This document contains responses to questions from potential offerors on solicitation number N4008017R0006 from the Department of the Navy Naval Facilities Engineering Command. The solicitation is for repair of HVAC systems and replacement of roofs at the Davis Center Building 3300 at Marine Corps Base Quantico in Virginia. Drawings can be provided for all buildings except Building 26100. The proposal due date is August 9, 2023 at 1200 PM. The entire roof must be replaced according to the provided plans and Basis of Design report. Alternate roofing systems or repairs will not be considered. Lower roofs must also be replaced. Dedicated contractor personnel are required for each task role.
The responses clarify the scope of work requires replacing all roofs according to provided drawings and specifications, with no alternatives or partial repairs accepted. The proposal due date and exclusions are also noted.
View the file
Other files
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| AMENDMENT 0001 | |||||||
| ATTACHMENT A - N4008017R0006 - GOVERNMENT RESPONSE TO PRE-PROPOSAL INQUIRIES | |||||||
| Question No. | Date Received | REFERENCE | QUESTION | GOVERNMENT RESPONSE | Posted on Amend No. | ||
| Page | Section | Para. | |||||
| 1 | 7/14/23 | - | - | - | The SOW states that this is a Design-Bid-Build. There are no drawings included in the contract documents. Will Drawings be provided or is this a Design Build? | Drawings can be provided for every building listed with the exception of Building 26100. | 0001 |
| 2 | 7/14/23 | - | - | - | The RFP States that the proposal due date is Monday August 9th. August 9th is a Wednesday. Is the proposal due date August 9th or August 7th? | The proposal due date is 1200 PM Wednesday, August 9, 2023. | 0001 |
| 3 | 6/9/23 | BoD; 1-1;6-1 | Chap. 1,6 | 2.2a;6.1.1-6.1.3 | Must the entire roof be replaced or is it eligible for a restoration? | YES - Replace entire Roof. See Plans A107 through A505 plus Chapters 1 and 6 of the Basis-of-Design (BoD) Report | 0001 |
| 4 | 6/9/23 | BoD; 1-1;6-1 | Chap. 1,6 | 2.2a;6.1.1-6.1.3 | Would a 20 year NDL warranted, USDA Bio Preferred, fully reinforced fluid applied restoration system be considered as an alternate to the replacement modified bitumen system specified? | NO. Please build according to the Plans and Specs. See Plans A107 through A505 plus Chapters 1 and 6 of the Basis-of-Design (BoD) Report | 0001 |
| 5 | 6/12/23 | BoD; 1-1;6-1 | Chapter 1,6 | 2.2a; 6.1.1; 6.1.3 | Are the lower roofs in the SOW to be repaired? | YES - Replace all Roofs. See Plans A107 through A505 plus chapters 1 & 6 of the Basis of Design (BoD) Report. | 0001 |
| 6 | 6/12/23 | 2 | Spec Section 00 22 13.00 20 | 1.2b | Can one person work like triple hat? | NO triple/double hats - required Contractor officials shall be dedicated to their particular/single tasks. | 0001 |
SOLICITATION NO. &"-,Bold"N4008017R0006&"-,Regular" PROJECT TITLE/LOCATION: Repair HVAC and Replace Roof, Davis Center, Building 3300, Marine Corps Base Quantico, VA 22134
| Attachment B: Pre-Bid/Proposal Inquiry Form |
| &"-,Italic"&KFF0000 |
July 2016
Sheet2
Sheet3
File details come from the government source that posted it. Updated .