N40080-19-Q-3018_AMENDMENT_0002.pdf

PDF 694 KB Posted

Attached to
B2185 Provide 400HZ in Rooms 2A25 and 2A50
Solicitation number
N4008019Q3018
Issued by

About this file

N40080-19-Q-3018_AMENDMENT_0002.pdf

View the file

Other files

File Type Posted
DRAWING_150-93010.pdf PDF
B2185_PROVIDE_400_HZ_ACQR_5602631_Attendance_Roster.pdf PDF
N40080-19-Q-3018_AMENDMENT_0001.pdf PDF
Base_Access_Request_Form.docx DOCX document
N40080-19-Q-3018_SOLICITATION.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

N4008019Q3018

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

SUBJ: B2185 PROVIDE 400HZ POWER TO ROOMS 2A25 TO 2A50

The Proposal Due Date shall remain 14 May 2019 at 2:00 PM.

Provide one (1) additional RFI Response (RFI #21).

***Offerors must include w ritten acknow ledgement of all amendments. Failure to do so w ill render your quote non-responsive.***

1. CONTRACT ID CODE PAGE OF PAGES

1 5

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 10-May-2019

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X N4008019Q3018

X 9B. DATED (SEE ITEM 11)

12-Apr-2019

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

10-May-2019

CODE

PUBLIC WORKS DEPARTMENT

NAS, PATUXENT RIVER

22445 PEARY ROAD, BLDG 504

PATUXENT RIVER MD 20670-5504

N40080 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

jennifer.m.thompson2@navy.milEMAIL:301-757-4486TEL:

JENNIFER M. THOMPSON / CONTRACTING OFFICER

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SECTION SF30 - BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION CLAUSES - SAP CLAUSES

The following have been modified:

RFI RESPONSES

B2185 Provide 400HZ Power to Rooms 2A25 and 2A50 – RFI’s

1.) RFP Page 9, Paragraph titled TIMEFRAME, states 120 days from time of award. The equipment lead time is 15 to 16 weeks after submittal approval. Adding 60 days would be beneficial to the government by not requiring expediting cost to be applied to the equipment and allow the contractor more time to install the equipment without adding overtime/after hours cost to complete the project. Can 60 days be added?

Government Response: The revised scope indicates 180 days.

2.) RFP Page 8, Paragraph titled DOMOLITION note 5., states place 4x8 sheets of ¾” plywood over computer room raised floor across desired path for removal of KATO unit. Will the raised floor with ¾” plywood support the six thousand pound KATO unit or will the unit need to be disassembled in place to decrease the load on the raised floor?

Government Response: The revised scope indicates disassemble and remove.

3.) RFP Page 8, Paragraph titled Lab 2A50: INSTALL note 3., states install 3” aluminum conduit. Is the Rigid Aluminum conduit and will dielectric/PVC conduit and fittings be required through all SCIF walls?

Government Response: The revised scope indicates PVC conduit.

4.) RFP Pages 8 and 9 titled FINISH and SPECIFICATIONS, this section does not call for factory startup. I believe factory startup should be required to protect the government and the contractor. It would also allow for any adjustments to the output of the unit after shipping.

Should we include factory startup cost?

Government Response: The revised scope indicates factory startup.

5.) RFP page 8 and 9 titled FINISH and SPECIFICATIONS, this does not request on site load testing. Will factory test / reports be the only unit testing required or will load testing on site be required? Please be aware that if onsite load testing is required there will be a large amount of heat from the load bank generated in the lab space and the AC may not be able to keep the room cool enough for existing equipment.

Government Response: No onsite load testing required.

6.) Pages 8 and 9 Titled SPECIFICATIONS: Noise Level <65 dB (A) @1m, I’m told that no manufacturer can meet this requirement and that UFGS 26 35 43 paragraph 2.1.12 chart allows up to 72 dba. Will up to 72 dba be allowed?

I also want to make you aware that a solid state 400HZ unit will always have a high pitch hum/whine. Just letting you know now so at the completion of the job the customer doesn’t complain, the hum/whine will be below the 65dba shown in the specification. The cooling fans for the unit is what will be higher than 65 dba.

Government Response: 72 dba will be allowed in compliance with the UFGS 26 35 43

7.) RFP Page 10 of 39, Paragraph 2.16 WARRANTY. Is it the intention of this warranty description that the frequency converter warranty will cover a two years period with the first year including full service parts and labor and the second year only including parts?

Government Response: Correct.

8.) RFP Page 9 of 39, Paragraph titled TIMEFRAME, states “120 days from time of award”. Request an additional 30 days to this timeframe. Manufacturers of solid state frequency converters have been affected by the Presidential Embargo which included raw materials used in these devices, such as high grade steel and high grade copper. This has resulted in not only increased prices but extended deliveries as well. Raw materials buyers are not buying large quantities in hopes of a change to the embargo, rather are buying on short term basis that has resulted in the extended deliveries. Adding 30 days would be beneficial to the manufacturer’s delivery schedule and beneficial to the government by not requiring expediting costs to be applied.

Government Response: The revised scope indicates 180 days.

9.) RFP Pages 8 & 9 of 39 Pages, Paragraph titled SPECIFICATIONS, lists the performance characteristics of the frequency converter. The listed overload ratings include 300% for 10 seconds and 400% for 1 second. We request those parameters be changed to comply with UFGS 26 35 43 Guide Specification Paragraph 2.1.1.11 which requires the parameters shown below. These parameters were agreed to in industry conversations with NAVFAC Criteria Norfolk VA citing safety to personnel and equipment.

Government Response: Parameters should meet UFGS 26 35 43.

10.) Please confirm that this is NOT a design build project and that all/any engineering/calculations required to confirm code compliant constructability as described in the SOW has been previously completed. If not please provide any design/shop drawing submittals required for this project.

Government Response: This is not a Design Build.

11.) Please confirm that 3rd party commissioning will not be required for this project. If this is incorrect please specify features of work to be commissioned.

Government Response: No 3rd part commissioning required.

12.) Please confirm that no hazardous materials, have been identified nor should be accounted for as part of this proposal.

Government Response: No hazardous materials discussed or identified at any site visits to the facility.

13.) May the QC manager/SSHO also act as site Superintendent (aka Triple Hat)? Please provide/confirm the administrative staffing requirements and minimum supervision personnel qualifications for this project.

Government Response: No triple hat. Superintendent and QC can combine. Safety must be a separate individual.

14.) Please confirm that all new conduit for this project shall be ridged aluminum. If this is incorrect, please provide all other acceptable conduit options.

Government Response: The revised scope indicates PVC conduit.

15.) Will dielectric unions be required at all wall penetrations? If not all locations, please provide locations where metallic conduit can be continuous without breaks.

Government Response: The revised scope indicates PVC conduit.

16.) Please confirm that, per discussions during the site walk, the existing 400HZ converter can be shut down and removed during normal working hours and that there will not be a limited allotment of time to get the new converter operational for customer use. If this is incorrect, please provide the max amount of time for replacement and/or specify the tasks that must be completed after-hours.

Government Response: All work to be completed during normal working hours with exception to any electrical shutdowns deemed necessary.

17.) Will the final testing of the operation of the EPO button, which may shut down other equipment, have to be completed afterhours?

Government Response: The final EPO button testing shall be completed afterhours.

18.) Due to the long lead time of the new converter, 120 day duration listed in the RFQ may not allow enough time to guarantee on time completion of this project. Can the project duration be extended to at least 210 days?

Government Response: The revised scope indicates 180 days.

19.) Please confirm that the existing raised floor, with ¾” plywood cover as described in the SOW, should be assumed to be capable of handling the weight of the old converter being rolled out of the space without any additional measures necessary to distribute the weight.

Government Response:

The revised scope indicates disassembly of the unit.

20.) If the footprint for the new converter is smaller than that of the existing there might be a permanent line on the raised floor tiles where they have faded. Please confirm that these marks, if present, are acceptable and that the floor tile do not need to be replaced. If they are to be replaced, are there enough available spares available at the building?

Government Response: Marks from the previous unit are acceptable and no new floor tiles will be required.

21.) In Amendment 1 Page 8 under Lab: 2A50 Install #4. “Install 6/1 (6 over 1) conductor cabling in PVC conduit.”

That isn’t a valid description for a cable type. Can someone provide and better description or a reference part number?

Government Response: Please see the attached example of the 7 conductor AC output cable assembly (attachment titled Drawing 150-93010).

(End of Summary of Changes)