CLIN_0005_Attachments.pdf
PDF 157 KB Posted
- Attached to
- Shielding Federal contract opportunity
- Solicitation number
- N3904019Q0086
About this file
ALL ATTACHMENTS HAVE BEEN REPLACED
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| CLIN_0003_Attachments.pdf | ||
| CLIN_0004_Attachments.pdf | ||
| CLIN_0002_Attachments.pdf | ||
| CLIN_0001_Attachments.pdf | ||
| Urgency_Statement_Redacted.pdf | ||
| CLIN_0002_Attachments.pdf | ||
| N3904019Q0086_RFQ.pdf | ||
| CLIN_0001_Attachments.pdf | ||
| CLIN_0003_Attachments.pdf | ||
| CLIN_0005_Attachments.pdf | ||
| CLIN_0004_Attachments.pdf |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REQ DOC NO. - 8313V047 ATTACHMENT AMD
CONTINUATION SHEET CONTRACT NO. - PAGE
OF
NAME OF OFFER OR/CONTRACTOR
ITEM # SUPPLIES/SERVICES QTY U/I
SHIELD BOLT 24 EA
C. DESCRIPTION/SPECIFICATIONS.
C.1. PIECE 5 OF FINAL CLOSURE COVER, STAINLESS STEEL, XY SHIELD
(RF-6600, LIN 0006) MANUFACTURED IAW PNS 2370B0000155 REV
ORG. SEE ATTACHMETS FOR ADDITIONAL REQUIREMENTS AND
INFORMATION.
C.2. PNSY RESERVES THE RIGHT TO INSPECT THE BOLTS AT AN
APPROXIMATE HALF WAY POINT OF CONSTRUCTION.
C.2.1. CONTRACTOR SHALL NOTIFY PNSY WITH PROJECTED WORK
SCHEDULE. HALFWAY POINT OF CONSTRUCTION SHALL BE
DETERMINED BY THE CONTRACTOR AND PNSY AFTER
AWARD OF CONTRACT.
C.3. NAVSEA HQ C-2-0023 MERCURY CONTROL
D. PRESERVATION/PACKAGING/PACKING.
D.1. D4 PREPARATION FOR DELIVERY (COMMERCIALLY PACKAGED).
E. INSPECTION AND ACCEPTANCE.
E.1. HQ E-1-0003, INSPECTION & ACCEPTANCE OF F.O.B. DESTINATION
DELIVERIES.
E.2. FAR 52.246-2 INSPECTION OF SUPPLIES. FIXED PRICE
E.3. FAR 52.212-4 CONTRACT TERMS & CONDITONS (COMMERCIAL)
e e
CONTRACT ----------
PRINTED 11/30/2018 PAGE
EXHIBIT A
(ADP DD FORM 1423 (MECHANIZED EQUIVALENT) PER DAR CLAUSE 16-815)
CONTRACT DATA REQUIREMENTS LIST
SYSTEM/ITEM SHIELD CAP CATEGORY
ASSEMBLY
ITEM NO 001 CONTRACTOR
01 SEQ NO A001
02 DATA DESC CERTIFICATE OF COMPLIANCE
03 SUBTITLE
04 DID NUMBER PER ATTACHMENT 1 TO EXHIBIT A
05 CONTRACT PARA C.7.1
REF
06 TECH OFFICE 2370.1
07 DD 250 REQ DD
08 APP CODE
09 IAC INPUT
10 FREQUENCY 0-TIME
11 AS OF DATE
12 DATE1ST WITH MATERIAL
SUBM
13 DATE SUB
SUBM
14 DISTRIBUTION 410/2370 1/ 0 VIA MAIL (NO DD 250 REQD)
15 TOTAL 1
16 REMARKS
SEQ. NO. A001
PREPARED BY DATE
APPROVED BY DATE
DD FORM 1423
CONTRACT ----------
PRINTED 11/30/2018 PAGE
EXHIBIT A
(ADP DD FORM 1423 (MECHANIZED EQUIVALENT) PER DAR CLAUSE 16-815)
CONTRACT DATA REQUIREMENTS LIST
SYSTEM/ITEM SHIELD CAP
ASSEMBLY
CATEGORY
ITEM NO 002 CONTRACTOR
01 SEQ NO
02 DATA DESC
03 SUBTITLE
04 DID NUMBER
05 CONTRACT REF
06 TECH OFFICE
07 DD 250 REQ
08 APP CODE
09 IAC INPUT
10 FREQUENCY
11 AS OF DATE
12 DATE 1ST SUBM
13 DATE SUB SUBM
14 DISTRIBUTION
15 TOTAL
16 REMARKS
PREPARED BY
APPROVED BY
A002
LIQUID PENETRANT CERTIFICATION
PER ATTACHMENT 1 TO EXHIBIT A
PARA. C.7.2
2370.1
DD
0-TIME
WITH MATERIAL
410 1/
0 VIA MAIL (NO DD 250 REQD)
SEQ. NO. A002
DATE
DATE
CO,RACT • -------- -
PRINTED 11/30/2018 PAGE
ATIACHMENT 1 TO EXHIBIT A (DD FORM 1423)
SYSTEM/ITEM SHIELD CAP CATEGORY
ASSEMBLY
ITEM NO 003 CONTRACTOR
01 SEQ NO A003
02 DATA DESC LOAD TEST CERTIFICATION
03 SUBTITLE
04 DID NUMBER PER ATTACHMENT 1 TO EXHIBIT A
05 CONTRACT REF PARA. C.7.3
06 TECH OFFICE 2370.1
07 DD 250 REQ DD
08 APP CODE
09 IAC INPUT
10 FREQUENCY 0-TIME
11 AS OF DATE
12 DATE 1ST SUBM WITH MATERIAL
13 DATE SUB SUBM
14 DISTRIBUTION 410 1/ 0 VIA MAIL (NO DD 250 REQD)
15 TOTAL 1
16 REMARKS
SEQ. NO. A003
PREPARED BY DATE
eel-RA CT •
PRINTED 11/30/2018
ATTACHMENT 1 TO EXHIBIT A (OD FORM 1423)
SYSTEM/ITEM SHIELD CAP
ASSEMBLY
CATEGORY
ITEM NO 004 CONTRACTOR
SEQ NO
DATA DESC
SUBTITLE
DID NUMBER
CONTRACT REF
TECH OFFICE
DD 250 REQ
APP CODE
IAC INPUT
FREQUENCY
AS OF DATE
DATE 1ST SUBM
DATE SUB SUBM
A004
VISUAL TEST CERTIFICATION (IF APPLICABLE)
PER ATTACHMENT 1 TO EXHIBIT A
PARA. C.7.4
2370.1
DD
0-TIME
WITH MATERIAL
PAGE
14 DISTRIBUTION 410 1/
0 VIA MAIL (NO DD 250 REQD)
15 TOTAL
16 REMARKS
SEQ. NO. A004
PREPARED BY DATE
CO,RACT • PRINTED 11/30/2018 PAGE
CONTRACT/SOLICITATION - -------- -
ITEM (DAT A FOR ITEM
REQUIRED CERTIFICATION
A. CERTIFICATION SHALL BE SUPPLIED WITH EACH SHIPMENT OF MATERIAL.
CERTIFICATION (CERTIFICATE OF COMPLIANCE) SHALL BE SUPPLIED AS OUTLINED IN
PARAGRAPH B. THE VENDOR IS LIABLE FOR CONDUCTING ALL TESTS, ANALYSES,
INSPECTIONS, AND EXAMINATIONS, ETC., AS SPECIFIED BY THE CONTRACT AND
SPECIFICATIONS WHETHER CERTIFICATIONS ARE REQUIRED OR NOT.
CERTIFICATE OF COMPLIANCE (PROVIDE THE FOLLOWING VERBATIM STATEMENT OR
COMPLETE THE OPTIONAL FORM AT THE END OF THIS PART):
"I ATTEST ALL ITEMS FURNISHED ON THIS CONTRACT ARE IN FULL COMPLIANCE WITH
ALL CONTRACT REQUIREMENTS. THE INSPECTION AND TEST REPORTS PROVIDED
REPRESENT THE ACTUAL ATTRIBUTES OF THE ITEMS FURISHED ON THIS CONTRACT AND
INDICATE FULL COMPLIANCE WITH ALL APPLICABLE SPECIFICATION AND CONTRACT
REQUIREMENTS."
B. CERTIFICATION SHALL BE SUPPLIED PER THE FOLLOWING INSTRUCTIONS:
1. THE CERTIFICATION OF COMPLIANCE SHALL CONTAIN THE SIGNATURE AND TITLE OF
THE VENDOR OFFICIAL DESIGN A TED RESPONSIBLE FOR QUALITY ASSURANCE.
2. THE MATERIAL IDENTIFICATION (E.G. LOT, BATCH, PART#, ETC.) SHALL BE INCLUDED
ON THE CERTIFICATE OF COMPLIANCE AND ASSOCIATED TEST CERTIFICATIONS.
eel-RA CT • ---------
PRINTED 11/30/2018 PAGE
CERTIFICATE OF COMPLIANCE
COMPANY NAME
MATERIAL IDENTIFICATION (COMPLETE APPLICABLE ITEMS)
CONTRACT NO.
ITEM NO.
ORDER NO.
LOCALSTOCKNUMBER: ~------~
MANUFACTURER'S PART NUMBER -----
I ATTEST ALL ITEMS FURNISHED ON THIS CONTRACT ARE IN FULL COMPLIANCE WITH ALL
CONTRACT REQUIREMENTS. THE INSPECTION AND TEST REPORTS PROVIDED REPRESENT
THE ACTUAL ATTRIBUTES OF THE ITEMS FURISHED ON THIS CONTRACT AND INDICATE
FULL COMPLIANCE WITH ALL APPLICABLE SPECIFICATION AND CONTRACT
REQUIREMENTS.
SIGNATURE DATE ------------
QUALITY ASSURANCE OFFICIAL
c
B
A
4 3
1. MANUFACTURING REQUIREMENTS
1.1. WHERE MIL-SPECS, STANDARDS, TECHNICAL PUBLICATIONS ANOIDR REFERENCE
DRAWINGS ARE NOTED, THE LATEST REVISION SHALL BE IN EFFECT UNLESS OTHERWISE
SPECIFIED.
1.2. BREAK ALL SHARP EDGES TO A 1164" CHAMFER (OR SMALLER).
1.3. ALL SURFACES MUST HAVE A 125 RA FINISH (OR BETTER) UNLESS OTHERWISE SPECIFIED.
2. WELDING & NON..[)ESTRUCTIVE TESTING (NOT) REQUIREMENTS
2.1. NONE.
3. LOAD TEST & NON..[)ESTRUCTIVE TESTING (NOT) REQUIREMENTS
3.1. NONE.
4. CLEANLINESS REQUIREMENTS
4.1. ALL ACCESSIBLE SURFACES SHALL BE VISIBLY FREE OF CUTTING FLUID, TAPE RESIDUE, MACHINE CHIPS, GREASE, OL, FLUX. DIRT, GRIT, SCALE, RUST, SMEARED METAL OR
OTHER FOREIGN MATERIAL. THIN FILMS OF TIGHTLY ADHERENT RUST OR OXIDE ARE
ACCEPTABLE. IF EQUIPMENT COMPONENTS REQUIRE ASSEMBLY, ALL ACCESSIBLE
SURFACES SHOULD BE INSPECTED AND CLEANED AS NECESSARY PRIOR TO ASSEMBLY.
5. MARKING REQUIREMENTS
5.1. MARK PER MIL-ST0-792, TYPE I (VIBRATING TOOL), TYPE II (ELECTROCHEMICAL) OR TYPE
VII (ENGRAVING) THE FOLLOWING ON THE SPECIFIED SURFACES:
"RF~. LIN 0006"
5.1.1. USE - .25' TALL X - .12" WIDE CHARACTERS. DO NOT EXCEED .02" DEPTH.
8. DOCUMENTATION REQUIREMENTS "
6.1. NONE.
NIA
NEXT ASSY I USED ON
APPLICATION
4 3
RE
BOLT
PC# I DESCRIPTION
DECIMAL TOLERENCEI:
>tX • :t0.1 X.XX • t:0.01
X.XXX • s.0.005 XJOOOC • t a.oms ntAC110N8: t 1m
AMGl.£8: * 0.5"
UNl.ESS OTHERWISE SPECIFIED, OlfllENSIONS Mtf. IN INCHES.
DRAWING OIMtiNSIONAL & GEOMETRIC r(tl..EREHCES PER~y14.s..2008
THIRD ANGLE PROJECTION
--$---Et
2 1
REVISION HISTORY
DESCRIPTION
UNS S21800 I 1
MATERIAL I QTY
APPROVAi/CONCURRENCE
I SIGNAn!RE lDATE
SlJPV. l"' JEFFW..60!'
DATE APPROVED
REMARKS
PORTSMOUTH NAVAL SHIPYARD
NUCLEAR FIEFUELING ENGINEERING DIVISION
CODE 2370 - KIT'fERY, ME c
B
A c
B
A
¢ 2.250 +.000 -.026
3 2 1
1.50 7.50---------------4
-.D c:> c:>
--..,c:>
I ::z __.
I ~
1§ __ J'f
1.000 HEX SOCKET
PER ASME 818.3
LL.
0::::
MARKING SPECIFICATION 1
(NOTE 5.1)
2X R .062 1 112-8 UN~-----~
2.5 MIN FUL.L THREAD~-+----~---~~
PORTSMOUTtf NAVAL SHIPYARD NUCLEAR REFUELl~G ENGINEERING DIVISION
CODE 2310 - KITTERY, ME
c
B
A
File details come from the government source that posted it.