This is a Vendor Compliance Checklist for a Conex HVAC system rental/service requirement at Naval Base Point Loma in San Diego, California. The checklist specifies detailed technical and operational requirements for equipment to be provided under Solicitation Number N3904026Q3099 for a 52-week period from July 20, 2026 to July 18, 2027, with two option periods totaling 13 weeks.
The primary components required include: one 25-ton HVAC unit, one 150KW electric fan coil unit-heater, 300 feet of 20-inch diameter flexible duct, and 300 feet of electrical power cable. The 25-ton HVAC unit must not exceed 16 feet long by 8.5 feet wide, provide minimum 10,000 CFM capacity and 72kW heat output, feature dual thermostat control, operate at 480V/120A/3PH/60Hz with Camlok J-series electrical connections, include 600 feet of cabling, have minimum two 20-inch discharge ports, and maintain MERV 8 filtration. The 150KW fan coil unit must not exceed 8 feet long by 4 feet wide by 5 feet high with maximum 2,500-pound weight, deliver minimum 7,000 CFM airflow, include 150KW electric heat with 240°F temperature rise, employ TEFC premium motors with VFD controllers, operate at 480 VAC/3 phase/200 FLA maximum, feature Camlok connections, and include E-stop, 200-foot heavy-duty cable, and protective cover. All equipment must be fully assembled, in first-class operating condition, and include vendor-provided maintenance with on-site technician response within 12 hours and repair or replacement within 24-48 hours.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Category | Requirement | SOW Reference | Compliant (Yes/No) | Explanation (If No) |
| Component List | Qty 1: 25 Ton HVAC | 3.1, PC-1 | ||
| Qty 1: Electric Fan Coil Unit-Heater (150KW) | 3.1, PC-2 | |||
| Qty 300 FT: 20 Inch Diameter Flex Duct | 3.1, PC-3 | |||
| Qty 300FT: Electrical Power cable (for each electrical run per unit) | 3.1, PC-4 | |||
| 25 Ton HVAC Unit | Maximum Dimensions: 16 ft long x 8.5 ft wide. | 3.2 | ||
| Must include fork pocket slots and overhead rigging connections. | 3.2 | |||
| Minimum: 10,000 CFM Capacity. | 3.2 | |||
| Minimum 72kW Heat. | 3.2 | |||
| Dual Thermostat Control. | 3.2 | |||
| Nominal: 480V/120A/3PH/60Hz. | 3.2 | |||
| Camlok electrical connections (J series locking style 1016 series) | 3.2 | |||
| 600ft of cabling supplied. | 3.2 | |||
| Minimum 2-20"� Discharge Ports. | 3.2 | |||
| Filtration rating of MERV 8 | 3.2 | |||
| 150KW Fan Coil | Maximum Dimensions: 8'L x 4'W x 5'H. | 3.4 | ||
| Maximum Weight: 2500lbs. | 3.4 | |||
| Must include fork pocket slots and overhead rigging connections. | 3.4 | |||
| Minimum Airflow: 7000 CFM at 5.6 inches Total Static Pressure. | 3.4 | |||
| Minimum Heat: 150KW electric heat with 240°F air temperature rise. | 3.4 | |||
| TEFC premium motors with VFD controller. | 3.4 | |||
| 480 VAC / 3 Phase / 200FLA max. | 3.4 | |||
| Camlok style electrical connections (J series locking style 1016 series) | 3.4 | |||
| Thermostatically controlled discharge air temperature. | 3.4 | |||
| Supplied with E-Stop, 200ft heavy-duty cable, and protective cover. | 3.4 | |||
| One 20-inch diameter outlet. | 3.4 | |||
| Flexible Duct Work | Flexible Ducting, 20 Inch diameter, 25ft long per section | 3.3.1 | ||
| Flex duct rated for positive pressure supply air applications | 3.3.2 | |||
| Apllication temperature: -20°F / +180°F | 3.3.5 | |||
| No yellow or magenta coloring of duct | 3.3.8 | |||
| Couplers provided | 3.3.10 | |||
| Electrical Power Cable | Power cable provided with each piece of electrical machinary for all circuits requiring power | 3.5.1 | ||
| Power cable length shall be 300 FT in length for each electrical run required | 3.5.2 | |||
| Power cable shall be rated for 460VAC/3PH | 3.5.3 | |||
| Gauge selection for power cable must prevent significant voltage drop | 3.5.4 | |||
| General | Fully-assembled, ready-to-use, first-class operating condition. | 4.1 | ||
| Contractor responsible for all maintenance (except daily checks). | 4.2 | |||
| Technician on-site within 12 hours of notification. | 4.2 | |||
| Repair within 24 hours or replace within 48 hours. | 4.2 |