N3943020R2205_RFI_1.pdf
PDF 98 KB Posted
- Solicitation number
- N3943020R2205
About this file
This document contains a solicitation for architectural and engineering services for petroleum, oil, and lubricants systems and supporting facilities at various locations worldwide. The Naval Facilities Engineering and Expeditionary Warfare Center seeks proposals for indefinite delivery, indefinite quantity multiple award contracts with a base period of performance of sixty months and a total maximum value of $150 million to be allocated across six awards. A minimum of three awards will be reserved for small businesses. Task orders will range typically between $25,000 and $5 million. Selection criteria prioritize specialized experience in inspections, design, and construction oversight of petroleum systems, as well as professional qualifications, capacity to perform multiple simultaneous projects, past performance, and support for small businesses. Proposals are due by November 20, 2019 and awards are expected to be made beginning September 1, 2020. The solicitation describes the required architectural, engineering, program management, and construction management services for petroleum facilities and systems.
Responses to Questions 1
View the file
Other files
| File | Type | Posted |
|---|---|---|
| N3943020R2205 RFI 4.pdf | ||
| N3943020R2205_RFI_3.pdf | ||
| N3943020R2205_RFI_2.pdf | ||
| SAES_AUG2019.pdf | ||
| Attachment_A_-_PPQ.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
No. Reference Question Answer
1 N3943020R2205 The solicitation states: “Part II is limited to one page for the prime contractor.” We plan to submit as a JV prime, made up of two large business JV partners. Please confirm we are permitted to submit separate Part IIs for each JV partner.
No. If the offeror is going to be a joint-venture, then it is a separate legal entity from the JV Partners, so only the JV should be listed in Part II. Note that the synopsis states that firms must be registered in SAM prior to submission of the SF-330s; which would include any joint ventures.
2 N3943020R2205 The solicitation states: “Part II is limited to one page for the prime contractor.” We plan to support this contract from multiple offices and typically provide a Part II for each office represented on the resumes. Please confirm we are permitted to submit separate Part IIs for each branch office that will perform a key role on work awarded under this contract.
No. See the submission requirements for Factor (6) Location.
3 N3943020R2205 I see that Part I is limited to 30 pages. I’m assuming that counts front and back of each sheet as two pages. Or should this be 30 single-sided pages?
Front and back of sheet is counted as two pages.
4 N3943020R2205 Is it required that the projects we use to demonstrate specialized experience be complete?
Yes
5 N3943020R2205 Would NAVFAC EXWC consider allowing the use of one 11 x 17 page for Section D, Organization Chart?
No
6 N3943020R2205 The solicitation states: SF 330 Part I is limited to 30 pages.” There are no exclusions to the page count listed such as cover, dividers, agency-wide Summary Subcontract Report and Past Performance Questionnaires (Attachment A). Please confirm that these items are excluded from the 30-page limit.
Dividers are excluded. Any page with content will be considered as a page.
7 N3943020R2205 We intend to submit as a JV prime. Please confirm that each of the 2-member JV may submit the required agency-wide Summary Subcontract Report.
If the offeror is a currently existing JV, then any ISRs for the existing JV should be submitted. If the offeror is a new JV, then ISRs for each of the JV partners should be submitted.
8 N3943020R2205 Is there a limit on team member and respective resumes?
No, but the overall page limits must be adhered to.
9 N3943020R2205 Does NAVFAC EXWC want to see resumes of specific key team members? If so, which positions?
The SAES requires “Design and engineering services will require expertise in architectural, mechanical, electrical, civil, structural, waterfront, fire protection and environmental disciplines as it pertains to Department of Defense (DoD) POL systems.” The key personnel, or subconsultants, should demonstrate these capabilities.
10 N3943020R2205 When does the 5-year requirement start for individual project experience?
Work on these projects must have been performed in the last five (5) years, as the posting date of this synopsis.
11 N3943020R2205 If we have a current PPQ, will that be acceptable to resubmit for this proposal? Or does a new one in the supplied format need to be created and submitted for evaluation?
An existing PPQ is acceptable.