N39040Q5333V266 Exhibit A_DISPOSAL CONTAINERS - TC.pdf
PDF 192 KB Posted
- Attached to
- Various Nuclear Disposal Containers
- Solicitation number
- N39040Q5333V266
About this file
This document is a Contract Data Requirements List (CDRL) in the form of DD Form 1423 (Mechanized Equivalent) for contract N39040Q5333V266 covering three disposal container systems: Small Shear Block Disposal Container, Large Shear Block Disposal Container, and Lead Screw Disposal Container.
The CDRL establishes mandatory data submission requirements for safety hoist rings and lifting lugs on each container type. For the Small Shear Block containers (2 units), contractors must submit one Certificate of Compliance per item, plus two visual test certifications (before and after), two magnetic particle test certifications (before and after), and two load/proof test certifications for safety hoist rings. For lifting lugs, the same testing and certification pattern applies. The Large Shear Block containers (16 units) require identical certification types but scaled to 16 units. The Lead Screw Disposal Container (1 unit) requires the same certification suite but for a single unit. All submissions are designated as "O-TIME" (one-time) submittals to be delivered with material shipment. Additionally, Material Safety Data Sheets must be submitted once per shipment covering all items. All submissions route to distribution code 410 via mail without DD 250 required. Technical office oversight is 2370.3, and all data references contract paragraphs C.7.1 through C.8.6 and C.9.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTRACT/SOLICITATION: N39040Q5333V266
EXHIBIT A
(ADP DD FORM 1423 (MECHANIZED EQUIVALENT) PER DAR CLAUSE 16-815)
CONTRACT DATA REQUIREMENTS LIST
SYSTEM/ITEM: SMALL SHEAR BLOCK DISPOSAL CONTAINER
CATEGORY ____________
ITEM NO CONTRACTOR
01 SEQ NO A002AA
02 DATA DESC CERTIFICATE OF COMPLIANCE
03 SUBTITLE SAFETY HOIST RING
04 DID NUMBER PER ATTACHMENT 1 TO EXHIBIT A
05 CONTRACT REF PARA. C.7.1
06 TECH OFFICE 2370.3
07 DD 250 REQ SD
08 APP CODE
09 IAC INPUT
10 FREQUENCY O-TIME; SUBMIT ONE COC PER ITEM (2 UNITS)
11 AS OF DATE
12 DATE 1ST SUBM WITH MATERIAL
13 DATE SUB SUBM
14 DISTRIBUTION 410 __/ 0 VIA MAIL (N0 DD 250 REQD)
15 TOTAL __
16 REMARKS QTY (1) SUBMITTAL
SEQ. NO.:
PREPARED BY ________________________________________________ DATE__________________ APPROVED BY ________________________________________________ DATE__________________
DD FORM 1423
01 SEQ NO A002AB
02 DATA DESC VISUAL TEST CERTIFICATION
03 SUBTITLE BEFORE; SAFETY HOIST RING
04 DID NUMBER PER ATTACHMENT 1 TO EXHIBIT A
05 CONTRACT REF PARA. C.7.2
06 TECH OFFICE 2370.3
07 DD 250 REQ SD
08 APP CODE
09 IAC INPUT
10 FREQUENCY O-TIME; SUBMIT ONE CERTIFICATION PER UNIT (QTY 2)
11 AS OF DATE
12 DATE 1ST SUBM WITH MATERIAL
13 DATE SUB SUBM
14 DISTRIBUTION 410 __/ 0 VIA MAIL (N0 DD 250 REQD)
16 REMARKS QTY (2) SUBMITTALS
01 SEQ NO A002AC
03 SUBTITLE AFTER: SAFETY HOIST RING
04 DID NUMBER PER ATTACHMENT 1 TO EXHIBIT A
05 CONTRACT REF PARA. C.7.3
06 TECH OFFICE 2370.3
07 DD 250 REQ SD
08 APP CODE
09 IAC INPUT
10 FREQUENCY O-TIME; SUBMIT ONE CERTIFICATION PER UNIT (QTY 2)
11 AS OF DATE
12 DATE 1ST SUBM WITH MATERIAL
13 DATE SUB SUBM
14 DISTRIBUTION 410 __/ 0 VIA MAIL (N0 DD 250 REQD)
01 SEQ NO A002AD
02 DATA DESC MAGNETIC PARTICLE TEST
03 SUBTITLE BEFORE: SAFETY HOIST RING
04 DID NUMBER PER ATTACHMENT 1 TO EXHIBIT A
05 CONTRACT REF PARA. C.7.4
06 TECH OFFICE 2370.3
07 DD 250 REQ SD
08 APP CODE
09 IAC INPUT
10 FREQUENCY O-TIME; SUBMIT ONE CERTIFICATION PER UNIT (QTY 2)
11 AS OF DATE
12 DATE 1ST SUBM WITH MATERIAL
13 DATE SUB SUBM
14 DISTRIBUTION 410 __/ 0 VIA MAIL (N0 DD 250 REQD)
01 SEQ NO A002AE
03 SUBTITLE AFTER: SAFETY HOIST RING
04 DID NUMBER PER ATTACHMENT 1 TO EXHIBIT A
05 CONTRACT REF PARA. C.7.5
06 TECH OFFICE 2370.3
07 DD 250 REQ SD
08 APP CODE
09 IAC INPUT
10 FREQUENCY O-TIME; SUBMIT ONE CERTIFICATION PER UNIT (QTY 2)
11 AS OF DATE
12 DATE 1ST SUBM WITH MATERIAL
13 DATE SUB SUBM
14 DISTRIBUTION 410 __/ 0 VIA MAIL (N0 DD 250 REQD)
01 SEQ NO A002AF
02 DATA DESC LOAD PROOF TEST CERIFICATION
03 SUBTITLE SAFETY HOIST RING
04 DID NUMBER PER ATTACHMENT 1 TO EXHIBIT A
05 CONTRACT REF PARA. C.7.6
06 TECH OFFICE 2370.3
07 DD 250 REQ SD
08 APP CODE
09 IAC INPUT
10 FREQUENCY O-TIME; SUBMIT ONE CERTIFICATION PER UNIT (QTY 2)
11 AS OF DATE
12 DATE 1ST SUBM WITH MATERIAL
13 DATE SUB SUBM
14 DISTRIBUTION 410 __/ 0 VIA MAIL (N0 DD 250 REQD)
01 SEQ NO A002AG
03 SUBTITLE LIFTING LUGS
04 DID NUMBER PER ATTACHMENT 1 TO EXHIBIT A
05 CONTRACT REF PARA. C.8.1
06 TECH OFFICE 2370.3
07 DD 250 REQ SD
08 APP CODE
09 IAC INPUT
10 FREQUENCY O-TIME; SUBMIT ONE COC PER ITEM (2 UNITS)
11 AS OF DATE
12 DATE 1ST SUBM WITH MATERIAL
13 DATE SUB SUBM
14 DISTRIBUTION 410 __/ 0 VIA MAIL (N0 DD 250 REQD)
01 SEQ NO A002AH
02 DATA DESC VISUAL TEST CERIFICATION
03 SUBTITLE BEFORE: LIFTING LUGS
04 DID NUMBER PER ATTACHMENT 1 TO EXHIBIT A
05 CONTRACT REF PARA. C.8.2
06 TECH OFFICE 2370.3
07 DD 250 REQ SD
08 APP CODE
09 IAC INPUT
10 FREQUENCY O-TIME; SUBMIT ONE CERTIFICATION PER UNIT (QTY 2)
11 AS OF DATE
12 DATE 1ST SUBM WITH MATERIAL
13 DATE SUB SUBM
14 DISTRIBUTION 410 __/ 0 VIA MAIL (N0 DD 250 REQD)
01 SEQ NO A002AI
03 SUBTITLE AFTER: LIFTING LUGS
04 DID NUMBER PER ATTACHMENT 1 TO EXHIBIT A
05 CONTRACT REF PARA. C.8.3
06 TECH OFFICE 2370.3
07 DD 250 REQ SD
08 APP CODE
09 IAC INPUT
10 FREQUENCY O-TIME; SUBMIT ONE CERTIFICATION PER UNIT (QTY 2)
11 AS OF DATE
12 DATE 1ST SUBM WITH MATERIAL
13 DATE SUB SUBM
14 DISTRIBUTION 410 __/ 0 VIA MAIL (N0 DD 250 REQD)
01 SEQ NO A002AJ
03 SUBTITLE BEFORE: LIFTING LUGS
04 DID NUMBER PER ATTACHMENT 1 TO EXHIBIT A
05 CONTRACT REF PARA. C.8.4
06 TECH OFFICE 2370.3
07 DD 250 REQ SD
08 APP CODE
09 IAC INPUT
10 FREQUENCY O-TIME; SUBMIT ONE CERTIFICATION PER UNIT (QTY 2)
11 AS OF DATE
12 DATE 1ST SUBM WITH MATERIAL
13 DATE SUB SUBM
14 DISTRIBUTION 410 __/ 0 VIA MAIL (N0 DD 250 REQD)
01 SEQ NO A002AK
03 SUBTITLE AFTER: LIFTING LUG
04 DID NUMBER PER ATTACHMENT 1 TO EXHIBIT A
05 CONTRACT REF PARA. C.8.5
06 TECH OFFICE 2370.3
07 DD 250 REQ SD
08 APP CODE
09 IAC INPUT
10 FREQUENCY O-TIME; SUBMIT ONE CERTIFICATION PER UNIT (QTY 2)
11 AS OF DATE
12 DATE 1ST SUBM WITH MATERIAL
13 DATE SUB SUBM
14 DISTRIBUTION 410 __/ 0 VIA MAIL (N0 DD 250 REQD)
01 SEQ NO A002AL
02 DATA DESC LOAD/PROOF TEST CERTIFICATION
03 SUBTITLE LIFTING LUGS
04 DID NUMBER PER ATTACHMENT 1 TO EXHIBIT A
05 CONTRACT REF PARA. C.8.6
06 TECH OFFICE 2370.3
07 DD 250 REQ SD
08 APP CODE
09 IAC INPUT
10 FREQUENCY O-TIME; SUBMIT ONE CERTIFICATION PER UNIT (QTY 2)
11 AS OF DATE
12 DATE 1ST SUBM WITH MATERIAL
13 DATE SUB SUBM
14 DISTRIBUTION 410 __/ 0 VIA MAIL (N0 DD 250 REQD)
SYSTEM/ITEM: LARGE SHEAR BLOCK DISPOSAL CONTAINER
01 SEQ NO A004AA
03 SUBTITLE SAFETY HOIST RING
04 DID NUMBER PER ATTACHMENT 1 TO EXHIBIT A
05 CONTRACT REF PARA. C.7.1
06 TECH OFFICE 2370.3
07 DD 250 REQ SD
08 APP CODE
09 IAC INPUT
10 FREQUENCY O-TIME; SUBMIT ONE COC PER ITEM (16 UNITS)
11 AS OF DATE
12 DATE 1ST SUBM WITH MATERIAL
13 DATE SUB SUBM
14 DISTRIBUTION 410 __/ 0 VIA MAIL (N0 DD 250 REQD)
01 SEQ NO A004AB
03 SUBTITLE BEFORE; SAFETY HOIST RING
04 DID NUMBER PER ATTACHMENT 1 TO EXHIBIT A
05 CONTRACT REF PARA. C.7.2
06 TECH OFFICE 2370.3
07 DD 250 REQ SD
08 APP CODE
09 IAC INPUT
10 FREQUENCY O-TIME; SUBMIT ONE CERTIFICATION PER UNIT (QTY 16)
11 AS OF DATE
12 DATE 1ST SUBM WITH MATERIAL
13 DATE SUB SUBM
14 DISTRIBUTION 410 __/ 0 VIA MAIL (N0 DD 250 REQD)
16 REMARKS QTY (16) SUBMITTALS
01 SEQ NO A004AC
03 SUBTITLE AFTER: SAFETY HOIST RING
04 DID NUMBER PER ATTACHMENT 1 TO EXHIBIT A
05 CONTRACT REF PARA. C.7.3
06 TECH OFFICE 2370.3
07 DD 250 REQ SD
08 APP CODE
09 IAC INPUT
10 FREQUENCY O-TIME; SUBMIT ONE CERTIFICATION PER UNIT (QTY 16)
11 AS OF DATE
12 DATE 1ST SUBM WITH MATERIAL
13 DATE SUB SUBM
14 DISTRIBUTION 410 __/ 0 VIA MAIL (N0 DD 250 REQD)
SYSTEM/ITEM: LARE SHEAR BLOCK DISPOSAL CONTAINER
01 SEQ NO A004AD
03 SUBTITLE BEFORE: SAFETY HOIST RING
04 DID NUMBER PER ATTACHMENT 1 TO EXHIBIT A
05 CONTRACT REF PARA. C.7.4
06 TECH OFFICE 2370.3
07 DD 250 REQ SD
08 APP CODE
09 IAC INPUT
10 FREQUENCY O-TIME; SUBMIT ONE CERTIFICATION PER UNIT (QTY 16)
11 AS OF DATE
12 DATE 1ST SUBM WITH MATERIAL
13 DATE SUB SUBM
14 DISTRIBUTION 410 __/ 0 VIA MAIL (N0 DD 250 REQD)
01 SEQ NO A004AE
03 SUBTITLE AFTER: SAFETY HOIST RING
04 DID NUMBER PER ATTACHMENT 1 TO EXHIBIT A
05 CONTRACT REF PARA. C.7.5
06 TECH OFFICE 2370.3
07 DD 250 REQ SD
08 APP CODE
09 IAC INPUT
10 FREQUENCY O-TIME; SUBMIT ONE CERTIFICATION PER UNIT (QTY 16)
11 AS OF DATE
12 DATE 1ST SUBM WITH MATERIAL
13 DATE SUB SUBM
14 DISTRIBUTION 410 __/ 0 VIA MAIL (N0 DD 250 REQD)
01 SEQ NO A004AF
03 SUBTITLE SAFETY HOIST RING
04 DID NUMBER PER ATTACHMENT 1 TO EXHIBIT A
05 CONTRACT REF PARA. C.7.6
06 TECH OFFICE 2370.3
07 DD 250 REQ SD
08 APP CODE
09 IAC INPUT
10 FREQUENCY O-TIME; SUBMIT ONE CERTIFICATION PER UNIT (QTY 16)
11 AS OF DATE
12 DATE 1ST SUBM WITH MATERIAL
13 DATE SUB SUBM
14 DISTRIBUTION 410 __/ 0 VIA MAIL (N0 DD 250 REQD)
01 SEQ NO A004AG
03 SUBTITLE LIFTING LUGS
04 DID NUMBER PER ATTACHMENT 1 TO EXHIBIT A
05 CONTRACT REF PARA. C.8.1
06 TECH OFFICE 2370.3
07 DD 250 REQ SD
08 APP CODE
09 IAC INPUT
10 FREQUENCY O-TIME; SUBMIT ONE COC PER ITEM (16 UNITS)
11 AS OF DATE
12 DATE 1ST SUBM WITH MATERIAL
13 DATE SUB SUBM
14 DISTRIBUTION 410 __/ 0 VIA MAIL (N0 DD 250 REQD)
01 SEQ NO A004AH
03 SUBTITLE BEFORE: LIFTING LUGS
04 DID NUMBER PER ATTACHMENT 1 TO EXHIBIT A
05 CONTRACT REF PARA. C.8.2
06 TECH OFFICE 2370.3
07 DD 250 REQ SD
08 APP CODE
09 IAC INPUT
10 FREQUENCY O-TIME; SUBMIT ONE CERTIFICATION PER UNIT (QTY 16)
11 AS OF DATE
12 DATE 1ST SUBM WITH MATERIAL
13 DATE SUB SUBM
14 DISTRIBUTION 410 __/ 0 VIA MAIL (N0 DD 250 REQD)
01 SEQ NO A004AI
03 SUBTITLE AFTER: LIFTING LUGS
04 DID NUMBER PER ATTACHMENT 1 TO EXHIBIT A
05 CONTRACT REF PARA. C.8.3
06 TECH OFFICE 2370.3
07 DD 250 REQ SD
08 APP CODE
09 IAC INPUT
10 FREQUENCY O-TIME; SUBMIT ONE CERTIFICATION PER UNIT (QTY 16)
11 AS OF DATE
12 DATE 1ST SUBM WITH MATERIAL
13 DATE SUB SUBM
14 DISTRIBUTION 410 __/ 0 VIA MAIL (N0 DD 250 REQD)
01 SEQ NO A004AJ
03 SUBTITLE BEFORE: LIFTING LUGS
04 DID NUMBER PER ATTACHMENT 1 TO EXHIBIT A
05 CONTRACT REF PARA. C.8.4
06 TECH OFFICE 2370.3
07 DD 250 REQ SD
08 APP CODE
09 IAC INPUT
10 FREQUENCY O-TIME; SUBMIT ONE CERTIFICATION PER UNIT (QTY 16)
11 AS OF DATE
12 DATE 1ST SUBM WITH MATERIAL
13 DATE SUB SUBM
14 DISTRIBUTION 410 __/ 0 VIA MAIL (N0 DD 250 REQD)
01 SEQ NO A004AK
03 SUBTITLE AFTER: LIFTING LUG
04 DID NUMBER PER ATTACHMENT 1 TO EXHIBIT A
05 CONTRACT REF PARA. C.8.5
06 TECH OFFICE 2370.3
07 DD 250 REQ SD
08 APP CODE
09 IAC INPUT
10 FREQUENCY O-TIME; SUBMIT ONE CERTIFICATION PER UNIT (QTY 16)
11 AS OF DATE
12 DATE 1ST SUBM WITH MATERIAL
13 DATE SUB SUBM
14 DISTRIBUTION 410 __/ 0 VIA MAIL (N0 DD 250 REQD)
SYSTEM/ITEM: LARGE SHEAR BLOCK DISPOSAL CONTAINER
ITEM NO CONTRACTOR________________
01 SEQ NO A004AL
03 SUBTITLE LIFTING LUGS
04 DID NUMBER PER ATTACHMENT 1 TO EXHIBIT A
05 CONTRACT REF PARA. C.8.6
06 TECH OFFICE 2370.3
07 DD 250 REQ SD
08 APP CODE
09 IAC INPUT
10 FREQUENCY O-TIME; SUBMIT ONE CERTIFICATION PER UNIT (QTY 16)
11 AS OF DATE
12 DATE 1ST SUBM WITH MATERIAL
13 DATE SUB SUBM
14 DISTRIBUTION 410 __/ 0 VIA MAIL (N0 DD 250 REQD)
SYSTEM/ITEM: LEAD SCREW DISPOSAL CONTAINER
01 SEQ NO A006AA
03 SUBTITLE SAFETY HOIST RING
04 DID NUMBER PER ATTACHMENT 1 TO EXHIBIT A
05 CONTRACT REF PARA. C.7.1
06 TECH OFFICE 2370.3
07 DD 250 REQ SD
08 APP CODE
09 IAC INPUT
10 FREQUENCY O-TIME; SUBMIT ONE COC PER ITEM (1 UNITS)
11 AS OF DATE
12 DATE 1ST SUBM WITH MATERIAL
13 DATE SUB SUBM
14 DISTRIBUTION 410 __/ 0 VIA MAIL (N0 DD 250 REQD)
01 SEQ NO A006AB
03 SUBTITLE BEFORE; SAFETY HOIST RING
04 DID NUMBER PER ATTACHMENT 1 TO EXHIBIT A
05 CONTRACT REF PARA. C.7.2
06 TECH OFFICE 2370.3
07 DD 250 REQ SD
08 APP CODE
09 IAC INPUT
10 FREQUENCY O-TIME; SUBMIT ONE COC PER ITEM (1 UNIT)
11 AS OF DATE
12 DATE 1ST SUBM WITH MATERIAL
13 DATE SUB SUBM
14 DISTRIBUTION 410 __/ 0 VIA MAIL (N0 DD 250 REQD)
01 SEQ NO A006AC
03 SUBTITLE AFTER: SAFETY HOIST RING
04 DID NUMBER PER ATTACHMENT 1 TO EXHIBIT A
05 CONTRACT REF PARA. C.7.3
06 TECH OFFICE 2370.3
07 DD 250 REQ SD
08 APP CODE
09 IAC INPUT
10 FREQUENCY O-TIME; SUBMIT ONE COC PER ITEM (1 UNIT)
11 AS OF DATE
12 DATE 1ST SUBM WITH MATERIAL
13 DATE SUB SUBM
14 DISTRIBUTION 410 __/ 0 VIA MAIL (N0 DD 250 REQD)
01 SEQ NO A006AD
03 SUBTITLE BEFORE: SAFETY HOIST RING
04 DID NUMBER PER ATTACHMENT 1 TO EXHIBIT A
05 CONTRACT REF PARA. C.7.4
06 TECH OFFICE 2370.3
07 DD 250 REQ SD
08 APP CODE
09 IAC INPUT
10 FREQUENCY O-TIME; SUBMIT ONE COC PER ITEM (1 UNIT)
11 AS OF DATE
12 DATE 1ST SUBM WITH MATERIAL
13 DATE SUB SUBM
14 DISTRIBUTION 410 __/ 0 VIA MAIL (N0 DD 250 REQD)
SYSTEM/ITEM: LEAD SCREW DISPOSAL CONTAINER CATEGORY ____________
01 SEQ NO A006AE
03 SUBTITLE AFTER: SAFETY HOIST RING
04 DID NUMBER PER ATTACHMENT 1 TO EXHIBIT A
05 CONTRACT REF PARA. C.7.5
06 TECH OFFICE 2370.3
07 DD 250 REQ SD
08 APP CODE
09 IAC INPUT
10 FREQUENCY O-TIME; SUBMIT ONE COC PER ITEM (1 UNIT)
11 AS OF DATE
12 DATE 1ST SUBM WITH MATERIAL
13 DATE SUB SUBM
14 DISTRIBUTION 410 __/ 0 VIA MAIL (N0 DD 250 REQD)
01 SEQ NO A006AF
03 SUBTITLE SAFETY HOIST RING
04 DID NUMBER PER ATTACHMENT 1 TO EXHIBIT A
05 CONTRACT REF PARA. C.7.6
06 TECH OFFICE 2370.3
07 DD 250 REQ SD
08 APP CODE
09 IAC INPUT
10 FREQUENCY O-TIME; SUBMIT ONE COC PER ITEM (1 UNIT)
11 AS OF DATE
12 DATE 1ST SUBM WITH MATERIAL
13 DATE SUB SUBM
14 DISTRIBUTION 410 __/ 0 VIA MAIL (N0 DD 250 REQD)
01 SEQ NO A006AG
03 SUBTITLE LIFTING LUGS
04 DID NUMBER PER ATTACHMENT 1 TO EXHIBIT A
05 CONTRACT REF PARA. C.8.1
06 TECH OFFICE 2370.3
07 DD 250 REQ SD
08 APP CODE
09 IAC INPUT
10 FREQUENCY O-TIME; SUBMIT ONE COC PER ITEM (1 UNIT)
11 AS OF DATE
12 DATE 1ST SUBM WITH MATERIAL
13 DATE SUB SUBM
14 DISTRIBUTION 410 __/ 0 VIA MAIL (N0 DD 250 REQD)
01 SEQ NO A006AH
03 SUBTITLE BEFORE: LIFTING LUGS
04 DID NUMBER PER ATTACHMENT 1 TO EXHIBIT A
05 CONTRACT REF PARA. C.8.2
06 TECH OFFICE 2370.3
07 DD 250 REQ SD
08 APP CODE
09 IAC INPUT
10 FREQUENCY O-TIME; SUBMIT ONE COC PER ITEM (1 UNIT)
11 AS OF DATE
12 DATE 1ST SUBM WITH MATERIAL
13 DATE SUB SUBM
14 DISTRIBUTION 410 __/ 0 VIA MAIL (N0 DD 250 REQD)
01 SEQ NO A006AI
03 SUBTITLE AFTER: LIFTING LUGS
04 DID NUMBER PER ATTACHMENT 1 TO EXHIBIT A
05 CONTRACT REF PARA. C.8.3
06 TECH OFFICE 2370.3
07 DD 250 REQ SD
08 APP CODE
09 IAC INPUT
10 FREQUENCY O-TIME; SUBMIT ONE COC PER ITEM (1 UNIT)
11 AS OF DATE
12 DATE 1ST SUBM WITH MATERIAL
13 DATE SUB SUBM
14 DISTRIBUTION 410 __/ 0 VIA MAIL (N0 DD 250 REQD)
01 SEQ NO A006AJ
03 SUBTITLE BEFORE: LIFTING LUGS
04 DID NUMBER PER ATTACHMENT 1 TO EXHIBIT A
05 CONTRACT REF PARA. C.8.4
06 TECH OFFICE 2370.3
07 DD 250 REQ SD
08 APP CODE
09 IAC INPUT
10 FREQUENCY O-TIME; SUBMIT ONE COC PER ITEM (1 UNIT)
11 AS OF DATE
12 DATE 1ST SUBM WITH MATERIAL
13 DATE SUB SUBM
14 DISTRIBUTION 410 __/ 0 VIA MAIL (N0 DD 250 REQD)
01 SEQ NO A006AK
03 SUBTITLE AFTER: LIFTING LUG
04 DID NUMBER PER ATTACHMENT 1 TO EXHIBIT A
05 CONTRACT REF PARA. C.8.5
06 TECH OFFICE 2370.3
07 DD 250 REQ SD
08 APP CODE
09 IAC INPUT
10 FREQUENCY O-TIME; SUBMIT ONE COC PER ITEM (1 UNIT)
11 AS OF DATE
12 DATE 1ST SUBM WITH MATERIAL
13 DATE SUB SUBM
14 DISTRIBUTION 410 __/ 0 VIA MAIL (N0 DD 250 REQD)
01 SEQ NO A006AL
03 SUBTITLE LIFTING LUGS
04 DID NUMBER PER ATTACHMENT 1 TO EXHIBIT A
05 CONTRACT REF PARA. C.8.6
06 TECH OFFICE 2370.3
07 DD 250 REQ SD
08 APP CODE
09 IAC INPUT
10 FREQUENCY O-TIME; SUBMIT ONE COC PER ITEM (1 UNIT)
11 AS OF DATE
12 DATE 1ST SUBM WITH MATERIAL
13 DATE SUB SUBM
14 DISTRIBUTION 410 __/ 0 VIA MAIL (N0 DD 250 REQD)
15 TOTAL __
16 REMARKS QTY (1) SUBMITTAL
SEQ. NO.:
PREPARED BY ________________________________________________ DATE__________________
SYSTEM/ITEM: (SMALL/LARGE SHEAR BLOCK DISPOSAL CONTAINER)/ LEAD SCREW
DISPOSAL CONTAINER
01 SEQ NO A007
02 DATA DESC MATERIAL SAFETY DATA SHEETS
03 SUBTITLE
04 DID NUMBER PER ATTACHMENT 1 TO EXHIBIT A
05 CONTRACT REF PARA. C.9
06 TECH OFFICE 2370.3
07 DD 250 REQ SD
08 APP CODE
09 IAC INPUT
10 FREQUENCY SUBMIT ONE COC FOR ALL ITEMS IN A SHIPMENT
11 AS OF DATE
12 DATE 1ST SUBM WITH MATERIAL SHIPMENT
13 DATE SUB SUBM
14 DISTRIBUTION 410 __/ 0 VIA MAIL (N0 DD 250 REQD)
16 REMARKS QTY (1) SUBMITTAL PER SHIPMENT