This document is a compliance and exceptions template for a Statement of Work (SOW) requiring submission of equipment and services specifications.
The SOW specifies a complete compressed air system package consisting of: a 100 horsepower, oil-free, air-cooled rotary screw compressor with 115 PSIG pressure set point, remote e-stop, 460VAC three-phase power requirement, and outdoor capability; a 200-foot electrical power cable with Camlok connections rated for 200 amperes; a 500-gallon ASME-rated air receiving tank with 150 PSIG minimum working pressure and 3-inch connections; a desiccant air dryer with 400 SCFM flow rate, -40°F pressure dew point capability, and 120 VAC single-phase power; 250 feet of 3-inch air hose in 50-foot sections with SPUD connections and 150 PSI minimum working pressure; and a manifold with 3-inch inlet/outlet and minimum four 1.25-inch connections with isolation valves. The contractor must also provide equipment start-up and commissioning services, preventative maintenance, training, and specified deliverables. Bidders are required to complete the template by responding "YES" or "NO" to confirm compliance with all SOW requirements and must identify any exceptions with detailed explanations for non-compliance items. All responses must be consistent with supporting product literature, brochures, and specification sheets submitted with the quotation.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
COMPLIANCE WITH SOW. EXCEPTIONS TO SOW.
(See Instructions Below) (See Instructions Below)
3.2-3.4 100HP LPAC
100% Oil free air Air pressure set point:
115PSIG
Remote E-Stop provided and connected Air cooled Compressor connection:3-IN Max. starting amps: 400A Max. operating amps: 200A Operate from one 460VAC circuit Suitable for outdoor operation Dimensions Freeze protection UL listed
3.4 Electrical Power Cable
200ft in length Camlok connections Capable of supporting amperage
3.5 Operating and Safety Controls
3.6 500 Gallon Air Receiving Tank ASME rated Pressure relief valve
Air receiver connection:3-IN
Min. working pressure rating:
150 PSIG
3.7 Desiccant Air Dryer
Flow rate: 400SCFM
Air dryer connection:3-IN
-40°F pressure dew point
120 VAC, single phase, 20A
Rated working pressure:
150PSIG
Suitable for outdoor use Dimensions UL listed
3.8 3-IN Air Hose 250-FT total length 50-FT sections SPUD Connections Min. Working pressure:150PSI
Safety restraint devices
3.9 Manifold
3-IN inlet 3-IN outlet
Min. (4) 1.25-IN Connections
Isolation valves on each output
SOW REQUIREMENT
Equipment
3.10 Equipment Start-up and Commissioning Services
6.3 Preventative Maintenance
6.4 Training
6.5 Deliverables
1. COMPLIANCE WITH SOW.
Services
INSTRUCTIONS
(i) Use YES or NO to identify if equipment and services comply with all SOW requirements.
(ii) Ensure answers are consistent with any brochures, specification sheets or other descriptive literature provided in your quote.
2. EXCEPTIONS TO SOW.
(i) Identify any exceptions to the SOW. Note: answers are required for any NO in prior column.