J-1700000-03 Historial Data Cranes.xlsx
XLSX spreadsheet 30 KB Posted
- Solicitation number
- N40080
About this file
This pre-solicitation notice announces an upcoming solicitation for facilities support services at Naval Support Activity Patuxent River locations. The single-award IDIQ contract will have a one-year base period and four one-year option periods, not to exceed 66 months total. Services include custodial, pest control, grounds maintenance, landscaping, pavement clearance, transportation, and material handling. The incumbent contractor is Diversified Service Contracting, Inc. under an $71M contract. The NAICS code is 561720 with a $19.5M size standard. The solicitation will utilize FAR Part 15 procedures and a tradeoff source selection method. The RFP is targeted for release on 30 January 2020 with proposals due 20 February 2020. This procurement will be set aside for 8(a) certified small businesses. Interested contractors must register in SAM and monitor the beta.SAM website for solicitation amendments.
The pre-solicitation notice provides details on an upcoming solicitation for facilities support services at Naval Support Activity Patuxent River locations. Services will include custodial, pest control, grounds maintenance, and transportation/material handling. The single-award IDIQ contract is estimated at $71M with a base period of one year and four one-year options not to exceed 66 months total. The solicitation process and award will be restricted to certified 8(a) small businesses. The final RFP is scheduled for January 2020 with proposals due the following month.
View the file
Other files
Show all 35
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
2017-2018
| Lift Ticket No. | Date Received from PW | Locataion | Building or Area | NAWC/NDW | Date Requested | Time Requested | # Days Advance Notice | Description | Type of Crane Used | |
| 1 | 8/21/17 | PAX | EMP 2100 | NAWC | 11/21/17 | 8:30 AM | 93 | EMP Site Manlift Day 1 | 65T | |
| 2 | 8/21/17 | PAX | EMP 2100 | NAWC | 11/22/17 | 8:30 AM | 94 | Emp Site Manlift Day 2 (backup for rain) | 65T | |
| 3 | 10/6/17 | PAX | VQ4 | NDW | 10/19/17 | 8:00 AM | 14 | Lifting a 32,000 pound mobile armory off a flat bed truck, placing it adjacent to BLDG 2199, then shimming the | ||
| armory to level it and anchoring it to the ground | 55T | |||||||||
| 4 | 11/7/17 | PAX | FARM | NAWC | 11/20/17 | 7:00 AM | 14 | This is a single crane lift request for the lifting and placement of probing gear on top of the heavy positioner on Bldg 2193. The crane is to place a large metal bracket, a small 53230 positioner, and a lattice tower stacked on top of the heavy positioner. Weight of the heaviest item is 1750lbs | 55T | |
| 5 | 11/7/17 | PAX | FARM | NAWC | 11/20/17 | 7:00 AM | 14 | This is a single crane lift request for the lifting and placement of a 40’ metal tower. On the tower there currently exists a cabinet and small antenna; both of those items must be removed first. Then the tower is to be lifted off of its existing trailer and placed on a concrete pad. The concrete pad has 4 metal plate, the tower must be held in place while the tower is welded to the plates | 55T | |
| 6 | 11/7/17 | PAX | FARM | NAWC | 11/27/17 | 7:00 AM | 21 | This is a single crane lift of a test article installed on the FARM F-18 model. The test article is located in the centerline position on the model. The request is to remove the test article and place in a provided stand on the ground. | 55T | |
| 7 | 11/7/17 | PAX | FARM | NAWC | 11/27/17 | 7:00 AM | 21 | This is a single crane lift of a test article installed on the FARM F-18 model. The test article is located in the centerline position on the model. The request is to remove the test article and place in a provided stand on the ground. | 55T | |
| 8 | 11/7/17 | Webster | 8271 | NAWC | 11/28/17 | 8:00 AM | 22 | AN/SPN-43C antenna pedestal needs to be lifted from a 23 foot tower to the ground and replaced with a different pedestal to the 23 foot tower. | 55T | |
| 9 | 11/7/17 | Webster | 8165 | NAWC | 11/30/17 | 8:00 AM | 24 | We need to remove DDG118 antennas (6 total) from the roof of 8165 and install DDG119 antennas (6 total). | 55T | |
| 10 | 11/7/17 | PAX | FARM | NAWC | 11/30/17 | 8:00 AM | 24 | This is a single crane lift of a test article installed on the FARM F-18 model. The test article is located in the centerline position on the model. The request is to remove the test article and place in a provided stand on the ground. | 55T | |
| 11 | 11/30/17 | PAX | FARM | NAWC | 12/1/17 | 8:00 AM | 2 | This is a single crane lift of a test article installed on the FARM F-18 model. The test article is located in the centerline position on the model. The request is to remove the test article and place in a provided stand on the ground. | 55T | |
| 12 | 12/4/17 | PAX | 2641 (SAIL) | NAWC | 12/14/17 | 8:00 AM | 11 | Items from the 64' Platform need to be lifted and placed on the ground. | 55T | |
| 13 | 12/5/17 | PAX | FARM | NAWC | 12/19/17 | 8:00 AM | 15 | This is a single crane lift request for the removal and then the re-install of a test device approximately the same size as an aircraft fuel cell. The effort is to remove the device from the F-18 model, some work needs to be done on the test device, then re-install the test device. The amount of time required for the work is approximately 1 hour. Device is to be mounted on the centerline station of the FARM F-18 model. | 55T | |
| 14 | 12/18/17 | Webster | 8271 | NAWC | 12/28/17 | 8:00 AM | 11 | AN/SPN antenna pedestal needs to lifted from a 23ft tower to the ground and replaced with a different pedestal to the 23ft. tower | 55T | |
| 15 | 1/2/18 | Webster | 8054 | NAWC | 1/16/18 | 1:00 PM | 15 | The 1500 lb., 12 foot diameter, OE-120 antenna that is bolted to the tower positioner will be put up onto tower 8054. All personnel working rigging aloft shall have required fall protection, an anchor point provided by a trained competent person is provided for fall prevention on the tower. Base air operations must be informed of lift activity and no lifting to be done until cleared through ATC.T | 55T | |
| 16 | 1/12/18 | PAX | FARM (3200) | NAWC | 1/19/18 | 8:00 AM | 8 | This is a single crane lift request for the installation of two devices in the Bldg 3200 chamber. The first device is a model tower base, the second device is a model tower shaft. Both devices need to be mounted onto a positioner located inside the chamber area. A large exterior door can be opened to gain access | 55T | |
| 17 | 1/12/18 | PAX | FARM (2197) | NAWC | 1/23/18 | 8:00 AM | 12 | This is a single crane lift request for the removal and then the re-install of a test device approximately the same size as an aircraft fuel cell. The effort is to remove the device from the F-18 model, some work needs to be done on the test device, then re-install the test device. The amount of time required for the work is approximately 1 hour. Device is to be mounted on the centerline station of the FARM F-18 model. | 55T | |
| 18 | 1/16/18 | PAX | 1630 ATR | NAWC | 2/5/18 | 8:00 AM | 21 | lifting off equipment cabinets from pedestal 6 on the lower radar deck | 55T | |
| 19 | 1/16/18 | PAX | 1630 ATR | NAWC | 2/27/18 | 8:00 AM | 43 | lifting equipment cabinets back onto the pedestal three weeks later | 55T | |
| 20 | 1/18/18 | Webster | 8054 | NAWC | 1/23/18 | 1:00 PM | 6 | The 1500 lb., 12 foot diameter, OE-120 antenna that is bolted to the tower positioner will be put up onto tower 8054. All personnel working rigging aloft shall have required fall protection, an anchor point provided by a trained competent person is provided for fall prevention on the tower. Base air operations must be informed of lift activity and no lifting to be done until cleared through ATC. | 55T | |
| 21 | 1/18/18 | Webster | 8054 | NAWC | 1/29/18 | 8:00 AM | 12 | The 1500 lb., 12 foot diameter, OE-120 antenna that is bolted to the tower positioner will be put up onto tower 8054. All personnel working rigging aloft shall have required fall protection, an anchor point provided by a trained competent person is provided for fall prevention on the tower. Base air operations must be informed of lift activity and no lifting to be done until cleared through ATC. | 55T | |
| 22 | 1/8/18 | Webster | 8054 | NAWC | 1/17/18 | 1:00 PM | 10 | This is a single crane lift request for the removal and then the re-install of a test device approximately the same size as an aircraft fuel cell. The effort is to remove the device from the F-18 model, some work needs to be done on the test device, then re-install the test device. The amount of time required for the work is approximately 1 hour. Device is to be mounted on the centerline station of the FARM F-18 model. | 55T | |
| 23 | 1/22/18 | PAX | FARM (2197) | NAWC | 1/30/18 | 8:00 AM | 9 | This is a single crane lift request for the removal and then the re-install of a test device approximately the same size as an aircraft fuel cell. The effort is to remove the device from the F-18 model, some work needs to be done on the test device, then re-install the test device. The amount of time required for the work is approximately 1 hour. Device is to be mounted on the centerline station of the FARM F-18 model. | 55T | |
| 24 | 1/24/18 | PAX | 2122 | NAWC | 1/31/18 | 8:00 AM | 8 | The 861lb Radar Set Group OY-80(V)3/SPN-46(V) (quantity 1) that are bolted to the tower platforms will be taken down and new antennas lifted into their place. Base air operations must be informed of lift activity and no lifting to be done until cleared through ATC. | 55T | |
| 25 | 1/16/18 | PAX | 1630 ATR | NAWC | 2/5/18 | 8:00 AM | 21 | lifting off equipment cabinets from pedestal 6 on the lower radar deck | 55T | |
| 26 | 2/20/18 | Webster | 8054 | NAWC | 3/5/18 | 1:00 PM | 14 | The 1500 lb, 12 foot diameter, OE-120 antenna that is bolted to the tower positioner will be put up onto tower 8054. All personnel working rigging aloft shall have required fall protection, an anchor point provided by a trained competent person is provided for fall prevention on the tower. Base air operations must be informed of lift activity and no lifting to be done until cleared through ATC. | 55T | |
| 27 | 2/22/18 | PAX | 2122 | NAWC | 3/7/18 | 8:00 AM | 14 | The 861lb Radar Set Group OY-80(V)3/SPN-46(V) (quantity 1) that are bolted to the tower platforms will be taken down and new antennas lifted into their place. Base air operations must be informed of lift activity and no lifting to be done until cleared through ATC. | 55T | |
| 28 | 2/26/18 | Webster | 8054 | NAWC | 3/9/18 | 8:00 AM | 12 | The 1500 lb, 12 foot diameter, OE-120 antenna that is bolted to the tower positioner will be taken down from the tower 8054. All personnel working rigging aloft shall have required fall protection, an anchor point provided by a trained competent person is provided for fall prevention on the tower. Base air operations must be informed of lift activity and no lifting to be done until cleared through ATC. | 55T | |
| 29 | 2/27/18 | PAX | FARM 2197 | NAWC | 3/7/18 | 9:00 AM | 9 | This is a single crane lift request for the removal and then the re-install of a test device approximately the same size as an aircraft fuel cell. The effort is to remove the device from the F-18 model, some work needs to be done on the test device, then re-install the test device. The amount of time required for the work is approximately 1 hour. Device is to be mounted on the centerline station of the FARM F-18 model. | 55T | |
| 30 | 3/1/18 | Webster | 8054 | NAWC | 3/13/18 | 1:00 PM | 13 | The 1500 lb, 12 foot diameter, OE-120 antenna that is bolted to the tower positioner will be put up onto tower 8054. All personnel working rigging aloft shall have required fall protection, an anchor point provided by a trained competent person is provided for fall prevention on the tower. Base air operations must be informed of lift activity and no lifting to be done until cleared through ATC. | 55T | |
| 31 | 3/5/18 | Webster | 8054 | NAWC | 3/19/18 | 8:00 AM | 15 | The 1500 lb, 12 foot diameter, OE-120 antenna that is bolted to the tower positioner will be put up onto tower 8054. All personnel working rigging aloft shall have required fall protection, an anchor point provided by a trained competent person is provided for fall prevention on the tower. Base air operations must be informed of lift activity and no lifting to be done until cleared through ATC. | 55T | |
| 32 | 3/6/18 | Webster | 8271 | NAWC | 3/27/18 | 8:00 AM | 22 | AN/SPN-43C antenna pedestal needs to be lifted from a 23 foot tower to the ground and replaced with a different pedestal to the 23 foot tower. | 55T | |
| 33 | 3/5/18 | PAX | EMP 2100 | NAWC | 4/17/18 | 8:00 AM | 44 | EMP Site Manlift Day 1 | 65T | |
| 34 | 3/5/18 | PAX | EMP 2100 | NAWC | 4/18/18 | 8:00 AM | 45 | Emp Site Manlift Day 2 (backup for rain) | 65T | |
| 35 | 3/6/18 | PAX | FARM 2197 | NAWC | 3/9/18 | 9:00 AM | 4 | This is a single crane lift request for the removal and then the re-install of a test device approximately the same size as an aircraft fuel cell. The effort is to remove the device from the F-18 model, some work needs to be done on the test device, then re-install the test device. The amount of time required for the work is approximately 1 hour. Device is to be mounted on the centerline station of the FARM F-18 model. | 55T | |
| 36 | 3/13/18 | Webster | 8054 | NAWC | 3/28/18 | 1:00 PM | 16 | The 300 lb SPN-43 with feed on it is 120 inches wide by 72 inches high. All personnel working rigging aloft shall have required fall protection, an anchor point provided by a trained competent person is provided for fall prevention on the tower. Base air operations must be informed of lift activity and no lifting to be done until cleared through ATC. | 55T | |
| 37 | 3/13/18 | Webster | 8054 | NAWC | 3/30/18 | 1:00 PM | 18 | The 300 lb SPN-43 with feed on it is 120 inches wide by 72 inches high. All personnel working rigging aloft shall have required fall protection, an anchor point provided by a trained competent person is provided for fall prevention on the tower. Base air operations must be informed of lift activity and no lifting to be done until cleared through ATC. | 55T | |
| 38 | 3/27/18 | Webster | 8054 | NAWC | 4/9/18 | 8:00 AM | 14 | The 300 lb SPN-43 with feed on it is 120 inches wide by 72 inches high. All personnel working rigging aloft shall have required fall protection, an anchor point provided by a trained competent person is provided for fall prevention on the tower. Base air operations must be informed of lift activity and no lifting to be done until cleared through ATC. | 55T | |
| 39 | 3/28/18 | Webster | 8054 | NAWC | 3/30/18 | 1:00 PM | 3 | The 300 lb SPN-43 with feed on it is 120 inches wide by 72 inches high. All personnel working rigging aloft shall have required fall protection, an anchor point provided by a trained competent person is provided for fall prevention on the tower. Base air operations must be informed of lift activity and no lifting to be done until cleared through ATC. | 55T | |
| 40 | 3/27/18 | PAX | 2197 (FARM) | NAWC | 4/3/18 | 8:00 AM | 8 | This is a single crane lift request for the removal of a test device approximately the same size as an aircraft fuel cell. Device is currently mounted on the centerline station of the FARM F-18 model. | 55T | |
| 41 | 3/27/18 | PAX | 2197 (FARM) | NAWC | 4/6/18 | 8:00 AM | 11 | This is a single crane lift request for the installation of a test device approximately the same size as an aircraft fuel cell. Device is currently mounted on the centerline station of the FARM F-18 model. | 55T | |
| 42/44 | 3/30/18 | PAX | 2122 | NAWC | 4/9/18 | 7:00 AM | 11 | The 861lb Radar Set Group OY-80(V)3/SPN-46(V) (quantity 1) that are bolted to the tower platforms will be taken down and new antennas lifted into their place. Base air operations must be informed of lift activity and no lifting to be done until cleared through ATC | 55T | |
| 43 | 3/28/18 | Webster | 8054 | NAWC | 3/30/18 | 1:00 PM | 3 | The 300 lb SPN-43 with feed on it is 120 inches wide by 72 inches high. All personnel working rigging aloft shall have required fall protection, an anchor point provided by a trained competent person is provided for fall prevention on the tower. Base air operations must be informed of lift activity and no lifting to be done until cleared through ATC. | 55T | |
| 44 | 3/30/18 | PAX | 2122 | NAWC | 4/13/18 | 7:00 AM | 15 | The 861lb Radar Set Group OY-80(V)3/SPN-46(V) (quantity 1) that are bolted to the tower platforms will be taken down and new antennas lifted into their place. Base air operations must be informed of lift activity and no lifting to be done until cleared through ATC | 55T | |
| 45 | 4/9/18 | Webster | 8054 | NAWC | 4/13/18 | 1:00 PM | 5 | The 300 lb SPN-43 with feed on it is 120 inches wide by 72 inches high. All personnel working rigging aloft shall have required fall protection, an anchor point provided by a trained competent person is provided for fall prevention on the tower. Base air operations must be informed of lift activity and no lifting to be done until cleared through ATC. | 55T | |
| 46 | 4/9/18 | PAX | 2197 (FARM) | NAWC | 4/17/18 | 8:00 AM | 9 | This is a single crane lift request for the installation of a test device approximately the same size as an aircraft fuel cell. Device is currently mounted on the centerline station of the FARM F-18 model. | 55T | |
| 47 | 4/9/18 | PAX | 2193 (FARM) | NAWC | 4/17/18 | 8:00 AM | 9 | This request is for two efforts. First effort is the moving of a large ground plane to a trailer located in the field at Bldg 2193. Second effort is to install a lattice towers on the top of the upper positioner located at Bldg 2193 | 55T | |
| 48 | 4/9/18 | PAX | 2197 (FARM) | NAWC | 4/25/18 | 8:00 AM | 17 | This is a single crane lift request for the installation of a test device approximately the same size as an aircraft fuel cell. Device is currently mounted on the centerline station of the FARM F-18 model. | Cancelled - Charged Lift | |
| 49 | 4/10/18 | PAX | Hangar 144 | NAWC | 4/30/18 | 1:00 PM | 21 | Three block approximately 32" high will be strategically positioned in the hangar to match the F-35B landing gear. The F-35B will then be hoisted and positioned on the blocks. | 65T | |
| 50 | 4/9/18 | PAX | 2197(Farm) | NAWC | 5/2/18 | 8:00 AM | 24 | This is a single crane lift request for the installation of a test device approximately the same size as an aircraft fuel cell. Device is currently mounted on the centerline station of the FARM F-18 model. | Cancelled - Charged Lift | |
| 51 | 4/9/18 | PAX | 2197(Farm) | NAWC | 5/10/18 | 8:00 AM | 32 | This is a single crane lift request for the installation of a test device approximately the same size as an aircraft fuel cell. Device is currently mounted on the centerline station of the FARM F-18 model. | 55T | |
| 52 | 4/9/18 | PAX | 2197(Farm) | NAWC | 5/15/18 | 8:00 AM | 37 | This request is for crane service at the FARM for the purpose of removing the F-18E model from the Bldg 2197 tower, moving the model mounting bracket to the bottom side of the model, then installing the model right side up on the Bldg 2197 tower. Removal of the F-18E model, setting it in the stands, and moving the bracket to the bottom side of the model can be done by a single crane. The flipping and installation of the model will require two cranes. | 65T | |
| 53 | 55T | |||||||||
| 54 | 4/9/18 | PAX | 2197(Farm) | NAWC | 5/29/18 | 8:00 AM | 51 | This request is for crane service at the FARM for the purpose of removing the F-18E model from the Bldg 2197 tower, moving the model mounting bracket to the top side of the model, then installing the model upside down on the Bldg 2197 tower. |
Removal of the F-18E model, setting it in the stands, and moving the bracket to the top side of the model can be done by a single crane. The flipping and installation of the model will require two cranes.
| Cancelled - Charged Lift | |||||||||
| 55 | 1 | Cancelled - Charged Lift | |||||||
| 56 | 4/13/18 | Webster | 8054 | NAWC | 4/16/18 | 8:00 AM | 4 | The 300 lb SPN-43 with feed on it is 120 inches wide by 72 inches high. All personnel working rigging aloft shall have required fall protection, an anchor point provided by a trained competent person is provided for fall prevention on the tower. Base air operations must be informed of lift activity and no lifting to be done until cleared through ATC. | 55T |
| 57 | 4/17/18 | Webster | 8054 | NAWC | 4/23/18 | 8:00 AM | 7 | The 300 lb SPN-43 with feed on it is 120 inches wide by 72 inches high. All personnel working rigging aloft shall have required fall protection, an anchor point provided by a trained competent person is provided for fall prevention on the tower. Base air operations must be informed of lift activity and no lifting to be done until cleared through ATC. | 55T |
| 58 | 4/17/18 | Webster | 8054 | NAWC | 4/30/18 | 1:00 PM | 14 | The 1500 lb, 12 foot diameter, OE-120 antenna that is bolted to the tower positioner will be put up onto tower 8054. The 300 lb SPN-43 with feed on it is 120 inches wide by 72 inches high. All personnel working rigging aloft shall have required fall protection, an anchor point provided by a trained competent person is provided for fall prevention on the tower. Base air operations must be informed of lift activity and no lifting to be done until cleared through ATC. | 55T |
| 59 | 5/10/18 | PAX | 2197 (FARM) | NAWC | 5/24/18 | 8:00 AM | 15 | This is a single crane lift request for the installation of a test device approximately the same size as an aircraft fuel cell. Device is currently mounted on the centerline station of the FARM F-18 model. | 55T |
| 60 | 4/26/18 | Webster | 8054 | NAWC | 5/4/18 | 1:00 PM | 9 | he 1500 lb, 12 foot diameter, OE-120 antenna that is bolted to the tower positioner will be taken off of tower 8054. All personnel working rigging aloft shall have required fall protection, an anchor point provided by a trained competent person is provided for fall prevention on the tower. Base air operations must be informed of lift activity and no lifting to be done until cleared through ATC. | 55T |
| 61 | 4/26/18 | Pax | 1461 | NAWC | 5/9/18 | 9:00 AM | 14 | LIFT 32K Equipment off of Truck and set by the Bay | 65T |
| 62 | 4/27/18 | PAX | Hangar 144 | NAWC | 5/14/18 | 1:00 PM | 18 | Three block approximately 32" high will be strategically positioned in the hangar to match the F-35B landing gear. The F-35B will then be hoisted and positioned on the blocks. | 65T |
| 63 | 5/1/18 | PAX | 2197(Farm) | NAWC | 5/10/18 | 8:00 AM | 10 | This is a single crane lift request for the installation of a test device approximately the same size as an aircraft fuel cell. Device is currently mounted on the centerline station of the FARM F-18 model. | 55T |
| 64 | 5/4/18 | Webster | 8054 | NAWC | 5/7/18 | 1:00 PM | 4 | he 1500 lb, 12 foot diameter, OE-120 antenna that is bolted to the tower positioner will be taken off of tower 8054. All personnel working rigging aloft shall have required fall protection, an anchor point provided by a trained competent person is provided for fall prevention on the tower. Base air operations must be informed of lift activity and no lifting to be done until cleared through ATC. | 55T |
| 65 | 5/9/18 | PAX | Hangar 144 | NAWC | 5/21/18 | 1:00 PM | 13 | Three block approximately 32" high will be strategically positioned in the hangar to match the F-35B landing gear. The F-35B will then be hoisted and positioned on the blocks. | 65T |
| 66 | 5/15/18 | Webster | 8054 | NAWC | 5/16/18 | 1:00 PM | 2 | Requested date of lift: 05/16/18 or soonest availability thereafter Requested time of lift: 1300 Customer POC for lift: Pat Murphy; John Davis Customer POC for lift phone number: 301-995-6903; 301-995-8108 Number of days required: 1 Lift height (feet): 56 Lift weight (pounds): 1500/300 Lift location: Tower 8054 Overhead obstruction: no Detailed description of lift: The 1500 lb, 12 foot diameter, OE-120 antenna that is bolted to the tower positioner will be taken off of tower 8054. The 300 lb SPN-43 with feed on it is 120 inches wide by 72 inches high will be installed on tower 8054. All personnel working rigging aloft shall have required fall protection, an anchor point provided by a trained competent person is provided for fall prevention on the tower. Base air operations must be informed of lift activity and no lifting to be done until cleared through ATC. | 55T |
| 67 | 5/15/18 | Webster | 8165 | NAWC | 6/12/18 | 8:00 AM | 29 | We need to remove DDG120 antennas (6 total) from the roof of 8165 and install DDG121 antennas (4 total). | 55T |
| 68 | 5/18/18 | Webster | 8054 | NAWC | 5/24/18 | 1:00 PM | 7 | The 300 lb SPN-43 with feed on it is 120 inches wide by 72 inches high. All personnel working rigging aloft shall have required fall protection, an anchor point provided by a trained competent person is provided for fall prevention on the tower. Base air operations must be informed of lift activity and no lifting to be done until cleared through ATC. | 55T |
| 69 | 5/21/18 | PAX | FARM(2197) | NAWC | 6/12/18 | 8:00 AM | 23 | This is a single crane lift request for the removal and reinstallation of a test device approximately the same size as an aircraft fuel cell. Device is currently mounted on the centerline station of the FARM F-18 model. Once the device is removed from the F-18 model work must be done to reconfigure it, should take 2 hours or less. Then the reconfigured test device needs to be reinstalled in the same location on the F-18 model. | 55T |
| 70 | 5/22/18 | Webster | 8131 | NAWC | 5/25/18 | 8:00 AM | 4 | Lift AN/SPN-50 antenna group from ground level and mount on top of the 35 foot tower | 55T |
| 71 | 5/29/18 | Webster | 8054 | NAWC | 6/5/18 | 1:00 PM | 8 | The 300 lb SPN-43 with feed on it is 120 inches wide by 72 inches high. All personnel working rigging aloft shall have required fall protection, an anchor point provided by a trained competent person is provided for fall prevention on the tower. Base air operations must be informed of lift activity and no lifting to be done until cleared through ATC. | |
| 55T | |||||||||
| 72 | 6/4/18 | Webster | 8054 | NAWC | 6/7/18 | 1:00 PM | 4 | The 300 lb SPN-43 with feed on it is 120 inches wide by 72 inches high. All personnel working rigging aloft shall have required fall protection, an anchor point provided by a trained competent person is provided for fall prevention on the tower. Base air operations must be informed of lift activity and no lifting to be done until cleared through ATC. | |
| 55T | |||||||||
| 73 | 6/5/18 | PAX | 1461 | NAWC | 6/20/18 | 1:00 PM | 16 | Crane shall lift load off a lowboy trailer parked adjacent to side of building using {4) lift points on top of chamber and (2) on backside. Staging of crane shall be in driveway at overhead door#lO. Previous lift used slings combined fro lift with two being longer then other slings due to side lift points. 2) Load lift to 30 feet and booom toward building about 30 feet and place chamber on tank skates on metal road plates near door #10. Chamber to face toward building for forklift to pick load using support braces installed by manufacture. | 65T |
| 74 | 6/6/18 | Webster | 8054 | NAWC | 6/14/18 | 1:00 PM | 9 | The 300 lb SPN-43 with feed on it is 120 inches wide by 72 inches high. All personnel working rigging aloft shall have required fall protection, an anchor point provided by a trained competent person is provided for fall prevention on the tower. Base air operations must be informed of lift activity and no lifting to be done until cleared through ATC. | 55T |
| 75 | 6/8/18 | PAX | 144 | NAWC | 6/22/18 | 1:00 PM | 15 | The F-35 aircraft is currently sitting on 32" high blocks and will need to be placed back on the floor. | 65T |
| 76 | 6/11/18 | Webster | 8271 | NAWC | 6/14/18 | 8:00 AM | 4 | lift an AN/SPN-43C Antenna reflector from the 23-foot tower to the ground and lift an Antenna reflector from the ground to the 23-foot tower. The tower location is between buildings 8271 and 8144 on Webster Field. 43C Antenna reflector is 5 ft. by 7 ft. and weighs 350 Lbs | 55T |
| 77 | 6/14/18 | PAX | 2197 | NAWC | 6/26/18 | 8:00 AM | 13 | This is a single crane lift request for the removal and reinstallation of a test device approximately the same size as an aircraft fuel cell. Device is currently mounted on the centerline station of the FARM F-18 model. Once the device is removed from the F-18 model work must be done to reconfigure it, should take 2 hours or less. Then the reconfigured test device needs to be reinstalled in the same location on the F-18 model. | 55T |
| 78 | 6/15/18 | PAX | 144 | NAWC | 6/28/18 | 1:00 PM | 14 | The F-35 aircraft is currently sitting on 32" high blocks and will need to be placed back on the floor. | 65T |
| 79 | 6/18/18 | Webster | 8054 | NAWC | 7/2/18 | 1:00 PM | 15 | 300 lb SPN-43 with feed on it is 120 inches wide by 72 inches high will be installed on tower 8054. All personnel working rigging aloft shall have required fall protection, an anchor point provided by a trained competent person is provided for fall prevention on the tower. Base air operations must be informed of lift activity and no lifting to be done until cleared through ATC. | 55T |
| 80 | 6/15/18 | PAX | 2197 (FARM) | NAWC | 7/10/18 | 8:00 AM | 26 | This is a single crane lift request for the removal and reinstallation of test devices approximately the same size as an aircraft fuel cell. Device is currently mounted on the centerline station of the FARM F-18 model. Task is to remove one pod and install a similar pod on the centerline of the F-18 model | 55T |
| 81 | 6/15/18 | Webster | 8054 | NAWC | 6/25/18 | 8:00 AM | 11 | The 1500 lb, 12 foot diameter, OE-120 antenna that is bolted to the tower positioner will be taken off of tower 8054. The 300 lb SPN-43 with feed on it is 120 inches wide by 72 inches high will be installed on tower 8054. All personnel working rigging aloft shall have required fall protection, an anchor point provided by a trained competent person is provided for fall prevention on the tower. Base air operations must be informed of lift activity and no lifting to be done until cleared through ATC. | 55T |
| 82 | 6/21/18 | Webster | 8271 | NAWC | 7/17/18 | 8:00 AM | 27 | Tower located between 8271 and 8144 Overhead obstruction: No Detailed description |
of lift: AN/SPN-43C antenna pedestal needs to be lifted from a 23 foot tower to the ground and replaced with a different pedestal to the 23 foot tower.
| 55T | ||||||||||
| 83 | 7/9/18 | PAX | FARM 2197 | NAWC | 7/17/18 | 8:00 AM | 9 | This is a single crane lift request for the removal and reinstallation of test devices approximately the same size as an aircraft fuel cell. Device is currently mounted on the centerline station of the FARM F-18 model. Task is to remove one pod and install a similar pod on the centerline of the F-18 model. | 55T | |
| 84 | 7/13/18 | PAX | FARM 2197 | NAWC | 7/24/18 | 8:00 AM | 12 | This is a single crane lift request for the removal and reinstallation of test devices approximately the same size as an aircraft fuel cell. Device is currently mounted on the centerline station of the FARM F-18 model. Task is to remove one pod and install a similar pod on the centerline of the F-18 model. | 55T | |
| 85 | 7/13/18 | Webster | 8054 | NAWC | 7/25/18 | 1:00 PM | 13 | : Tower 8054 Overhead obstruction: no Detailed description of lift: The 150 lb SPN-46 with feed on it and will be removed from the tower 8054. The 1500 lb, 12 foot diameter, OE-120 antenna that is bolted to the tower positioner will be installed on the tower 8054. All personnel working rigging aloft shall have required fall protection, an anchor point provided by a trained competent person is provided for fall prevention on the tower | Cancelled - Charged Lift | |
| 86 | 7/19/18 | PAX | 1591 | NAWC | 8/14/18 | 8:00 AM | 27 | Replace old Antenna Pedestal, replace with new | 55T | |
| 87 | 7/19/18 | PAX | 101 | NAWC | 8/15/18 | 8:00 AM | 28 | Replace old Antenna Pedestal, replace with new | 55T | |
| 88 | 7/19/18 | PAX | 101 | NAWC | 8/15/18 | 8:00 AM | 28 | Replace old Antenna Pedestal, replace with new | 55T | |
| 89 | 7/27/18 | PAX | FARM 2197 | NAWC | 8/1/18 | 8:00 AM | 6 | This is a single crane lift request for the removal of a test device approximately the same size as an aircraft fuel cell. Device is currently mounted on the centerline station of the FARM F-18 model. The request is to have the crane lift the device, the FARM crew will spin it 180 degrees, then reinstall in the same location on the F-18 model | 55T | |
| 90 | 8/1/18 | PAX | 2905A | NAWC | 8/13/18 | 1:00 PM | 13 | Three block approximately 32" high will be strategically positioned in the hangar to match the MQ-4C Triton landing gear. The MQ-4C Triton will then be hoisted and positioned on the blocks. | 65T | |
| 91 | 8/1/18 | PAX | FARM 2197 | NAWC | 8/7/18 | 8:00 AM | 7 | This is a single crane lift request for the removal of a test device approximately the same size as an aircraft fuel cell. Device is currently mounted on the centerline station of the FARM F-18 model | 55T | |
| 92 | 8/2/18 | Pax | 2187 | NAWC | 8/7/18 | 8:00 AM | 6 | Move Connex box off of ramp to building 90 deg to the grass area next to ramp. | 55T | |
| 93 | 8/8/18 | PAX | 1591 | NAWC | 8/21/18 | 8:00 AM | 14 | Replace old Antenna Pedestal, replace with new | 55T | |
| 94 | 8/8/18 | PAX | 101 | NAWC | 8/22/18 | 8:00 AM | 15 | Replace old Antenna Pedestal, replace with new | 55T | |
| 95 | 8/9/18 | PAX | 2905A | NAWC | 8/15/18 | 1:00 PM | 7 | Three block approximately 32" high will be strategically positioned in the hangar to match the MQ-4C Triton landing gear. The MQ-4C Triton will then be hoisted and positioned on the blocks. | 65T | |
| 96 | 8/10/18 | Webster | 8165 | NAWC | 9/5/18 | 8:00 AM | 27 | We need to remove OE570 antennas (2 total) from the roof of 8165 and install OE570 antennas (2 total). 4 of the antennas are pedestal style (approx. 650lbs) | 55T | |
| 97 | 8/14/18 | Webster | 8054 | NAWC | 8/27/18 | 1:00 PM | 14 | : Tower 8054 Overhead obstruction: no Detailed description of lift: The 150 lb SPN-46 with feed on it and will be removed from the tower 8054. The 1500 lb, 12 foot diameter, OE-120 antenna that is bolted to the tower positioner will be installed on the tower 8054. All personnel working rigging aloft shall have required fall protection, an anchor point provided by a trained competent person is provided for fall prevention on the tower | 55T | |
| 98 | 8/14/18 | PAX | 1370 | NAWC | 8/24/18 | 10:00 AM | 11 | Install a Flag Pole at Quaterdeck | 55T | |
| 99 | 8/20/18 | PAX | FARM 2197 | NAWC | 9/4/18 | 8:00 AM | 16 | This is a single crane lift request for work at two locations, same building. First, the removal of a lattice tower, a medium size positioner, and a large mounting fixture from the rooftop of building 2193. Second Lift, at the 1500’ TX pad for building 2193 install a squint unit on top of the tower. | 55T | |
| 100 | 8/20/18 | PAX | FARM 2197 | NAWC | 9/4/18 | 8:00 AM | 16 | This is a single crane lift request for work at two locations, same building. First, the removal of a lattice tower, a medium size positioner, and a large mounting fixture from the rooftop of building 2193. Second, at the 1500’ TX pad for building 2193 install a squint unit on top of the tower. | 55T | |
| 101 | 8/21/18 | PAX | FARM 2197 | NAWC | 9/18/18 | 8:00 AM | 29 | This is a lift and flip effort to remove the F-18 model from the bldg 2197 tower and place it on the ground. In placing the model on the ground the model’s lower wheel assembly and forward wheel assembly must be installed (the model will not go back on the stands). | 55T | |
| 102 | 8/21/18 | PAX | FARM 2197 | NAWC | 9/18/18 | 8:00 AM | 29 | This is a lift and flip effort to remove the F-18 model from the bldg 2197 tower and place it on the ground. In placing the model on the ground the model’s lower wheel assembly and forward wheel assembly must be installed (the model will not go back on the stands). | 55T | |
| 103 | 8/21/18 | PAX | FARM 2197 | NAWC | 9/18/18 | 8:00 AM | 29 | Move Items from FARM to DRMO Off Load | 55T | |
| 104 | 8/28/18 | Webster | 8054 | NAWC | 9/4/18 | 1:00 PM | 8 | The 1500 lb, 12 foot diameter, OE-120 antenna that is bolted to the tower positioner will be installed on the tower | 55T | |
| 105 | 8/21/18 | PAX | FARM 2197 | NAWC | 9/18/18 | 8:00 AM | 29 | This is a lift and flip effort to remove the F-18 model from the bldg 2197 tower and place it on the ground. In placing the model on the ground the model’s lower wheel assembly and forward wheel assembly must be installed (the model will not go back on the stands). | 65T | |
| 106 | 8/21/18 | PAX | FARM 2197 | NAWC | 9/18/18 | 8:00 AM | 29 | This is a lift and flip effort to remove the F-18 model from the bldg 2197 tower and place it on the ground. In placing the model on the ground the model’s lower wheel assembly and forward wheel assembly must be installed (the model will not go back on the stands). | 55T | |
| 107 | 8/21/18 | PAX | FARM 2197 | NAWC | 9/18/18 | 8:00 AM | 29 | Move Items from FARM to DRMO Off Load | 55T | |
| 108 | 8/31/18 | PAX | FARM 2197 | NAWC | 9/18/18 | 8:00 AM | 19 | This is a single crane lift request for work at two locations, same building. First, the removal of a lattice tower, a medium size positioner, and a large mounting fixture from the rooftop of building 2193. Second, at the 1500’ TX pad for building 2193 install a squint unit on top of the tower. | 55T | |
| 109 | 8/31/18 | PAX | FARM 2197 | NAWC | 9/18/18 | 8:00 AM | 19 | Second, at the 1500’ TX pad for building 2193 install a squint unit on top of the tower. | 55T | |
| 110 | 9/14/18 | PAX | 2905 | NAWC | 9/24/18 | 8:00 AM | 11 | Remove the MQ-4C Triton from the 32" high isolation blocks. | 65T | |
| 111 | 9/14/18 | PAX | Emory Rd | NAWC | 9/26/18 | 7:30 AM | 13 | Each trailer will need to be lifted by crane onto a low boy trailer supplied by DLA transportation from Fort Meade | 65T | |
| 112 | 9/16/18 | PAX | FARM 2197 | NAWC | 9/24/18 | 8:00 AM | 9 | This is three efforts, same building. The first effort is to move the F-18C model from the 2194 1000’ pad location and move it and the model stands to the parking area in front of Bldg 3199, at the FARM. The F-18C model is currently on stands. To move the model a flatbed truck is needed and one crane. The crane lifts the model, the stands are forklifted onto the flatbed, and the model is then placed on the stands, strapped down, and moved. | 55T | |
| 113 | 9/16/18 | PAX | FARM 2197 | NAWC | 9/24/18 | 8:00 AM | 9 | The second effort is to lift a short tower from the cart at bldg. 2194, place it on the flatbed, and transport it to the 2194 1000’ pad. Once at the 2194 1000’ pad the crane needs to place the tower in a spot, FARM personnel mark the pad. The crane then lifts and swings the tower away enough to allow the FARM crew to drill holes, then the tower is placed on the pad and bolted down. Last item is the installation of a small positioner onto the top of the short tower. The third effort, which can be done at the same time the short tower is removed from the cart, is to install a 53230 positioner onto the rooftop of bldg. 2194. | 55T | |
| 114 | 9/19/18 | Webster | 8054 | NAWC | 9/25/18 | 1:00 PM | 7 | Detailed description of lift: The 150 lb SPN-46 with feed on it and will be removed from the tower 8054. The 300 lb | ||
| SPN-43 with feed on it is 120 inches wide by 72 inches high will be installed on tower 8054 | 55T | |||||||||
| 115 | 9/25/18 | Webster | 8054 | NAWC | 9/28/18 | 1:00 PM | 4 | request a lift at the range for Friday 9/28 at 1300 or the next available lift, to remove a SPN-43 and install a SPN-46. | 55T |
| Lift Ticket No. | Date Received from PW | Locataion | Building or Area | NAWC/NDW | Date Requested | Time Requested | # Days Advance Notice | Description | Type of Crane Used |
| 1 | 10/4/18 | Webster | 8054 | NAWC | 10/15/18 | 10:00 AM | 12 | The 1500 lb, 12 foot diameter, OE-120 antenna that is bolted to the tower positioner will be installed on the tower 8054. | 55T |
| 2 | 10/12/18 | Webster | 8054 | NAWC | 10/19/18 | 8:00 AM | 8 | The 1500 lb, 12 foot diameter, OE-120 antenna that is bolted to the tower positioner will be installed on the tower 8054. All personnel working rigging aloft shall have required fall protection, an anchor point provided by a trained competent person is provided for fall prevention on the tower. Base air operations must be informed of lift activity and no lifting to be done until cleared through ATC. | 55T |
| 3 | 10/12/18 | Webster | 8054 | NAWC | 10/22/18 | 1:00 PM | 11 | The 1500 lb, 12 foot diameter, OE-120 antenna that is bolted to the tower positioner will be installed on the tower 8054. | 55T |
| 4 | 10/12/18 | Webster | 8165 | NAWC | 11/7/18 | 8:00 AM | 27 | 1 Lift height (feet): 40 Lift weight (pounds): Up to 650 lbs Lift locations (specify if multiple sites): 8165 Overhead obstruction: None Detailed description of lift: We need to remove OE570 antennas (2 total) from the roof of 8165 and install OE570 antennas (2 total). Remove and install 4 EHF antennas. | 55T |
| 5 | 10/12/18 | Webster | 8165 | NAWC | 11/8/18 | 8:00 AM | 28 | 1 Lift height (feet): 40 Lift weight (pounds): Up to 650 lbs Lift locations (specify if multiple sites): 8165 Overhead obstruction: None Detailed description of lift: We need to remove OE570 antennas (2 total) from the roof of 8165 and install OE570 antennas (2 total). Remove and install 4 EHF antennas. _RAIN DATE | 55T |
| 6 | 10/19/18 | Webster | 8054 | NAWC | 10/26/18 | 1:00 AM | 8 | The 150 lb SPN-46 with feed on it and will be removed from the tower 8054. The 1500 lb, 12 foot diameter, OE-120 antenna that is bolted to the tower positioner will be installed on the tower 8054. | 55T |
| 7 | 10/19/18 | Webster | 8271 | NAWC | 11/14/18 | 8:00 AM | 27 | AN/SPN-43C antenna pedestal needs to be lifted from a 23 foot tower to the ground and replaced with a different pedestal to the 23 foot tower. | 55T |
| 8 | 10/23/18 | PAX | 2100 (EMP) | NAWC | 12/4/18 | 8:30 AM | 43 | EMP Tower MX (DAY 1) | 65T |
| 9 | 10/24/18 | PAX | 2100 (EMP) | NAWC | 12/5/18 | 8:30 AM | 43 | EMP Tower MX (DAY 2) | 65T |
| 10 | 10/30/18 | PAX | 1703 (ATR) | NAWC | 11/6/18 | 9:00 AM | 8 | Antenna twin-tower structure needs repaired, therefore the lift is as follows: 1. Remove horizontal HF antenna and set on the ground. 2. Lay down center mast of antenna.3. Lay down first twin-tower. 4. Lay down second twin-tower. | 65T |
| 11 | 10/30/18 | PAX | 1703 (ATR) | NAWC | 11/8/18 | 9:00 AM | 10 | Antenna twin-tower structure needs repaired, therefore the lift is as follows: 1. Remove horizontal HF antenna and set on the ground. 2. Lay down center mast of antenna.3. Lay down first twin-tower. 4. Lay down second twin-tower. | 65T |
| 12 | 11/5/18 | PAX | 1703 (ATR) | NAWC | 11/19/18 | 8:00 AM | 15 | On second lift day: 5. Erect first twin-tower. 6. Erect second twin-tower.7. Erect antenna mast. 8. Lift HF antenna and place on top of antenna mast. | 65T |
| 13 | 11/7/18 | Webster | 8054 | NAWC | 11/14/18 | 10:00 AM | 8 | Remove SPN-46 and Install SPN-43 | 55T |
| 14 | 10/24/18 | PAX | 2100 (EMP) | NAWC | 12/6/18 | 8:30 AM | 44 | BACKUP DATE EMP SITE (CUSTOMER IS AWARE OF CHARGEABLE DATE) Coincides with Lift #8 and #9 | 65T |
| 15 | 11/13/18 | Webster | 8054 | NAWC | 11/20/18 | 1:00 PM | 8 | The 150 lb SPN-46 with feed on it and will be removed from the tower 8054. The 1500 lb, 12 foot diameter, OE-120 antenna that is bolted to the tower positioner will be installed on the tower 8054. | 55T |
| 16 | 11/13/18 | PAX | FARM | NAWC | 11/28/18 | 8:00 AM | 16 | This effort is to install a small positioner on top of a short tower. | 55T |
| 17 | 11/13/18 | PAX | FARM | NAWC | 11/28/18 | 8:00 AM | 16 | This is for two efforts at Bldg 2193. First effort is to remove the top portion of the tower and place it on the ground. The tower will need to be cut once the crane is attached to it. The second effort is to place a plate on top of the positioner at Bldg 2193. | 55T |
Summary
| Counts | 2017-2018 | 2018 | Total |
| 55T | 93 | 11 | 104 |
| 65T | 17 | 6 | 23 |
| Cancelled - Charged Lift | 5 | 0 | 5 |
| Totals | 115 | 17 | 132 |
File details come from the government source that posted it. Updated .