N4002726R0005.pdf

PDF 521 KB Posted

Attached to
MK 41 VERTICAL LAUNCH SYSTEM (VLS) OVERHAUL
Solicitation number
N4002726R0005
Issued by

About this file

This is a Request for Proposal (RFP) for an Indefinite Delivery, Indefinite Quantity (IDIQ) firm fixed-price contract to provide MK-41 Vertical Launching System (VLS) cell and uptake hatch overhaul services. The solicitation was issued by the Southeast Regional Maintenance Center (SERMC), Naval Station Mayport, on September 28, 2026, with a proposal deadline of October 29, 2026, at 1200 hours local time. The contract will be performed at Naval Station Mayport and the contractor's facility, with work including disassembly, cleaning, decontamination, inspection, non-destructive testing, surface preparation, coating application, reassembly, and quality control on both cell and uptake hatches. The contract spans five one-year ordering periods from 2027 through 2031, with estimated requirements of 150 cell hatches and 20 uptake hatches in the first ordering period, declining to 110 cell hatches and 20 uptake hatches in subsequent periods.

The Government will evaluate proposals using a best-value trade-off source selection with past performance being significantly more important than price. Award will be made on an FFP basis with delivery FOB Destination to SERMC Building 191, Massey Avenue, Mayport Naval Station, Florida. Offerors must demonstrate compliance with specific technical requirements including ISO 9001 quality management system certification, NACE or SSPC/NBPI corrosion control certifications, MK-41 VLS cell and uptake hatch certification for both facility and personnel per the certification programs outlined in References 3.7 and 3.8, qualified welders and silverbrazers, and certified NDT inspectors. The minimum guarantee is $10,000, and the maximum contract value will be determined at award. Past performance will be evaluated using up to five finalized CPARS evaluations within the prior three years, with very relevant past performance defined as contracts exceeding $350,000 involving MK-41 VLS cell and uptake hatch work. Proposals must include three volumes: price proposal with Section B CLINs and Attachment J-1 ELIN pricing, past performance documentation, and pre-award information including organizational charts, quality assurance program documentation, and required certifications. Questions must be submitted by October 12, 2026.

View the file

Other files

File Type Posted
N4002726R00050001.pdf PDF
S-1 Request for Specification Clarification.pdf PDF
J-1 ELIN PRICING Ordering Periods 1 through 5.xlsx XLSX spreadsheet
Exhibit A CDRL.pdf PDF
J-6 NAVSEA SI 009-032.pdf PDF
J-4 NAVSEA SI 009-012.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Previous Edition is Unusable 33-134 STANDARD FORM 33 (REV. 9-97)

Prescribed by GSA FAR (48 CFR) 53.214(c)

SOLICITATION, OFFER AND AWARD

1. THIS CONTRACT IS A RATED ORDER

UNDER DPAS (15 CFR 700)

RATING

DO-A3

PAGE OF PAGES

1 76

2. CONTRACT NO. 3. SOLICITATION NO.

N4002726R0005

4. TYPE OF SOLICITATION

[ ] SEALED BID (IFB)

X ] NEGOTIATED (RFP)

5. DATE ISSUED

28 Sep 2026

6. REQUISITION/PURCHASE NO.

N40027VLS001

7. ISSUED BY CODE N40027 8. ADDRESS OFFER TO (If other than Item7) CODE

COMMANDER SOUTHEAST REGIONAL MAINTENANCE

MAYPORT NAVAL STATION

PO BOX 280057

JACKSONVILLE FL 32228 TEL: (904) 270-5126

FAX: (904) 270-5056

See Item 7

TEL:

FAX:

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

SOLICITATION

9. Sealed offers in original and copies for furnishing the supplies or services in the Schedule will be received at the place specified in Item 8, or if handcarried, in the depository located in S e e S e c t i o n L until 12:00 PM local time 29 Oct 2026 (Hour) (Date)

CAUTION - LATE Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and conditions contained in this solicitation.

10. FOR INFORMATION

CALL:

A. NAME

DANIELLE B FUJIO-WHITE

B. TELEPHONE (Include area code) (NO COLLECT CALLS)

(904)270-5126 EXT 3368

C. E-MAIL ADDRESS

danielle.b.fujio-white.civ@us.navy.mil

11. TABLE OF CONTENTS

(X) SEC. DESCRIPTION PAGE(S) (X) SEC. DESCRIPTION PAGE(S)

PART I - THE SCHEDULE PART II - CONTRACT CLAUSES

X A SOLICITATION/ CONTRACT FORM 1 X I CONTRACT CLAUSES 45 - 53

X B SUPPLIES OR SERVICES AND PRICES/ COSTS 2 - 9 PART III - LISTOF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS

X C DESCRIPTION/ SPECS./ WORK STATEMENT 10 - 29 X J LIST OF ATTACHMENTS 54

X D PACKAGING AND MARKING 30 PARTIV - REPRESENTATIONS AND INSTRUCTIONS

X E INSPECTION AND ACCEPTANCE 31 - 32

X K

REPRESENTATIONS, CERTIFICATIONS AND

OTHER STATEMENTS OF OFFERORS 55 - 66 X F DELIVERIES OR PERFORMANCE 33 - 34

X G CONTRACT ADMINISTRATION DATA 35 - 40 X L INSTRS., CONDS., AND NOTICES TO OFFERORS 67 - 73 X H SPECIAL CONTRACT REQUIREMENTS 41 - 44 X M EVALUATION FACTORS FOR AWARD 74 - 76

OFFER (Must be fully completed by offeror) NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.

12. In compliance with the above, the undersigned agrees, if this offer is accepted within calendar days (60 calendar days unless a different period is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.

13. DISCOUNT FOR PROMPT PAYMENT

(See Section I, Clause No. 52.232-8)

14. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the SOLICITATION for offerors and related documents numbered and dated):

AMENDMENT NO. DATE AMENDMENT NO. DATE

15A. NAME

AND

ADDRESS

OF

OFFEROR

CODE FACILITY 16. NAME AND TITLE OF PERSON AUTHORIZED TO

SIGN OFFER (Type or print)

15B. TELEPHONE NO (Include area code) 15C. CHECK IF REMITTANCE ADDRESS

IS DIFFERENT FROM ABOVE - ENTER

SUCH ADDRESS IN SCHEDULE.

17. SIGNATURE 18. OFFER DATE

AWARD (To be completed by Government)

19. ACCEPTED AS TO ITEMS NUMBERED 20. AMOUNT 21. ACCOUNTING AND APPROPRIATION

22. AUTHORITY FOR USING OTHER THAN FULL AND OPEN COMPETITION:

10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( )

23. SUBMIT INVOICES TO ADDRESS SHOWN IN

(4 copies unless otherwise specified)

ITEM

24. ADMINISTERED BY (If other than Item7) CODE 25. PAYMENT WILL BE MADE BY CODE

26. NAME OF CONTRACTING OFFICER (Type or print)

TEL: EMAIL:

27. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

28. AWARD DATE

IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.

N4002726R0005

Section B - Supplies or Services and Prices

ITEM NO SUPPLIES/SERVICES MAX

QUANTITY

UNIT UNIT PRICE MAX AMOUNT

CLIN

Number

1 Lot

MK 41 VLS ORDERING PERIOD ONE

FFP

Provide MK-41 VLS Cell and Uptake Hatch Overhaul in accordance with the Statement of Work.

Ordering Period One: 1 January through 31 December 2027

NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.

FOB: Destination

PURCHASE REQUEST NUMBER: N40027VLS001

PSC CD: J998

MAX

NET AMT

UNIT UNIT PRICE MAX AMOUNT

CLIN

Number

MK 41 VLS ORDERING PERIOD TWO

Provide MK-41 VLS Cell and Uptake Hatch Overhaul in accordance with the Statement of Work.

Ordering Period Two: 1 January through 31 December 2028

NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.

FOB: Destination

UNIT UNIT PRICE MAX AMOUNT

CLIN

Number

MK 41 VLS ORDERING PERIOD THREE

Provide MK-41 VLS Cell and Uptake Hatch Overhaul in accordance with the Statement of Work.

Ordering Period Three: 1 January through 31 December 2029

NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.

FOB: Destination

UNIT UNIT PRICE MAX AMOUNT

CLIN

Number

MK 41 VLS ORDERING PERIOD FOUR

Provide MK-41 VLS Cell and Uptake Hatch Overhaul in accordance with the Statement of Work.

Ordering Period Four: 1 January through 31 December 2030

NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.

FOB: Destination

UNIT UNIT PRICE MAX AMOUNT

CLIN

Number

MK 41 VLS ORDERING PERIOD FIVE

Provide MK-41 VLS Cell and Uptake Hatch Overhaul in accordance with the Statement of Work.

Ordering Period Five: 1 January through 31 December 2031

NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.

FOB: Destination

UNIT UNIT PRICE MAX AMOUNT

CLIN

Number

DATA for CLINS 0001 - 0005

Contract Data Requirements List (CDRL) DD Form 1423, Exhibit A. Not Separately Priced (NSP). Price to be included in CLINS 0001 - 0005.

FOB: Destination

CLAUSES INCORPORATED BY FULL TEXT

B-215-H002 REFUNDS (SPARES AND SUPPORT EQUIPMENT) (NAVSEA) (OCT 2018)

(a) In the event that the price of a spare part or item of support equipment delivered under this contract significantly exceeds its intrinsic value, the Contractor agrees to refund the difference. Refunds will not be made to recoup the amount of cost decreases that occur over time due to productivity gains (excluding economic purchase quantity considerations) or changes in market conditions.

(b) For purposes of this requirement, the intrinsic value of an item is defined as follows:

(1) If the item is one which is sold or is substantially similar or functionally equivalent to one that is sold in substantial quantities to the general public, intrinsic value is the established catalog or market price, plus the value of any unique requirements, including delivery terms, inspection, packaging, or labeling.

(2) If there is no comparable item sold in substantial quantities to the general public, intrinsic value is defined as the price an individual would expect to pay for the item based upon an economic purchase quantity as defined in FAR 52.207-4, plus the value of any unique requirements, including delivery terms, inspection, packaging or labeling.

(c) At any time up to two years after delivery of a spare part or item of support equipment, the Contracting Officer may notify the Contractor that based on all information available at the time of the notice, the price of the part or item apparently exceeds its intrinsic value.

(d) If notified in accordance with paragraph (c) above, the Contractor agrees to enter into good faith negotiations with the Government to determine if, and in what amount, the Government is entitled to a refund.

(e) If agreement pursuant to paragraph (d) above cannot be reached, and the Navy's return of the new or unused item to the Contractor is practical, the Navy, subject to the Contractor's agreement, may elect to return the item to the Contractor.

Upon return of the item to its original point of Government acceptance, the Contractor shall refund in full the price paid.

If no agreement pursuant to paragraph (d) above is reached, and return of the item by the Navy is impractical, the Contracting Officer may, with the approval of the Head of the Contracting Activity, issue a Contracting Officer's final decision on the matter, subject to Contractor appeal as provided in the "Disputes" clause (FAR 52.233-1).

(f) The Contractor shall make refunds, as required under this requirement, in accordance with instructions from the Contracting Officer.

(g) The Contractor shall not be liable for a refund if the Contractor advised the Contracting Officer in a timely manner that the price it would propose for a spare part or item of support equipment exceeded its intrinsic value, and with such advice, specified the estimated proposed price, the estimated intrinsic value and known alternative sources or item, if any, that can meet the requirement.

(h) This requirement does not apply to any spare parts or items of support equipment whose price is determined through adequate price competition. This requirement also does not apply to any spare part or item of support equipment if the Contractor submitted, and certified the currency, accuracy and completeness of, cost or pricing data applicable to the item.

(End of text)

B-227-H001 PROVISIONING TECHNICAL DOCUMENTATION – WITHHOLDING OF PAYMENT

(NAVSEA) (OCT 2018)

(a) For the purpose of paragraph (c) of the "Progress Payments" clause of this contract, if included, the requirement that the Contractor develop and deliver Provisioning Technical Documentation (PTD) is considered to be a "material requirement of this contract," and Contractor failure to make adequate progress in the development of PTD, or to deliver acceptable PTD on a timely basis, may result in reduction or suspension of Progress Payments as provided in said paragraph.

(b) The PTD is considered to be a part of the "Technical Data" specified to be delivered under this contract for the purposes of the "Technical Data--Withholding of Payment" (DFARS 252.227-7030) clause. The terms and conditions of the clause entitled "Limitation On Withholding of Payments (FAR 52.232-9), if included in this contract, shall not apply to withholding of payment for failure to make timely delivery of the PTD or delivery of deficient PTD.

B-231-H002 WORKSITE TRAVEL COSTS (NAVSEA) (OCT 2018)

(a) The contractor shall not charge, and the Government shall not pay, as an allowable cost under this contract, any manhour costs (whether straight-time or overtime) for contractor personnel or subcontractor personnel traveling to or from worksites, including travel to worksites other than the contractor's facility for performance of contract work.

(b) Workers being paid under this contract, as prime contractor personnel or subcontractor personnel, will complete a full shift at the worksite, and no compensation will be paid for travel time before or after the shift.

(c) This requirement pertains only to payments for travel time before or after these workers' regular shifts (commuting costs), and does not apply to legitimate travel costs incurred during normal working hours, provided that those costs are otherwise reasonable, allocable and allowable and approved in writing by the Government. This requirement does not apply to manufacturer's representatives or Original Equipment Manufacturer (OEM) representatives when specifically required by the Government work specifications.

(d) Additionally, the contractor shall not charge, and the Government shall not pay, any transportation costs under this contract associated with transporting contractor or subcontractor personnel between the contractor's facility (or subcontractor's facility), and any other worksite to perform ship repair, maintenance or modernization.

Transportation costs include, but are not limited to, bus fare, car fare, train fare, or boat fare, paid by the work force, or paid by the contractor on behalf of the work force.

Section C - Descriptions and Specifications

STATEMENT OF WORK

1. TITLE:

MK-41 VLS Cell and Uptake Hatch Overhaul

2. PLACE OF PERFORMANCE:

The work will be performed at Naval Station Mayport and the Contractor’s facility.

3. REFERENCES:

3.1 IMS – 4810-6692849-0019 REV F MK41 Vertical Launching System Cell Hatch Overhaul Manual (SERMC), Attachment J-2

3.2 IMS – 4810 – 5223397-79 REV B MK41 Vertical Launching System Uptake Hatch Overhaul Manual (SERMC), Attachment J-3

3.3 NAVSEA STANDARD ITEM 009-012, Weld, Fabricate, and Inspect; accomplish, Attachment J-4

3.4 NAVSEA INST 8394.2G MK 41 VERTICAL LAUNCHING SYSTEM SAFETY AND DESIGN PRECEPTS, Attachment J-5

3.5 NAVSEA STANDARD ITEM 009-32, Cleaning and Painting Requirements, Attachment J-6

3.6 Exhibit Line Item Number (ELIN) Pricing, Attachment J-1

3.7 MK 41 Vertical Launching System Cell Hatch Certification Program, Attachment J-7

3.8 MK 41 Vertical Launching System Uptake Hatch Certification Program, Attachment J-8

4. DESCRIPTION OF TASK:

The contractor shall overhaul and preserve VLS cell hatches and uptake hatches in accordance with the references outlined in Paragraph 3 above. The contractor shall perform the work as an independent contractor and not as an agent of the Government. This is an Indefinite Delivery, Indefinite Quantity supply contract with pre-priced ELINs that will be invoked at the delivery order level in the quantities and amounts as designated in Reference 3.6.

5. OVERHAUL REQUIREMENTS:

Requirements and workflow for Overhaul of Vertical Launch System Cell Hatches:

Pickup and transportation, initial assessment, disassembly, cleaning and decontamination, detailed inspection and non-destructive testing (NDT), surface preparation and coating application, reassembly and quality control, touch-up and final preservation in accordance with References 3.1, 3.3, 3.4 and 3.5.

Requirements and workflow for Overhaul of Vertical Launch System Uptake Hatches:

Pickup and transportation, initial assessment, disassembly, cleaning and decontamination, detailed inspection and non-destructive testing (NDT), surface preparation and coating application, reassembly and quality control, touch-up and final preservation in accordance with References 3.2, 3.3, 3.4 and 3.5.

5.1 The SERMC Technical Point of Contact is:

Ronny Wood Project Manager Email: ronny.l.wood.civ@us.navy.mil Phone: 904-270-5126 Ext 3115

5.2 Inspection of VLS Hatches

Arrangements for location, date and inspection may be made by communicating with the Technical Point of Contact listed in 5.1.

6. REPORTS:

6.1 Submit Cell Hatch Overhaul Data Sheet in accordance with 3.1, Section 11.

6.2 Submit Uptake Hatch Overhaul Data Sheet in accordance with 3.2, Section 7.

6.3 Submit a report listing any unrepairable cell hatches or uptake hatches to the SERMC Technical Point of Contact in accordance with 3.1, Section 4.2.1.

6.4 The SERMC Technical Point of Contact is identified above in 5.1.

7. TRAVEL:

No per diem or travel costs will be paid under this contract.

8. SECURITY:

The minimum level of security required for this task is UNCLASSIFIED.

9. REQUIRED CERTIFICATIONS

The contractor’s overhaul site and personnel shall be certified to perform Vertical Launching System cell hatch assemblies through Reference 3.7, MK 41 Vertical Launching System Cell Hatch Certification Program of 1 MAR 2022. The contractor’s overhaul site and personnel shall be certified to perform uptake hatch assemblies through Reference 3.8, MK 41 Vertical Launching System Uptake Hatch Certification Program of 2 SEP 2022. MK 41 VLS Certification Programs require certification of both the overhaul site and the personnel to perform the requirements of References 3.1 and 3.2.

The contractor’s personnel shall be certified with Corrosion Control Certifications, NACE or SSPC/NBPI trained, in accordance with Reference 3.5.

10. DELIVERY:

The contractor will deliver the hatches in Ready For Issue (RFI) condition, Condition Code A in accordance with

3.1 and 3.2, to SERMC. The contractor shall return all hatches deemed unrepairable by the Technical Point of Contact in accordance with 3.1 and 3.2 to SERMC.

Building 191 Massey Avenue Mayport Naval Station, FL 32228-0057

(904) 270-5700

11. ORGANIZATION AND PERSONNEL:

The contractor shall have an organization with the experience and ability to apply management techniques, methods and procedures required to complete the requirements of this contract. The contractor shall employ trained and technically qualified personnel in accordance with 3.7 and 3.8 to meet the requirements of the statement of work for the duration of the contract. The contractor is required to have the overhaul site and personnel certifications listed in Paragraph 9 above. The contractor shall substantiate the qualifications of any individual performing work under this contract.

12. GENERAL REQUIREMENTS:

12.1 Simultaneous performance of multiple delivery orders is anticipated and may be required. Conversely, periods of weeks or months may lapse without orders, depending on the needs of the Government.

12.2 The following is a general estimate of the types and number of hatches required in the five year ordering period. This is only an estimate. The Government may increase or decrease these estimates as required.

Ordering Period Cell Hatches Uptake Hatches

One 150 20 Two 110 20

Three 110 20 Four 110 20 Five 110 20

12.3 The Contractor shall provide a Quality Management System meeting ISO 9000 series standards.

12.4 The Contractor shall manage subcontractors, including selecting, scheduling, managing, monitoring and controlling of subcontractors.

12.5 The Contractor shall manage all Safety/Security, including safety training, required first aid/medical services, fire protection/procedures, and physical yard security.

12.6 The Contractor shall control Hazardous Material/Waste and satisfy all legal requirements and local requirements for removal, storage, and disposal of hazardous waste. This includes providing segregated storage of Hazardous Material and obtaining all required state/federal agency issued hazardous waste generator numbers and disposal documentation.

12.7 The Contractor shall not commence any work unless it can be completed within the scheduled performance period.

12.8 The Government is not obligated, nor is the Government limited to the quantities listed in the chart above. The quantities listed are for estimating purposes only.

12.9 The Contractor shall maintain all documentation generated by this contract in accordance with FAR 4.7.

13. GOVERNMENT FURNISHED PROPERTY (GFP):

The contractor shall pick up the VLS cell hatches and VLS uptake hatches at Warehouse Building 191, unless other locations are specified in the delivery order. The contractor shall contact the Warehouse at (904) 270-5700 to coordinate the pickup of hatches. Contractor will reuse shipping crates provided.

14. USE OF BLACK OXIDE COATED THREADED FASTENERS (BOCTFs):

Use of black-oxide coated brass threaded fasteners (BOCBTF) is prohibited in the accomplishment of any work.

BOCBTFs are most commonly marked with “462”, “464”, “F467C”, “F467D”, “F468C”, and “F468D.”

15. CITIZENSHIP REQUIREMENTS:

The contractor shall comply with the Department of Defense Industrial Security Manual (DoD 5220.22), and any revisions to that manual as of the proposal due date prescribed, for verification of all U. S. Citizens.

The contractor shall refer all questions pertaining to the above to the Southeast Regional Maintenance Center (SERMC) Security Manager, phillip.actkins.civ@us.navy.mil and carbon copy the Contracting Officer.

16. THREAT CONDITIONS:

While the current Threat Condition is set at Bravo, Threat Condition Charlie shall be assumed when submitting a proposal for this solicitation. Any costs associated with delays, disruptions, or security precautions associated with Threat Condition Charlie shall be included in your proposal. Contractors will not receive additional compensation for delays, disruptions, or security precautions associated with Threat Condition Charlie.

17. REQUIRED STANDARD OF WORKMANSHIP:

Unless otherwise specifically provided in this contract, the quality of all repairs rendered hereunder shall conform to the highest standards in the relevant profession, trade, or field of endeavor. All repairs shall be rendered by or supervised directly by individuals fully qualified in the relevant profession, trade, or field, and holding any licenses required by law.

18. QUALITY ASSURANCE PROGRAM:

The Contractor shall provide and maintain a quality assurance program that, at a minimum, adheres to the requirements of ASQ/ANSI/ISO 9001:2015 “Quality Management Systems-Requirements” and supplemental requirements imposed by this contract, and shall perform or have performed the inspections and tests pursuant to that program to substantiate that the material and workmanship provided conform to the drawings, specifications, job orders, and contract requirements listed herein.

BASE ACCESS REQUIREMENTS

SERMC Security Division uses the Contractor Visit Request (SERMC 5220/2) form for processing requests to visit ships and SERMC. The Contractor Visit Request is only for contractors that do not have access to Defense Information System for Security (DISS). If the contractors employees are not listed in DISS or the contracting company does not have access to DISS, the contractor Facility Security Officer (FSO) or designated representative shall fill out the Contractor Visit Request Form and submit the form to SERMC Security Division at SERMC_MYPT_SECURITY@navy.mil . If the contractor has access to DISS, contact your FSO or Security Management Office to submit a visit request via DISS to SERMC, which is the preferred method for submitting government or embedded contractor visit requests. Submit the company’s DBIDS request to SERMC_MYPT_SECURITY_DBIDS@navy.mil . Contractors must also submit a complete Department of the Navy, Local Population ID Card/Base Access Pass Registration (SECNAV 5512/1) Form to NAVSTA Mayport – Main Gate Visitor Control, during registration. Additional information that may also be required either before, or during the DBIDS registration process may include: Employee’s legal full name, date of birth, social security number, company name, address, phone number, and email address, contract number, contract date(s) of performance, employee identification number (EIN), a digital photo, fingerprints, and employee home address and phone number. Contractor personnel shall comply with all current badging and security procedures required to gain access to any Government site (e.g. DBIDS). Access to Naval Installation and sites may only be gained by obtaining a badge (either permanent or temporary) from the Installation security office. It is the Contractor's responsibility to check for and obtain changes and updated information at each installation on a continual basis. Further information can be found at: https://www.cnic.navy.mil/regions/cnrma/om/contractor_verification_system.html. For information regarding the Defense Biometric Identification System (BIDS): http://dbids.dmdc.mil or for information pertaining to SERMC: http://www.navsea.navy.mil/Home/RMC/SERMC.

C-202-H001 ADDITIONAL DEFINITIONS–BASIC (NAVSEA) (OCT 2018)

(a) Department - means the Department of the Navy.

(b) Commander, Naval Sea Systems Command - means the Commander of the Naval Sea Systems Command of the Department of the Navy or his duly appointed successor.

(c) References to The Federal Acquisition Regulation (FAR) - All references to the FAR in this contract shall be deemed to also reference the appropriate sections of the Defense FAR Supplement (DFARS), unless clearly indicated otherwise.

(d) National Stock Numbers - Whenever the term Federal Item Identification Number and its acronym FIIN or the term Federal Stock Number and its acronym FSN appear in the contract, order or their cited specifications and standards, the terms and acronyms shall be interpreted as National Item Identification Number (NIIN) and National Stock Number (NSN) respectively which shall be defined as follows:

(1) National Item Identification Number (NIIN). The number assigned to each approved Item Identification under the Federal Cataloging Program. It consists of nine numeric characters, the first two of which are the National Codification Bureau (NCB) Code. The remaining positions consist of a seven digit non-significant number.

(2) National Stock Number (NSN). The National Stock Number (NSN) for an item of supply consists of the applicable four-position Federal Supply Class (FSC) plus the applicable nine-position NIIN assigned to the item of supply.

C-204-H001 USE OF NAVY SUPPORT CONTRACTORS FOR OFFICIAL CONTRACT FILES (NAVSEA)

(OCT 2018)

(a) NAVSEA may use a file room management support contractor, hereinafter referred to as "the support contractor", to manage its file room, in which all official contract files, including the official file supporting this procurement, are retained. These official files may contain information that is considered a trade secret, proprietary, business sensitive or otherwise protected pursuant to law or regulation, hereinafter referred to as “protected information”. File room management services consist of any of the following: secretarial or clerical support; data entry; document reproduction, scanning, imaging, or destruction; operation, management, or maintenance of paper-based or electronic mail rooms, file rooms, or libraries; and supervision in connection with functions listed herein.

(b) The cognizant Contracting Officer will ensure that any NAVSEA contract under which these file room management services are acquired will contain a requirement that:

(1) The support contractor not disclose any information;

(2) Individual employees are to be instructed by the support contractor regarding the sensitivity of the official contract files;

(3) The support contractor performing these services be barred from providing any other supplies and/or services, or competing to do so, to NAVSEA for the period of performance of its contract and for an additional three years thereafter unless otherwise provided by law or regulation; and,

(4) In addition to any other rights the contractor may have, it is a third party beneficiary who has the right of direct action against the support contractor, or any person to whom the support contractor has released or disclosed protected information, for the unauthorized duplication, release, or disclosure of such protected information.

(c) Execution of this contract by the contractor is considered consent to NAVSEA's permitting access to any information, irrespective of restrictive markings or the nature of the information submitted, by its file room management support contractor for the limited purpose of executing its file room support contract responsibilities.

(d) NAVSEA may, without further notice, enter into contracts with other contractors for these services. Contractors should enter into separate non-disclosure agreements with the file room contractor. Contact the Procuring Contracting Officer for contractor specifics. However, any such agreement will not be considered a prerequisite before information submitted is stored in the file room or otherwise encumber the government.

C-211-H008 QUALIFICATION OF CONTRACTOR NON-DESTRUCTIVE TESTING (NDT) PERSONNEL

(NAVSEA) (OCT 2018)

(a) The Contractor and any Non-destructive Testing (NDT) subcontractor shall utilize for the performance of required NDT, only Level I, II and III personnel currently certified in accordance with NAVSEA Technical Publication T9074-AS-GIB-010/271, Revision 1 of 11 September 2014. Documentation pertaining to the qualification and certification of NDT personnel shall be made available to the Contracting Officer for review upon request.

(b) These requirements do not apply with respect to nuclear propulsion plant systems and other matters under the technical cognizance of the Office of Navy Nuclear Propulsion (NAVSEA 08). Because of health and safety considerations, such matters will continue to be handled as directed by NAVSEA 08.

C-211-H016 SPECIFICATIONS AND STANDARDS (NAVSEA) (OCT 2018)

(a) Definitions.

(i) A "zero-tier reference" is a specification, standard, or drawing that is cited in the contract (including its attachments).

(ii) A "first-tier reference" is either: (1) a specification, standard, or drawing cited in a zero-tier reference, or (2) a specification cited in a first-tier drawing.

(a) Requirements. All zero-tier and first-tier references, as defined above, are mandatory for use. All lower tier references shall be used for guidance only unless specifically identified below.

None

C-211-H017 UPDATING SPECIFICATIONS AND STANDARDS (NAVSEA) (DEC 2018)

The contractor may request that this contract be updated to include the current version of the applicable specification or standard if the update does not affect the form, fit or function of any deliverable item or increase the cost/price of the item to the Government. The contractor should submit update requests to the Procuring Contracting Officer with copies to the Administrative Contracting Officer and cognizant program office representative for approval. The contractor shall perform the contract in accordance with the existing specifications and standards until notified of approval/disapproval of its request to update by the Procuring Contracting Officer. Any approved alternate specifications or standards will be incorporated into the contract.

C-211-H018 APPROVAL BY THE GOVERNMENT (NAVSEA) (JAN 2019)

Approval by the Government as required under this contract and applicable specifications shall not relieve the Contractor of its obligation to comply with the specifications and with all other requirements of the contract, nor shall it impose upon the Government any liability it would not have had in the absence of such approval.

C-215-H002 CONTRACTOR PROPOSAL (NAVSEA) (OCT 2018)

(a) Performance of this contract by the Contractor shall be conducted and performed in accordance with the detailed obligations to which the Contractor committed itself in Proposal dated to be completed at time of award in response to Solicitation No. N4002726R0005.

(b) The technical volume(s) of the Contractor's proposal is(are) hereby incorporated by reference and made subject to the "Order of Precedence" (FAR 52.215-8) clause of this contract. Under the "Order of Precedence" clause, the technical volume(s) of the Contractor's proposal referenced herein is (are) hereby designated as item (f) of the clause, following "the specifications" in the order of precedence.

C-217-H005 GROWTH AND NEW WORK (NAVSEA) (JAN 2019)

(a) The Contractor is required to notify the Contracting Officer via email regarding growth and new work within 30 days of discovery:

(1) of any apparent errors or omissions in the contract (SF 33, specifications, drawings, etc.); and,

(2) of any/all conflicts between the contract package and actual conditions observed during ship check(s) and/or contract execution.

(b) Growth work is synonymous with over and above work, which is described in DFARS 252.217-7028, Over and Above Work and it provides the process for adjudication.

(c) New work is distinguished from over and above work and is outside the scope of the competitively procured requirement. New work will be approved in accordance with FAR Part 6 and associated policies and procedures.

(d) The Government will NOT negotiate modifications to increase the contract price to address errors or omissions to the contract package which were reasonably apparent to the contractor prior to proposal submission.

(End of Text)

C-222-H001 ACCESS TO THE VESSELS BY NON-U.S. CITIZENS (NAVSEA) (APR 2019)

(a) No person not known to be a U.S. citizen shall be eligible for access to naval vessels, work sites and adjacent areas when said vessels are under construction, conversion, overhaul, or repair, except upon a finding by COMNAVSEA or his designated representative that such access should be permitted in the best interest of the United States. The Contractor shall establish procedures to comply with this requirement and NAVSEAINST 5510.2D.

(b) If the Contractor desires to employ non-U.S. citizens in the performance of work under this contract or agreement that requires access as specified in paragraph (a) of this requirement, approval must be obtained prior to access for each contract or agreement where such access is required. To request such approval for non-U.S. citizens of friendly countries, the Contractor shall submit to the cognizant Contract Administration Office (CAO), an Access Control Plan (ACP) which shall contain as a minimum, the following information:

(1) Badge or Pass oriented identification, access, and movement control system for non-U.S. citizen employees with the badge or pass to be worn or displayed on outer garments at all times while on the Contractor's facilities and when performing work aboard ship.

(i) Badges must be of such design and appearance that permits easy recognition to facilitate quick and positive identification.

(ii) Access authorization and limitations for the bearer must be clearly established and in accordance with applicable security regulations and instructions.

(iii) A control system, which provides rigid accountability procedures for handling lost, damaged, forgotten or no longer required badges, must be established.

(iv) A badge or pass check must be performed at all points of entry to the Contractor's facilities or by a site supervisor for work performed on vessels outside the Contractor's plant.

(2) Contractor's plan for ascertaining citizenship and for screening employees for security risk.

(3) Data reflecting the number, nationality, and positions held by non-U.S. citizen employees, including procedures to update data as non-U.S. citizen employee data changes, and pass to cognizant CAO.

(4) Contractor's plan for ensuring subcontractor compliance with the provisions of the Contractor's ACP.

(5) These conditions and controls are intended to serve as guidelines representing the minimum requirements of an acceptable ACP. They are not meant to restrict the Contractor in any way from imposing additional controls necessary to tailor these requirements to a specific facility.

(c) To request approval for non-U.S. citizens of hostile and/or communist-controlled countries (listed in Department of Defense Industrial Security Manual, DOD 5220.22-M or available from cognizant CAO), Contractor shall include in the ACP the following employee data: name, place of birth, citizenship (if different from place of birth), date of entry to U.S., extenuating circumstances (if any) concerning immigration to U.S., number of years employed by Contractor, position, and stated intent concerning U.S. citizenship. COMNAVSEA or his designated representative will make individual determinations for desirability of access for the above group. Approval of ACP's for access of non-U.S. citizens of friendly countries will not be delayed for approval of non-U.S. citizens of hostile communist-controlled countries. Until approval is received, Contractor must deny access to vessels for employees who are non- U.S. citizens of hostile and/or communist-controlled countries.

(d) The Contractor shall fully comply with approved ACPs. Noncompliance by the Contractor or subcontractor serves to cancel any authorization previously granted, in which case the Contractor shall be precluded from the continued use of non-U.S. citizens on this contract or agreement until such time as the compliance with an approved ACP is demonstrated and upon a determination by the CAO that the Government's interests are protected. Further, the Government reserves the right to cancel previously granted authority when such cancellation is determined to be in the Government's best interest. Use of non-U.S. citizens, without an approved ACP or when a previous authorization has been canceled, will be considered a violation of security regulations. Upon confirmation by the CAO of such violation, this contract, agreement or any job order issued under this agreement may be terminated or default in accordance with the clause entitled "Default (Fixed-Price Supply and Service)" (FAR 52.249-8), "Default (Fixed-Price Research and Development)" (FAR 52.249-9) or "Termination (Cost Reimbursement)" (FAR 52.249- 6), as applicable.

(e) Prime Contractors have full responsibility for the proper administration of the approved ACP for all work performed under this contract or agreement, regardless of the location of the vessel, and must ensure compliance by all subcontractors, technical representatives and other persons granted access to U.S. Navy vessels, adjacent areas, and work sites.

(f) In the event the Contractor does not intend to employ non-U.S. citizens in the performance of the work under this contract, but has non-U.S. citizen employees, such employees must be precluded from access to the vessel and its work site and those shops where work on the vessel's equipment is being performed. The ACP must spell out how non-U.S. citizens are excluded from access to contract work areas.

(g) The same restriction as in paragraph (f) above applies to other non-U.S. citizens who have access to the Contractor's facilities (e.g., for accomplishing facility improvements, from foreign crewed vessels within its facility, etc.) except that, with respect to access to the vessel and worksite, the restrictions shall not apply to uniformed U.S.

Navy personnel who are non-U.S. citizens and who are either assigned to the ship or require access to the ship to perform their duties.

C-223-H003 EXCLUSION OF MERCURY (NAVSEA) (MAR 2019)

(a) Definitions. As used in this text:

Article means a manufactured item other than a fluid or particle: (i) which is formed to a specific shape or design during manufacture; (ii) which has end use function(s) dependent in whole or in part upon its shape or design during end use; and (iii) which under normal conditions of use does not release more than very small quantities, e.g., minute or trace amounts of a hazardous chemical, and does not pose a physical hazard or health risk to employees.

Boundary of containment means a continuous tight seal (barrier) to prevent the release of functional mercury during normal operation and maintenance. Examples include the exterior of a fluorescent lamp, glass capsule of a mercury switch, and container for mercury reagents. A double boundary of containment consists of two independent seals.

Functional mercury means mercury or mercury compound(s) contained in equipment that is required for the equipment to operate properly, such as that found in mercury switches, fluorescent lamps, flat-panel monitors, thermostats, thermostat probes, small coin type batteries, barometers, and dental amalgams.

Hardware means any article, container, piece of material, individual part, subassembly, assembly, component, or system to which mercury control requirements apply.

Mercury-free means hardware that does not contain functional mercury and is not contaminated by mercury or mercury compounds.

Portable means items that are frequently transported during normal operation. Desk lamps, shop lights, and hand-held instruments are considered portable, while bulbs in stationary light fixtures are not. In general, items that require transport only during maintenance, installation, and removal of the items are not considered portable.

(b) The Contractor, and all subcontractors and vendors, shall ensure that mercury or mercury containing compounds are not intentionally added to, or come in direct contact with, hardware or supplies furnished under this contract.

(1) The Contractor shall ensure that mercury and mercury compounds are not taken onboard naval vessels by Contractor, subcontractor, or vendor personnel except for functional mercury used in batteries, dental amalgams, fluorescent lamps, flat-panel monitors, required instruments, sensors or controls, weapon systems, and chemical analysis reagents specified by the Naval Sea Systems Command (NAVSEA).

(2) Portable fluorescent lamps and portable instruments containing elemental mercury must be shock-proof in accordance with MIL-DTL-901E entitled Requirements for Shock Tests, H.I. (High Impact) Shipboard Machinery, Equipment, and Systems and have mercury enclosed by a double boundary of containment. Some devices with liquid crystal display (LCD) screens utilize a fluorescent bulb backlight to illuminate the LCD screen.

No additional restrictions or controls apply to devices with LCD screens; however, the Contractor shall remove the LCD screen and seal it in plastic following any evidence that the backlight failed.

(3) For Submarines, any use of mercury containing items must be approved as required by the Nuclear

Powered Submarine Atmosphere Control Manual (S9510-AB-ATM-010/U) Volume 1.

(4) The Contractor shall ensure that mercury and mercury compounds do not contact hardware surfaces in systems covered by NAVSEA Manual NAVSEA 0989-064-3000 entitled Cleanliness Requirements for Nuclear Propulsion Plant Maintenance and Construction, submarine air systems, level I systems per NAVSEA Publication 0948-LP-045-7010, NAVSEA Material Control Standard, or the submarine safety program (SUBSAFE) surfaces during maintenance or repair. Such hardware is designated as mercury-free. The Contractor shall ensure that all other hardware that could be structurally degraded by contamination with elemental mercury or reactive mercury compounds is separated from it by sufficient distance, or boundaries of containment that effectively prevents contact in all but the most extreme circumstances.

(5) The Contractor shall check any hardware surfaces in the above systems which are known or suspected to have come in contact with mercury or mercury compounds for evidence of structural degradation and external mercury contamination. The existence of external mercury contamination can be determined following MIL-STD-2041D entitled Control of Detrimental Materials.

(6) The presence of mercury in a product may be determined by checking product labeling on material safety data sheets or safety data sheets. Chemical analysis is not required.

(7) The Contractor shall dispose of any mercury and mercury compounds in accordance with OPNAV Manual (OPNAV M-5090.1) entitled Environmental Readiness Program Manual of 10 January 2014.

(8) If the use of mercury or mercury compounds cannot be avoided, a risk assessment and waiver request, if required, must be performed and submitted per the NAVSEA Hazardous Material Avoidance Process (T9070-AL- DPC-020/077-2). For systems covered by the NAVSEA Manual NAVSEA 0989-064-3000 entitled Cleanliness Requirements for Nuclear Propulsion Plant Maintenance and Construction, submit the risk assessment and waiver request, if required to Nuclear Propulsion (NAVSEA 08).

(c) In all cases where mercury or a mercury compound has contacted hardware surfaces required to be mercury-free the Contractor shall immediately provide a report to the NAVSEA Dry Environmental Systems and Hazardous Materials (NAVSEA 05P5) via the cognizant contract administration safety office. Reports concerning systems covered by NAVSEA Manual 0989-064-3000 must include NAVSEA Nuclear Propulsion Directorate (SEA 08) in the distribution. Reports must be in letter form and include the date and details of the contact, the surfaces contacted, the recovery actions taken, and the status of the affected surfaces.

C-223-W002 ON-SITE SAFETY REQUIREMENTS (NAVSEA) (OCT 2018)

(a) The contractor shall ensure that each contractor employee reads any necessary safety documents within 30 days of commencing performance at any Government facility. Required safety documents can be obtained from the respective safety office. Contractors shall notify the Safety office points of contact below to report completion of the required training via email. The email shall include the contractor employee’s name, work site, and contract number.

(b) It is expected that contractor employees will have received training from their employer on hazards associated with the areas in which they will be working and know what to do in order to protect themselves. Contractors are required to adhere to the requirements of 29 CFR 1910, 29 CFR 1926 and applicable state and local requirements while in Government spaces. The contractor shall ensure that all on-site contractor work at the Government facility is in accordance with any local safety instructions as provided via the COR. The contractor shall report all work-related injuries/illnesses that occurred while working at the Government site to the COR.

(c) Contractors whose employees perform work within Government spaces in excess of 1000 hours per calendar quarter during a calendar year shall submit the data elements on OSHA Form 300A, Summary of Work Related Injuries and Illnesses, for those employees to the safety office, via the COR by 15 January for the previous calendar year, even if no work related injuries or illnesses occurred. If a contractor’s injury/illness rates are above the Bureau of Labor Statistics industry standards, a safety assessment may be performed by the Safety Office to determine if any administrative or engineering controls can be utilized to prevent further injuries/illnesses, or if any additional Personal Protective Equipment or training will be required.

(d) Any contractor employee exhibiting unsafe behavior may be removed from the Government site. Such removal shall not relieve the contractor from meeting its contractual obligations and shall not be considered an excusable delay as defined in FAR 52.249-14.

(e) The Safety Office points of contacts are as follows:

Ms. Julie Dolson (904)-270-5126 X 5386 Email: julie.l.dolson.civ@us.navy.mil

Mr. Kerry Abrams (904)270-6404

Email: kerry.w.abrams.civ@us.navy.mil

C-227-H006 DATA REQUIREMENTS (NAVSEA) (OCT 2018)

The data to be furnished hereunder shall be prepared in accordance with the Contract Data Requirements List, DD Form 1423, Exhibit A , attached hereto.

C-227-H009 ACCESS TO DATA OR COMPUTER SOFTWARE WITH RESTRICTIVE MARKINGS (NAVSEA)

(JAN 2019)

(a) Performance under this contract may require that the Contractor have access to technical data, computer software, or other sensitive data of another party that contains restrictive markings. If access to such data or software is required or to be provided, the Contractor shall enter into a written agreement with such party prior to gaining access to such data or software. The agreement shall address, at a minimum, (1) access to, and use of, the restrictively marked data or software exclusively for the purposes of performance of the work required by this contract, and (2) safeguards to protect such data or software from unauthorized use or disclosure for so long as the data or software remains properly restrictively marked. In addition, the agreement shall not impose any limitation upon the Government or its employees with respect to such data or software. A copy of the executed agreement shall be provided to the Contracting Officer. The Government may unilaterally modify the contract to list those third parties with which the Contractor has agreement(s).

(b) The Contractor agrees to: (1) indoctrinate its personnel who will have access to the data or software as to the restrictions under which access is granted; (2) not disclose the data or software to another party or other Contractor personnel except as authorized by the Contracting Officer; (3) not engage in any other action, venture, or employment wherein this information will be used, other than under this contract, in any manner inconsistent with this requirement; (4) not disclose the data or software to any other party, including, but not limited to, joint venturer, affiliate, successor, or assign of the Contractor; and (5) reproduce the restrictive stamp, marking, or legend on each use of the data or software whether in whole or in part.

(c) These restrictions on use and disclosure of the data and software also apply to information received from the Government through any means to which the Contractor has access in the performance of this contract that contains restrictive markings.

(d) The Contractor agrees that it will promptly notify the Contracting Officer of any attempt to gain access to any information with restrictive markings. Such notification shall include the name and organization of the individual, company, or Government representative seeking access to such information.

(e) The Contractor shall include this requirement in subcontracts of any tier which involve access to information covered by paragraph (a), substituting "subcontractor" for "Contractor" where appropriate.

(f) Compliance with this requirement is a material requirement of this contract.

C-228-H002 MINIMUM INSURANCE REQUIREMENTS (NAVSEA) (JAN 2019)

(a) In accordance with the clause(s) of this contract entitled "Insurance--Work On a Government Installation" (FAR 52.228-5) and “Liability and Insurance” (DFARS 252.217-7012), as applicable, the Contractor shall procure and maintain insurance, of at least the kinds and minimum amounts set forth below:

(i) Workers' compensation and employer’s liability coverage shall be at least $100,000, except as provided in

FAR 28.307-2(a), if applicable

(ii) Bodily injury liability insurance coverage shall be written on the comprehensive form of policy of at least $500,000 per occurrence.

(iii) Automobile liability policies covering automobiles operated in the…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .