CLIN_0004_Attachments.pdf
PDF 359 KB Posted
- Attached to
- Shielding Federal contract opportunity
- Solicitation number
- N3904019Q0086
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Urgency_Statement_Redacted.pdf | ||
| CLIN_0005_Attachments.pdf | ||
| CLIN_0002_Attachments.pdf | ||
| CLIN_0003_Attachments.pdf | ||
| CLIN_0004_Attachments.pdf | ||
| CLIN_0001_Attachments.pdf | ||
| CLIN_0002_Attachments.pdf | ||
| N3904019Q0086_RFQ.pdf | ||
| CLIN_0001_Attachments.pdf | ||
| CLIN_0003_Attachments.pdf | ||
| CLIN_0005_Attachments.pdf |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REQ DOC NO. - 8313V046 ATTACHMENT
CONTINUATION SHEET CONTRACT NO. - PAGE
OF
NAME OF OFFER OR/CONTRACTOR
!ITEM# SUPPLIES/SERVICES QTY U/I
SHIELD CAP ASSEMBLY 8 EACH
C. DESCRIPTION/SPECIFICATIONS.
C.1 PIECE 4 OF FINAL CLOSURE COVER, STAINLESS STEEL, XY SHIELD
(RF-6600, LIN 0005) MANUFACTURED JAW PNS 2370B0000102 REV
ORG. SEE A TT ACHMETS FOR ADDITIONAL REQUIREMENTS AND
INFORMATION.
C.2 PNSY PLANS TO INSPECT THE COVER AT AN APPROXIMATE HALF
WAY POINT OF CONSTRUCTION.
C.2.1 CONTRACTOR SHALL NOTIFY PNSY WITH PROJECTED
WORK SCHEDULE. HALFWAY POINT OF CONSTRUCTION SHALL
BE DETERMINED BY THE CONTRACTOR AND PNSY AFTER
AWARD OF CONTRACT.
C.3 PERFORM A TORQUE BASED LOAD TEST OF THE SPECIFIED
THREADED HOLES PER THE INSTRUCTIONS ABD REQUIREMENTS
OF THE A TT ACHED DRAWINGS.
C.4 PERFORM LIQUID PENETRANT (PT) INSPECTIONS PER NA VSEA
TECHNICAL PUBLICATION T9074-AS-GIB-010/271 2014 EDITON, 11
SEPTEMBER 2018.
C.4.1 USE MIL-STD-2035A 15 MAY 1995, FOR ALL NON
DESTUCTIVE INSPECTION ACCEPTANCE CRITERIA.
C.4.2 VISUAL INSPECTIONS (5X MINIMUM) MAYBE PERFORMED
IN CASES WHERE LIQUID PENETRANT INSPECTIONS ARE
IMPRACTICAL.
C.6 NAVSEA HQ C-2-0023 MERCURY CONTROL
C.7 DATA REQUIREMENTS PER EXHIBIT A (DD-1423) & ATTACH #1.
C.7.1 CERTIFICATE OF COMPLIANCE; EXHIBIT A SEQUENCE AOOl.
C.7.2 LIQUID PENETRANT TEST CERTIFICATION, EXHIBIT A
SEQUENCE A002.
C.7.3 LOAD TEST CERIFICATION, EXHIBIT A SEQUENCE A003 .
C.7.4 VISUAL TEST CERTIFICATION (IF APPLICABLE), EXHIBIT A
SEQUENCE A004.
D. PRESERVATION/PACKAGING/PACKING.
D.l D4 PREPARATION FOR DELIVERY (COMMERCIALLY PACKAGED).
E. INSPECTION AND ACCEPTANCE.
E.1 FAR 52.246-2 INSPECTION OF SUPPLIES. FIXED PRICE
E.2 FAR 52.212-4 CONTRACT TERMS & CONDITONS (COMMERCIAL)
E.3 NAVSEA HQ E-1-0003 INSPECTION & ACCEPTANCE OF F.O.B.
SES TINA TION DELIVERIES.
CONTRACT - ----- - ---
PRINTED 11/30/2018 PAGE
EXHIBIT A
(ADP DD FORM 1423 (MECHANIZED EQUIVALENT) PER DAR CLAUSE 16-815)
CONTRACT DATA REQUIREMENTS LIST
SYSTEM/ITEM SHIELD CAP
ASSEMBLY
CATEGORY
ITEM NO
01 SEQ NO
02 DATA DESC
03 SUBTITLE
04 DID NUMBER
05 CONTRACT
REF
06 TECH OFFICE
07 DD 250 REQ
08 APP CODE
09 IAC INPUT
10 FREQUENCY
11 AS OF DATE
12 DATE1ST
SUBM
13 DATE SUB
SUBM
14 DISTRIBUTION
15 TOTAL
16 REMARKS
PREPARED BY
APPROVED BY
001 CONTRACTOR
A001
CERTIFICATE OF COMPLIANCE
PER ATTACHMENT 1 TO EXHIBIT A
PARA. C.7.1
2370.1
DD
0-TIME
WITH MATERIAL
410/2370 1/ 0 VIA MAIL (NO DD 250 REQD)
SEQ. NO. A001
DATE
DATE
DD FORM 1423
CONTRACT
PRINTED 11/30/2018 PAGE
EXHIBIT A
(ADP DD FORM 1423 (MECHANIZED EQUIVALENT) PER DAR CLAUSE 16-815)
CONTRACT DATA REQUIREMENTS LIST
SYSTEM/ITEM
ITEM NO
01 SEQ NO
SHIELD CAP
ASSEMBLY
A002
CATEGORY
CONTRACTOR
02 DATA DESC LIQUID PENETRANT CERTIFICATION
03 SUBTITLE
DID NUMBER
CONTRACT REF
TECH OFFICE
DD 250 REQ
08 APP CODE
09 IAC INPUT
PER ATTACHMENT 1 TO EXHIBIT A
PARA. C.7.2
2370.1
DD
10 FREQUENCY 0-TIME
11 AS OF DATE
12 DATE 1ST SUBM WITH MATERIAL
13 DATE SUB SUBM
DISTRIBUTION
TOTAL
410 1/
0 VIA MAIL (NO DD 250 REQD)
16 REMARKS
SEQ. NO. A002
PREPARED BY DATE
APPROVED BY DATE
CO,RACT • ---------
PRINTED 11/30/2018 PAGE ----
ATTACHMENT 1 TO EXHIBIT A (DD FORM 1423)
SYSTEM/ITEM SHIELD CAP CATEGORY
ASSEMBLY
ITEM NO 003 CONTRACTOR
01 SEQ NO A003
02 DATA DESC LOAD TEST CERTIFICATION
03 SUBTITLE
04 DID NUMBER PER ATTACHMENT 1 TO EXHIBIT A
05 CONTRACT REF PARA. C.7.3
06 TECH OFFICE 2370.1
07 DD 250 REQ DD
08 APP CODE
09 IAC INPUT
10 FREQUENCY 0-TIME
11 AS OF DATE
12 DATE 1ST SUBM WITH MATERIAL
13 DATE SUB SUBM
14 DISTRIBUTION 410 1/ 0 VIA MAIL (NO DD 250 REQD)
15 TOTAL 1
16 REMARKS
SEQ. NO. A003
PREPARED BY DATE
cclHACT •
PRINTED 11/30/2018 PAGE
ATTACHMENT 1 TO EXHIBIT A (DD FORM 1423)
SYSTEM/ITEM SHIELD CAP CATEGORY
ASSEMBLY
ITEM NO 004 CONTRACTOR
01 SEQ NO A004
02 DATA DESC VISUAL TEST CERTIFICATION (IF APPLICABLE)
03 SUBTITLE
04 DID NUMBER PER ATTACHMENT 1 TO EXHIBIT A
05 CONTRACT REF PARA. C.7.4
06 TECH OFFICE 2370.1
07 DD 250 REQ DD
08 APP CODE
09 IAC INPUT
10 FREQUENCY 0-TIME
11 AS OF DATE
12 DATE 1ST SUBM WITH MATERIAL
13 DATE SUB SUBM
14 DISTRIBUTION 410 1/ 0 VIA MAIL (NO DD 250 REQD)
15 TOTAL 1
16 REMARKS
SEQ. NO. A004
PREPARED BY DATE
CO.RACT • - - -------
PRINTED 11/30/2018 PAGE ----
CONTRACT/SOLICITATION ------- - - -
ITEM (DAT A FOR ITEM
REQUIRED CERTIFICATION
A. CERTIFICATION SHALL BE SUPPLIED WITH EACH SHIPMENT OF MATERIAL.
CERTIFICATION (CERTIFICATE OF COMPLIANCE) SHALL BE SUPPLIED AS OUTLINED IN
PARAGRAPH B. THE VENDOR IS LIABLE FOR CONDUCTING ALL TESTS, ANALYSES,
INSPECTIONS, AND EXAMINATIONS, ETC., AS SPECIFIED BY THE CONTRACT AND
SPECIFICATIONS WHETHER CERTIFICATIONS ARE REQUIRED OR NOT.
CERTIFICATE OF COMPLIANCE (PROVIDE THE FOLLOWING VERBATIM STATEMENT OR
COMPLETE THE OPTIONAL FORM AT THE END OF THIS PART):
"I ATTEST ALL ITEMS FURNISHED ON THIS CONTRACT ARE IN FULL COMPLIANCE WITH
ALL CONTRACT REQUIREMENTS. THE INSPECTION AND TEST REPORTS PROVIDED
REPRESENT THE ACTUAL ATTRIBUTES OF THE ITEMS FURISHED ON THIS CONTRACT AND
INDICATE FULL COMPLIANCE WITH ALL APPLICABLE SPECIFICATION AND CONTRACT
REQUIREMENTS."
B. CERTIFICATION SHALL BE SUPPLIED PER THE FOLLOWING INSTRUCTIONS:
1. THE CERTIFICATION OF COMPLIANCE SHALL CONTAIN THE SIGNATURE AND TITLE OF
THE VENDOR OFFICIAL DESIGNATED RESPONSIBLE FOR QUALITY ASSURANCE.
2. THE MATERIAL IDENTIFICATION (E.G. LOT, BATCH, PART#, ETC.) SHALL BE INCLUDED
ON THE CERTIFICATE OF COMPLIANCE AND ASSOCIATED TEST CERTIFICATIONS.
eel-RA CT e
PRINTED 11/30/2018 PAGE
CERTIFICATE OF COMPLIANCE
COMPANY NAME
MATERIAL IDENTIFICATION (COMPLETE APPLICABLE ITEMS)
CONTRACT NO.
ITEM NO.
LOCAL STOCK NUMBER:
ORDER NO.
MANUFACTURER'S PART NUMBER -----
I ATTEST ALL ITEMS FURNISHED ON THIS CONTRACT ARE IN FULL COMPLIANCE WITH ALL
CONTRACT REQUIREMENTS. THE INSPECTION AND TEST REPORTS PROVIDED REPRESENT
THE ACTUAL ATTRIBUTES OF THE ITEMS FURISHED ON THIS CONTRACT AND INDICATE
FULL COMPLIANCE WITH ALL APPLICABLE SPECIFICATION AND CONTRACT
REQUIREMENTS.
SIGNATURE DATE - - ------ ----
QUALITY ASSURANCE OFFICIAL
4 3 2 1
1. MANUFACTURING REQUIREMENTS REVISION HISTORY
1.1. WHERE MIL-SPECS. STANDARDS, TECHNICAL PUBLICATIONS ANO/OR REFERENCE RE DESCRIPTION DATE A PROVED
DRAWINGS ARE NOTED, THE LATEST REVISION SHALL BE IN EFFECT UNLESS OTHERWISE
SPECIFIED.
1.2. BREAK ALL SHARP EDGES TO A 1164' CHAMFER (OR SMALLER).
1.3. ALL SURFACES MUST HAVE A 125 RA FINISH (OR BETTER).
2. WELDING & NON-OESTRUCTIVE TESTING (NOT) REQUIREMENTS
c 2.1. NONE. I 3. LOAD TEST & NON-OESTRUCTIVE TESTING (NOT) REQUIREMENTS
3.1. COMPONENT Wiil BE LOAD TESTED PER ASSEMBLY DRAWING ..
4. CLEANLINESS REQUIREMENTS
4.1. ALL ACCESSIBLE SURFACES SHALL BE VlSIBL Y FREE OF CUTIING FLUID, TAPE RESIDUE, MACHINE CHIPS, GREASE, OIL, FLUX, DIRT, GRIT, SCALE, RUST, SMEARED METAL OR
OTHER FOREIGN MATERIAL THIN FILMS OF TIGHTLY ADHERENT RUST OR OXIDE ARE
ACCEPTABLE. IF EQUIPMENT COMPONENTS REQUIRE ASSEMBLY, ALL ACCESSIBLE
SURFACES SHOULD BE INSPECTED AND CLEANED AS NECESSARY PRIOR TO ASSEMBLY. • 5. MARKING REQUIREMENTS
5.1. NONE.
I. HEAT TREAT REQUIREMENTS
6.1. NONE.
7. DOCUMENTATION REQUIREMENTS
7.1. NONE.
B B
1 CAP UNS 530400 1 • PC# DESCRIPTION MATERIAL QTY REMARKS
DECWAL TOLBIENCEa: UNl£SS OTHERWJSE SPECIFlED, APPROVAi/CONCURRENCE PORTSllllOUTH NAVAL SHIPYARD A XX • t 0.1 DtMENStONS A/tE IN INCHES. SIGNAnJRE DATE NUCLEAR l!EFUELING ENGINEERING DIVISION X..XX • t:0.01
X..XXX•t:0.<115 5l)PV. IS/ JEfFWILaofl CODE 2370 - KITfERY, ME XJOOO( . :I: 0.DIXllS DRAWING OIM~NSIONAl &
A
FUCT10tla: :t 1132 GEOMETllJC TOLERENCES
ANOLE8: t 0.51" PER ASME y14.5-2008
THIRD ANGLE PROJECTION
-· --Et-237080000102 RF-6600
NEXT ASSY USED ON
APPLICATION
4 3 2 c
B
A
2X .531 +.008/-.001 THRU
v¢ 1.ooox82° l-$-1¢ .01o@lslAI
Ai ... ----.
~- -1----
: I I I I
¢ 10.50
B
I I U r-<
II " II I
I I I I I I I I I I I I
I II :: _j ~ L,ooJ l-$-1¢ .o2@1slAI
4 3
1/4-20 UNC 28
T 1.000 MAX TAP DRILL
T .688 MIN FULL THREAD
l-$-1¢ .D1o@lslAI
SECTION A-A
~_J"
1.10 :~----l---
PORTSMOUTH NAVAL SHIPYARD
NUCLEAR REFUELING ENGINEERING DIVISION
CODE 2370 ·KITTERY, ME
c
B
A
A
4 3
1. MANUFACTURING REQUIREMENTS
1.1 . WHERE MIL-SPECS, STANDARDS, TECHNICAL PUBLICATIONS AND/OR REFERENCE
DRAWINGS ARE NOTED, THE LATEST REVISION SHALL BE IN EFFECT UNLESS OTHERWISE
SPECIFIED.
2. WELDING & NON-OESTRUC11VE TESTING (NOT) REQUIREMENTS
2.1. NONE.
3. LOAD TEST & NON-DESTRUCTlVE THTING (NOT) REQUIREMENTS
3.1. THE HOIST RING TO REMAIN PERMANENTLY INSTALLED.
3.2. ITEM IS <100 LB. LOAD TEST & NOT NOT REQUIRED.
3.3. THE WORKING LOAD LIMIT (WU) OF THE HOIST RING IS 100 LB.
4. CLEANLINESS REQUIREMENTS
4.1. ALL ACCESSIBLE SURFACES SHALL BE VISIBLY FREE OF CUTTING FLUID, TAPE RESIDUE, MACHINE CHIPS, GREASE, OIL, FLUX, DIRT, GRIT, SCALE, RUST, SMEARED METAL OR
OTHER FOREIGN MATERIAL THIN FILMS OF TIGHTLY ADHERENT RUST OR OXIDE ARE
ACCEPTABLE. IF EQUIPMENT COMPONENTS REQUIRE ASSEMBLY, ALL ACCESSIBLE
SURFACES SHOULD BE INSPECTED AND CLEANED AS NECESSARY PRIOR TO ASSEMBLY.
5. MARKING REQUIREMENTS
5.1. MARK PER MIL-SlD-792, TYPE I (VIBRATING TOOL), TYPE II (ELECTROCHEMICAL) OR TYPE
VII (ENGRAVING) THE FOLLOWING ON THE SPECIFIED SURFACES:
'RF.aiOO, LIN 0005 WT: (XX] LB'
5.1.1 . USE -1· TALL X - .5" WIDE CHARACTERS. DO NOT EXCEED .02' DEPTH.
5.12. (XX] IS THE ACTUAL WEIGHT OF PC1 SHIELD CAP BASE (EXCLUDING THE WEIGHT OF
THE HOIST RING).
5.2. MARK PER MIL-STD-792, TYPE I (VIBRATING TOOL), TYPE 11 (ELECTROCHEMICAL) OR TYPE
VII (ENGRAVING) THE FOLLOWING ON THE SPECIFIED SURFACES:
'Wll 100 LB, PERIODIC INSPECTION (N/Ar
5.2.1. USE -25' TALL X - .12" WIDE CHARACTERS. DO NOT EXCEED 0.02" DEPTH.
5.3. MARK PER MIL-STD-792, TYPE I (VIBRATING TOOL), TYPE II (ELECTROCHEMICAL) OR TYPE
VII (ENGRAVING) THE FOLLOWING ON THE SPECIFIED SURFACES:
'DO NOT REMOVE HOIST RING'
5.3.1. USE -.5' TALL X - .25' WIDE CHARACTERS. DO NOT EXCEED .02' DEPTH.
8. DOCUMENTATION REQUIREMENTS
6.1. NONE.
NIA
NEXT ASSY I USED ON
APPLICATION
RE
3 THREADLOCKEft
2 1/4-20 UNC HOIST RING
SHIELD CAP BASE
PC# I DESCRIPTION
OEallAl. Tot.EllENCH:
X.X• tD.1 x..xx .. t0.01
X.XXX • * O.D
X..XXXX • * O.UD5
FMC'TIONS: :t 1132
ANOt.Ea: :t. O.f:l9
UN..ESS OTHERWtSE SPECIFIED, OIUENSK>NS ARE ... INCHES.
DAAWIHG DIMENSIONAi. &
GEOMETRIC TOLERENCES
PER ASME Yt4.f-200I
THIRD ANGLE PROJECTION
--$---Et
2 1
REVISION HISTORY
DESCRIPTION
PLASTIC AIR
AMS6349 1
UNS $30400
MATf:RIAL I QiY
APPll()VAl/CONCUARENCE
I SIGNATURE !DATE
SUPV, 14'JEFFWILSON l1CY2'111
181 llY.-.N KllOQHT ( 11)122)11
AIOil.A WUAYAAATNEI 1<117111
NNSY
DATE APPROVED
LOCTITE 242 OR EQUIVALENT
AMt:RICAN DRILL BUSHING (CAGE 02064)
PIN 33112 OR EQUIVALENT
MFG PE~ 273080000156
REMARKS
F'ORTSMOU~ NAVAL SHIPYARD
NUCLEAR REFUEUpjG ENGINEERING DIVISION
COOE 2310 ·KITTERY, ME
SHIELD CAP ASSEMBLY
(RF-6600, LIN 0005)
c
B
A
4 3
ASSEMBLY
APPLY PC3 TO THREADS OF
PC2 PRIOR TO ASSEMBLY
/~ I \
I @ I I I I I
TORQUE 4 - 5 FT-LB
r-
I I I I I I I I I I
)-------1-- J..-----~--
I
PORTSMOUTH NAVAL SHIPYARD
NUCLEAR REFUELING ENGINEERING DllllSION
CODE j!370 · KITTERY, ME c
B
A
4 3 2 1
MARKING MARKING SPECIFICATION 2
(NOTE 5.2)
WU. 1lO lB PERICIJIC INSPECTKll NIA
DO NOT REMOVE HOIST RING
RF~6600----(Qf
UN 0005 °
XX lB
MARKING SPECIFICATION 1 ------'
(NOTE 5.1)
3 2
--MARKING SPECIFICATION 3
(NOTE5.3)
PORTSMOUTH NAVAL SHIPYARD
NUCLEAR ~EFUELING ENGINEERING DMSION
CODE 2370 - KtTl'ERY, ME c
B
File details come from the government source that posted it.