N40080-23-R-0001-0004.pdf
PDF 199 KB Posted
- Attached to
- Regional Vertical Transportation Equipment (VTE) and Vehicle Arresting Barriers (VAB) Services
- Solicitation number
- N4008023R0001
About this file
This document is an amendment to a solicitation for regional vertical transportation equipment and vehicle arresting barrier services. The services required include inspection, maintenance, and repair of vertical transportation equipment such as elevators, vehicle access barriers, a pedestrian bridge, and sump pumps at various Navy and Marine Corps locations within a 100-mile radius of Washington, D.C. The amendment extends the proposal due date to November 14, 2022 at 10:00 AM EST, posts the pre-proposal meeting agenda and materials, and provides government responses to offeror questions. The total evaluated price shall be the sum of recurring and non-recurring contract line item prices for the base year and four option years, with a six-month option to extend services. The solicitation is issued by the Naval Facilities Engineering Systems Command.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ACQR5915040
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
Reg'l VTE and VAB Services ACQR #5915040
The purpose of this amendment is to:
A. Extend proposal due date from November 7, 2022 to November 14, 2022 at 10AM, EST.
B. Post Pre-proposal Meeting Agenda w ith attendee list.
C. Post Pre-proposal Meeting Pow erpoint. (NOTE: Revised Proposal due date is not updated in the documents.)
D. Post Government Responses to Requests for Information (RFI) questions.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 4
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 04-Nov-2022
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N4008023R0001
X 9B. DATED (SEE ITEM 11)
21-Sep-2022
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
04-Nov-2022
CODE
NAVAL FACILITIES ENGINEERING SYS COMMAND
1314 HARWOOD STREET SE
WASHINGTON DC 20374
N40080 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
N4008023R0001
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
GOVT RESPONSE TO RFI
GOVERNMENT’S RESPONSE TO REQUEST FOR INFORMATION (RFI)
QUESTION 1
Re: J-1502000-01 Facility Investment Master Inventory, Will the successful bidder be required to provide services per the maintenance and testing frequencies specified on the Master Inventory Spreadsheet?
GOVERNMENT RESPONSE
Per Annex 1502000 Spec Item 3.1-3.1.4, the contractor shall develop and implement an IMP program for VTE, VAB, Draw Bridge, and Sump Pump systems and equipment to ensure they are safe, fully functional, and operational. The Contractor’s IMP shall comply with manufacturers’ recommended procedures, OEM standards, and MO-118 - Inspection of Vertical Transportation Equipment.
Per Annex 1502000 Spec Item 3.3-3.3.1, The Contractor shall develop an inspection, testing, and certification program. The Contractor shall provide inspection, testing, and certification services to ensure they are safe, fully functional, and operational. Testing, inspection, and certification services performed in accordance with applicable references.
QUESTION 2
Re: Volume II – Technical Proposal (i) Solicitation Submittal Requirements. It is noted that this includes the three Past Performance Questionnaires/CPARs evaluations.
Question: Should a bidder not have CPARs evaluations, it was noted that there was not an approved form for Past Performance Questionnaires included within the solicitation documents. Please validate and/or clarify if one will be provided via an addendum.
GOVERNMENT RESPONSE: The statement “this includes the three Past Performance Questionnaires/CPARs evaluations” is referring to the limited number of pages (45), which shall include the number of items you intend to submit: three CPARS or three PPQ or a combination, no more than three. If the bidder has CPARS evaluation, the bidder shall submit the CPARS; if the bidder does not have CPARS, the bidder shall submit the PPQ.
SECTION SF 1449 - CONTINUATION SHEET
SOLICITATION/CONTRACT FORM
The required response date/time has changed from 03-Nov-2022 10:00 AM to 14-Nov-2022 10:00 AM.
The following have been added by reference:
52.219-14 (Dev) Limitations on Subcontracting (DEVIATION 2021-O0008) SEP 2021
The following have been modified:
SECTION L INSTRUCTIONS
Section L - Instructions, conditions, and notices to offerors or respondents
NOTICE TO OFFERORS:
a. Your acquisition points of contact for this project are Contract Specialist Shonn Gilkes at (202) 685-8262, or email shonn.m.gilkes.civ@us.navy.mil and Contracting Officer James H. Waite at (202) 685-3141, or email james.h.waite.civ@us.navy.mil.
b. Proposal shall be submit no later than 10:00 am (EST) on 14 November 2022.
c. Electronic copies of each proposal volume shall be submitted through the Solicitation Module of the Procurement Integrated Enterprise Environment (PIEE) suite at https://piee.eb.mil/. Proposals submitted by mail or hand-carried will not be evaluated. Proposals sent through proprietary or third party File Transfer Protocol (FTP) sites or DoD SAFE will not be retrieved. It is the responsibility of the Offeror to confirm receipt of proposals. All proposals received after the exact time specified for receipt shall be treated as late submissions and will not be considered except under facts and circumstances allowed by the Federal Acquisition Regulation (FAR). For instructions on how to post an offer, please refer to the Posting Offer demo: https://pieetraining.eb.mil/wbt/sol/Posting_Offer.pdf. It is the Offeror’s responsibility to obtain written confirmation of receipt of all electronic files of the full proposal by the Contracting office. In the event that the Solicitation Module is down, the alternate method for proposal submission is via email to the aforementioned POCs ONLY. The Offeror must obtain prior approval from the Contracting Officer to use the alternate submission method. Offerors are responsible for ensuring electronic copies are virus-free and shall run an anti-virus scan before submission. Electronic copies of each volume shall be compatible with the following software products: Adobe Acrobat Reader 11 and Microsoft Office Suite 2016. Narrative portions of the proposal shall be in Adobe Acrobat portable document file (pdf) searchable text format. The Offeror shall not embed sound or video (e.g., MPEG) files into the proposal files. Electronic files shall be clearly identified for each volume, section, and item.
Please refer to PIEE-SAM.gov Email Alignment website for further guidance.
Please allow SUFFICIENT TIME for your proposal to be received prior to the proposed closing time. Price and Non- Price proposals shall be submitted via PIEE-SAM.gov and labeled “Proposal - Regional VTE Services N40080-23-R-0001”, as a subject line.
**All proposals must be received by the due date and time. Any proposals submitted after the time set for receipt will be documented with the date and hour of receipt and labeled as “late submission” and will held unopened until after award.
REQUEST FOR PROPOSALS (RFP) INFORMATION/CLARIFICATION QUESTIONS:
All questions from offerors concerning any aspect of this request for proposal (RFP) must be submitted in writing via email. Prospective offerors are requested to submit written questions specifying the section paragraph of the specification for which clarification is desired. All inquiries will be answered in writing. Telephone questions will not be entertained. Offerors are specifically cautioned that verbal discussions and replies to questions shall not have the effect of changing the provisions of the written RFP.
Prospective offerors are required to review the entire solicitation package before submitting questions. Requests for Information (RFI’s) during the proposal preparation period shall be submitted by email to eric.t.walker@navy.mil and james.h.waite.civ@us.navy.mil . RFI’s must be submitted in a WORD document and submitted by the Prime Contractor only. Subcontractors with questions must submit them through the Prime Contractor. Please do not send RFIs in an email only, but in a Word document.
The RFI cutoff date is no later than 12:00 pm (EST) on 31 October 2022.
SITE VISIT – 10:00 am EST on October 19, 2022 at Building #212 Washington Navy Yard. Offerors may review the enclosed “Site Visit Information Document” for further instructions.
Proposal Instructions:
VOLUME I – PRICE PROPOSAL
PRICE:
https://piee.eb.mil/ https://pieetraining.eb.mil/wbt/sol/Posting_Offer.pdf
(i) Solicitation Submittal Requirements:
Submit one (1) price proposal clearly marked as Volume I - Price Proposal. The evaluated price shall be the sum of the Recurring Work and Non-Recurring Work CLINS for a 12 month Base period and four (4) 12 month Option Periods with a six (6) month option to extend services. Provide the total price for performance of work required by the solicitation for all contract line items, including options as presented in Section B. The Offeror shall also submit pricing information regarding the contract line items, sub-line items, and exhibit line items using the ELIN spreadsheet titled Section J, Attachment J-0200000-08 Exhibit Line Item Numbers (ELINs).xls. There is no page limitation for the Price Proposal. Below are required items for the Volume I – Price Proposal.
• Include a cover page with Solicitation Number, Solicitation Title, Prime Contractor Name, Address, Phone Number, DUNS, Cage Code, Point of Contact, phone number, and email address.
• Text pages 8 ½ x 11 format, minimum 10 point font, Times New Roman.
• Completed SF 1449 signed with all amendments acknowledged.
• Price Schedule (include MS Excel version and PDF)
• Copy of Online Representation and Certifications and proof of registration in System for Award
Management (SAM)
• Bid Guarantee in accordance with FAR Clause 52.228-1, Bid Guarantee shall be at least 20% of the bid price for base year recurring work only but shall not exceed $736,000.00
VOLUME II – TECHNICAL PROPOSAL
(i) Solicitation Submittal Requirements:
Submit one (1) technical proposal clearly marked as the Volume II - Technical Proposal. Technical proposals shall be submitted in 8-1/2 x 11 page format; size 10 font Times New Roman, limited to 45 pages, inclusive of all charts, licenses/certifications, forms and other documentation responsive to the solicitation requirements. This includes the three (3) Past Performance Questionnaires/CPARs evaluations.
Pages that exceed the maximum 45 page limit for Volume II, Technical Proposals shall not be considered during evaluation of the proposal. Further, no pricing shall be included in the technical proposal.
The technical proposal cover page shall be in an 8 ½ x 11 format submitted in size10 point font and Times New Roman font style. The cover page shall provide:
• Solicitation Number, Solicitation Title, Prime Contractor Name/JV, Address, Phone Number, DUNS, Cage Code, Point of Contact, phone number, and email address
• Completed SF 1449 signed with all amendments acknowledged.
• Name, title, email, phone and fax number of authorized representative.
The following have been deleted:
52.219-14 Limitations On Subcontracting SEP 2021
(End of Summary of Changes)
File details come from the government source that posted it. Updated .