SS800-AG-MAN-010_-_P-9290_Rev_A.pdf
PDF 2 MB Posted
- Attached to
- External Video Camera System
- Solicitation number
- N3904015RFIVIDEOCAM
About this file
SS800-AG-MAN-010 - P-9290 Rev A
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SYSTEM CERTIFICATION PROCEDURES
AND CRITERIA MANUAL FOR
DEEP SUBMERGENCE SYSTEMS
THIS DOCUMENT SUPERSEDES: NAVSEA P-9290
APPROVED FOR PUBLIC RELEASE. DISTRIBUTION IS UNLIMITED.
PUBLISHED BY DIRECTION OF COMMANDER, NAVAL SEA SYSTEMS COMMAND
SS800-AG-MAN-010/P-9290
REVISION A
0910-LP-018-2840 3 NOVEMBER 1998
CHANGE 1 – 12 MAR 2012
THIS PAGE INTENTIONALLY LEFT BLANK
A CHANGE 1
SS800-AG-MAN-010/P-9290
LIST OF EFFECTIVE PAGES
Date of Original pages is: 3 November 1998
Original 10
Total Number of pages in this publication is 368 consisting of the following:
Page Change Page Change Number Number Number Number
Title Page ............................. CHANGE 1
List of Effective Pages .......... CHANGE 1
Change Record ..................... ORIGINAL i through xxii ......................... CHANGE 1
1-1 through 1-10 ................... CHANGE 1
2-1 through 2-2 ..................... CHANGE 1
2-3 through 2-4 ...................... ORIGINAL
2-5 through 2-18 ................... CHANGE 1
3-1 through 3-36 ................... CHANGE 1
4-1 through 4-14 ................... CHANGE 1
5-1 through 5-8 ..................... CHANGE 1
A-1 through A-2 .................... CHANGE 1
A-3 through A-6 ..................... ORIGINAL
A-7 through A-8 ................... CHANGE 1
A-9 through A-10 ................... ORIGINAL
B-1 through B-6 ..................... ORIGINAL
B-7 through B-12 .................. CHANGE 1
B-13 through B-16 ................. ORIGINAL
B-17 through B-18 ................ CHANGE 1
B-19 through B-24 ................. ORIGINAL
B-25 through B-32 ................ CHANGE 1
B-33 through B-34 ................. ORIGINAL
B-35 through B-36 ................ CHANGE 1
B-37 through B-44 ................. ORIGINAL
C-1 through C-2.................... CHANGE 1
C-3 through C-6..................... ORIGINAL
LIST OF EFFECTIVE PAGES (CONT’D)
Page Change Page Change Number Number Number Number
CHANGE 1 B
D-1 through D-2..................... ORIGINAL
E-1 through E-2 .................... CHANGE 1
E-3 through E-12 ................... ORIGINAL
F-1 through F-2 .................... CHANGE 1
F-3 through F-4 ..................... ORIGINAL
F-5 through F-32 .................. CHANGE 1
G-1 through G-6 ................... CHANGE 1
H-1 through H-22................... ORIGINAL
H-23 through H-24................ CHANGE 1
H-25 through H-34................. ORIGINAL
I-1 through I-16 ..................... CHANGE 1
J-1 through J-4 ..................... CHANGE 1
J-5 through J-8 ...................... ORIGINAL
K-1 through K-6 ..................... ORIGINAL
K-7 through K-8 .................... CHANGE 1
K-9 through K-10 ................... ORIGINAL
K-11 through K-12 ................ CHANGE 1
K-13 through K-18 ................. ORIGINAL
K-19 through K-20 ................ CHANGE 1
K-21 through K-24 ................. ORIGINAL
K-25 through K-26 ................ CHANGE 1
K-27 through K-28 ................. ORIGINAL
K-29 through K-30 ................ CHANGE 1
K-31 through K-38 ................. ORIGINAL
K-39 through K-40 ................ CHANGE 1
K-41 through K-42 ................. ORIGINAL
K-43 through K-44 ................ CHANGE 1
K-45 through K-46 ................. ORIGINAL
K-47 through K-48 ................ CHANGE 1
K-49 through K-50 ................. ORIGINAL
L-1 through L-2 ..................... CHANGE 1
L-3 through L-8 ...................... ORIGINAL
M-1 through M-4 ................... CHANGE 1
INDEX 1 - INDEX 22 ............ CHANGE 1
SS800-AG-MAN-010/P-9290
RECORD OF CHANGES
CHANGE
NO.
DATE
TITLE OR BRIEF
DESCRIPTION
ENTERED BY
i CHANGE 1
TABLE OF CONTENTS
Chapter 1: General Information ............................................................. 1-1
1.1 Introduction ........................................................................................................ 1-1
1.2 Background ....................................................................................................... 1-1
1.2.1 History ......................................................................................................... 1-1
1.2.2 Lessons Learned ......................................................................................... 1-2
1.3 Certification Definitions ...................................................................................... 1-3
1.3.1 Deep Submergence System ....................................................................... 1-3
1.3.2 Deep Submergence System Personnel ...................................................... 1-3
1.3.3 Scope of Certification .................................................................................. 1-3
1.3.4 Certification Program Plan .......................................................................... 1-4
1.3.5 Scope of Certification Notebook .................................................................. 1-4
1.3.6 Surveys ....................................................................................................... 1-4
1.3.7 Objective Quality Evidence ......................................................................... 1-4
1.3.8 Certification Survey Plan ............................................................................. 1-5
1.3.9 Certification Package .................................................................................. 1-5
1.3.10 Certification ............................................................................................... 1-5
1.3.11 Authorization for Manned Use ................................................................... 1-5
1.3.12 Letter of Certification ................................................................................. 1-5
1.3.13 Initial Certification ...................................................................................... 1-6
1.3.14 Sustaining Certification.............................................................................. 1-6
1.3.15 Prohibition Against Manned Operations .................................................... 1-6
1.3.16 Suspension of Certification ........................................................................ 1-6
1.3.17 Letter of Suspension of Certification ......................................................... 1-6
1.3.18 Reinstatement of Certification (Re-Certification) ....................................... 1-7
1.3.19 Functional Audits ....................................................................................... 1-7
1.3.20 Technical Assistance Review (Tech Assist) .............................................. 1-7
1.4 Principal Participants ......................................................................................... 1-7
1.5 Deep Submergence Systems Oversight Board (DSSOB) ................................. 1-8
1.6 Basis for Initial DSS Certification ....................................................................... 1-9
1.7 DSS Certification Process ................................................................................. 1-9
1.8 Documentation Hierarchy .................................................................................. 1-9
CHANGE 1 ii
Chapter 2: The System Certification Process ...................................... 2-1
2.1 Introduction ........................................................................................................ 2-1
2.2 Application for Initial Certification ....................................................................... 2-1
2.2.1 Plan of Action and Milestones ..................................................................... 2-2
2.2.2 System Safety Program Plan ...................................................................... 2-2
2.2.3 Proposed Certification Program Plan (CPP) ............................................... 2-6
2.2.4 Proposed Scope of Certification .................................................................. 2-7
2.2.4.1 Scope of Certification ............................................................................ 2-8
2.2.4.2 Scope of Certification Notebook ............................................................ 2-9
2.2.4.3 Memorandum of Understanding ............................................................ 2-9
2.2.5 Certification Survey Plan ........................................................................... 2-10
2.3 Approval of System SOC Documents .............................................................. 2-10
2.4 Departure From Specification .......................................................................... 2-10
2.4.1 Processing Departures From Specification ............................................... 2-11
2.4.2 DFS Administrative Control and Records .................................................. 2-12
2.5 Technical Certification Requirements .............................................................. 2-14
2.6 Certification Package ....................................................................................... 2-14
2.7 Internal Certification Survey ............................................................................. 2-14
2.8 SCA Surveys ................................................................................................... 2-14
2.9 Operational Demonstration .............................................................................. 2-15
2.10 Issuance of Certification ................................................................................ 2-15
2.11 Sustaining Certification .................................................................................. 2-16
2.12 Modifications .................................................................................................. 2-16
2.13 Suspension of Certification ............................................................................ 2-16
2.14 Functional Audits ........................................................................................... 2-17
2.15 Process For Changing The Manual ............................................................... 2-17
2.15.1 Change Submittal .................................................................................... 2-17
2.15.2 Change Status Accounting ...................................................................... 2-17
2.15.3 Manual Distribution ................................................................................. 2-18
Chapter 3: Requirements for Certification ........................................... 3-1
3.1 Introduction ........................................................................................................ 3-1
3.2 Design and Configuration Management ............................................................ 3-1
3.2.1 Summary Description of the DSS ................................................................ 3-2 iii CHANGE 1
3.2.2 Design Parameters ..................................................................................... 3-2
3.2.3 Subsystem Descriptions .............................................................................. 3-3
3.2.4 Design Analysis and Calculations ............................................................... 3-4
3.2.4.1 Design Calculations ............................................................................... 3-4
3.2.4.2 Stress Analysis ...................................................................................... 3-5
3.2.5 Drawings ..................................................................................................... 3-6
3.2.6 Operability and Maintainability .................................................................... 3-7
3.2.7 Justification of Materials .............................................................................. 3-7
3.2.8 Toxic and Flammable Materials .................................................................. 3-7
3.2.9 Atmosphere Analysis .................................................................................. 3-8
3.2.10 Vacuum in Manned and Floodable Spaces ............................................... 3-9
3.2.11 System Safety Program ............................................................................ 3-9
3.3 Material Control ................................................................................................. 3-9
3.3.1 Definition of Material SOC Control Divisions ............................................. 3-10
3.3.1.1 Material Control Division A .................................................................. 3-10
3.3.1.2 Material Control Division B .................................................................. 3-10
3.3.1.3 Material Control Division C .................................................................. 3-11
3.3.2 Material Procurement ................................................................................ 3-11
3.3.3 Material Marking and Traceability ............................................................. 3-11
3.3.3.1 MCD A Material Marking and Traceability ........................................... 3-11
3.3.3.2 MCD B Material Marking and Traceability ........................................... 3-12
3.3.3.3 MCD C Material Marking and Traceability ........................................... 3-12
3.3.4 Receipt Inspection ..................................................................................... 3-12
3.3.4.1 MCD A Receipt Inspection .................................................................. 3-12
3.3.4.2 MCD B Receipt Inspection .................................................................. 3-13
3.3.4.3 MCD C Receipt Inspection .................................................................. 3-13
3.3.5 Verification of Completion of Required Testing ......................................... 3-13
3.3.6 Installation Verification .............................................................................. 3-14
3.3.6.1 Installation Verification Requirement for MCD A, B and C Material ..... 3-14
3.3.7 Material Transfer ....................................................................................... 3-14
3.3.7.1 Material Certification Maintained ......................................................... 3-14
3.3.7.2 Material Certification Lapsed (DSS/Ship In Inactivation Availability) ... 3-15
3.3.7.3 Material Recertification Required......................................................... 3-17
3.4 Fabrication Process Control ............................................................................ 3-17
CHANGE 1 iv
3.4.1 Work Procedures ...................................................................................... 3-17
3.4.2 Welding Procedures .................................................................................. 3-18
3.4.3 Brazing Procedures ................................................................................... 3-18
3.4.4 Pipe Bending Procedures.......................................................................... 3-19
3.4.5 Cleaning Procedures ................................................................................. 3-19
3.5 Quality Assurance............................................................................................ 3-20
3.5.1 Design and Drawing Control ..................................................................... 3-21
3.5.2 Fabrication and Manufacturing Control ..................................................... 3-21
3.5.3 Testing and Inspection Control .................................................................. 3-22
3.5.4 Calibration ................................................................................................. 3-22
3.5.5 Audits ........................................................................................................ 3-23
3.6 Test Performance ............................................................................................ 3-23
3.6.1 Development Tests ................................................................................... 3-23
3.6.2 Quality Assurance Tests ........................................................................... 3-24
3.6.3 System Operation, Integration and Proof Tests ........................................ 3-24
3.6.3.1 Proof, Builder's Pre-Trial or Pre-Sea Trial Tests .................................. 3-24
3.6.3.2 Structural Testing ................................................................................ 3-24
3.6.3.3 Fluid System Testing ........................................................................... 3-24
3.6.3.4 Cleanliness Testing ............................................................................. 3-25
3.6.3.5 Electrical Testing ................................................................................. 3-25
3.6.3.6 Inclination Testing................................................................................ 3-27
3.6.3.7 Access to Vital Equipment ................................................................... 3-27
3.7 Operational Demonstration and Trials Stage (Builder’s Trials or Sea Trials) ... 3-27
3.7.1 Certification/Re-Certification Dive ............................................................. 3-30
3.7.2 Emergency Surfacing ................................................................................ 3-31
3.7.3 Test Dive Deficiencies ............................................................................... 3-31
3.7.4 Manned Use of One Atmosphere DSSs in Pursuit of Certification (or Reinstatement of Certification) ............................................................................ 3-32
3.8 Operating and Emergency/Casualty Procedures ............................................. 3-33
3.8.1 Operating Manual ...................................................................................... 3-34
3.9 Maintenance Procedures ................................................................................. 3-35
3.9.1 Maintenance Requirement Card ............................................................... 3-35
3.9.2 SOC Planned Maintenance Documentation .............................................. 3-36
Chapter 4: On-Site Certification Survey ............................................... 4-1 v CHANGE 1
4.1 Introduction ........................................................................................................ 4-1
4.2 Types of Surveys ............................................................................................... 4-1
4.2.1 Initial Certification Survey ............................................................................ 4-1
4.2.2 Sustaining Certification Survey ................................................................... 4-1
4.2.2.1 Sustaining Certification Survey Periodicity ............................................ 4-2
4.2.3 Reinstatement of Certification Survey ......................................................... 4-2
4.2.4 End-Of-Availability Survey........................................................................... 4-2
4.2.5 Internal Surveys .......................................................................................... 4-2
4.2.5.1 Internal Survey Periodicity ..................................................................... 4-3
4.3 Preparation For Survey ...................................................................................... 4-3
4.3.1 Scheduling of SCA Surveys ........................................................................ 4-3
4.3.1.1 Work Completion Requirements ............................................................ 4-3
4.3.1.2 Maintenance Requirement Status ......................................................... 4-4
4.3.1.3 Testing Procedure Status ...................................................................... 4-4
4.3.1.4 Departure Status ................................................................................... 4-4
4.3.1.5 Certification Survey Plan ....................................................................... 4-6
4.3.1.6 Personnel .............................................................................................. 4-6
4.4 Survey Team Personnel .................................................................................... 4-6
4.5 Certification Survey Cards ................................................................................. 4-6
4.6 Survey Guidelines.............................................................................................. 4-8
4.7 Operational Demonstration ................................................................................ 4-8
Chapter 5: Sustaining Certification ....................................................... 5-1
5.1 Introduction ........................................................................................................ 5-1
5.2 Qualification Policy ............................................................................................ 5-1
5.3 Responsibilities .................................................................................................. 5-1
5.3.1 Program Manager and SCA Responsibilities .............................................. 5-2
5.3.2 Sustaining Activity Responsibilities ............................................................. 5-2
5.3.3 Industrial Facility/Supervising Authority Responsibilities ............................. 5-3
5.4 Sustaining Certification Control Procedures ...................................................... 5-4
5.4.1 Re-entry Control .......................................................................................... 5-4
5.4.2 Work Procedures ........................................................................................ 5-4
5.4.3 Planned Maintenance Procedures .............................................................. 5-5
5.4.4 Temporary Modifications ............................................................................. 5-6
CHANGE 1 vi
5.5 Test and Trials Stage ......................................................................................... 5-7
5.6 Sustaining Certification Survey .......................................................................... 5-7
5.7 Operating Limits................................................................................................. 5-7
5.8 Continuation of Certification ............................................................................... 5-7
APPENDIX A: Categorization of SOC Materials and Components ... A-1
A.1 INTRODUCTION ...............................................................................................A-1
A.2 CATEGORY 1 MATERIALS ..............................................................................A-1
A.3 CATEGORY 2 MATERIALS ..............................................................................A-4
A.3.1 Structural Materials .....................................................................................A-4
A.4 CATEGORY 3 MATERIALS ..............................................................................A-5
A.4.1 Pressure Hull/Vessel and Other Structural Materials ..................................A-6
A.5 VIEWING WINDOW MATERIALS .....................................................................A-7
A.6 FLOTATION MATERIALS .................................................................................A-7
A.7 HYDRAULIC SYSTEM FLUIDS ........................................................................A-8
A.8 ELECTRICAL/ELECTRONIC SYSTEM MATERIALS .......................................A-8
A.9 FAIRING AND MISCELLANEOUS NONSTRUCTURAL MATERIALS ..............A-9
A.10 LIFE SUPPORT SYSTEM MATERIALS .........................................................A-9
APPENDIX B: Design Factors for Deep Submergence Systems ...... B-1
B.1 INTRODUCTION ...............................................................................................B-1
B.2 STRUCTURAL DESIGN CONSIDERATIONS ..................................................B-1
B.2.1 Fatigue ........................................................................................................B-2
B.2.2 Fracture Toughness ....................................................................................B-3
B.3 DESIGN STRENGTH PARAMETERS OF EXTERNALLY LOADED PRESSURE
HULLS/VESSELS, HARD STRUCTURES ...............................................................B-4
B.3.1 Inelastic Stability .........................................................................................B-5
B.3.2 Elastic Stability ............................................................................................B-5
B.3.3 Stress Analysis ...........................................................................................B-5
B.3.4 Verification of Calculated Collapse Pressure ..............................................B-6
B.3.4.1 Testing Procedures/Test Instrumentation .............................................B-7
B.3.5 Verification of As-Built Strength (Proof Test) ..............................................B-7
B.3.5.1 Proof Testing Procedures/Instrumentation ............................................B-8
B.4 DESIGN STRENGTH PARAMETERS OF INTERNALLY LOADED PRESSURE
VESSELS/HARD STRUCTURES .............................................................................B-8 vii CHANGE 1
B.4.1 Stress Analysis ...........................................................................................B-9
B.4.2 Verification of Calculated Design Operating Pressure ................................B-9
B.4.2.1 Testing Procedures/Test Instrumentation ...........................................B-10
B.5 MISCELLANEOUS PRESSURE VESSELS AND HARD STRUCTURES .......B-10
B.6 DESIGN OF PENETRATIONS INTO AND THROUGH THE PRESSURE HULL
ENVELOPE ............................................................................................................B-10
B.6.1 Piping Penetrations ...................................................................................B-11
B.6.2 Electrical Penetrations ..............................................................................B-11
B.6.3 Viewports ..................................................................................................B-11
B.6.4 Hatches/Closures .....................................................................................B-12
B.6.5 Seals .........................................................................................................B-12
B.7 MATERIAL SELECTION .................................................................................B-13
B.7.1 Corrosion Resistance................................................................................B-13
B.7.1.1 Electrolytic Corrosion ..........................................................................B-13
B.7.1.2 Stress Corrosion .................................................................................B-14
B.7.2 Toxicity......................................................................................................B-14
B.7.3 Flammability ..............................................................................................B-14
B.8 FABRICATION ................................................................................................B-15
B.8.1 Fabrication, Welding and Brazing .............................................................B-15
B.8.2 Threaded Fasteners .................................................................................B-15
B.8.3 Locking Devices for Mechanical Fasteners ...............................................B-16
B.8.4 Protective Finishes ...................................................................................B-16
B.9 NAVAL ARCHITECTURE DESIGN .................................................................B-16
B.9.1 Stability and Equilibrium............................................................................B-16
B.9.1.1 Inclining Experiments and Trim Dives for Submersibles and Submerged Habitats ............................................................................................................B-17
B.9.2 Additional Conditions ................................................................................B-18
B.10 DESIGN OF PIPING SYSTEMS ...................................................................B-18
B.10.1 Piping System Flexibility .........................................................................B-19
B.10.2 Piping Systems Component Structural Design Consideration ................B-20
B.10.2.1 Categories of Stress ..........................................................................B-21
B.10.3 Design of Piping Systems and Components ...........................................B-22
B.10.4 Hoses and Umbilical (Deck Shelters, Etc.) .............................................B-23
B.10.5 Special Considerations for Oxygen Systems ..........................................B-24
B.10.6 Piping System Design Verification ..........................................................B-25
CHANGE 1 viii
B.10.7 Relief Valves ...........................................................................................B-25
B.11 DESIGN OF ELECTRICAL SYSTEMS .........................................................B-25
B.11.1 Power Requirements ..............................................................................B-25
B.11.1.1 Batteries ............................................................................................B-25
B.11.2 Wiring Methods .......................................................................................B-25
B.11.3 Ungrounded System ...............................................................................B-27
B.11.4 Fault Current Protection ..........................................................................B-27
B.11.5 Electrical Shock Hazards ........................................................................B-27
B.11.6 Insulation Considerations........................................................................B-28
B.11.7 Electrical Connectors and Penetrators....................................................B-28
B.11.7.1 Electrical Connectors ........................................................................B-28
B.11.7.2 Electrical Penetrators ........................................................................B-28
B.11.7.3 Electrical Hull Penetrator Protection ..................................................B-29
B.11.8 Lighting Systems ....................................................................................B-29
B.11.9 Instrumentation .......................................................................................B-29
B.11.10 Communication Systems ......................................................................B-29
B.11.11 Heating Systems ...................................................................................B-30
B.12 PROPULSION SYSTEM ...............................................................................B-30
B.13 HUMAN ENGINEERING ...............................................................................B-30
B.13.1 Sound Levels ..........................................................................................B-30
B.13.2 Thermal Control ......................................................................................B-31
B.14 LIFE SUPPORT SYSTEM .............................................................................B-31
B.14.1 Life Support System Design Specification ..............................................B-32
B.14.1.1 Closed Circuit Life Support Design Specification ..............................B-32
B.14.1.2 Open Circuit Life Support Design Specification.................................B-33
B.14.2 Breathing Gas System General Design Considerations .........................B-33
B.14.3 Breathing Gas Equipment Considerations ..............................................B-35
B.14.3.1 Breathing Gas Compressors .............................................................B-35
B.14.3.2 Stored Breathing Gas Supply ............................................................B-36
B.14.3.3 Carbon Dioxide Removal ..................................................................B-37
B.14.3.4 Breathing Gas Relief Valves .............................................................B-38
B.14.3.5 Instrumentation .................................................................................B-38
B.15 OPERATIONAL CONTROL SYSTEMS ........................................................B-40
B.15.1 Control Power Supply .............................................................................B-40 ix CHANGE 1
B.15.2 Control Actuators ....................................................................................B-41
B.16 FIRE PROTECTION SYSTEM ......................................................................B-42
B.17 NAVIGATION SYSTEMS ..............................................................................B-42
B.18 FOOD AND WATER SUPPLY ......................................................................B-42
B.19 WASTE SYSTEMS .......................................................................................B-42
B.20 RESCUE/RETRIEVAL SYSTEMS ................................................................B-43
B.21 HANDLING SYSTEMS ..................................................................................B-43
APPENDIX C: Testing Parameters for Permanently or Temporarily Mounted External Implodable and Explodable Items C-1
C.1 INTRODUCTION.............................................................................................. C-1
C.2 DEFINITIONS .................................................................................................. C-3
C.3 DETERMINATION OF WHETHER OR NOT AN EXPLODABLE OR
IMPLODABLE IS CRITICAL OR NONCRITICAL .................................................... C-4
C.4 TESTING REQUIRED FOR NONCRITICAL IMPLODABLE/EXPLODABLE
VOLUMES ............................................................................................................... C-5
C.5 TESTING NECESSARY FOR CRITICAL IMPLODABLE VOLUMES .............. C-5
C.6 TESTING NECESSARY FOR CRITICAL EXPLODABLE VOLUMES .............. C-6
C.7 TEST RECORD OQE REQUIRED FOR CRITICAL IMPLODABLE AND
EXPLODABLE VOLUMES ...................................................................................... C-6
APPENDIX D: Testing Parameters for Explodable Items due to Decompression .............................................................. D-1
D.1 INTRODUCTION.............................................................................................. D-1
D.2 DESCRIPTION AND ORIENTATION ............................................................... D-1
D.3 TEST PROCEDURE ........................................................................................ D-1
D.4 POROUS OR VENTED COMPONENTS ......................................................... D-2
APPENDIX E: DSS Breathing Gas and Atmospheric Requirements E-1
E.1 INTRODUCTION ...............................................................................................E-1
E.2 BREATHING GAS CONSUMPTION .................................................................E-1
E.3 SURFACE BREATHING AIR REQUIREMENTS...............................................E-2
E.3.1 Surface Oxygen Requirements ...................................................................E-3
E.3.2 Carbon Dioxide Production and Toxic Effects .............................................E-5
E.3.3 Carbon Dioxide Removal ............................................................................E-6
E.3.4 Carbon Dioxide Levels ................................................................................E-7
CHANGE 1 x
E.4 ATMOSPHERIC CONTAMINANTS ..................................................................E-8
E.5 CARBON MONOXIDE LEVELS ........................................................................E-8
E.6 DECOMPRESSION CONSIDERATIONS .........................................................E-8
E.7 BREATHING GAS ALGORITHMS ....................................................................E-9
E.7.1 Conversion Factors .....................................................................................E-9
E.7.2 Steady Oxygen Production and Removal Process ...................................E-10
E.7.3 Carbon Dioxide Buildup With No Removal Process .................................E-10
E.7.4 Steady Contaminant Introduction And Removal Process .........................E-10
E.7.5 No Contaminant Introduction But Constant Removal Process ..................E-11
E.7.6 Expected Contamination From a Volatile Solvent .....................................E-11
APPENDIX F: General Guidelines for Control of Atmospheric Contaminants in Manned DSS ...................................... F-1
F.1 INTRODUCTION ............................................................................................... F-1
F.2 DSS FACTORS EFFECTING ATMOSPHERE CONTROL ............................... F-1
F.2.1 Mission Duration ......................................................................................... F-1
F.2.2 Atmospheric Pressure ................................................................................. F-2
F.2.3 Material Density .......................................................................................... F-3
F.2.4 Atmospheric Temperature........................................................................... F-3
F.2.5 Atmospheric Control Equipment ................................................................. F-3
F.2.6 Cleanliness ................................................................................................. F-3
F.3 CONTROLLING AND MONITORING CONTAMINANTS .................................. F-3
F.3.1 Background ................................................................................................. F-3
F.3.2 Controlling Personnel Contaminants ........................................................... F-4
F.3.3 Controlling and Monitoring Breathing Gas Purity ........................................ F-5
F.3.4 Controlling and Monitoring Gaseous Contaminants in Breathing Gas Systems ................................................................................................................ F-6
F.3.5 Monitoring Gaseous Contaminants in the DSS ........................................... F-7
F.3.5.1 Unmanned DSS Atmospheric Testing ................................................... F-7
F.3.5.2 Manned DSS Atmospheric Testing ....................................................... F-9
F.4 CONTROLLING AND MONITORING NON-METALLIC MATERIAL ................. F-9
F.4.1 Non-Metallic Material List .......................................................................... F-10
F.4.2 Non-Metallic Material Off-Gas Testing ...................................................... F-10
F.4.3 Non-Metallic Material Off-Gas Test Report ............................................... F-11
F.4.4 Non-Metallic Material Qualification ............................................................ F-12 xi CHANGE 1
F.4.4.1 Initial Qualification Process ................................................................. F-13
F.4.4.2 Vendor Qualified Materials .................................................................. F-13
F.4.4.3 Lot Sampled Materials ......................................................................... F-14
F.5 IDENTIFYING CONTAMINANTS .................................................................... F-14
F.5.1 Physical Nature of Contaminants .............................................................. F-15
F.5.2 Medical Effects of Contaminants ............................................................... F-16
F.5.3 Target Compound Lists ............................................................................. F-18
F.5.4 Target Compound List Approval ............................................................... F-19
F.5.5 Breathing Gas System and Manned Space Off-Gas Test Report ............. F-20
F.6 EVALUATING OFF-GAS AND ATMOSPHERIC ANALYSIS RESULTS ......... F-20
F.7 LABORATORIES PERFORMING ANALYSES................................................ F-21
F.8 FLAMMABILITY TESTING .............................................................................. F-28
F.8.1 Flammability Test Equipment .................................................................... F-29
F.8.2 Material Sample Test Documentation Requirements ................................ F-30
F.8.3 Alternate Procedure for Complete Assemblies ......................................... F-30
APPENDIX G: General Guidelines for Cleaning Breathing Gas Systems .......................................................................... G-1
G.1 INTRODUCTION ............................................................................................. G-1
G.2 REFERENCES ................................................................................................ G-1
G.2.1 Military Standards ...................................................................................... G-1
G.2.2 Commercial Specifications ........................................................................ G-1
G.2.3 Other ......................................................................................................... G-1
G.3 SYSTEM AND COMPONENT CLEANLINESS CONCERNS .......................... G-2
G.4 CLEANING METHODS AND MATERIALS ...................................................... G-3
G.4.1 Approved Cleaning Agents ........................................................................ G-3
G.4.2 Cleaning Processes .................................................................................. G-3
G.4.3 Commercial Oxygen Cleaning Specifications ............................................ G-4
G.5 POST CLEANING GAS ANALYSIS ................................................................. G-4
G.6 MAINTAINING THE SYSTEM IN A CLEAN CONDITION ................................ G-4
G.6.1 Providing a Clean Gas............................................................................... G-4
G.6.2 Maintaining Cleanliness During Maintenance and Repairs ....................... G-5
APPENDIX H: Design Guidelines for DSS Handling Systems .......... H-1
H.1 INTRODUCTION.............................................................................................. H-1
CHANGE 1 xii
H.2 DEFINITIONS .................................................................................................. H-1
H.3 DESIGN CRITERIA AND GUIDELINES .......................................................... H-2
H.3.1 Equipment Design Criteria ......................................................................... H-2
H.3.1.1 Types of Loads .................................................................................... H-3
H.3.1.2 Environmental Considerations ............................................................. H-3
H.3.1.2.1 Sea State ....................................................................................... H-4
H.3.1.2.2 Air and Water Temperature ........................................................... H-4
H.3.1.2.3 Precipitation ................................................................................... H-4
H.3.1.2.4 Wind Velocity ................................................................................. H-4
H.3.1.2.5 Ocean Currents ............................................................................. H-4
H.3.1.2.6 Corrosion ....................................................................................... H-5
H.3.1.3 System Considerations ........................................................................ H-5
H.3.2 Human Engineering and Operational Design Considerations.................... H-5
H.3.2.1 Emergency Conditions and Reduced Operating Capability ................. H-6
H.4 DESIGN AND TESTING REQUIREMENTS .................................................... H-6
H.4.1 Load Bearing Component Requirements................................................... H-7
H.4.1.1 Load Bearing Component Design ........................................................ H-7
H.4.1.1.1 Design Factors of Safety ............................................................... H-7
H.4.1.2 Submission of Drawings and Calculations for Load Bearing Components .......................................................................................................................... H-9
H.4.1.3 System Testing for Load Bearing Components ................................. H-10
H.4.2 Hydraulic and Pneumatic System Requirements ..................................... H-14
H.4.2.1 System Design ................................................................................... H-14
H.4.2.2 System Testing .................................................................................. H-15
H.4.2.2.1 Hydrostatic Testing Requirements............................................... H-15
H.4.2.2.2 System Tightness Testing Requirements .................................... H-16
H.4.2.2.3 Maintenance Testing Requirements ............................................ H-17
H.4.2.3 Relief and Counter-Balance Valves ................................................... H-18
H.4.2.4 Cleaning, Flushing, and Preservation ................................................ H-19
H.4.3 Electrical Power Requirements and Controls .......................................... H-19
H.4.3.1 System Design ................................................................................... H-19
H.4.3.2 System Testing .................................................................................. H-20
H.4.3.2.1 Maintenance Testing Requirements ............................................ H-20
H.5 CERTIFICATION REQUIREMENTS .............................................................. H-21
H.5.1 Initial and Sustaining Certification Requirements .................................... H-21 xiii CHANGE 1
H.5.2 Certification Surveys ................................................................................ H-25
H.5.3 Suspension of Certification ...................................................................... H-26
APPENDIX I: Re-Entry Control Procedures ......................................... I-1
I.1 INTRODUCTION ................................................................................................. I-1
I.1.1 Work Procedures .......................................................................................... I-1
I.2 RE-ENTRY CONTROL IMPLEMENTATION RESPONSIBILITIES ..................... I-2
I.3 REC CLOSEOUT ................................................................................................ I-3
I.3.1 REC Closeout via Deep Dive Test Forms or DFSs ....................................... I-3
I.3.2 REC Closeout with Incomplete Work ............................................................ I-3
I.3.3 Deep Dive DFS and Test Form Depth Restrictions ....................................... I-4
I.4 RE-ENTRY CONTROL FORM AND INSTRUCTION MATRIX ............................ I-5
I.5 RE-ENTRY CONTROL LOG ............................................................................... I-5
I.6 RE-ENTRY CONTROL RECORD RETENTION REQUIREMENTS .................... I-6
I.7 EXCEPTIONS TO RE-ENTRY CONTROL .......................................................... I-6
APPENDIX J: DSS Pipe and Piping Components Pressure Testing Requirements .................................................................. J-1
J.1 INTRODUCTION ............................................................................................... J-1
J.2 RESTRICTIONS ................................................................................................ J-1
J.3 DEFINITIONS .................................................................................................... J-1
J.4 TEST PRESSURE TOLERANCES .................................................................... J-3
J.5 TEST PRESSURE DURATION ......................................................................... J-3
J.6 HYDROSTATIC TESTING REQUIREMENTS ................................................... J-3
J.7 JOINT TIGHTNESS TESTING REQUIREMENTS ............................................. J-4
J.8 SEAT TIGHTNESS TESTING REQUIREMENTS .............................................. J-5
J.9 PRESSURE DROP TESTING REQUIREMENTS.............................................. J-6
J.10 OBJECTIVE QUALITY EVIDENCE ................................................................. J-6
APPENDIX K: Certification Survey Plan .............................................. K-1
K.1 INTRODUCTION ...............................................................................................K-1
K.2 CERTIFICATION SURVEY PLAN DEVELOPMENT .........................................K-1
K.2.1 Proposed Certification Survey Plan ............................................................K-2
K.2.2 Certification Survey Plan Review ................................................................K-2
K.3 CERTIFICATION SURVEY PLAN FORMAT AND CONTENT ..........................K-2
CHANGE 1 xiv
K.3.1 Item/System Accountability .........................................................................K-2
K.3.2 Certification Survey Plan (Parts I, II, III & IV) ..............................................K-3
APPENDIX L: Access to and Operation of Vital Equipment .............. L-1
L.1 INTRODUCTION ............................................................................................... L-1
L.2 LIST OF COMPONENTS VITAL TO EMERGENCY RECOVERY..................... L-1
L.3 INSPECTION OF DEEP SUBMERGENCE SYSTEMS ..................................... L-1
L.4 ACCESSIBILITY CONDITIONS......................................................................... L-2
L.5 ACCESS TO VITAL EQUIPMENT AND COMPONENTS AND EQUIPMENT
INSPECTION PROCEDURE .................................................................................... L-4
L.5.1 Objective ..................................................................................................... L-4
L.5.2 Required Inspections .................................................................................. L-4
L.5.2.1 Accessibility ........................................................................................... L-4
L.5.2.2 Access Time Check ............................................................................... L-4
L.5.3 Scheduling of Inspection ............................................................................. L-4
L.5.4 General Information .................................................................................... L-5
L.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .