This is a Statement of Work for the manufacturing of Small Shear Block Disposal Containers (RF-2203) for Portsmouth Naval Shipyard (PNSY). The contractor must manufacture three types of disposal containers in accordance with specified PNSY drawings: two Small Shear Block Disposal Containers (drawing 2370A0000389, Revision A, serialized 009 and 010), sixteen Large Shear Block Disposal Containers (drawing 2370A0000388, Revision A, serialized 011-026), and one Lead Screw Disposal Container (drawing PNS 2370A0000137, Revision C, serialized 006). All containers must comply with specifications outlined in their respective drawings and include all required certifications and test reports.

The contractor is responsible for notifying PNSY with a projected work schedule and coordinating mid-construction and completion inspections with the government. PNSY reserves the right to conduct unplanned inspections during fabrication with a minimum of two working days notice. A post-award verification will be conducted by the local DCMA office to confirm the contractor's facilities and capability to meet contract requirements. The contractor must provide a minimum of two working days notice to PNSY prior to shipment of completed containers. Technical points of contact at PNSY Code 2370 are Jeff Turgeon (207-438-5375), Jon Domingue (207-438-6809), and Phil Mitchell (207-438-4559).

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Statement of Work

Small Shear Block Disposal Containers (RF-2203)

1. Manufacturing Requirements:

1.1. Each Small Shear Block Disposal Container (SBDC) is to be manufactured in accordance with Portsmouth Naval Shipyard (PNSY) drawing 2370A0000389, Revision A. A total of two (2) complete Small Shear Block Disposal Containers are required to be built.

1.2. Each Large Shear Block Disposal Container (SBDC) is to be manufactured in accordance with Portsmouth Naval Shipyard (PNSY) drawing 2370A0000388, Revision A. A total of sixteen (16) complete Large Shear Block Disposal Containers are required to be built.

1.3. Each Lead Screw Disposal Container is to be manufactured in accordance with Portsmouth Naval Shipyard drawing PNS 2370A0000137, Revision C. A total of one (1) complete Lead Screw Disposal Container is required to be built.

2. The PNSY technical Point of Contact (POC) in Code 2370 is Jeff Turgeon (207-438-5375), Jon Domingue (207-438-6809) or Phil Mitchell (207-438-4559).

3. PNSY Code 2370 requires a technical review of contractor bid prior to contract award.

4. Certifications, Tests and Reports:

4.1. The contractor will comply with all specifications and provide all certifications and test reports as outlined in PNSY drawing 2370A0000389, Revision A, for the Small Shear Block Disposal Containers. The two containers will be serialized with “009” and “010” respectively.

4.2. The contractor will comply with all specifications and provide all certifications and test reports as outlined in PNSY drawing 2370A0000388, Revision A, for the Large Shear Block Disposal Containers. Each container shall be serialized with a number from “011” to “026”.

4.3. The contractor will comply with all specifications and provide all certifications and test reports as outlined in drawing PNS 2370A0000137, Revision C, for the Lead Screw Disposal Container. The contractor will serialize the container with the number “006”

5. PNSY plans to inspect the containers at an approximate half way point of construction and at completion of construction. Contractor shall notify PNSY with projected work schedule.

Halfway point of construction shall be determined by the contractor and PNSY after award of contract.

6. PNSY reserves the right to inspect the containers at any time during fabrication in addition to the mid-construction visit outlined above. A minimum of two working days notice will be given to the contractor for unplanned visits by a PNSY representative.

7. The local DCMA office shall conduct an "on-site" contractor post-award to verify that the contractor maintains facilities and fully understands the contract terms, conditions and responsibilities, ensuring contract specifications and requirements are able to be met. The buyer reserves the right to attend the post-award verification along with DCMA.

8. Contractor shall contact PNSY a minimum of two working days prior to shipment of completed containers to Portsmouth Naval Shipyard.