOR EDGING Annex 15

Section J of Annex 15: J-1503050-09 - Page 29 of 33 Housing Funded Grounds Area - Service Level II

N40084-14-R-5400

ATTACHMENT J-1503050-09 - ROUGH DRAWINGS FOR EDGING Annex 15

Section J of Annex 15: J-1503050-09 - Page 30 of 33

N40084-14-R-5400

ATTACHMENT J-1503050-09 - ROUGH DRAWINGS FOR EDGING Annex 15

Section J of Annex 15: J-1503050-09 - Page 31 of 33

N40084-14-R-5400

ATTACHMENT J-1503050-09 - ROUGH DRAWINGS FOR EDGING Annex 15

Section J of Annex 15: J-1503050-09 - Page 32 of 33

N40084-14-R-5400

ATTACHMENT J-1503050-09 - ROUGH DRAWINGS FOR EDGING Annex 15

Section J of Annex 15: J-1503050-09 - Page 33 of 33

N40084-14-R-5400

SECTION J, ANNEX 15

ATTACHMENT J-1503050-10

GROUNDS AREA (SM AND LM)

Section J of Annex 15: J-1503050-10 - Page 1 of 2

Spec Item Spec Item

3.1.3 3.1.1.2

Category Per Area Sub-total Unit of

Measure Lawn Landscape Unwanted Vegetation Landscape

Debris Removal Per Area Sub-total

Unit of Measure Edging*3&4

5,600 〇 〇 〇 〇 2,120 〇

5,800 〇 〇 2,330 〇

6,200 〇 〇 2,020 〇

9,200 〇 〇 〇 〇 2,040 〇

4,600 〇 〇 1,180 〇

6,800 〇 〇 〇 〇 1,770 〇

4,300 〇 〇 1,150 〇

700 〇 〇 〇 50 〇

2,200 〇 〇 450 〇

200 〇 〇 - 5,400 〇 〇 -

11,800 〇 〇 680 〇

3,300 〇 〇 530 〇

6,700 〇 〇 1,110 〇

10,400 〇 〇 2,230 〇

11,700 〇 〇 2,300 〇

15,500 〇 〇 2,660 〇 4,400 〇 〇 1,210 〇

14,900 2,310 24,300 890 19,000 2,470 40,100 300 15,900 2,090 15,000 250 12,600 〇 〇 1,950 〇 9,100 〇 〇 1,390 〇 1,700 - N/A

14,100 〇 〇 1,470 〇 6,000 〇 〇 360 〇 3,600 370 N/A 6,300 〇 〇 460 〇

19,000 〇 〇 2,170 〇

5,400 〇 〇 580 〇 13,900 〇 〇 - 5,700 - N/A

15,900 〇 〇 3,950 〇

23,100 〇 〇 4,580 〇 18,500 〇 〇 2,500 〇

11,000 - 14,500 -

Security Fence*5 (Provide services outside of the fence)

N/A 3,900 LM 〇 〇

Spider Fence*5 (Provide services between the security fence and spider fence)

N/A 3,000 LM 〇 〇

All

(II, III, IV)

½ ~ 1 inch Rough and Approximate Total

Length for Edging*3&4 Total 43,240 LM N/AAll (A01 ~ A11, C01 ~ C07, C14, C15, C17, C18, C20 ~ C23, and C25 ~ C27)

N/A N/A

13,110 LM

N/A N/A

N/A

N/A

N/A

Measurement - Edging*3&4

30,130 LM

C28*7

N/A

C22 C23 C24 C25 C26 C27

Measurement - Ground Area Spec Item 3.1.2

Vegetation Control

C29*7

C20 C21

Service Level

Minimum - Maximum Growth Height (mm) or Edging Width (inch)

Supporting Command

Area

C04

C01 C02 C03

A06 A07 A08

25 mm ~ 150 mmIV

207,700

C19

C10 C11 C12 C13 C14

C18

Spec Item 3.1.1.1 Mowing & Trimming

SM

Improved Grounds Area including Prestige Area

Station Funded

C07 C08 C09

C15 C16 C17

Area Code A01 A02 A03

A05 A04

II 25 mm ~ 80 mm Grass Area*2

A10*6 A11*6

A09

Grass Area*2

C05 C06

51,000 SM

N/A

ATTACHMENT J-1503050-10

GROUNDS AREA (SM AND LM)

Section J of Annex 15: J-1503050-10 - Page 2 of 2

Spec Item Spec Item

3.1.3 3.1.1.2

Category Per Area Sub-total Unit of

Measure Lawn Landscape Unwanted Vegetation Landscape

Debris Removal Per Area Sub-total

Unit of Measure Edging*3&4

II 25 mm ~ 80 mm Grass Area*2 6,500 6,500 〇 〇 2,130 2,130 〇

III 25 mm ~ 100 mm Grass Area*2 20,600 20,600 〇 〇 190 190 〇

All

(II, III)

½ ~ 1 inch Rough and Approximate Total

Length for Edging*3&4 Total 2,320 LM N/A 23,800 〇 〇 5,800 〇

7,800 〇 〇 1,500 〇

All H03 Area 23,100 〇

CO's House Area 2,100 〇 〇

8,500 〇 〇 800 〇 12,000 〇 〇 2,400 〇

½ ~ 1 inch Rough and Approximate Total Length for Edging*3&4 Total 15,500 LM N/A

Area Code

Supporting Command

Area Service Level

Minimum - Maximum Growth Height (mm) or Edging Width (inch)

Improved Grounds Area including Prestige Area Measurement - Ground Area

*Note 2: indicated measurements (SM) are for the grass area inside of the Security and/or Spider fence. Provided measurements may include up to 10% difference from the actual measurement of grass areas.

*Note 6: The indicated Measurement - Ground Area (SM) for Grass Area between the interlocking pavers includes the measurement of interlocking pavers, too (e.g., Bldg #1430 through 1440, Bachelor Enlisted Quarters (BEQ), Bldg #606, Kintai Inn).

*Note 5: Refer to the Spec Item 3, FFP Work of Annex 15 in Section C for Contractor's responsible boundaries. Provided measurements may include up to 10% difference from the actual measurement of fence length.

*Note 4: Edging service is required within the Security and/or Spiders fences only.

*Note 1 : mm = millimeter, LM = liner meter, SM = square meter, CO = Commanding Officer

Spec Item 3.1.2

*Note 3: Rough and approximate measurements (LM) for the edging as well as the Rough Drawing for Edging provided in J-1503050-09 are provided for the purpose of reference only and not an exact locations and measurement. The Contractor shall provide edging services for the areas and locations as specified in Spec Item 3.1.1.2, Section C of Annex 15, but information provided in attachments, Section J.

Housing Funded

Grass Area*2

DoDDS Funded

II

25 mm ~ 80 mm

SM

SM

D01

D02 LM

Spec Item 3.1.1.1 Measurement - Edging*3&4Mowing & Trimming Vegetation Control

15,500

H01

All (D01 & D02)

〇

H02

H04 H05

*Note 7: Slope Area, Not included in FFP work portion of this Contract, however may be ordered via a Task Order under the IDIQ portion as required..

LM

All (H01 & H05)

H03 75,200 〇5,000

ATTACHMENT J-1503050-11

HISTORICAL DATA

Section J of Annex 15: J-1503050-11 - Page 1 of 4

Grounds Maintenance Historical Data – Periods of 1 April 2012 through 31 March 2013

1. Lawn Care, Mowing and Trimming (Spec Item 3.1.1.1) and Vegetation Control (Spec Item 3.1.2)

Remarks: Numbers indicated are frequencies for grass cutting completed, covering entire areas; however, partial grass cutting was performed during December through February for areas as required (not area-wide cutting).

Area Code Service Level Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar

2-1A A01 II 2 2 3 3 3 3 2 2 1 1 1 1 24

2-1B A02 II 2 2 3 2 3 2 2 2 1 1 1 1 22

DoDDS Funded 2A D01 II 1 2 2 2 2 2 2 1 1 1 1 1 18

2C A03 II 2 2 2 2 2 2 2 1 1 1 1 1 19

2D A04 II 2 2 3 2 3 2 2 2 1 1 1 1 22

2E A06 II 2 2 3 2 3 2 2 1 1 1 1 1 21

2F A02 II 2 2 2 2 2 2 2 1 1 1 1 1 19

2H A04, A10 II 2 2 3 2 3 2 2 1 1 1 1 1 21

2I A05 II 2 2 2 2 2 2 2 1 1 1 1 1 19

Mainside 1 H03 II 2 2 3 3 3 2 2 2 1 1 1 1 23 Mainside 2 H02 II 2 2 2 2 2 2 2 1 1 1 1 1 19 Monzen H01 II 2 2 2 2 2 2 2 1 1 1 1 1 19 North side 1 H05 II 1 2 2 2 2 2 2 1 1 1 1 1 18 North side 2 H04 II 1 2 2 2 2 2 2 1 1 1 1 1 18

Total per Month 25 28 34 30 34 29 28 18 14 14 14 14 282 Total by Growth Season

Frequency/Month Ratio

Service Level

Minimum – Maximum

Growth Height

Supporting Command

Area Code Grass Growth Rate and Month

TotalPrevious Contract

New Contract High Medium to Low Ceased to Low

II 25 mm ~ 80 mm

Station Funded

Station Funded

Housing Funded

117 109 56

29.25 27.25 14.00 41% 39% 20%

Section J of Annex 15: J-1503050-11 - Page 2 of 4

3-2B A08 II 2 2 3 3 3 2 2 2 1 1 1 1 23

3-2J C21 IV 2 2 2 2 2 2 1 1 1 1 1 1 18

3-2K A07 II 2 2 2 2 2 2 2 1 1 1 1 1 19

3-2L C22 IV 2 2 2 2 2 2 2 1 1 1 1 1 19

3-2M C14 IV 2 2 2 2 2 2 2 1 1 1 1 1 19

3-2N C15 IV 2 2 2 2 2 2 2 1 1 1 1 1 19

3-2O C15 IV 2 2 1 2 1 2 2 1 1 1 1 1 17

DoDDS Funded 3J D02 III 2 1 1 2 2 1 1 1 1 1 1 1 15

3Y A09 II 1 2 1 2 1 1 2 1 1 1 1 1 15

IV 1 1 1 1 1 1 1 1 1 1 1 1 12

IV 1 1 1 1 1 1 1 1 1 1 1 1 12

Total per Month 19 19 18 21 19 18 18 12 11 11 11 11 188

Total by Growth Season Frequency/Month

Ratio

Service Level

Minimum – Maximum

Growth Height

Supporting Command

Area Code Grass Growth Rate and Month

TotalPrevious Contract

New Contract High Medium to Low Ceased to Low

III 25 mm ~ 100 mm

Station Funded

Station Funded Monzen Security and Spider Fence Mainside Security and Spider Fence

77 67 44

19.25 16.75 11.00

23%41% 36%

Section J of Annex 15: J-1503050-11 - Page 3 of 4

4-1C C17 IV 1 1 1 1 1 2 1 1 1 1 1 1 13

4-3A C03 IV 1 2 1 1 1 1 1 1 1 1 1 1 13

4-3B C04 IV 1 1 1 1 1 1 1 1 1 1 1 1 12

4-3C C05 IV 2 1 1 1 1 1 1 1 1 1 1 1 13

4-3D C06 IV 1 1 1 1 1 1 1 1 1 1 1 1 12

4-3E C07 IV 1 1 1 1 1 1 1 1 1 1 1 1 12

4-3G C07 IV 1 2 1 1 1 1 1 1 1 1 1 1 13

4-3K C23 IV 1 1 1 1 1 1 1 1 1 1 1 1 12

4-3L C25 IV 1 1 2 1 2 1 1 1 1 1 1 1 14

4A C01 IV 2 1 1 2 1 2 1 1 1 1 1 1 15

4B C02 IV 1 1 1 1 1 1 1 1 1 1 1 1 12

4C C03 IV 1 1 1 1 1 1 1 1 1 1 1 1 12

4D C21 IV 1 1 1 1 1 1 1 1 1 1 1 1 12

4E C21 IV 1 1 1 1 1 1 1 1 1 1 1 1 12

4F C04 IV 1 1 1 1 1 1 1 1 1 1 1 1 12

4N C20 IV 1 1 1 1 1 1 1 1 1 1 1 1 12

4O C18 IV 1 1 1 1 1 1 1 1 1 1 1 1 12

4R A11, C26 IV 1 1 1 1 1 1 1 1 1 1 1 1 12

4S C27 IV 1 1 1 1 2 1 2 1 1 1 1 1 14

Total per Month 21 21 20 20 21 21 20 19 19 19 19 19 239 Total by Growth Season

Frequency/Month Ratio

Service Level

Minimum – Maximum

Growth Height

Supporting Command

Area Code Grass Growth Rate and Month

Total

IV 25 mm ~ 150 mm Station Funded

Previous Contract

New Contract High Medium to Low Ceased to Low

34% 34% 32%

82 81 76

20.50 20.25 19.00

GROUNDS MAINTENANCE SERVICES AT U. S. MARINE CORPS AIR STATION (MCAS) IWAKUNI,

JAPAN

Section J of Annex 15: J-1503050-11 - Page 4 of 4

2. Lawn Care, Edging (Spec Item 3.1.1.2)

Area Code Service Level Oct Nov Dec Jan Feb Mar

2-1A A01 II 1

2-1B A02 II 1

DoDDS Funded 2A D01 II 1

2C A03 II 1

2D A04 II 1

2E A06 II 1

2F A02 II 1

2H A04, A10 II 1

2I A05 II 1

Mainside 1 H03 II 1 Mainside 2 H02 II 1 Monzen H01 II 1 North side 1 H05 II 1 North side 2 H04 II 1

Total per Month 0 0 9 5 0 0 Total per Year

Area Code Service Level Oct Nov Dec Jan Feb Mar

3-2B A08 II 1

3-2J C21 IV 1

3-2K A07 II 1

3-2L C22 IV 1

3-2M C14 IV 1

3-2N C15 IV 1

3-2O C15 IV 1

DoDDS Funded 3J D02 III 1 Station Funded 3Y A09 II 1

Total per Month 0 0 0 3 6 0 Total per Year

Note: Edging for Service Level IV Areas was not required for the previous contract.

Ceased to Low

III 1 inch Station Funded

Service Level Width

Supporting Command

Area Code Edging Previous Contract

New Contract Low

Ceased to Low

II 1 inch

Station Funded

Station Funded

Housing Funded

Low Service Level Width

Supporting Command

Area Code

Previous Contract

New Contract

Edging

ATTACHMENT J-1503050-12 - LOCATION MAPS FOR LANDSCAPING AREAS INCLUDING JAPANESE GARDEN

Section J of Annex 15: J-1503050-12 - Page 1 of 1

In association with:

Walters, Kimura, Motoda, Inc.

Honolulu, Hawaii

Prepared by:

Group 70 International, Inc.

Honolulu, Hawaii

Prepared with oversight of:

Commander, Naval Facilities Engineering Command, Pacific Pearl Harbor, Hawaii

Marine Corps Air Station Iwakuni

Installation Appearance Plan FINAL October 2010

Sextion J

GROUNDS MAINTENANCE SERVICES AT U. S. MARINE CORPS AIR STATION (MCAS) IWAKUNI, JAPAN N40084-14-R-5400

ATTACHMENT J-1503050-13 - MCAS IWAKUNI INSTALLATION APPEARANCE PLAN (IAP) Annex 15

Section J of Annex 15: J-1503050-13 - Page 1 of 26

MCAS Iwakuni Installation Appearance Plan TOC - 1

TAble Of COnTenTS eXeCUTIVe SUMMARY

CHAPTeR 1 InTRODUCTIOn AnD OVeRVIeW IAP Format ..................................................................... 1-2 Highlighted Themes ....................................................... 1-3 Study Area and IAP Functional Districts ......................... 1-4 Goals of IAP .................................................................... 1-7

DeSIGn GUIDeS SeCTIOn CHAPTeR 2 SITe DeSIGn

Application of the Guidelines ......................................... 2-2 Site Anti-Terrorism and Force Protection and Security Considerations .......................................... 2-3 Station Boundaries ......................................................... 2-4 Gates and Entrances ..................................................... 2-6 Road Circulation and Hierarchy ..................................... 2-7 Streetscapes .................................................................. 2-8 Arterials .......................................................................... 2-9 Collectors ..................................................................... 2-10 Local Streets ................................................................ 2-11 Roundabouts ................................................................ 2-12 Pathways ...................................................................... 2-13 Promenades ................................................................. 2-14 Walkways ..................................................................... 2-15 Activity Nodes .............................................................. 2-16 Building Siting .............................................................. 2-17 District Boundaries ....................................................... 2-18 Plazas and Courtyards ................................................. 2-20 Parking Lots ................................................................. 2-21 Service Elements ......................................................... 2-22 Utilities .......................................................................... 2-23

CHAPTeR 3 ARCHITeCTURe Application of the Guidelines ......................................... 3-2 Architectural Character .................................................. 3-3 Presenting the USMC Image ......................................... 3-3 Iwakuni Culture and History ........................................... 3-4 Balance of Variety and Consistency ............................... 3-5 Wind and Seismic Criteria ............................................. 3-5 Building Accessibility Considerations ............................. 3-5 General Building Design

Building Form ............................................................ 3-9 Scale ....................................................................... 3-10 Massing .................................................................. 3-11 Proportion ............................................................... 3-12 Rhythm ................................................................... 3-13 Texture .................................................................... 3-14

Architectural Features Roof Forms ............................................................. 3-17 Roofing Materials .................................................... 3-18 Exterior Walls .......................................................... 3-19 Fenestration ............................................................ 3-20 Covered Entries ...................................................... 3-21 Courtyards .............................................................. 3-22 Shading Elements................................................... 3-23 Trims and Surface Articulation ................................ 3-24 Service Equipment Enclosures ............................... 3-25

CHAPTeR 4 bUIlDInG COlOR Application of the Guidelines ......................................... 4-2 Color Selection ............................................................... 4-3 Color Assignments to Building Components ................. 4-6

Sextion J

GROUNDS MAINTENANCE SERVICES AT U. S. MARINE CORPS AIR STATION (MCAS) IWAKUNI, JAPAN N40084-14-R-5400

Section J of Annex 15: J-1503050-13 - Page 2 of 26

TOC - 2

Table of Contents

Technical Application ................................................... 4-12 Color Approval Processes ............................................ 4-13

CHAPTeR 5 lAnDSCAPe ARCHITeCTURe Application of the Guidelines ......................................... 5-2 Landscaping .................................................................. 5-5

Landscape Character ............................................... 5-6 Landscape Planning ................................................. 5-8 Landscape Design Guidelines ................................ 5-11 Street Trees ............................................................ 5-12 Street Tree Diversity ............................................... 5-13 Street Tree Compositions/Arrangement ................. 5-14 Street Tree Planting Placement and Positioning ..... 5-15 Street Tree Recommendations .............................. 5-16 Parking Lot Planting ................................................ 5-18 Facility Planting ....................................................... 5-19 Open Space Planting .............................................. 5-20 Image Planting ........................................................ 5-21 Screening and Buffering ......................................... 5-22 Landscape Maintenance ........................................ 5-23

Site Amenities .............................................................. 5-27 Fences and Walls ................................................... 5-28 Security Fences ...................................................... 5-29 General Fences....................................................... 5-30 Screen Walls ........................................................... 5-31 Pavers and Paving .................................................. 5-32 Pavilions .................................................................. 5-33 Bus Shelters ............................................................ 5-34 Site Lighting ............................................................ 5-35 Street Lighting ........................................................ 5-36 Parking and Area Lighting ...................................... 5-37 Low Level Lighting .................................................. 5-38 Flag Poles, Memorials, and Static Displays ............ 5-39 Bollards ................................................................... 5-40 Picnic Tables ........................................................... 5-41 Benches .................................................................. 5-42

Trash Receptacles .................................................. 5-43 Cigarette Receptacles ............................................ 5-44 Bicycle Racks and Shelters .................................... 5-45 Drinking Fountains .................................................. 5-46 Barbecue Grills ....................................................... 5-47

CHAPTeR 6 SIGnAGe Application of the Guidelines ......................................... 6-2 General Guidelines for Signs .......................................... 6-5 Typography..................................................................... 6-6 Sign Layout for Tenant Identification Signs .................... 6-7 Graphics ......................................................................... 6-8 Sign Placement ............................................................ 6-10 Accessibility Considerations ........................................ 6-11 Sign Types

Overview of Sign Types........................................... 6-15 Direction Signs ........................................................ 6-31 Regulatory Signs ..................................................... 6-35 Motivation Signs ..................................................... 6-45 Informational Signs ................................................. 6-51 Wall Mounted Signs ................................................ 6-55 Electronic Signs ...................................................... 6-59

IMPleMenTATIOn SeCTIOn CHAPTeR 7 IMPleMenTATIOn MeCHAnISMS

IAP Review Process........................................................ 7-2 Heirarchy of Elements .................................................... 7-4 IAP Project Selection Criteria ......................................... 7-5 Funding Opportunities .................................................... 7-6

APPenDICeS Appendix A: Color Theory Appendix B: Plant Material (Includes Recommended Plant List) Appendix C: Designing for Minimal Maintenance Appendix D: Landscape Maintenance Appendix E: Guiding Principles for Landscape Maintenance

Sextion J

GROUNDS MAINTENANCE SERVICES AT U. S. MARINE CORPS AIR STATION (MCAS) IWAKUNI, JAPAN N40084-14-R-5400

ATTACHMENT J-1503050-13 - MCAS IWAKUNI INSTALLATION APPEARANCE PLAN (IAP) Annex 15

Section J of Annex 15: J-1503050-13 - Page 3 of 26 miyako.hayashi.ja Highlight miyako.hayashi.ja Highlight miyako.hayashi.ja Highlight miyako.hayashi.ja Highlight

TOC - 4

Table of Contents lIST Of ACROnYMS ASCE American Society of Civil Engineers

AT/FP Anti-Terrorism/Force Protection

ADA Americans with Disabilities

ADAAG Americans with Disabilities Act Accessibility Guidelines

B Body

Ba Base or Kicker

BMPs Best Management Practices

BQ Bachelor Quarters

CASBEE Comprehensive Assessment System for Building Environmental Efficiency

CMU Concrete Masonry Unit

CLR Clearance

COMFLEACT Commander Fleet Activities

CONUS Continental United States

COTR Contracting Officer’s Technical Representative

DoD Department of Defense

ECF Entry Control Facilities

EFS Exterior Finish Systems

EIFS Exterior Insulated Finish Systems

FIP Facilities Improvement Program

FISC Fleet Industrial Support Center

GFRC Glass Fiber Reinforced Concrete

HQ Headquarters

HVAC Heating, Ventilation, and Air Conditioning

IAP Installation Appearance Plan

IBC International Building Code

ID Identification

IDE Intrusion Detection Equipment

IDQ Indefinite Quantity Contracts

JMSDF Japanese Maritime Self-Defense Forces

JPMA Japan Paint Manufacturer Association

LED Light Emitting Diode

LEED Leadership in Energy and Environmental Design

LRV Light Reflective Value

MILCON Military Construction

MPI Master Painter’s Institute

MCAS Marine Corps Air Station

MCCS Marine Corps Community Services

MCX Marine Corps Exchange

MUTCD Manual on Uniform Traffic Control Devices

NAVFAC Pacific Naval Facilities Engineering Command Pacific

NCO Non-Commissioned Officer

PCP Preliminary Criteria Package

PWO Public Works Officer

SHSM Standard Highway Signs and Markings

SRI Solar Reflectance Index

T/A Trim/Accent

TYP Typical

UFC Unified Facility Criteria

UFGS Unified Facility Guide Specifications

USGBC U.S. Green Building Council

USMC United States Marine Corps

USN United State Navy

UV Ultraviolet

VOC Volatile Organic Compound

Sextion J

GROUNDS MAINTENANCE SERVICES AT U. S. MARINE CORPS AIR STATION (MCAS) IWAKUNI, JAPAN N40084-14-R-5400

Section J of Annex 15: J-1503050-13 - Page 4 of 26

1 - 2

Chapter 1 | Introduction and Overview

Implementation

The Implementation section (Chapter 7) addresses the design review process. A single coordinated process in the Facilities Department for reviewing planned maintenance work, renovations, and new construction projects is recommended.

Having a structured process with trained personnel has a significant impact on improving base appearance consistency and quality.

IAP FORMAT

TherearetwodistinctsectionstotheMCASIwakuniIAP:Design
GuidesandImplementation.

Design Guides

The Design Guides provide overarching guidance for the following elements:

• Chapter 2 Site Design

• Chapter 3 Architecture

• Chapter 4 Building Color

• Chapter 5 Landscape Architecture

• Chapter 6 Signage

The Design Guides should be used by MCAS Iwakuni personnel and contractors to guide new projects, renovations, and maintenance work and to ensure unified installation appearance.

The Design Guides should be disseminated to government personnel with design responsibilities and to all relevant personnel at the start of each project.

Specific IAP related resources are listed in each chapter for ease of reference.

Sextion J

GROUNDS MAINTENANCE SERVICES AT U. S. MARINE CORPS AIR STATION (MCAS) IWAKUNI, JAPAN N40084-14-R-5400

ATTACHMENT J-1503050-13 - MCAS IWAKUNI INSTALLATION APPEARANCE PLAN (IAP) Annex 15

Section J of Annex 15: J-1503050-13 - Page 5 of 26 miyako.hayashi.ja Highlight miyako.hayashi.ja Highlight

MCAS Iwakuni Installation Appearance Plan 5 - 1

Chapter 5 | Landscape Architecture

Landscape architecture applies artistic and scientific principles to the planning, design, and management of the natural and built environment. Through the arrangement of planting, landforms, and site amenities, landscape architecture helps create environments that are useful, aesthetically pleasing, safe, and enjoyable.

It is the goal of MCAS Iwakuni to implement appropriate and responsible landscape architecture throughout the Station, in line with budget allowances and considerations for unique project requirements.

In general, landscape architecture should be provided to:

• Enhance and organize the Station’s environment

• Visually organize buildings or a complex of buildings

• Enhance the Station’s architecture

• Link facilities with pedestrian connections

• Facilitate sustainability

• Encourage the use of outdoor facilities

This chapter provides guidance for landscape architecture in two sections: landscaping and site amenities. The landscaping section focuses on the planned arrangement of planting and natural landforms. The site amenities section focuses on the integration of built forms and furnishings that provide for the comfort, convenience, or enjoyment of a site.

Both landscaping and site amenities contribute to the overall makeup of landscape architecture.

Whenever possible, projects should allocate the industry standard of 3-4% of new construction costs for landscape architecture. These costs should be moderated with the unique requirements of the project and the master plan for the Station to ensure that the appropriate, rather than minimum, amount of landscape architecture is installed.

Sextion J

GROUNDS MAINTENANCE SERVICES AT U. S. MARINE CORPS AIR STATION (MCAS) IWAKUNI, JAPAN N40084-14-R-5400

Section J of Annex 15: J-1503050-13 - Page 6 of 26

5 - 2

REFERENCES

PUBLICATIONS

• UFC 4-010-01 DoD Minimum Antiterrorism Standards for Buildings

• UFC 4-030-01 Sustainable Development

• UFC 3-210-10 DoD Low Impact Development

• UFC 4-030-01 DoD Sustainable Development

• UFC 3-201-02 Landscape Architecture

• UFC 3-210-02 POV Site Circulation and Parking

• UFC 3-260-01 Airfield and Heliport Planning and Design

UFC2-000-05NFacilityPlanningCriteriaforNavy/•
MarineCorpsShoreInstallationsAppendixE
•MIL-HDBK-1013/10MilitaryHandbook,Design
GuidelinesforSecurityFencing,Gates,Barriers,and
GuardFacilities

• MCO 5530.14A Marine Corps Physical Security Program Manual

WEBSITES

• Whole Building Design Guide, Landscape Architecture http://www.wbdg.org/design/dd_landscapearch.php

•WholeBuildingDesignGuide,LowImpact
DevelopmentTechnologies

http://www.wbdg.org/resources/lidtech.php

•WholeBuildingDesignGuide,LandscapeArchitecture
andtheSiteSecurityDesignProcess

http://www.wbdg.org/resources/landscape_sitesecurity.

php

• United States Green Building Council http://www.usgbc.org/

APPLICATION OF THE GUIDELINES

The landscape architecture guidelines shall apply to all landscaping and site amenities at MCAS Iwakuni. Since landscaping affects other topics in these guidelines, designers shall coordinate the guidance of this chapter with other chapters to minimize possible conflicts.

The landscape architecture chapter provides guidance for required and desired landscaping and site amenities for the Station. Designers shall consult the master plan to coordinate landscape architecture elements with the overall Station layout. Where these guidelines provide options, designers may select from the elements presented to accommodate the specific requirements of the project.

Some of the graphic presentations in this chapter are meant to illustrate the concepts presented and to provide visual reference for preferred elements. The intent of providing these suggestions is to increase communication between designers and the Facilities Department on achieving the desired character for the installation.

DesignersshallcoordinateearlywiththeFacilities
Departmenttoensurethattheyaremeetingthelandscaping
goalsfortheinstallation.TheFacilitiesDepartmentwillhave

final decision on development proposals for landscaping and site amenities.

Sextion J

GROUNDS MAINTENANCE SERVICES AT U. S. MARINE CORPS AIR STATION (MCAS) IWAKUNI, JAPAN N40084-14-R-5400

Section J of Annex 15: J-1503050-13 - Page 7 of 26

5 - 5

MCAS Iwakuni Installation Appearance Plan

LANDSCAPING

The landscaping design guide is intended to provide a comprehensive program to incorporate landscaping into the Station’s physical setting. In this section are subsections on:

Landscape Character•

– Balance of Variety and Consistency

– Local Landscaping Considerations

– Japanese Culture

Landscape Planning•

– Designing for Minimal Maintenance

– Plant Protection and Preservation

Landscape Design Guidelines•

– Street Trees

– Parking Lot Planting

– Facility Planting

– Open Space Planting

– Image Planting

– Screening and Buffering

Landscape Maintenance•

Landscape elements not covered in these guidelines may be

utilized,buttheyshouldcomplement,notclashwith,theIAP
guidance.Deciduoustreesallowforwintersolaraccess

Sextion J

GROUNDS MAINTENANCE SERVICES AT U. S. MARINE CORPS AIR STATION (MCAS) IWAKUNI, JAPAN N40084-14-R-5400

ATTACHMENT J-1503050-13 - MCAS IWAKUNI INSTALLATION APPEARANCE PLAN (IAP) Annex 15

Section J of Annex 15: J-1503050-13 - Page 8 of 26

5 - 6

LANDSCAPE CHARACTER

The landscape character for MCAS Iwakuni is intended to be consistent across the Station, express variation to avoid monotony, and reflect the local cultural sense of place.

To achieve the intended character, the landscape shall blend native and adaptive plants in a design expression that meets the standards, ideals, and functions of the USMC.

In general, the landscape shall:

Incorporate durable plant material and landscape features•

Incorporate native and adaptive plants that are appropriate • to the climate and site

Commemorate the culture of Japan through the use of • native plants and design elements

Balance of Variety and Consistency

Diverse architecture is inherent to military installations. The landscape design of MCAS Iwakuni can provide a unifying element by blending, screening and softening the variety of architectural forms and expressions, as well as provide buffers or transitional areas between different land uses.

While landscape design should be coordinated to provide a consistent landscape character, effort should also be made to provide variety and interest. The key is to find a balance between consistency and variety.

Local Landscaping Considerations

Landscaping at MCAS Iwakuni presents challenges due to the environmental and soil conditions:

• High water table

• Salt spray

• Saline soil

• Fill soil with varying characteristics

• Poor soil quality due to lack of organic material

The existing plant inventory is quite minimal and there is a limited record of proven performance of plant species, especially large canopy trees. In addition, the more mature

treesaregrowingatMonzenHousingandtheSeniorOfficer
Housing,whichhavedifferentsoilconditionsthantherestof

the Station.

The Recommended Plant List provided in Appendix B Plant Material identifies a variety of plant materials that are

appropriateforMCASIwakuniandcompatiblewithexisting
plantmaterials.However,duetothevaryingenvironmental
andsoilcharacteristics,aesthetic/designconsiderations,and

planting location constraints, the landscape architect must use personal judgement in selecting the appropriate materials for each specific situation.

Typhoons occasionally pass near Iwakuni, but rarely strike the area directly. However, as much of the damage from typhoons is to vegetation, the selection and location of appropriate plant materials is important.

Sextion J

GROUNDS MAINTENANCE SERVICES AT U. S. MARINE CORPS AIR STATION (MCAS) IWAKUNI, JAPAN N40084-14-R-5400

Section J of Annex 15: J-1503050-13 - Page 9 of 26

5 - 7

Japanese Culture

In support of Executive Order 13148, Beneficial Landscaping, it is Navy policy to “use regionally native plants for landscaping.” Native plants have adapted to survive in climatic conditions that exist in the area and often require less water, care and maintenance.

Native plants are also an important part of a region’s cultural heritage. These plants were intertwined with the daily lives of the Japanese and were used for food, paper, medicine, fuel, dyes, construction and tools.

The use of native plants will serve as a means through which people might learn about Japanese culture, for example:

•Useofthenamesakeplantsaroundthemid-risetowers,
i.e.AzaleaatSatsukiTowerandHydrangeaatAjisaiTower,
willprovidemoremeaningtothebuilding’sname
•PlantIroha-MomijiorJapaneseMaple(Acerpalmatum),
theprefecturaltreeofHiroshima,becauseitrelatestothe

long history of the Maple as the subject of poems, novels, paintings and other art forms

The intent is not to suggest the creation of traditional Japanese gardens throughout the installation. While they may be appropriate at high profile areas, such gardens tend to be high maintenance due to extensive pruning requirements. The use of elements of traditional Japanese garden design such as rock, cobblestone, gravel, gates, and fencing is encouraged, where appropriate.

Sakura or Cherry Trees (Prunus spp.) planted at the Theater; the use of namesake plants provides meaning to building names

Traditional Japanese gardens may be appropriate at high visual impact areas, but typically require high maintenance due to extensive pruning requirements

Rock and gravel, elements of traditional Japanese garden design, may be used to create an attractive and low maintenance landscape

Sextion J

GROUNDS MAINTENANCE SERVICES AT U. S. MARINE CORPS AIR STATION (MCAS) IWAKUNI, JAPAN N40084-14-R-5400

Section J of Annex 15: J-1503050-13 - Page 10 of 26

5 - 8

LANDSCAPE PLANNING

Good landscape planning can positively affect the visual environment of the Station and reduce maintenance costs.

Choosing appropriate plant material for a given location and properly locating the plants are key in creating excellent landscaping.

Landscape planning elements discussed in this section include:

Plant Protection and Preservation•

Designing for Minimal Maintenance•

All landscape plans shall be prepared and stamped by a licensed landscape architect.

Designing for Minimal Maintenance

All landscapes require some degree of maintenance. The level of maintenance can be reduced through the selection of appropriate landscaping material, careful siting, and proper

SUSTAINABILITY

• Energy Conservation - The placement of plant materials can significantly increase energy efficiency;

locate deciduous trees to shade south, west and east-facing windows and walls in the summer and allow for winter solar heat gain; do not plant evergreen trees that will block southern exposures in the winter when the sun is lower in the sky

•TemperatureModification-Plantmaterialsreducethe
ambientairtemperatureandstabilizetemperatures,
decreasingextremes

• Reduce Stormwater Runoff and Improve Hydrology – Plant materials intercept and store rainfall, delaying the onset of peak flows

• Erosion and Dust Control - Plant material reduces splash and runoff or sheet flow erosion and controls dust by stabilizing the soil

•OzoneReduction–Theuseofcanopytreestoshade
parkedcarsreducestheproductionofozone

• Improve Air Quality – Plant materials absorb gaseous pollutants through leaf surfaces, intercept particulate matter and release oxygen through photosynthesis

Deciduous trees provide shade at the playground in the summer, but allows for solar access in the winter

Sextion J

GROUNDS MAINTENANCE SERVICES AT U. S. MARINE CORPS AIR STATION (MCAS) IWAKUNI, JAPAN N40084-14-R-5400

Section J of Annex 15: J-1503050-13 - Page 11 of 26

5 - 9 installation. Appendix C provides a comprehensive list of guidelines for designing for minimal maintenance; below are highlights:

Guidelines

• Plant trees instead of shrubs whenever possible to maximize the benefits to the environment and visual impacts. Select the largest trees possible to achieve maximum effect.

Use a combination of evergreen and deciduous trees to • provide summer shade and winter solar access

Provide only a temporary irrigation system during the plant • establishment period due to the annual rainfall

Allow plants to conform to their natural shape; this allows • the plant to mature in a healthy manner, and saves on resources required for trimming Add organic matter into the soil to provide nutrients, • improve drainage, and improve the water and nutrient-holding capacity of the soil Provide a gravel or concrete maintenance strip around the • perimeter of buildings

BEST MANAGEMENT PRACTICES

Avoid litter-producing plants near the airfield and related • maintenance areas

Donotplanttreesthatwillprojectintoorrequirefrequent•
trimmingtostay3M(10feet)belowtheimaginary

surfaces of the airfield

Avoid landscaping that will encourage birds and other • wildlife from visiting or utilizing the airfield

InstalllandscapingincompliancewithUFC3-260-01•
AirfieldandHeliportPlanningandDesignandUFC
2-000-05NFacilityPlanningCriteriaforNavy/Marine
CorpsShoreInstallationsAppendixE
NantenorNandina(Nandina
domestica);native,low

maintenance shrub that does not require regular pruning

Icho or Ginkgo (Ginkgo biloba);

locally available tree that is low maintenance, drought tolerant, pest and disease-resistant and tolerates most soils

Sextion J

GROUNDS MAINTENANCE SERVICES AT U. S. MARINE CORPS AIR STATION (MCAS) IWAKUNI, JAPAN N40084-14-R-5400

ATTACHMENT J-1503050-13 - MCAS IWAKUNI INSTALLATION APPEARANCE PLAN (IAP) Annex 15

Section J of Annex 15: J-1503050-13 - Page 12 of 26 miyako.hayashi.ja Highlight

5 - 23

LANDSCAPE MAINTENANCE

Proper maintenance is critical to sustaining the contributions that landscaping makes to the Station’s appearance. A successful maintenance program will:

Ensure clean and orderly appearance of grounds•

• Protect the health and safety of users

• Maintain the design intent of the landscaping

• Operate efficiently and within cost constraints

Detailedguidanceonlandscapemaintenanceisprovidedin
AppendixD.Maintenancepersonnelshouldbetrainedand

supervised to ensure compliance with program objectives.

GuidingPrinciplesforLandscapeMaintenanceinEnglish
andJapaneseisprovidedinAppendixEandshouldbe

shared with Station landscape maintenance personnel and contractors conducting landscape maintenance at MCAS Iwakuni.

Main Gate inside MCAS Iwakuni

Parking lot at Robert M. Casey Medical & Dental Clinic

Minimize high maintenance pruning

Sextion J

GROUNDS MAINTENANCE SERVICES AT U. S. MARINE CORPS AIR STATION (MCAS) IWAKUNI, JAPAN N40084-14-R-5400

ATTACHMENT J-1503050-13 - MCAS IWAKUNI INSTALLATION APPEARANCE PLAN (IAP) Annex 15

Section J of Annex 15: J-1503050-13 - Page 13 of 26 miyako.hayashi.ja Highlight miyako.hayashi.ja Highlight miyako.hayashi.ja Highlight

Appendix D: Landscape Maintenance

GROUNDS MAINTENANCE SERVICES AT U. S. MARINE CORPS AIR STATION (MCAS) IWAKUNI, JAPAN N40084-14-R-5400

Section J of Annex 15: J-1503050-13 - Page 14 of 26

D - 3

Shrubs

Exercise care to avoid ‘girdling’ shrubs located in turf • areas

Trim and prune shrubs for health, safety and aesthetic • appearance; do not allow shrubs to obstruct vision at intersections, entranceways, or pedestrian walkways.

Prune shrubs that grow against or over structures

Trim and maintain hedges adjacent to roadways at a height • of 900 mm (36 inches) or less; hedges should not be placed within 9 M (30 feet) of a major intersection

Prune shrubs not identified as hedges to even form to match • its natural growth characteristics; water shoots, suckers, and branches not conforming to the desired shape and size should be removed

Some overgrown plants can be pruned to within 100 to • 150 mm (4 to 6 inches) of the ground as they will resprout, producing a thick growth of new shoots; knowledge of the plant material and its response to pruning is essential;

renovate selected overgrown plants over several months by removing a portion (one-third) of the old growth at each of three major prunings; removing all of the old growth over time will restore the natural appearance and retain the use of the plant in the landscape

Shear formal hedges so they are wider at the base than at • the top; frequency of shearing hedges depends on species, desired height and width, and design intent; shearing has a longer effect if performed after a flush of growth has ceased;

shear to one to three new leaves and buds; timing is based on the amount and cycle of growth; upper corners of the sheared hedges can be rounded or square-cut, depending on preference; visible stubs and branches shattered or split by shears should be removed with a clean cut with hand pruners

Exercise care to avoid ‘girdling’ shrubs in turf areas

Sharinbai or Yeddo Hawthorne (Rhaphiolepis umbellata)

Sextion J

GROUNDS MAINTENANCE SERVICES AT U. S. MARINE CORPS AIR STATION (MCAS) IWAKUNI, JAPAN N40084-14-R-5400

Section J of Annex 15: J-1503050-13 - Page 15 of 26

D - 4

Appendix D | Landscape Maintenance

Selectively prune informal hedges and screens by hand to • control height but retain a natural, softer appearance

If a hedge or screen has outgrown its desired size or • becomes unkempt, ragged or leggy (open at the base), cut back to one-half of the existing height and width; the height and form will redevelop to that desired after shearing a few times; renovation pruning is best accomplished just before a flush of growth so that the hedge is bare for the shortest period of time

Apply a 25 mm – 75 mm (1 to 3-inch) layer of mulch to • conserve moisture, buffer soil temperature, reduce erosion, provide nutrients and discourage the establishment of weeds; avoid placing mulch against the stems to avoid potential disease and insect damage; apply from near its stem(s) to the dripline for individual shrubs

Fertilize based on the requirements of the specific shrub; • the total nitrogen required should be apportioned equally to the number of fertilizer applications, usually 4 times a year; avoid dense piles of fertilizer at the crown or base of shrubs; apply minor elements as required

Kanamemochi or Japanese Photinia (Photinia glabra)

Hana Tsukubane Utsugi or Glossy Abelia (Abelia grandiflora)

Sextion J

GROUNDS MAINTENANCE SERVICES AT U. S. MARINE CORPS AIR STATION (MCAS) IWAKUNI, JAPAN N40084-14-R-5400

Section J of Annex 15: J-1503050-13 - Page 16 of 26

D - 5

Trees

Remove dead trees•

Relocate or remove trees that must be regularly pruned due to • poor placement in relation to structures and utilities

Periodically inspect stakes, ties, guy supports and turnbuckles • and adjust as needed to avoid girdling and promote natural development; remove as soon as they are no longer needed

Have a certified arborist complete or oversee tree pruning•

Prune trees according to the latest International Society of • Arboriculture (ISA) Pruning Guidelines

Selectively prune trees for safety and health reasons•

Trim trees to leave a clear height of 4.25 M (14 feet) over streets, •

2.5 M (8 feet) over sidewalks and footpaths, and as necessary to clear power lines and other types of obstructions

Allow trees to grow to their mature heights and sizes according • to their species; topping ruins the natural form of the tree and increases the hazard potential of the plant; at no time should any tree be ‘topped’, ‘stubbed’, or ‘hat racked’ (pruning of all major branches to a uniform height or removal of all lateral or side branches); special pruning techniques such as ‘heading back’ (drastic shortening of major branches to a uniform level) or ‘elevating’ (removal of significant portion of the lower branches to a uniform height) should be considered only when no other alternative is available

Prune canopy trees to encourage healthy growth and prevent • wind damage to the trees

Pruning Frequency: Most routine pruning (removal of weak, • diseased or dead limbs) can be done at any time; growth is maximized and wound closure is fastest if pruning takes place before the spring growth flush, some trees tend to “bleed” if pruned in early spring; this may appear unsightly, but has little effect on the tree; avoid pruning any tree that is under stress, or just after the spring growth flush

Relocate or remove trees that are in conflict with structures or utilities

Periodically inspect tree guys and supports; adjust and remove as needed

Sextion J

GROUNDS MAINTENANCE SERVICES AT U. S. MARINE CORPS AIR STATION (MCAS) IWAKUNI, JAPAN N40084-14-R-5400

ATTACHMENT J-1503050-13 - MCAS IWAKUNI INSTALLATION APPEARANCE PLAN (IAP) Annex 15

Section J of Annex 15: J-1503050-13 - Page 17 of 26

D - 6

Remove storm damaged and diseased or hazardous • growth as soon as possible after discovery

Pruning wounds do not need to be covered with a pruning • seal or paint, these materials do not prevent entry of disease or insects and may reduce closure of the wound

Prune roots of trees as needed; only one side of the tree • should be pruned per year and root pruning should not start until three years after the tree has been planted

If tree guards are installed, inspect them every year to • ensure that they are not restricting the growth of the trees;

adjust any tree guards that constrict the trunk or branches;

leave room for air to circulate.

If mulch is applied around trees to provide nutrients and for • weed suppression, moisture conservation, reduction of soil compaction, and buffering of soil temperature:

– Use a 50 mm (2-inch) layer for soils that are not well drained, and up to 100 mm (4-inches) if drainage is good

– Do not use excessive applications of finely textured mulch, which may cause oxygen deprivation; use a 25 to 50 mm (1 to 2-inch) layer only

– Do not pile mulch directly against the trunks and stems of trees which may cause inner bark (phloem) stress, fungal and bacterial diseases, and make trees more susceptible to borers; keep mulch 75 to 150 mm (3 to 6-inches) away from the trunks of young trees and 200 to 300 mm (8 to 12–inches) away from the trunks of mature trees

– Do not use mulch that is not properly composted

– Do not use mulch in perpetually wet soils which need as much oxygen as possible

– Mulch out to the tree’s dripline

Yurinoki or Tulip Tree (Liriodendron tulipifera)

Momiji-ba Suzukake Noki or London Plane Tree (Platanus acerifolia)

Sextion J

GROUNDS MAINTENANCE SERVICES AT U. S. MARINE CORPS AIR STATION (MCAS) IWAKUNI, JAPAN N40084-14-R-5400

Section J of Annex 15: J-1503050-13 - Page 18 of 26

D - 8

Palms

Prune palms to remove dead, dying, diseased, damaged • or unwanted fronds, seed pods and fruit clusters

– Remove petiole frond bases, shave trunks and form a sheath bowl at the base of remaining fronds

– Frond should be pruned to a 180-degree angle above the horizontal plane

– All tools should be disinfected with a 50 percent chlorine bleach solution or an approved disinfectant where a possible transmission of disease between individual palms exists

If mulch is applied around palms to provide nutrients and • for weed suppression, moisture conservation, reduction of soil compaction, and buffering of soil temperature:

– Use a 50 mm (2-inch) layer for soils that are not well drained, and up to 100 mm (4-inches) if drainage is good

– Do not use excessive applications of finely…