Bridges_Preaward Inquiry Form_RFI no. 21-24.pdf

PDF 105 KB Posted

Attached to
BRIDGES INSPECTION AND ASSESSMENT WORLDWIDE
Solicitation number
N3943024R0017
Issued by

About this file

This document contains questions and answers regarding Solicitation Number N3943024R0017 for bridge inspection and assessment services worldwide issued by the Department of the Navy Naval Facilities Engineering Command. The solicitation seeks proposals for an indefinite delivery/indefinite quantity contract to provide architect-engineer services including bridge inspection team leaders who must have a professional engineering license, inspection of an unknown number of bridges worldwide, and submission of required credentials and certifications with medical certifications for divers submitted post-award as part of dive safety plans. Questions addressed clarification on submission requirements, quantities of overseas bridges, file size limits, and qualifications for proposed team leaders.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOLICITATION NO. N3943024R0017 PRE‐AWARD INQUIRY FORM

PROJECT TITLE/LOCATION: Bridges Inspection and Assessment Worldwide

Page Section Para.

1. Under Criteria 1 it lists “All diving personnel proposed for this contract shall include, training certs and medical certification”; however under the Submission Requirements it states professional registration, certification, licensure and/or accreditation in the appropriate disciplines (must include PE Number, State, and

Expiration date and provide FHWA approved training course completion certification.)

a. Do we need to submit the ADCI divers cards and Medical clear to dive document at this time?

Or is it just required post award as part of our dive safety document.

Please submit the documents listed under "submission requirements"‐ medical certs for divers will be submitted post award as part of dive safety plans. 4

Are you able to provide the total quantity of bridges that are Outside the Continental US

(OCONUS), that could be part of this contract?

No‐ not at this time. The exact number of bridges varies year to year and is dependent on a variety of factors. 4

Recognizing we can submit our proposal electronically, is there a file size limit?

The file size limit is unknown. If offerors are unable to submit their proposals due to file size, they may request a DoD Safe link to submit their proposal. Late proposals will not be accepted due to issues related with file size. 4

Do ALL personnel proposed for the four roles that are outlined in the RFP on page 3 are they required to have those credentials (licensed PE, minimum of three years NBIS Bridge Inspection experience)? For example, we have team leaders who are qualified to the federal standards but don't have a PE can we shall include a resume for these individuals and or include them on the organization chart?

A proposed bridge inspection Team

Leader for this contract must have a

PE. You can still provide a resume, but they will be considered as an assistant inspector. 4