N3904026Q5450_ BNM_Redacted.pdf

PDF 138 KB Posted

Attached to
TEIKOKU/CHEMPUMP, G-SERIES, MANUFACTURER’S P/N GC-3K-3S. Brand Name Mandatory. Q&A Updated 4/27/26
Solicitation number
N3904026Q5450
Issued by

About this file

This is a Justification for Use of Other Than Full and Open Competition for a Simplified Acquisition Threshold procurement.

The document justifies a single-source acquisition for ChemPump G Series GC-3K-3S pumps ordered under procurement number 3697182603 F05 KOI 001, to be procured in accordance with non-deviational Drawing NED-0269. The justification is based on brand name sole source grounds, as this specific pump model is the only product that meets the government's particular technical requirements after extensive research and testing over multiple years. The required pump specifications include specific pump type, flow and pressure ratings, assembly dimensions, impeller attachment method, rotation direction indication, fittings, material composition of hard and soft goods, canned motor design, dry stator configuration, and cleanliness and chemical analysis test compliance capabilities. The document states that alternative pumps have not been identified through additional research efforts, and pursuing further sourcing activities would create unacceptable risks of cost overruns, schedule delays, personnel safety issues, and system integrity compromises.

The justification was certified by Matthew D Godfrey on 3/4/2026 and approved by Contracting Officer Michael McCluskey on 3/15/2026. The document confirms compliance with FAR 13.106-1(b)(1)(i) and FAR 13.106-3(b)(3)(i) requirements for simplified acquisition threshold purchases utilizing other than full and open competition.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(This is only applicable to acquisitions under the Simplified Acquisition Threshold. Acquisition using FAR Subpart 13.5 shall follow the special documentation requirements at FAR 13.501.)

USE OF OTHER THAN FULL AND OPEN COMPETITION FOR AN ACQUISITION

UNDER THE SIMPLIFIED ACQUISITION THRESHOLD

I. BACKGROUND:

1. FAR 13.106-1(b)(1)(i) states for purchases not exceeding the simplified acquisition threshold, Contracting Officers may solicit from one source if the Contracting Officer determines that the circumstances of the contract action deem only one source reasonably available (e.g., urgency, exclusive licensing agreements, brand-name or industrial mobilization).

2. As required by FAR 13.106-3(b)(3)(i), this memorandum explains the absence of competition for this acquisition, as only one source will be solicited for this requirement (or for a portion of the requirement) and the requirement is not expected to exceed the simplified acquisition threshold.

II. DESCRIPTION OF ITEM OR SERVICE:

Provide a description of the item or service required, to include its intended use, the name of the required source or brand name, and the required delivery date/period of performance.

III. THE DETERMINATION FOR USE OF OTHER THAN FULL AND OPEN

COMPETITION IS BASED ON THE FOLLOWING (select all that apply):

A. ___ ONLY ONE RESPONSIBLE SOURCE (select all that apply):

1. ___ RESTRICTIVE RIGHTS. The source has established proprietary rights, limited rights in data, patent rights, copyrights or secret processes in the item or service required.

Explain what rights are restricted, why the restrictive rights make the required item or service available from only one source, and why another company could not satisfy the Government�s need.

2. ___ EXCLUSIVE LICENSING AGREEMENTS. The item or service is only available from the Original Equipment Manufacturer (OEM), or there is only one authorized distributor or technical representative for the OEM.

Identify the OEM and explain the circumstances surrounding why the item or service is only available from the OEM.

OR

Identify the distributor(s)/authorized technical representative(s) for the item or service. Provide evidence of the exclusive licensing agreement as an attachment to this document. NOTE: If there is more than one distributor/authorized technical representative for an OEM part, then Part B, BRAND NAME SOLE SOURCE, is applicable, and Part A, ONLY ONE RESPONSIBLE SOURCE, should be left blank).

3. ___ OTHER REASONS. Other reason not identified above. Provide details on mission impact if requirement is not solicited from only one source.

B. _X_ BRAND NAME. Item required must be a brand name product, or feature of a product, particular to one manufacturer.

Pumps ordered under 3697182603 F05 KOI 001 are required to be ChemPump G Series GC-3K- 3S per non-deviational Drawing NED-0269. Through extensive research and testing over multiple years, availabilities, and engineers, this is the only pump that meets our specific technical requirements including pump type, flows and pressures required, dimensions of the assembly, method of impeller attachment, rotation direction indication, fittings, material types of hard and soft goods to pass required cleanliness and chemical analysis testing, and with a canned motor and dry stator. Additional research has not led to finding any other pump to meet our requirements and furthering this effort risks incurring additional cost and time overruns to project schedule and mission readiness and could result in risks to personnel safety and system integrity.

C. ___UNUSUAL AND COMPELLING URGENCY. The supplies or services are of such unusual and compelling urgency that the Government would be seriously injured unless the agency is permitted to limit the number of sources from which it solicits bids or proposals.

Urgent requirements are supplies or services that will result in a work stoppage, or are mission critical and the routine processing time would result in injury to the Government. The determination that the procurement for the above item/service is an urgent and compelling requirement is based on the following:

1. Date on which the requirement was first identified:

2. Required delivery date/period of performance:

3. Explanation of why delivery/commencement of services by the date mentioned above is required: Explain the impact to the mission if the date above is not met, any special circumstances or conditions that exist which validate the requirement as �urgent,� estimated production lead time for the item, etc.

4. If appropriate, include any additional pertinent information:

IV. CERTIFICATIONS/APPROVALS:

A. Technical / Requirements Certification: I certify that the facts and representation under my cognizance which are included in this justification are complete and accurate to the best of my knowledge and belief.