Responses to RFIs 140820.pdf

PDF 107 KB Posted

Attached to
Corrosion Surveillance Program on Guam Federal contract opportunity
Solicitation number
N3943020R2240
Issued by
Department of the Navy Naval Facilities Engineering Command

View the file

Other files for this federal contract opportunity

Other files attached to Corrosion Surveillance Program on Guam, newest first.
File Type Posted
Amendment_3 N3943020R2240.pdf PDF
Amendment_2 N3943020R2240.pdf PDF
Responses to Final RFIs.pdf PDF
Exhibit G - Corrosion Assessment Checklist.pdf PDF
Amendment_1 N3943020R2240.pdf PDF
Exhibit H - PAST PERFORMANCE QUESTIONNAIRE.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REF PAGE QUESTION RESPONSE

1 1.2.2.3 8

Will the government consider allowing Corrosion Repair Actions to be conducted on Base with the contractor providing the temporary shelters, equipment, consumables and disposal?

As a general rule, the Contractor shall perform Corrosion Repair tasks at the Contractor’s facility. Refer to section 1.2.2.3 on page 8 of the solicitation. In accordance with section 1.2.2.4, on page 8 of the solicitation, an exception to this general rule can be made at the Government’s discretion on a case-by-case basis.

2 3.5 19

Will the government allow the contractor to move assets on Base?

Would depend on the asset and the necessity of the asset to perform work within the scope of the contract, also if there were any safety and/or legal concerns with regards to the asset.

3 N/A N/A Can the government provide the current corrosion condition of the assets?

The corrosion condition of assets would be established during the first three months of Corrosion Surveillance Services. Refer to section 3.1.1.3 on page 13 of the solicitation.

4 N/A N/A Can the Government provide an estimate of the current corrosion repair needs?

Corrosion repair needs are based on the corrosion condition of assets and prioritized by the needs of the Navy.

5 3.3.2.1 17 When parts need to be replace due to corrosion will the government provide these parts or will the contractor procure these parts?

The Contractor would provide replacement parts.

6 N/A N/A Is the government anticipating a single award? It is the Government’s intent to award to a single Offeror. Refer to Addendum to (h) on page 31.

Contract Min/Max Quantity

Value

Is the maximum amount of $24,000..00 a typo or is it actual maximum per item?

This is a typo, the maximum contract amount is $25,000,000.00.

8 N/A N/A

How often does the government anticipate ordering surveillance, abatement, or repair services?

It is the Government’s intent to establish and maintain constant Corrosion Surveillance Services for the duration of the contract’s period of performance. Corrosion abatement and repair services will be issued based on the corrosion condition of assets and prioritized by the needs of the Navy.

9 N/A N/A

Does the government anticipate awarding multiple task orders to occur simultaneously (i.e., will a surveillance and repair orders be conducted at the same time?

Yes, the Government anticipates active task orders being performed simultaneous. It is the Government’s intent to establish and maintain constant Corrosion Surveillance Services for the duration of the entire contract’s period of performance.

During which time corrosion abatement and repair services will be issued based on the corrosion condition of assets and prioritized by the needs of the Navy. It is possible that more than one task order related to corrosion abatement services and/or corrosion repair services be issued during the same period of performance.

10 N/A N/A

Has the government identified a service interval for how often corrosion surveillance and abatement services should be performed on equipment in Guam?

During every three consecutive month duration of the PoP for the Corrosion Surveillance Services TO, the Contractor shall perform a 100% inspections and assessments of all Naval Construction and Support Equipment assigned to Naval Expeditionary Forces located at Naval Base Guam. Refer to section 3.1.1.3 on page 13 of the solicitation. In addition, as part of the Corrosion Surveillance Services TO, the Contractor shall submit a monthly Corrosion Surveillance Report. Refer to section 3.1.4 on page 14 of the solicitation.

11 3.1.3.1 13

Appendix B does not provide an example of the Corrosion Assessment Checklist; however, procedures in NAVFAC-S6360-AW-MMO-010 section 5 appear to be identical to those contained in USMC TM 4795-OR/1A; will the same Corrosion Assessment Checklist employed by the Marine Corps also be used?

The Corrosion Assessment Checklist is provided as Exhibit G to the Solicitation.

12 3.2.5 16 Has Naval Base Guam Environmental Affairs approved the use of CARC touch-up painting outdoors?

Naval Base Guam Environmental Affairs has not approved the use of CARC touch-up painting outdoors on-base.

3.2.5.1 & 3.3.3.1.1

16 & 17

Can the government provide a list of non-CARC or OEM coatings that may be necessary in performing either corrosion abatement or corrosion repair services?

The Offeror shall be required to apply coating systems that are designed and intended for use on heavy-duty commercial equipment.

14 N/A N/A Can the government provide an estimate of approximately how many corrosion repair orders are anticipated in a 12-month period?

Corrosion repair services will be issued based on the corrosion condition of assets and prioritized by the needs of the Navy.

15 Attachment 1 N/A Attachment 1 (Price Proposal) lists specific labor categories and hours. Is the contractor limited to these in their proposal?

Yes, the intent is to establish firm-fixed labor categories rates across the duration of the contract for comparison of proposals during the solicitation phase.

16 Attachment 1 N/A

Attachment 1 (Price Proposal) is pre-populated with an amount for materials costs; is this the government's estimate for other direct costs?

These numbers are randomly populated to create a template for Offerors to substitute with their proposal numbers, it is not intended to represent any proposed material costs or other direct costs.

17 4.1 & Factor 1 21 & 34

SOW Section 4.0 states to submit the Quality Control Plan upon award, but the RFP also states to submit the Quality Control Plan with Factor I on page 34. Which is the correct direction?

Both, submit a copy of your company’s Quality Control Plan for review during source selection, and, if awarded, provide a copy of your company’s Quality Control Plan for the COR’s file.

18 Factor 1 34 If the Quality Control Plan is to be submitted with Factor I, will it be included in the 35 page limit for Volume I.

The Quality Control Plan will not be counted against the page limitations.

19 3.3.4 18

Will the government's QA personnel be on-site at the contractor's repair facility? How long can the contractor expect to wait for inspections in between repair processes?

It the Government’s intent for the COR and/or Naval Technical Representatives (NTR) to be on-site at the Contractor's repair facility during key milestones of the repair process to verify progress and compliance. Refer to section 6.4.1 on page 25 of the solicitation. The Government will work closely with the Contractor to limit any wait time in between repair processes.

20SF 1449 Block 10 1 The solicitation indicates a Small Business Set Aside;

what NAICS code and size standard is the government considering?

North American Industry Classification System (NAICS) 811310;

size standard is an annual revenue of $8,000,000 or below.

21 Factor 2 35 Will the government be providing a Past Performance Questionnaire Cover sheet?

The Government has attached a Past Performance Questionnaire Cover sheet for the Offerors’ client(s) to submit as indicated in the Solicitation, Factor 2, Page 35.

22 Factor 2 35

Can the government specify where the client needs to submit the PPQ?

The Past Performance Questionnaire Cover sheet submitted by the Offerors’ client(s) to the email address as indicated in the Solicitation (N3943020R2240) Primary Point of Contact or Secondary Point of Contact listing or refer to the OFFEROR’S SUBMITTALS information identified in the Solicitation, Page 31.

Documentation may be provided via official Contracting Office Address if the client(s) choose to use as long at material is provided before the Solicitation Due date.

ceived: 8.14.2020

23 N/A N/A

Can the PRIME use the subcontractors past performance for this effort?

The Government is seeking information regarding firms competing directly for the contract. Past performance information, when available, is utilized to help assess risk to the Government regarding successful completion. Since the Government does not have a direct contract with the Prime's subcontractor(s), their past performance information will not be evaluated.

24 N/A N/A Will there be a pre-site visit scheduled for vendors? The Government reserves the right to conduct pre-selection site visits, if needed, as part of the selection process.

25 N/A N/A

The corrosion surveillance will be done on multiple types of equipment many of which will require scaffolding or lifts to get to high areas. Will the government be providing scaffolding and or lifts?

The Contractor shall be responsible for any tools and/or equipment necessary to perform contract related tasks. Refer to section 1.2.1.1 on page 7 of the solicitation. If scaffolding is necessary, the Contractor would include those costs as part of their Request for TO Proposal (RFTOP) response.

26 N/A N/A

Report process and deadlines are very short. Will the government consider increasing the time allotted from one (1) day to ten (10) days?

Regarding the monthly Corrosion Surveillance Report, refer to section 3.1.4 on page 14 of the solicitation. This is a culmination of inspections and assessments results completed during that preceding month. Which, depending upon individual business decisions, can be worked on and updated at various intervals during the month in order to have a finished product by the end of each month.

27 3.2.3.2 15

Mobile washing equipment (self-contained and self-sufficient was rack) to be supplied by the contractor.

What will the requirements be as for length and width of the drive through working deck?

It is intended that any tasking related to washing be performed at designated wash stations/sites. These sites can accommodate the various sizes of USN expeditionary equipment.

28 N/A N/A Can the government provide dimensional specifications of the largest equipment requiring cleaning services?

Make and Model of equipment owned by the Government can be fluid, as such the Government cannot provide definitive dimensional data regarding equipment.

29 N/A N/A

Government states the contractor must provide power and water for the above Mobile wash rack.

Please confirm this as the cost to run generator power is very high. Can the contractor purchase power and water from the Government for cleaning services requirement on Naval Base Guam (NBG)?

As a general rule, the Government will not provide power and/or water. Although there may be an occasional exception, these utilities should not be considered as readily available.

30 3.3.3.1.7 17

Please clarify when the government requests an adhesion test in a specific area, if the test passes, will the government be paying for the recoating of that area?

No, testing is considered as part of the paint process.

31 N/A N/A

Since cleaning service, corrosion surveillance and Corrosion abatement is to be done on NBG, where and what size facility will be provided by the government?

It is intended that any tasking related to washing be performed at designated wash stations. Other corrosion abatement tasks can be done where the equipment stands, providing it meets enviornmental regulations.

32 N/A N/A Will there be an office with restrooms available? No office spaces offered as part of this contract.

33 N/A N/A If no offices and restrooms are available, will the contractor be allowed to install a mobile office with restroom facilities on site?

Prior to proposal due date Government will provide response.

34 3.1.1.3.2 13

Most corrosion occurs on undercarriage, please confirm the contractor is not required to inspect equipment undercarriages. Please define under carriage and what is not to be inspected.

As part of the routine Corrosion Surveillance Services, the Contractor will not be responsible for corrosion inspect of equipment undercarriages, refer to section 3.1.1.3.2 on page 13 of the solicitation. Interior surfaces of the cabs, any totally enclosed storage compartments, vehicle undercarriages, and engine compartments will be inspected during maintenance intervals by equipment maintenance personnel. If corrosion abatement or repair requirements are identified in these areas, those services may be included in a Corrosion Abatement Service TO or a Corrosion Repair Service TO.

35 3.3.2 & 3.3.3 17 who is responsible for supplying replacement parts? The Contractor would provide replacement parts.

36 3.5.1.1 19 how is the POP determined for repair? How much time will be given to perform repair work?

The PoP for repair work is based on a reasonable allocation of time versus work scope. Consideration is given to past performance of the same or similar work.

37 3.5.3 19

Will all equipment be operational to load equipment on trailers to transport, or will it be a requirement to tow non-operational equipment? If the equipment cannot be towed, is the contractor responsible for getting the unit operational?

Equipment sent out for corrosion repair services will be operational.

38 3.6.2.2.1 19

Is the contractor responsible for equipment that becomes available for surveillance, but insufficient time is given to complete surveillance from when it was made available?

The Contractor will not be responsible for equipment that becomes available for surveillance if insufficient time is given to complete surveillance from when it was made available.

However, the Government considers seven calendar days to be sufficient time to be included in the surveillance activities.

39 N/A N/A Can proposals be submitted electronically rather than hard copies delivered to Port Hueneme, CA?

Yes. Please see amendment, Clause 52.212-1 for guidance on electronic submissions

40 N/A N/A

Does the government have a comprehensive equipment list for review?

Make and Model of equipment owned by the Government can be fluid, as such the Government cannot provide comprehensive equipment list at this time. Examples of the type of construction equipment is provided in Exhibit A.

41 N/A N/A

Can the government provide surveillance forms and checklist for the equipment anticipated to be part of the Scope of Work?

The Corrosion Assessment Checklist and the Corrosion Surveillance Report must be in compliance with the contract as a whole, CDRL A001 (Corrosion Assessment Checklist), and CDRL A002 (Corrosion Surveillance Report).

42 N/A N/A Is this a best value or LPTA acquisition?

LPTA, refer to section 52.212-2 (c) on page 41 of the solicitation.