J-0200000-05-03 Crane and Rigging Gear Accident Report Form.pdf

PDF 152 KB Posted

Attached to
NSA Patuxent River Facilties Support Services (PAX FSS)
Solicitation number
N40080
Issued by

About this file

This pre-solicitation notice describes a requirements contract for facilities support services at Naval Support Activity Patuxent River. The single-award IDIQ contract will have recurring and non-recurring work items including custodial services, pest control, grounds maintenance, landscaping, pavement clearance, and transportation services. The solicitation will utilize FAR Part 15 procedures and require corporate experience, technical approach, management approach, safety, and past performance submissions along with pricing for evaluation. The tradeoff source selection process will consider proposals from other than the lowest priced or highest technically rated offerors. The NAICS code is 561720 with a $19.5 million small business size standard. The base period is up to 12 months with four 12-month option periods not to exceed 66 months total. The incumbent contractor is Diversified Service Contracting, Inc. under an $71 million contract. The 8(a) set-aside solicitation will be available on beta.SAM with a draft now and final RFP on or about January 30, 2020, and proposals due around February 20, 2020.

View the file

Other files

File Type Posted
JB-1_FTE_SHEET_PAX FSS.xlsx XLSX spreadsheet
J-0200000-02 CBA 2012-5371.PDF PDF
J-1503020-04 Frequencies for MWR.pdf PDF
J-0200000-02 WD 2015-4281 Revision 11.pdf PDF
J-1503010-06 NAS PAX Webster Field Map.PDF PDF
J-1503060-07 PAX Sidewalk Maps.pdf PDF
J-1503050-08 Prestige and Improved Inventory MRS.xlsx XLSX spreadsheet
J-1700000-01 Fleet Inventory Final.xlsx XLSX spreadsheet
J-0200000-05-04 Crane and Rigging Gear Near Miss Form.pdf PDF
J-1503060-08 PAX Airfield Sweeping Map.pdf PDF
J-1503020-04 Frequencies for NAWC.pdf PDF
J-1503060-06 Snow Removal Site Maps.pdf PDF
J-1503010-06 NAS Patuxent River Map.PDF PDF
J-1503020-04 Frequencies for NDW Solomons.pdf PDF
J-0200000-02 CBA for Local Lodge 4.pdf PDF
J-1503010-05 Custodial Inventory.xlsx XLSX spreadsheet
N40080-20-D-0001 Inquiry Form.xls XLS spreadsheet
J-1503050-08 Prestige and Improved Inventory.xlsx XLSX spreadsheet
J-1503020-14 Fence Maps.pdf PDF
J-1503020-04 Sustained Services.pdf PDF
J-0200000-09_ELINS_PAX_FSS.xlsx XLSX spreadsheet
J-1503010-06 NAS PAX Solomon's Island Map.PDF PDF
J-0200000-02 CBA 2012-5372.pdf PDF
J-1503020-04 Frequencies for NDW.pdf PDF
J-1700000-03 Historial Data Cranes.xlsx XLSX spreadsheet
J-0200000-02 WD 2015-4279 Revision 6.pdf PDF
J-1503020-04 Frequencies for NAVFAC.pdf PDF
J-1503050-07 Site Maps for Grounds Maintenance.pdf PDF
J-1503050-09 BASH Areas.pdf PDF
PAX FSS N40080-20-R-0001 DRAFT Solicitation.pdf PDF
J-1503060-04 PAX Sidewalk Inventory.XLSX XLSX spreadsheet
J-1503060-03 Pavement Clearing Inventory.xlsx XLSX spreadsheet
J-1503020-04 Frequencies for DECA.pdf PDF
J-0200000-05-01 Crane Checklist Form.pdf PDF
J-1503020-12 Historial Data Pest Control Service Calls.pdf PDF
Show all 35

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CRANE AND RIGGING GEAR ACCIDENT REPORT INSTRUCTIONS

This form is designed for fax transmission without a cover page or by e-mail and, with enclosures and signatures, shall be the official document. Electronic submission will be accepted without signatures but the names of the preparer, concurring personnel, and certifying official (for crane accidents only) shall be filled in. The e-mail address is m_nfsh_ncc_accident@navy.mil. The fax number is (757) 967-3808.

1. Accident Category: Indicate either crane accident or rigging gear accident.

2. From: The naval activity that is responsible for reporting the accident and UIC number.

3. Activity: The naval activity where the accident took place.

4. Report No.: The activity assigned accident number (e.g. 95-001).

5. Crane No.: The activity assigned crane number (e.g. PC-5), if applicable.

6. Category: Identify category of crane (i.e. 1, 2, 3, or 4), if applicable.

7. Accident Date: The date the accident occurred.

8. Time: The time (24-hour clock) the accident occurred (e.g. 1300).

9. Category of Service: Check the applicable service (SPS as defined by NAVSEA 0989-030-7000).

10. Crane Type: The type of crane involved in the accident (e.g. mobile, bridge), if applicable.

11. Crane Manufacturer: The manufacturer of the crane (e.g. Dravo, Grove, P&H), if applicable.

12. SPS: Was the crane or rigging gear being used in an SPS lift?

13. Complex lift: Was the crane or rigging gear being used in a complex lift?

14. Location: The detailed location where the accident took place (e.g. building 213, dry dock 5).

15. Weather: The weather conditions at time of accident (e.g. wind, rain, cold).

16. Crane Capacity: The certified capacity of the crane (e.g, 120,000 pounds), if applicable.

17. Hook Capacity: The capacity of the hook involved in the accident at the max radius of the operation, if applicable.

18. Weight of Load on Hook: If applicable, the weight of the load on the hook.

19. Fatality or Permanent Disability? Check yes or no.

20. Material/Property Cost Estimate: Estimate total cost of damage resulting from the accident.

21. Reported to NAVSAFECEN? Self-explanatory.

22. Accident Type: Check all that apply.

23. Cause of Accident: Check all that apply.

24. Chargeable to: Check all that apply.

25. Crane Function: Check all functions in operation at time of accident. Check N/A if a rigging gear accident.

26. Is this a recurring problem? Check yes or no. Identify any other similar accidents.

27. Situation Description/Corrective Actions: Self-explanatory.

28. Preparer: Self-explanatory.

29. Concurrences: Self-explanatory.

30. Certifying Official (Crane Accidents Only): Self-explanatory.

31. Brief Description: No more than one paragraph summarizing the resultant incident.

32. Background and Detailed Description: Provide the relevant background in a descriptive timeline of preconditions leading up to the event, as well as a detailed description of the event.

33. Corrective Actions: List all short term and long term corrective actions that are taken to prevent recurrence of the incident. Short Term Corrective Actions are those actions taken that will allow return to work in short time frame. Long Term actions are more ‘programmatic’ in nature and typically include: process revision, changes in training, ‘mistake proofing’, etc.

CRANE AND RIGGINGEAR ACCIDENT REPORT

Accident Category: Crane Accident Rigging Gear Accident

From:

UIC:

To: Navy Crane Center Bldg. 491 NNSY Portsmouth, VA 23709 Fax: 757-967-3808

Activity:

Report No:

Crane No:

Category:

Accident Date:

Time: hrs:

Category of Service: SPS GPS Crane Type:

Crane Manufacturer:

Was Crane/Rigging Gear Being Used in SPS: Yes No Was Crane/Rigging Gear Being Used in a Complex Lift/Critical

Non-Crane Rigging Operation: Yes No

Location:

Weather:

Crane Capacity:

Hook Capacity:

Weight of Load on hook:

Fatality or Permanent Disability? Yes No

Material/Property Cost Estimate:

Reported to NAVSAFECEN? Yes No

Accident Type:

Personal Injury Overload Derail Damaged Rigging Gear

Load Collision Two Blocked Dropped Load Damaged Crane

Crane Collision Damaged Load Other: Specify

Cause of Accident:

Improper Operation Equipment Failure Inadequate Visibility

Improper Rigging Switch Alignment inadequate Communication

Track Condition Procedural Failure Other: Specify

Chargeable to:

Crane Walker Rigger Operator

Maintenance Management/Supervision Other: Specify

Crane Function:

Travel Hoist Rotate Luffing Telescoping Other N/A

Is this accident indicative of a recurring problem? Yes No

If yes, list Accident Report Nos.:

ATTACH COMPLETE AND CONCISE SITUATION DESCRIPTION AND CORRECTIVE/PREVENTIVE ACTIONS TAKEN AS ENCLOSURE (1). Include probable cause and contributing factors. Assess damages and define responsibility. For equipment malfunction or failure, include specific description of the component and the resulting effect or problem caused by the malfunction or failure. List immediate and long term corrective/preventive actions assigned and respective codes.

Preparer:

Phone:

E-mail:

Code:

Date:

Concurrences: (Include Code, Signature and Date)

Certifying Official (Crane Accident Only):