Exhibit C Rev 2.xlsx
XLSX spreadsheet 27 KB Posted
- Attached to
- Barge Maintenance
- Solicitation number
- N39040400T4815
About this file
The file is a pricing schedule (Exhibit C Rev 2) for a Department of the Navy Naval Sea Systems Command barge maintenance contract. The detailed pricing matrix outlines multiple maintenance and repair services categorized into five main sections: Planned Maintenance Tasks, Cleaning and Sanitizing, Test and Inspections, Fire Fighting Equipment, and Habitability Repairs. The comprehensive list includes specific tasks such as monthly inspections of emergency lighting, fire extinguishers, mooring lines, and smoke detectors, as well as more extensive repairs like replacing urinals, toilets, sinks, shower heads, and addressing plumbing issues like clearing clogged drains and toilets. Notably, all listed tasks have a contractor unit price of $0.00, which suggests this may be a pre-pricing document or part of a broader contract negotiation. The solicitation (N39040400T4815) is specifically for barge maintenance services, with the work involving detailed preventative and corrective maintenance across various barge systems and infrastructure components.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Exhibit A Rev 2.xlsx | XLSX spreadsheet | |
| Exhibit B Rev 2.xlsx | XLSX spreadsheet | |
| N39040400T4815 Combined Synopsis Solicitation Rev 1.pdf | ||
| N39040400T4815 Questions and Answers.pdf | ||
| Attachment 1 Performance Work Statement Rev 1.pdf | ||
| Exhibit C Rev 1.xlsx | XLSX spreadsheet | |
| Exhibit A Rev 1.xlsx | XLSX spreadsheet | |
| N39040400T4815 Question and Answer.pdf | ||
| Exhibit B Rev 1.xlsx | XLSX spreadsheet | |
| Attachment 6 Wage Determination 2025-4111 Rev 32.pdf | ||
| Exhibit B.xlsx | XLSX spreadsheet | |
| N39040400T4815 Combined Synopsis Solicitation.pdf | ||
| Attachment 1 Performance Work Statement.pdf | ||
| Attachment 4 Quality Assurance Surveillance Plan.pdf | ||
| Attachment 5 PNS Operations Security Contract Requirements.pdf | ||
| Attachment 6 Wage Determination 2025-4011 Rev 31.pdf | ||
| Exhibit C.xlsx | XLSX spreadsheet | |
| Attachment 2 Work Request Template UPPR.pdf | ||
| Attachment 3 DD1423 Data Requirements.pdf | ||
| Exhibit A.xlsx | XLSX spreadsheet |
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Option Period 2
| Supplies/Services | Material or equivalent | Est Qty | Unit | Contractor Unit | ||||
| Price (LABOR) | Contractor Unit | |||||||
| Price (MATERIAL) | Contractor Bid Amount | |||||||
| A | 101 | Planned Maintenance Tasks | ||||||
| 101AA | Inspect barge trouble log over 24 events(days), excluding Holidays. | Labor only | 48 | EA | $0.00 | |||
| 101AB | Test emergency lighting monthly | Labor only | 12 | EA | $0.00 | |||
| 101AC | Inspect fire extinguishers monthly | Labor only | 12 | EA | $0.00 | |||
| 101AD | Inspect mooring lines monthly. | Labor only | 12 | EA | $0.00 | |||
| 101AE | Inspect brow assembly monthly, excluding Holidays. | Labor only | 12 | EA | $0.00 | |||
| 101AF | Inspect exterior lighting monthly. | Labor only | 12 | EA | $0.00 | |||
| 101AG | Test smoke detectors monthly | Labor only | 12 | EA | $0.00 | |||
| 101AH | Install smoke detector batteries annually | 9V battery | 25 | EA | $0.00 | |||
| 101AI | Clean washable vent filters quarterly | Labor only | 80 | EA | $0.00 | |||
| 101AJ | Test operate CHT system monthly | Labor only | 12 | EA | $0.00 | |||
| 101AK | Perform annual portable fire extinguisher certification | 20 lb ABC | 1 | EA | $0.00 |
| A | 102 | Cleaning and Sanitizing | ||||
| A | 102AA | Deep clean and sanitize affected area following sewage spill | 200 | SF | $0.00 | |
| 102AB | Pressure wash CHT tank interior | Labor only | 10 | EA | $0.00 |
| A | 103 | Test and Inspections | ||||
| A | 103AA | Accomplish a preliminary and final visual and operational inspection of all systems and equipment utilizing barge systems and equipment check off list. Submit a detailed report of all discrepancies. | Labor only | 2 | EA | $0.00 |
| A | 104 | Fire Fighting Equipment: Replace, Repair and Maintenance | ||||
| A | 104AA | Re-charge existing fire extinguishers, 20 lbs. or less | 2 | EA | $0.00 | |
| A | 104AB | Install new dry chemical fire extinguishers, 20 lbs. | Kidde 468003 | 1 | EA | $0.00 |
| A | 104AC | Replace smoke detector | Fire Sentry i9040E | 20 | EA | $0.00 |
| A | 105 | Habitability Repairs | ||||
| A | 105AA | Replace urinals | American Standard Maybrook | 1 | EA | $0.00 |
| A | 105AB | Replace toilets | TOTO CT705EN | 1 | EA | $0.00 |
| A | 105AC | Replace sinks | American Standard Declyn | 1 | EA | $0.00 |
| A | 105AD | Replace shower heads | Mixet Chrome 2 gpm | 10 | EA | $0.00 |
| A | 105AE | Replace shower mixing valves | Simmons Temptrol | 1 | EA | $0.00 |
| A | 105AF | Replace flushometer | Sloan royal commode or urinal | 5 | EA | $0.00 |
| A | 105AG | Replace lavatory sink faucet | Delta commercial single handle | 5 | EA | $0.00 |
| A | 105AJ | Replace composition ceiling panels (2 ft. x 4 ft.) vinyl coated | Parkland Finale 2x4 | 10 | EA | $0.00 |
| A | 105AK | Replace ceiling tile T-Rail | Armstrong | 50 | LF | $0.00 |
| A | 105AL | Replace towel racks | ASI 0755-SS24 | 4 | EA | $0.00 |
| A | 105AM | Replace soap dishes | ASI 0720-Z zamac | 4 | EA | $0.00 |
| A | 105AN | Replace shower curtains including hooks | ASI 1200-SHU/ASI V36 | 6 | EA | $0.00 |
| A | 105AP | Replace shower mats | 24" X 24" RUBBER | 6 | EA | $0.00 |
| A | 105AQ | Replace toilet paper holder (frame and spool) | ASI 0705-Z zamac | 5 | EA | $0.00 |
| A | 105AR | Replace water fountains | Elkay FD7003T1Z | 3 | EA | $0.00 |
| A | 105AS | Replace mini blinds | Aluminum 1", 36" X 64" | 20 | EA | $0.00 |
| A | 105AT | Replace flushometer hoses | 2 | EA | $0.00 | |
| A | 105AU | Clean flushometer diaphragm valve | Labor only | 10 | EA | $0.00 |
| A | 105AV | Replace commode wax ring | Labor only | 5 | EA | $0.00 |
| A | 105AW | Clear clogged commode | Labor only | 10 | EA | $0.00 |
| A | 105AZ | Clear clogged urinal | Labor only | 20 | EA | $0.00 |
| A | 105BA | Clear internal deck drain with plunger | Labor only | 10 | EA | $0.00 |
| A | 105BB | Clear internal deck drain with auger | Labor only | 10 | EA | $0.00 |
| A | 105BD | Clear internal deck drain with water ram | Labor only | 10 | EA | $0.00 |
| A | 105BE | Clear sink clog with plunger | Labor only | 10 | EA | $0.00 |
| A | 105BF | Clear sink clog with auger | Labor only | 10 | EA | $0.00 |
| A | 105BG | Clear sink clog with water ram | Labor only | 10 | EA | $0.00 |
| A | 105BH | Disassemble/clean/reassemble sink trap | Labor only | 10 | EA | $0.00 |
| A | 105BI | Disassemble/clean/reassemble urinal trap | Labor only | 10 | EA | $0.00 |
| A | 105BJ | Disassemble/clear/reassemble check valve (<4" diameter) | Labor only | 5 | EA | $0.00 |
| A | 105BK | Caulk shower stall interior | Labor only | 3 | EA | $0.00 |
| A | 105BL | Replace sink trap | Chrome plated brass, 1-1/2" | 10 | EA | $0.00 |
| A | 105BM | Replace urinal trap | Chrome plated brass, 1-1/2" | 10 | EA | $0.00 |
| A | 105BN | Fabricate replacement keys as per sample | Material only | 10 | EA | $0.00 |
| A | 105BO | Open and reset pin type lock sets to include 2 replacement keys | 5 | EA | $0.00 | |
| A | 105BP | Provide and install new heavy duty lock sets | Schlage Grade 1 orbit | 5 | EA | $0.00 |
| A | 105BQ | Replace or install hydraulic door closers | Falcon SC-70 series | 4 | EA | $0.00 |
| A | 105BR | Replace bulkhead insulation (2" thick) | 20 | SF | $0.00 | |
| A | 105BS | Replace bulkhead insulation (1" thick) | 20 | SF | $0.00 | |
| A | 105BT | Replace in-line potable water filters | Aqua-pure AP-117 | 10 | EA | $0.00 |
| A | 105BU | Remove/Replace pipe (soft solder) 1/2"-3/4" dia/ per foot | 5 | FT | $0.00 | |
| A | 105BV | Remove/Replace pipe (soft solder) 1"-2" dia/ per foot | 5 | FT | $0.00 | |
| A | 105BW | Remove/Replace pipe (soft solder) 2-1/2" - 3" dia/ per foot | 5 | FT | $0.00 | |
| A | 105BX | Remove/Replace pipe (welding) 1/2"-3/4" dia/ per foot | 5 | FT | $0.00 | |
| A | 105BY | Remove/Replace pipe (welding) 1"-2" dia/ per foot | 5 | FT | $0.00 | |
| A | 105BZ | Remove/Replace pipe (welding) 2-1/2" - 3" dia/ per foot | 5 | FT | $0.00 | |
| A | 105CA | Remove/Replace pipe (threaded) 1/2"-3/4" dia/ per foot | 5 | FT | $0.00 | |
| A | 105CB | Remove/Replace pipe (threaded) 1"-2" dia/ per foot | 5 | FT | $0.00 | |
| A | 105CC | Remove/Replace pipe (threaded) 2-1/2" - 3" dia/ per foot | 5 | FT | $0.00 | |
| A | 105CD | Remove/Replace pipe (brazing) 1/2"-3/4" dia/ per foot | 5 | FT | $0.00 | |
| A | 105CE | Remove/Replace pipe (brazing) 1"-2" dia/ per foot | 5 | FT | $0.00 | |
| A | 105CF | Remove/Replace pipe (brazing) 2-1/2" - 3" dia/ per foot | 5 | FT | $0.00 | |
| A | 105CG | Remove/Replace valve handle | 10 | EA | $0.00 | |
| A | 105CH | Tighten valve packing gland | Labor only | 20 | EA | $0.00 |
| A | 105CI | Replace valve packing (<2" diam) | 1 | EA | $0.00 | |
| A | 105CJ | Replace valve packing (>2" diam) | 1 | EA | $0.00 | |
| 105CK | Remove/replace threaded fastener < 1/2" dia | Labor only | 200 | EA | $0.00 | |
| 105CL | Remove/replace threaded fastener 1/2" - 3/4" dia | Labor only | 200 | EA | $0.00 | |
| 105CM | Cut threaded fastener <1/2" dia | Labor only | 20 | EA | $0.00 | |
| 105CN | Cut threaded fastener 1/2" - 3/4" dia | Labor only | 20 | EA | $0.00 |
| A | 106 | Electrical Repairs | ||||
| A | 106AA | Replace fluorescent tubes in closed fixtures: 12 inch | T-12 or T-8 | 10 | EA | $0.00 |
| A | 106AB | Replace fluorescent tubes in closed fixtures: 24 inch | T-12 or T-8 | 200 | EA | $0.00 |
| A | 106AC | Replace fluorescent tubes in closed fixtures: 48 inch | T-12 or T-8 | 100 | EA | $0.00 |
| A | 106AD | Replace bulbs in closed incandescent fixtures | 75 watt Medium base | 10 | EA | $0.00 |
| A | 106AE | Replace bulbs in spotlight fixtures | 75 watt Medium base | 10 | EA | $0.00 |
| A | 106AF | Replace starters | FS2, 4, or 5 | 100 | EA | $0.00 |
| A | 106AG | Replace bulb and battery in emergency light fixtures | Lithonia #ELM-2 | 10 | EA | $0.00 |
| A | 107AH | Install new nickel cadmium rechargeable emergency light fixtures | Lithonia #ELM-2 | 10 | EA | $0.00 |
| A | 106AI | Replace fuses | Bussman SC series | 10 | EA | $0.00 |
| A | 106AJ | Install new exit light fixtures | Lithonia #LSXW3 | 5 | EA | $0.00 |
| A | 106AK | Replace light switches | 10 | EA | $0.00 | |
| A | 106AL | Replace light switch/receptacle covers | 10 | EA | $0.00 | |
| A | 106AM | Replace force protection LED light fixtures | LED wallpak LUMAPRO 13E801 | 5 | EA | $0.00 |
| A | 107AN | Replace force protection light photo cells | Intermatic K4221C | 5 | EA | $0.00 |
| A | 106AO | Remove/Replace fluorescent ballast | Philips ICN-2P32-N | 50 | EA | $0.00 |
| A | 106AP | Remove/Replace 120V duplex receptacle | 4 | EA | $0.00 | |
| A | 106AQ | Remove/Replace 220V receptacle | 1 | EA | $0.00 | |
| A | 106AR | Remove/Replace 12ga, 3 conductor, electrical wire, per foot | 100 | FT | $0.00 | |
| A | 106AS | Remove/Replace 10ga, 3 conductor, electrical wire, per foot | 100 | FT | $0.00 | |
| A | 106AT | Electrically disconnect/reconnect hardwired 120V electrical appliance | Labor only | 5 | EA | $0.00 |
| A | 106AU | Electrically disconnect/reconnect hardwired 220V electrical appliance | Labor only | 5 | EA | $0.00 |
| A | 106AV | Electrically disconnect/reconnect hardwired 440V electrical appliance | Labor only | 5 | EA | $0.00 |
| A | 106AX | Remove/Replace 2' (3) Lamp fluorescent light fixture (Labor only) | Labor only | 2 | EA | $0.00 |
| A | 106AY | Remove/Replace 4' (4) Lamp, fluorescent light fixture | Lithonia #2GT8432A12 | 2 | EA | $0.00 |
| A | 106AZ | Remove/Replace 120V circuit breaker (Labor only) | Labor only | 2 | EA | $0.00 |
| A | 106BA | Remove/Replace 220V circuit breaker (Labor only) | Labor only | 2 | EA | $0.00 |
| A | 106BB | Remove/Replace 440V circuit breaker (Labor only) | Labor only | 1 | EA | $0.00 |
| A | 106BC | Remove/Replace internal PA system speaker | Bogen SPT-30A | 1 | EA | $0.00 |
| A | 106BD | Convert (3) bulb, 2ft fluorescent fixture to LED | Paclights 2ft 8W LED | 100 | EA | $0.00 |
| A | 107 | Miscellaneous Repairs | ||||
| A | 107AA | Replace hand rail | 1" steel pipe Sch 40 | 10 | LF | $0.00 |
| A | 107AB | Replace rubber based PRC, including underlayment | 10 | SF | $0.00 | |
| A | 107AC | Sand and reseal PRC (using compatible sealant) | 1,000 | SF | $0.00 | |
| A | 107AD | Replace vinyl tile, including underlayment | 200 | SF | $0.00 | |
| A | 107AE | Sand and reseal terrazzo decking | 500 | SF | $0.00 | |
| A | 107AF | Replace terrazzo decking | 50 | SF | $0.00 | |
| A | 107AG | Sand, colorcoat, re-flake and reseal PRC decking | 500 | SF | $0.00 | |
| A | 107AH | Overlay 1/4 in. thick terrazzo over existing terrazzo | 50 | SF | $0.00 | |
| A | 107AI | Replace non-skid | 100 | SF | $0.00 | |
| A | 107AJ | Manually shift brow roller table | Labor only | 1 | EA | $0.00 |
| A | 107AK | Adjust brow roller table chain | Labor only | 2 | EA | $0.00 |
| A | 107AL | Caulk window (<6' high) | 10 | EA | $0.00 | |
| A | 107AM | Caulk window (>6' high) | 5 | EA | $0.00 | |
| A | 107AN | Caulk siding seam | 100 | LF | $0.00 | |
| A | 107AO | Caulk door | 5 | EA | $0.00 | |
| A | 107AP | Pressure wash deck | Labor only | 1,000 | SF | $0.00 |
| A | 107AQ | Repair door hinge | Labor only | 10 | EA | $0.00 |
| A | 107AR | Replace door hinge | 5 | EA | $0.00 | |
| A | 107AS | Remove/Replace window (<6' high) | 2 | EA | $0.00 | |
| A | 107AT | Remove/Replace window (>6' high) | 2 | EA | $0.00 | |
| A | 107AU | Remove/Replace life-line (wire rope or chain, per foot) | 20 | LF | $0.00 | |
| A | 107AV | Open voids watertight covers (per void) | Labor only | 6 | EA | $0.00 |
| A | 107AW | Clean/dewater voids (per void <2" water) | 4 | EA | $0.00 | |
| A | 107AX | Remove/Replace void cover gaskets/hardware (per void cover) | 4 | EA | $0.00 | |
| A | 107AY | Paint interior bulkheads up to 8' | White, latex, interior paint | 1,000 | SF | $0.00 |
| A | 107AZ | Touch up paint exterior (< 1000 SF) | White, or gray, exterior alkyd | 1,000 | SF | $0.00 |
| A | 107BA | Remove/Replace coat hook | 10 | EA | $0.00 | |
| A | 107BB | Move 60" metal desk from pier to barge, or barge to pier | Labor only | 5 | EA | $0.00 |
| A | 107BC | Move 4 drawer metal file from pier to barge, or barge to pier | Labor only | 5 | EA | $0.00 |
| A | 107BD | Move office chair from pier to barge or barge to pier | Labor only | 5 | EA | $0.00 |
| A | 107BE | Move 6' shelf from pier to barge or barge to pier | Labor only | 5 | EA | $0.00 |
| A | 107BF | Remove/Replace 4' X 6' interior deck mat | 10 | EA | $0.00 | |
| A | 107BG | Remove/Replace desk | Nat'l Bus furniture 11968 | 5 | EA | $0.00 |
| A | 107BH | Remove/Replace file cabinet | Nat'l Bus Furniture 34499 | 10 | EA | $0.00 |
| A | 107BI | Remove/Replace bookshelf | Nat'l Bus Furniture 227685 | 10 | EA | $0.00 |
| A | 107BJ | Remove/Replace chair | Nat'l Bus furniture 56713 | 25 | EA | $0.00 |
| A | 107BK | Remove/Replace Whiteboard | Quartet S534 | 20 | EA | $0.00 |
| A | 107BL | Remove/Replace corkboard | Quartet 85347 | 5 | EA | $0.00 |
| A | 107BM | Remove/Replace cabinet | Nat'l Bus Furniture 36949 | 5 | EA | $0.00 |
| A | 107BN | Remove/Replace storage shelf | MSC Part #: 43957471 | 10 | EA | $0.00 |
| 108 | HVAC | |||
| 108AA | Inspect and provide preventative maintenance of HVAC system monthly | 12 | EA | $0.00 |
| In negotiating the fixed price for materials, the contractor shall submit quotes for the material required. The negotiated price for materials shall be the quote or invoice price submitted by the contractor for actual materials plus transportation charges, both subject to verification by the Government as to reasonableness. |
Total Estimate for Base Year No Bid
NOTE 1: Proposed prices for each line item are to be fully burdened to include the potential of escalating fuel costs, all direct and indirect costs, labor, material (with the exception of the provision for material in Undisclosed Work (Correct Discrepancies),. Additionally, any overtime cost required to complete these tasks must be included in the ELIN prices.
NOTE 2: ELINS are to be fully burdened to include any required subcontractors. Subcontract effort shall not be priced as material or considered as part of the material pools.
NOTE 3: ELINS are to be fully burdened to include any required rental equipment.
File details come from the government source that posted it. Updated .