ATT_06_Cost_Proposal-Estimate_Form_SEED_PROJ-14-R-0001.xls
XLS spreadsheet 91 KB Posted
- Solicitation number
- N4008413R0005
About this file
ATT 06 COST - SEED PROJECT
View the file
Other files
| File | Type | Posted |
|---|---|---|
| N40084-14-R-0001-0002.pdf | ||
| 14R0001_AMD0001.pdf | ||
| N40084-14-R-0001_RFP.pdf | ||
| ATT_04_MACC-GeneralSpec-08MAY2013.pdf | ||
| ATT_02_PPQ_JAPANESE.doc | DOC document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Front
| COST PROPOSAL/ESTIMATE FOR TASK ORDER/ TASK ORDER MODIFICATION | DATE: | ||||
| CONTRACT TITLE: | CONTRACT NO: | N40084-14-R-0001 | |||
| IDIQ CONSTRUCTION CONTRACT | ATTACHMENT 06 | ||||
| DESCRIPTION: | |||||
| PRIME CONTRACTOR'S WORK | Revisions/Comments | ||||
| 1. Direct Materials | |||||
| 2. Sales Tax on Materials | _____% of line 1 | ||||
| 3. Direct Labor | |||||
| 4. Insurance, Taxes, and Fringe Benefits | _____% of line 3 | ||||
| 5. Rental Equipment | |||||
| 6. Sales Tax on Rental Equipment | ______% of line 5 | ||||
| 7. Equipment Ownership and Operating Expenses | |||||
| 8. SUBTOTAL (add lines 1 - 7) | 0 | ||||
| 9. Field Overhead | ______% of line 8 | 0 | |||
| 10. SUBTOTAL (Add Lines 8 & 9) | 0 | ||||
| Prime Remarks: | |||||
| SUB-CONTRACTOR'S WORK | |||||
| 11 . Direct Materials | 0 | ||||
| 12. Sales Tax on Materials | ______% of line 11 | 0 | |||
| 13. Direct Labor | 0 | ||||
| 14. Insurance, Taxes, and Fringe Benefits | ______% of line 13 | 0 | |||
| 15. Rental Equipment | 0 | ||||
| 16. Sales Tax on Rental Equipment | ______% of line 15 | 0 | |||
| 17. Equipment Ownership and Operating Expenses | 0 | ||||
| 18. SUBTOTAL (add lines 11 - 17) | 0 | ||||
| 19. Field Overhead | ______% of line 18 | 0 | |||
| 20. SUBTOTAL (Add Lines 18 & 19) | 0 | ||||
| 21. Home Office Overhead | ______% of line 20 | 0 | |||
| 22. Profit | ______ of line 20 | 0 | |||
| 23. SUBTOTAL (Add Lines 20 - 22) | 0 | ||||
| Sub's Remarks: See attached sheet | |||||
| SUMMARY | |||||
| 24. Prime Contractor's Work (from line 10) | 0 | ||||
| 25. Sub-contractor's Work (from line 23) | 0 | ||||
| 26. SUBTOTAL (add lines 24 & 25) | 0 | ||||
| 27. Prime Overhead on sub-contractor | ______% of line 25 | 0 | |||
| 28. Prime's Home Office Overhead | ______% of line 24 | 0 | |||
| 29. Prime's Profit | ______% of line 26 | 0 | |||
| 30. SUBTOTAL (add lines 26 - 29) | 0 | ||||
| 31. Bond Premium | ______% of line 30 | 0 | |||
| 32. TOTAL COST (Add Lines 30 & 31) | 0 | ||||
| Estimated time extension and justification - | |||||
| Prime Contractor name: | |||||
| Sub-contractor name: | |||||
| Signature & Title of Preparer | |||||
| Date: |
Back
| INSTRUCTIONS FOR PREPARING PROPOSAL/ ESTIMATE FOR TASK ORDER/ TASK ORDER MODIFICATION | |||||||||||
| All price proposals shall be addressed to the Contracting Officer. Proposals must clearly state the conditions and scope of the project or proposed modification | |||||||||||
| and shall be accompanied by a breakdown of cost, as indicated. Lump sum costs will not be accepted in either the prime or sub-contractor's breakdown of direct cost. | |||||||||||
| The total cost for labor, material, and equipment rental (or ownership) for each item shall be transferred to the corresponding item on the front of this form. | |||||||||||
| For modification, the proposal should also include a request for an extension of time, in calendar days, only if overall completion of contract is impacted by the proposed | |||||||||||
| change. The contractor shall not proceed with any of the work included in the task order or modification prior to receipt of an executed task order in DD Form 1155 (for | |||||||||||
| new project) or modification of task order in SF 30. | |||||||||||
| BREAKDOWN OF DIRECT COSTS | Contract No. | Date: | 31-Dec-99 | ||||||||
| ITEMS OF WORK FOR | QTY | UNIT | MATERIAL | LABOR | R | EQUIPMENT | |||||
| PRIME CONTRACTOR | UNIT COST | TOTAL COST | UNIT COST | TOTAL COST | O | DAILY RATE | DAYS | TOTAL | |||
| Mobilization | |||||||||||
| Civil/Structural Work | |||||||||||
| Mechnical Work | |||||||||||
| Electrical Work | |||||||||||
| Design Cost | |||||||||||
| Demobilization | |||||||||||
| DIRECT PRIME CONTRACTOR'S TOTALS | 0 | 0 | TOTAL (RENTAL) | ||||||||
| TOTAL (OWNED) | 0 | ||||||||||
| ITEMS OF WORK FOR | QTY | UNIT | MATERIAL | LABOR | R | EQUIPMENT | |||||
| SUB-CONTRACTOR | UNIT COST | TOTAL COST | UNIT COST | TOTAL COST | O | DAILY RATE | DAYS | TOTAL | |||
| DIRECT SUB-CONTRACTOR'S TOTALS | 0 | 0 | TOTAL (RENTAL) | ||||||||
| TOTAL (OWNED) | 0 |
File details come from the government source that posted it. Updated .