About this file

NRL7481_LEED_NC2009_checklist.pdf

View the file

Other files for this federal contract opportunity

Other files attached to NRL 74/81, DBB, SOLID STATE ELECTRONIC DEVICES LABORATORY, NAVAL RESEARCH LABORATORY WASHINGTON, D. C., newest first.
File Type Posted
74-81_AMENDMENT_0005.pdf PDF
7481_AMENDMENT_0004.pdf PDF
Site_Visit_sign_in_sheet.pdf PDF
NRL_7481_Drawing_Revision1_6_27_19.pdf PDF
7481_AMENDMENT_0003.pdf PDF
2012_HAZMAT_Report.pdf PDF
74-81_AMENDMENT_0002.pdf PDF
74-81_AMENDMENT_0001.pdf PDF
Solicitation_for_NRL_7481.pdf PDF
N4008017R7398_NRL_74_81_Pre_Solicitation_Notice.docx.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

LEED 2009 for New Construction and Major Renovations NRL 74/81

Project Checklist 28 June 2019

12 6 8 Possible Points: 26 Y ? N Y ? N

Y Prereq 1 2 Credit 4 1 to 2 1 Credit 1 1 2 Credit 5 1 to 2

5 Credit 2 5 1 Credit 6 Rapidly Renewable Materials 1 1 Credit 3 Brownfield Redevelopment 1 1 Credit 7 1

6 Credit 4.1 6 1 Credit 4.2 1 11 4 Possible Points: 15 3 Credit 4.3 Alternative Transportation—Low-Emitting and Fuel-Efficient Vehicles 3 2 Credit 4.4 2 Y Prereq 1

1 Credit 5.1 Site Development—Protect or Restore Habitat 1 Y Prereq 2

1 Credit 5.2 Site Development—Maximize Open Space 1 1 Credit 1 1 1 Credit 6.1 Stormwater Design—Quantity Control 1 1 Credit 2 1 1 Credit 6.2 Stormwater Design—Quality Control 1 1 Credit 3.1 1

1 Credit 7.1 Heat Island Effect—Non-roof 1 1 Credit 3.2 1 1 Credit 7.2 1 1 Credit 4.1 1 1 Credit 8 Light Pollution Reduction 1 1 Credit 4.2 1

1 Credit 4.3 1 7 3 Possible Points: 10 1 Credit 4.4 1

1 Credit 5 1 Y Prereq 1 1 Credit 6.1 Controllability of Systems—Lighting 1 4 Credit 1 Water Efficient Landscaping 2 to 4 1 Credit 6.2 1

2 Credit 2 Innovative Wastewater Technologies 2 1 Credit 7.1 1 3 1 Credit 3 2 to 4 1 Credit 7.2 Thermal Comfort—Verification 1

1 Credit 8.1 1 11 2 22 Possible Points: 35 1 Credit 8.2 1

Y Prereq 1 3 3 Possible Points: 6 Y Prereq 2

Y Prereq 3 1 Credit 1.1 1 4 2 13 Credit 1 1 to 19 1 Credit 1.2 1

7 Credit 2 1 to 7 1 Credit 1.3 1 2 Credit 3 2 1 Credit 1.4 1 2 Credit 4 2 1 Credit 1.5 1 3 Credit 5 3 1 Credit 2 1

2 Credit 6 2 2 2 Possible Points: 4

9 5 Possible Points: 14 1 Credit 1.1 1

Y Prereq 1 1 Credit 1.2 1 2 1 Credit 1.1 1 to 3 1 Credit 1.3 1

1 Credit 1.2 Building Reuse—Maintain 50% of Interior Non-Structural Elements 1 1 Credit 1.4 1 2 Credit 2 1 to 2

2 Credit 3 1 to 2 55 11 44 Possible Points: 110 Certified 40 to 49 points Silver 50 to 59 points Gold 60 to 79 points Platinum 80 to 110

Construction IAQ Management Plan—During Construction

Outdoor Air Delivery Monitoring

Indoor Environmental Quality

Minimum Indoor Air Quality Performance Environmental Tobacco Smoke (ETS) Control

Increased Ventilation

Regional Priority Credits

Innovation and Design Process

Green Power

Water Use Reduction

Minimum Energy Performance Fundamental Refrigerant Management

Daylight and Views—Views

LEED Accredited Professional

Daylight and Views—Daylight

Low-Emitting Materials—Adhesives and Sealants Low-Emitting Materials—Paints and Coatings

Optimize Energy Performance

Energy and Atmosphere

Water Use Reduction—20% Reduction

Low-Emitting Materials—Composite Wood and Agrifiber Products Low-Emitting Materials—Flooring Systems

Indoor Chemical and Pollutant Source Control

Thermal Comfort—Design Controllability of Systems—Thermal Comfort

Sustainable Sites

Alternative Transportation—Public Transportation Access

Site Selection Development Density and Community Connectivity

Construction Activity Pollution Prevention

Construction IAQ Management Plan—Before Occupancy

Materials and Resources, Continued

Water Efficiency

Building Reuse—Maintain Existing Walls, Floors, and Roof

Alternative Transportation—Parking Capacity

Heat Island Effect—Roof

Recycled Content Regional Materials

Certified Wood

Alternative Transportation—Bicycle Storage and Changing Rooms

Materials Reuse

Storage and Collection of Recyclables

Materials and Resources

Fundamental Commissioning of Building Energy Systems

Total Construction Waste Management

Enhanced Commissioning On-Site Renewable Energy

Enhanced Refrigerant Management

Regional Priority: Building Reuse - 75% Regional Priority: Stormwater Design Quantity Control Regional Priority: Innovative Wastewater Tech Regional Priority: Specific Credit

Measurement and Verification

Innovation in Design: Mercury Free Lighting Innovation in Design: Green Education Innovation in Design: Water Use Reduction 45% Innovation in Design: Specific Title Innovation in Design: Specific Title

File details come from the government source that posted it.