This is a request for proposals for a design-bid-build construction project at Keflavik, Iceland. The Navy is seeking proposals to design and construct oil water separators for aircraft parking aprons at Keflavik Air Base under the European Deterrence Initiative. Offerors must propose on the base requirements in CLIN 0001 to design and construct Phase 1 and 2 sites by the specified deadline of July 10, 2023. The solicitation also includes optional CLINs 0002 through 0016 to extend the project scope to additional phases and sites, if awarded. Pricing must be provided for the base requirements and any selected options. The award will be made to the responsible offeror providing the best value based on a tradeoff of price and four non-price factors: experience, past performance, safety, and technical solution.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
N3319123R4009 Design-Bid-Build European Deterrence Initiative (EDI) Hotel Loop 1 & 2 Apron Oil Water Separators (OWS) at Keflavic, Iceland.
Proposals shall be submitted electronically per the instructions in Block 13 and Section 00 21 13
Please note: The deadline to submit proposals is in Central European Time (CET)
In accordance w ith FAR 36.204, the magnitude of this project is expected to be betw een 5,000,000 to 10,000,000.
GRAEME SILVA 314-626-8124
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS
NEGOTIATED
06-Jun-2023
(RFP)
(IFB)
X
CALL:
B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
See Item 7
2. TYPE OF SOLICITATION
SEALED BID
3. DATE ISSUED
9. FOR INFORMATION A. NAME
SOLICITATION
X
NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)
Prescribed by GSA FAR (48 CFR) 53.236-1(e)
11. The Contractor shall begin performance w ithin _______30 calendar days and complete it w ithin ________240 calendar days after receiving aw ard, notice to proceed. This performance period is X mandatory, negotiable. (See _________________________
12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES," indicate within how many calendar days after award in Item 12B.)
X YES NO
13. ADDITIONAL SOLICITATION REQUIREMENTS:
A. Sealed offers in original and __________ copies to perform the w ork required are due at the place specif ied in Item 8 by ___________ local time ______________10 Jul 2023 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.
shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
B. An offer guarantee X is, is not required.
C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
D. Offers providing less than _______90 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
1. SOLICITATION NO.
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
4. CONTRACT NO.
7. ISSUED BY CODE
NAVFAC EUROPE AFRICA CENTRAL
VIALE PORTO CAPODICHINO
NAPOLI 80144
N33191
PAGE OF PAGES
1 OF
CODE
(Title, identifying no., date):
12B. CALENDAR DAYS
02:00 PM (hour) Sealed envelopes containing offers
5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.
8. ADDRESS OFFER TO (If Other Than Item 7)
39 081 568 7750FAX:TEL: 39 081 568 7750 TEL: FAX:
N3319123R4009 81
20B. SIGNATURE
(REV. 4-85)STANDARD FORM 1442 BACK
TO SIGN
NSN 7540-01-155-3212
SOLICITATION, OFFER, AND AWARD (Continued) (Construction, Alteration, or Repair)
CODE FACILITY CODE
17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.
the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)
AMOUNTS SEE SCHEDULE OF PRICES
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT NO.
DATE
20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN
OFFER (Type or print)
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
(4 copies unless otherwise specified)
CODE
(Insert any number equal to or greater than
20C. OFFER DATE
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
10 U.S.C. 2304(c) 41 U.S.C. 253(c)
CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY
(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)
See Item 14
(Include only if different than Item 14)16. REMITTANCE ADDRESS
30B. SIGNATURE
29. AWARD (Contractor is not required to sign this document.)
document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .
gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.
30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)
30C. DATE
(Type or print)
TEL: EMAIL:
31B. UNITED STATES OF AMERICA 31C. AWARD DATE
BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
(Contractor is required to sign this28. NEGOTIATED AGREEMENT
(M ust be fully completed by offeror)OFFER
N3319123R4009
Section 00 10 00 - Solicitation
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 1 Each
Phase 1 and Phase 2 Sites
FFP
Phase 1 Hardened Aircraft Shelter (HAS) sites (HAS 7, HAS 8, HAS 9) and Phase 2 sites (HAS 4, HAS 5, HAS 6) — Price for the entire work complete in accordance with the drawings and specifications, but excluding work described in all other below “OPTION” Contract Line Items (CLIN) FOB: Destination
NET AMT
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0002 1 Each OPTION Phase 3, HAS 1
FFP
Price for the entire work at this HAS site complete in accordance with the drawings & specifications but excluding Electrical works FOB: Destination
NET AMT
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0003 1 Each OPTION Phase 3, HAS 2
FFP
Price for the entire work at this HAS site complete in accordance with the drawings & specifications but excluding Electrical works
0004 1 Each OPTION Phase 3, HAS 3
FFP
Price for the entire work at this HAS site complete in accordance with the drawings and specifications but excluding Electrical works
0005 1 Each OPTION Phase 4, HAS10
FFP
Price for the entire work at this HAS site complete in accordance with the drawings
0006 1 Each OPTION Phase 4, HAS 11
FFP
Price for the entire work at this HAS site complete in accordance with the drawings
0007 1 Each OPTION Phase 4, HAS 12
FFP
Price for the entire work at this HAS site complete in accordance with the drawings
0008 1 Each OPTION Phase 4, HAS 14
FFP
Price for the entire work at this HAS site complete in accordance with the drawings
0009 1 Each OPTION Electrical Work Phase 1 & 2 Sites
FFP
Electrical work for HAS 4, 5, 6, 7, 8, and 9 in CLIN 0001. Price for all electrical works exterior of Oil Water Separator (OWS) in support of OWS alarm and in accordance with the drawings and specifications
0010 1 Each OPTION Electrical Work, HAS 1
FFP
Price for all electrical works exterior of OWS in support of OWS alarm and in
0011 1 Each OPTION Electrical Work, HAS 2
FFP
Price for all electrical works exterior of OWS in support of OWS alarm and in
0012 1 Each OPTION Electrical Work, HAS 3
FFP
Price for all electrical works exterior of OWS in support of OWS alarm and in
0013 1 Each OPTION Electrical Work, HAS 10
FFP
Price for all electrical works exterior of OWS in support of OWS alarm and in
0014 1 Each OPTION Electrical Work, HAS 11
FFP
Price for all electrical works exterior of OWS in support of OWS alarm and in
0015 1 Each OPTION Electrical Work, HAS 12
FFP
Price for all electrical works exterior of OWS in support of OWS alarm and in
0016 1 Each OPTION Electrical Work, HAS 14
FFP
Price for all electrical works exterior of OWS in support of OWS alarm and in
DELIVERY INFORMATION
CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /
CAGE
0001 N/A N/A N/A N/A
0002 N/A N/A N/A N/A
0003 N/A N/A N/A N/A
0004 N/A N/A N/A N/A
0005 N/A N/A N/A N/A
0006 N/A N/A N/A N/A
0007 N/A N/A N/A N/A
0008 N/A N/A N/A N/A
0009 N/A N/A N/A N/A
0010 N/A N/A N/A N/A
0011 N/A N/A N/A N/A
0012 N/A N/A N/A N/A
0013 N/A N/A N/A N/A
0014 N/A N/A N/A N/A
0015 N/A N/A N/A N/A
0016 N/A N/A N/A N/A
Section 00 21 16 - Instructions to Proposers
CLAUSES INCORPORATED BY REFERENCE
52.204-7 System for Award Management OCT 2018 52.204-16 Commercial and Government Entity Code Reporting AUG 2020 52.204-22 Alternative Line Item Proposal JAN 2017 52.215-1 Instructions to Offerors--Competitive Acquisition NOV 2021 52.217-5 Evaluation Of Options JUL 1990 52.236-28 Preparation of Proposals--Construction OCT 1997
CLAUSES INCORPORATED BY FULL TEXT
52.211-14 NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PREPAREDNESS, AND ENERGY PROGRAM USE (APR 2008)
Any contract awarded as a result of this solicitation will be x DX rated order; DO rated order certified for national defense, emergency preparedness, and energy program use under the Defense Priorities and Allocations System (DPAS) (15 CFR 700), and the Contractor will be required to follow all of the requirements of this regulation. [Contracting Officer check appropriate box.]
(End of provision)
52.216-1 TYPE OF CONTRACT (APR 1984)
The Government contemplates award of a firm-fixed-price contract resulting from this solicitation.
52.233-2 SERVICE OF PROTEST (SEP 2006)
(a) Protests, as defined in section 33.101 of the Federal Acquisition Regulation, that are filed directly with an agency, and copies of any protests that are filed with the Government Accountability Office (GAO), shall be served on the Contracting Officer (addressed as follows) by obtaining written and dated acknowledgment of receipt from
Andrew Harris, Chief of Contracting
PSC 817, BOX 51
FPO, AE 09622
(b) The copy of any protest shall be received in the office designated above within one day of filing a protest with the GAO.
52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995) – ALTERNATE I (FEB 1995)
(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.
(b) An organized site visit has been scheduled for--
June 22, 2023 at 1000 hrs. See Section 00 21 16, Instruction to Proposers
52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998)
This solicitation incorporates one or more solicitation provisions by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. The offeror is cautioned that the listed provisions may include blocks that must be completed by the offeror and submitted with its quotation or offer. In lieu of submitting the full text of those provisions, the offeror may identify the provision by paragraph identifier and provide the appropriate information with its quotation or offer. Also, the full text of a solicitation provision may be accessed electronically at this/these address(es):
https://www.acquisition.gov/browse/index/far
252.203-7005 REPRESENTATION RELATING TO COMPENSATION OF FORMER DOD OFFICIALS (SEP 2022)
(a) Definition. Covered DoD official is defined in the clause at 252.203-7000, Requirements Relating to Compensation of Former DoD Officials.
(b) By submission of this offer, the Offeror represents, to the best of its knowledge and belief, that all covered DoD officials employed by or otherwise receiving compensation from the Offeror, and who are expected to undertake activities on behalf of the Offeror for any resulting contract, are presently in compliance with all applicable post-employment restrictions, including those contained in 18 U.S.C. 207, 41 U.S.C. 2101-2107, 5 CFR part 2641, section 1045 of the National Defense Authorization Act for Fiscal Year 2018 (Pub. L. 115-91), and Federal Acquisition Regulation 3.104-2.
252.204-7004 ANTITERRORISM AWARENESS TRAINING FOR CONTRACTORS (JAN 2023)
(a) Definition. As used in this clause--
Military installation means a base, camp, post, station, yard, center, or other activity under the jurisdiction of the Secretary of a military department or, in the case of an activity in a foreign country, under the operational control of the Secretary of a military department or the Secretary of Defense (see 10 U.S.C. 2801(c)(4)).
https://www.acquisition.gov/browse/index/far
(b) Training. Contractor personnel who require routine physical access to a Federally-controlled facility or military installation shall complete Level I antiterrorism awareness training within 30 days of requiring access and annually thereafter. In accordance with Department of Defense Instruction O-2000.16 Volume 1, DoD Antiterrorism (AT) Program Implementation: DoD AT Standards, Level I antiterrorism awareness training shall be completed--
(1) Through a DoD-sponsored and certified computer or web-based distance learning instruction for Level I antiterrorism awareness; or
(2) Under the instruction of a Level I antiterrorism awareness instructor.
(c) Additional information. Information and guidance pertaining to DoD antiterrorism awareness training is available at https://jko.jten.mil/ or as otherwise identified in the performance work statement.
(d) Subcontracts. The Contractor shall include the substance of this clause, including this paragraph (d), in subcontracts, including subcontracts for commercial products and commercial services, when subcontractor performance requires routine physical access to a Federally-controlled facility or military installation.
(End of clause)
252.204-7019 NOTICE OF NIST SP 800-171 DOD ASSESSMENT REQUIREMENTS (MAR 2022)
(a) Definitions.
Basic Assessment, Medium Assessment, and High Assessment have the meaning given in the clause 252.204-7020, NIST SP 800-171 DoD Assessments.
Covered contractor information system has the meaning given in the clause 252.204-7012, Safeguarding Covered Defense Information and Cyber Incident Reporting, of this solicitation.
(b) Requirement. In order to be considered for award, if the Offeror is required to implement NIST SP 800-171, the Offeror shall have a current assessment (i.e., not more than 3 years old unless a lesser time is specified in the solicitation) (see 252.204-7020) for each covered contractor information system that is relevant to the offer, contract, task order, or delivery order. The Basic, Medium, and High NIST SP 800-171 DoD Assessments are described in the NIST SP 800-171 DoD Assessment Methodology located at https://www.acq.osd.mil/asda/dpc/cp/cyber/safeguarding.html#nistSP800171.
(c) Procedures.
(1) The Offeror shall verify that summary level scores of a current NIST SP 800-171 DoD Assessment (i.e., not more than 3 years old unless a lesser time is specified in the solicitation) are posted in the Supplier Performance Risk System (SPRS) (https://www.sprs.csd.disa.mil/) for all covered contractor information systems relevant to the offer.
(2) If the Offeror does not have summary level scores of a current NIST SP 800-171 DoD Assessment (i.e., not more than 3 years old unless a lesser time is specified in the solicitation) posted in SPRS, the Offeror may conduct and submit a Basic Assessment to webptsmh@navy.mil for posting to SPRS in the format identified in paragraph (d) of this provision.
(d) Summary level scores. Summary level scores for all assessments will be posted 30 days post-assessment in SPRS to provide DoD Components visibility into the summary level scores of strategic assessments.
https://jko.jten.mil/ https://www.acq.osd.mil/asda/dpc/cp/cyber/safeguarding.html#nistSP800171 https://www.sprs.csd.disa.mil/ mailto:webptsmh@navy.mil
(1) Basic Assessments. An Offeror may follow the procedures in paragraph (c)(2) of this provision for posting Basic Assessments to SPRS.
(i) The email shall include the following information:
(A) Cybersecurity standard assessed (e.g., NIST SP 800-171 Rev 1).
(B) Organization conducting the assessment (e.g., Contractor self-assessment).
(C) For each system security plan (security requirement 3.12.4) supporting the performance of a DoD contract--
(1) All industry Commercial and Government Entity (CAGE) code(s) associated with the information system(s) addressed by the system security plan; and
(2) A brief description of the system security plan architecture, if more than one plan exists.
(D) Date the assessment was completed.
(E) Summary level score (e.g., 95 out of 110, NOT the individual value for each requirement).
(F) Date that all requirements are expected to be implemented (i.e., a score of 110 is expected to be achieved) based on information gathered from associated plan(s) of action developed in accordance with NIST SP 800-171.
(ii) If multiple system security plans are addressed in the email described at paragraph (d)(1)(i) of this section, the Offeror shall use the following format for the report:
Brief CAGE codes description of Date of Total Date score of System security plan supported by this the plan assessment score 110 will plan architecture achieved
(2) Medium and High Assessments. DoD will post the following Medium and/or High Assessment summary level scores to SPRS for each system assessed:
(i) The standard assessed (e.g., NIST SP 800-171 Rev 1).
(ii) Organization conducting the assessment, e.g., DCMA, or a specific organization (identified by Department of Defense Activity Address Code (DoDAAC)).
(iii) All industry CAGE code(s) associated with the information system(s) addressed by the system security plan.
(iv) A brief description of the system security plan architecture, if more than one system security plan exists.
(v) Date and level of the assessment, i.e., medium or high.
(vi) Summary level score (e.g., 105 out of 110, not the individual value assigned for each requirement).
(vii) Date that all requirements are expected to be implemented (i.e., a score of 110 is expected to be achieved) based on information gathered from associated plan(s) of action developed in accordance with NIST SP 800-171.
(3) Accessibility.
(i) Assessment summary level scores posted in SPRS are available to DoD personnel, and are protected, in accordance with the standards set forth in DoD Instruction 5000.79, Defense-wide Sharing and Use of Supplier and Product Performance Information (PI).
(ii) Authorized representatives of the Offeror for which the assessment was conducted may access SPRS to view their own summary level scores, in accordance with the SPRS Software User's Guide for Awardees/Contractors available at https://www.sprs.csd.disa.mil/pdf/SPRS_Awardee.pdf.
(iii) A High NIST SP 800-171 DoD Assessment may result in documentation in addition to that listed in this section.
DoD will retain and protect any such documentation as "Controlled Unclassified Information (CUI)" and intended for internal DoD use only. The information will be protected against unauthorized use and release, including through the exercise of applicable exemptions under the Freedom of Information Act (e.g., Exemption 4 covers trade secrets and commercial or financial information obtained from a contractor that is privileged or confidential).
252.215-7008 ONLY ONE OFFER (DEC 2022)
(a) Cost or pricing data requirements. After initial submission of offers, if the Contracting Officer notifies the Offeror that only one offer was received, the Offeror agrees to--
(1) Submit any additional cost or pricing data that is required in order to determine whether the price is fair and reasonable (10 U.S.C. 3705) or to comply with the statutory requirement for certified cost or pricing data (10 U.S.C.
3702 and FAR 15.403-3); and
(2) Except as provided in paragraph (b) of this provision, if the acquisition exceeds the certified cost or pricing data threshold and an exception to the requirement for certified cost or pricing data at FAR 15.403-1(b)(2) through (5) does not apply, certify all cost or pricing data in accordance with paragraph (c) of DFARS provision 252.215-7010, Requirements for Certified Cost or Pricing Data and Data Other Than Certified Cost or Pricing Data, of this solicitation.
(b) Canadian Commercial Corporation. If the Offeror is the Canadian Commercial Corporation, certified cost or pricing data are not required. If the Contracting Officer notifies the Canadian Commercial Corporation that additional data other than certified cost or pricing data are required in accordance with DFARS 225.870-4(c), the Canadian Commercial Corporation shall obtain and provide the following:
(1) Profit rate or fee (as applicable).
(2) Analysis provided by Public Works and Government Services Canada to the Canadian Commercial Corporation to determine a fair and reasonable price (comparable to the analysis required at FAR 15.404-1).
(3) Data other than certified cost or pricing data necessary to permit a determination by the U.S. Contracting Officer that the proposed price is fair and reasonable [U.S. Contracting Officer to provide description of the data required in accordance with FAR 15.403-3(a)(1) with the notification].
https://www.sprs.csd.disa.mil/pdf/SPRS_Awardee.pdf
(4) As specified in FAR 15.403-3(a)(4), an offeror who does not comply with a requirement to submit data that the U.S. Contracting Officer has deemed necessary to determine price reasonableness or cost realism is ineligible for award unless the head of the contracting activity determines that it is in the best interest of the Government to make the award to that offeror.
(c) Subcontracts. Unless the Offeror is the Canadian Commercial Corporation, the Offeror shall insert the substance of this provision, including this paragraph (c), in all subcontracts exceeding the simplified acquisition threshold defined in FAR part 2.
252.215-7013 SUPPLIES AND SERVICES PROVIDED BY NONTRADITIONAL DEFENSE CONTRACTORS
(JAN 2023)
Offerors are advised that in accordance with 10 U.S.C. 3457, supplies and services provided by a nontraditional defense contractor, as defined in DFARS 202.101, may be treated as commercial products or commercial services.
The decision to apply commercial product or commercial service procedures to the procurement of supplies and services from a nontraditional defense contractor does not require a commercial product or commercial service determination and does not mean the supplies or services are commercial.
252.225-7042 AUTHORIZATION TO PERFORM (APR 2003)
The offeror represents that it has been duly authorized to operate and to do business in the country or countries in which the contract is to be performed.
Section 00 22 16 - Supplementary Instructions to Proposers
INSTRUCTIONS TO PROPOSERS
** PLEASE READ ALL INSTRUCTIONS CAREFULLY**
I. INSTRUCTIONS FOR PREPARATION OF PROPOSALS
1. GENERAL
Proposals, as detailed below, shall be submitted electronically to Mr. Graeme L. Silva at graeme.l.silva.civ@us.navy.mil on or before the time (Central European Time) specified in Block 13 of the Standard Form (SF) 1442. Compliance with the submittal closing time and receipt of proposals shall be determined by using the time indicated on the receiving Contract Specialist’s computer. The offeror is responsible to verify that the Government has received the proposals.
All documents submitted as part of the proposals shall be in English and sent in PDF format via email to the addresses stated above. Submit the Price Proposal and Non-Price Proposal in two separate PDF files. Total size per email shall not exceed 10 megabytes to ensure receipt by U.S. Government email systems.
2. SITE VISIT
The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors are urged and expected to inspect the site where the work will be performed. An organized site visit will take place at 1000 hrs. on June 22, 2023. The Point of Contract to make arrangements to visit the site is as follows:
LT Samuel Beering
NAVFAC EURAFCENT
E-mail: samuel.c.beering.mil@us.navy.mil Office: +39 366 695 9366
a. For access to the site, email both LT Samuel Beering (samuel.c.beering.mil@us.navy.mil) and Graeme Silva (graeme.l.silva.civ@us.navy.mil) the following information:
1. First Name:
2. Last Name:
3. Company/Organization:
4. Passport Number:
5. Security Clearance Level:
6. Nationality:
7. E-Mail:
8. Phone Number:
9. Alt Phone Number (if needed):
b. If this information is not provided at least 10 calendar days prior to the visit, access to the site cannot be guaranteed.
c. LT Beering will respond acknowledging receipt of this e-mail. If you do not receive acknowledgement within 48 hours, call LT Beering’s phone number at +1-925-872-6574.
d. LT Beering will send a follow-up e-mail no later than three days prior to the site visit confirming that your access information has been processed.
e. The meeting location to receive your base access badge will be at the Keflavik Air Base Diamond Gate.
You will need to provide a valid form of Photo ID in order to receive your visitor badge and be permitted on the base. The address for this gate is Grænásbraut, 262, Iceland. The coordinates of the gate are:
1. Latitude: 63°57'57.90"N
2. Longitude: 22°35'30.16"W mailto:graeme.l.silva.civ@us.navy.mil mailto:samuel.c.beering.mil@us.navy.mil mailto:samuel.c.beering.mil@us.navy.mil
f. Members of the NAVFAC staff will direct visitors to the meeting location. At this location you will be required to sign-in.
g. Any questions related to the solicitation will need to be submitted in writing to the Contracting Officer.
Additional Restrictions:
Photographs will not be permitted.
3. AMENDMENTS
If necessary, any Amendment issued will be posted to Contract Opportunities on the website at https://sam.gov. It is the offeror’s responsibility to check the designated websites for any amendments to the solicitation.
4. INSTRUCTION FOR SUBMITTING PRE-PROPOSAL INQUIRIES
Offerors who determine that the technical and/or contractual requirements of this RFP require clarification(s) in order to permit submittal of a responsive proposal shall submit all questions in writing. Inquiries shall be submitted using the Pre-Proposal Inquiry (PPI) form provided as Attachment 3, via e-mail to Mr. Graeme L.
Silva at graeme.l.silva.civ@us.navy.mil. Receipt will be acknowledged. The PPI shall reference the drawing/detail and/or the specification section, including the paragraph number and include only one question per form. Verbal queries will not be entertained. Responses to the PPI will be provided by Amendment and will be posted to https://beta.sam.gov. Pre-proposal questions will be accepted ten (10) calendar days before the proposal due date, any inquiries made after that date may not be answered.
5. REQUIRED PROPOSAL DOCUMENTS
A. EVALUATION FACTORS FOR AWARD
1. The solicitation requires the evaluation of price and the following non-price factors:
Factor 1 – Experience Factor 2 – Past Performance Factor 3 – Safety Factor 4 – Technical Solution
The distinction between experience and past performance is that experience pertains to the volume of work completed by a contractor that are comparable to the types of work described under the definition of recent, relevant projects, in terms of size, scope, and complexity. Past performance pertains to both the relevance of recent efforts and how well a contractor has performed on the contracts.
2. Factor 3-Safety will only be rated Acceptable or Unacceptable. If an Offeror is rated Unacceptable for any factor, they will not be eligible for award, unless the deficiency(ies) is/are remedied through discussions (if held).
For the Offerors found Acceptable on Factor 3-Safety, the relative order of importance of the non-price evaluation factors is the technical factors (Factor 1-Corporate Experience and Factor 4-Technical Solution) are of equal importance to each other and, when combined are equal in importance to the past performance evaluation/performance confidence assessment factor (Factor 2-Past Performance). When the proposal is evaluated as a whole, the technical factors and past performance/performance confidence assessment factor combined (i.e., the non-price evaluation factors) are approximately equal to price.
The importance of price will increase if the Offerors’ non-price proposals are considered essentially equal in terms of overall quality, or if price is so high as to significantly diminish the value of a non-price proposal’s superiority to the Government. Award will be made to the responsible Offeror(s) whose offer conforms to the solicitation and represents the best value to the Government, price and non-price factors considered.
mailto:graeme.l.silva.civ@us.navy.mil
3. Basis of Evaluation and Submittal Requirements for Each Factor.
(a) Non-price Factors:
Solicitation Submittal Requirements:
The Offeror shall submit one (1) PDF file via email, with the following characteristics:
• Text pages 8 ½ x 11 format
• 12-point font, Times New Roman
• The electronic copy must be formatted as a single .pdf searchable file
• Include a cover page with Solicitation Number, Solicitation Title, Prime Contractor Name, Address, Phone Number, Fax Number, Unique Entity ID, Cage Code, Point of Contact, Title, phone number, and email address.
Factor 1, Experience:
(a) Solicitation Submittal Requirements:
The Offeror shall submit the following information:
(1) Construction Experience:
Submit a minimum of three (3) and maximum of five (5) relevant construction projects for the Offeror that best demonstrates your experience on relevant projects that are similar in size, scope, and complexity to the RFP.
For purposes of this evaluation, a relevant project is further defined as a commercial or industrial project that includes horizontal concrete construction (such as shallow foundations, concrete slabs, or concrete paving).
Relevant projects shall have been constructed in the country of Iceland and shall have a final construction value equal to or exceeding $500,000 USD. In addition, offerors must submit at least one (1) project relevant project that demonstrates experience with airfield paving and at least one (1) relevant project that include the construction of an Oil-Water Separator. Failure to submit at least one (1) relevant project that demonstrates experience with airfield paving and one (1) relevant project that includes construction of an Oil-Water Separator will result in an offeror being rated Unacceptable for this Factor. A proposal that is rated Unacceptable is unawardable.
Projects submitted for the Offeror shall be completed within the past ten (10) years of issuance of this RFP.
A project is defined as a construction project performed under a single task order or contract. For multiple award and indefinite delivery/indefinite quantity type contracts, the contract as a whole shall not be submitted as a project;
rather Offerors shall submit the work performed under a task order as a project.
The attached Construction Project Data Sheet (Attachment 6) is MANDATORY and SHALL be used to submit project information. Except as specifically requested, the Government will not consider information submitted in addition to this form. Individual blocks on this form may be expanded; however, total length for each project data sheet shall not exceed one (1) double-sided page (or two (2) single-sided pages).
For all submitted projects, the description of the project shall clearly describe the scope of work performed and the relevancy to the project requirements of this RFP (i.e., unique features, area, construction methods). In addition, the description should also address any sustainable features for the project, including specific descriptions of those features. Provide applicable documentation on projects that were validated and/or certified through a Sustainable Third Party Certification program.
If the Offeror is a Joint Venture (JV), relevant project experience should be submitted for projects completed by the Joint Venture entity. If the Joint Venture does not have shared experience, projects may be submitted for the Joint Venture members. If a project was performed by a JV, and not all partners from that JV are on the JV proposed for this contract, the Offeror shall clearly demonstrate what portion of the work was performed by the JV member offering on this contract and shall not include work performed by the JV as a whole. The JV member proposed for this contract shall specifically address field work performed by that JV member including field staffing and direct field work oversight. The JV member proposed for this contract shall also address home office management performed by that JV member including the number/percentage of employees provided for the overall contract by the JV members as well as the overall percentage of work performed by the JV member. The Offeror shall also submit a SIGNED copy of the Joint Venture agreement indicating the proposed participation of each Joint Venture member. Offerors are still limited to a total of five (5) projects combined.
If an Offeror is utilizing experience information of affiliates/subsidiaries/parent/LLC/LTD member companies (name is not exactly as stated on the SF1442), the proposal shall clearly demonstrate that the affiliate/subsidiary/parent firm will have meaningful involvement in the performance of the contract. The proposal shall state specific commitments of technical resources (e.g. personnel, equipment) that the affiliate/subsidiary/parent/LLC/LTD member companies commit to the performance of this contract. In particular, the proposal will clearly state the specific commitments of resources of the affiliate/subsidiary/parent/LLC/LTD member that will be located at the worksites and company offices in the city/area of the project. The proposal shall also describe specific roles of the affiliate/subsidiary/ parent/LLC/LTD member companies in terms of the work it will either self-perform or manage on behalf of the Offeror in performance of the contract. The Offeror MAY NOT utilize experience of a subcontractor to demonstrate construction experience under this evaluation factor unless specialized subcontractor experience is stated as acceptable. Failure to submit this information may result in a lower rating.
The Offeror may utilize experience of a subcontractor that will perform major or critical aspects of the requirement to demonstrate construction experience under this evaluation factor. The Offer must provide a letter of commitment and an explanation of the meaningful involvement that the subcontractor will have in performance of this contract. More weight may be given to the Offeror’s projects than to those submitted for subcontractors.
(b) Basis of Evaluation:
The basis of evaluation will include the Offeror’s demonstrated experience and depth of experience in performing relevant construction projects as defined in the solicitation submittal requirements. The assessment of the Offeror’s relevant experience will be used as a means of evaluating the capability of the Offeror to successfully meet the requirements of the RFP. The Government will only review five (5) projects for construction. Any projects submitted in excess of the five (5) for Construction Experience will not be considered.
Offerors who submit relevant projects that demonstrate experience self-performing relevant features of work may receive a higher rating than those who do not demonstrate self-performance. Self-performance is defined as an offeror who served as the Prime Contractor on the project and performed elements of the construction with in-house resources.
Offerors that demonstrate experience with relevant projects contracted with the United States Department of Defense may be considered more favorably than Offerors who do not demonstrate this experience.
JV Offerors that demonstrate relevant project experience for each of the JV members may be more favorably considered than JV Offerors who do not have relevant project experience for each entity.
Factor 2, Past Performance:
If a completed Contractor Performance Assessment Reporting System (CPARS) evaluation is available, it shall be submitted with the proposal for each project included in Factor 1 for Construction Experience. If there is not a completed CPARS evaluation then submit Past Performance Questionnaires (PPQ) (Attachment 7) for each project included in Factor 1 for Construction Experience. The Offeror should provide completed PPQ in the proposal.
Offerors shall not incorporate by reference into their proposal PPQs previously submitted for other RFPs. However, this does not preclude the Government from utilizing previously submitted PPQ information in the past performance evaluation. If the Offeror is unable to obtain a completed PPQ from a client for a project(s) before proposal closing date, the Offeror shall complete and submit with the proposal the first page of the PPQ, which will provide contract and client information for the respective project(s). The Government may make reasonable attempts to contact the client noted for that project(s) to obtain the PPQ information. However, Offerors should follow-up with clients/references to help ensure timely submittal of questionnaires. If the client requests, questionnaires may be submitted directly to the Government’s point of contact, Mr. Graeme Silva, via email at Graeme.l.silva.civ@us.navy.mil.
Offerors may provide any information on problems encountered and the corrective actions taken on projects submitted under Factor 1 - Experience. Offerors may also address any adverse past performance issues.
Explanations shall not exceed two (2) double-sided pages (or four (4) single-sided pages) in total.
The Government reserves the right to contact references for verification or additional information. The Government’s inability to contact any of the Offeror’s references or the references unwillingness to provide the information requested may affect the Government’s evaluation of this factor.
Performance awards or additional information submitted will not be considered.
(b) Basis of Evaluation:
This evaluation will consider how well the Offeror’s team performed on the relevant projects submitted under Factor 1 – Experience and may also consider past performance on other projects currently documented in known sources.
The Government will consider the recency and relevance of the information, the source of the information, context of the data, and general trends in the Contractor’s performance. This evaluation is separate and distinct from the Contracting Officer’s responsibility determination. The assessment of the Offeror’s teams’ past performance will be used as a means of evaluating the Offeror’s team’s probability to successfully meet the requirements of the RFP.
Offerors lacking relevant past performance history will receive a NEUTRAL Confidence rating. Past performance ratings of “Substantial Confidence” or “Satisfactory Confidence” hold more value than a “Neutral Confidence” rating and will be considered more favorably in the tradeoff.
Factor 3, Safety:
The Offeror shall submit the following information: (For a partnership or joint venture, only one safety narrative is required, but it must address each contractor who is part of the partnership or joint venture.)
Technical Approach to Safety:
Describe the Offeror’s technical approach to safety for its employees as well as the plan that the Offeror will implement to evaluate and measure safety performance of potential subcontractors as a part of the selection process for all levels of subcontractors. Also, describe methods that the Offeror will employ to ensure and monitor safe work practices at all subcontractor levels. The Safety Narrative, which shall include all information requested in this paragraph, shall be limited to three single-sided pages.
The Government reserves the right to review other available sources (public/Government internal) of information.
These may include but are not limited to OSHA data, NAVFAC’s Contractor Incident Reporting System (CIRS), Contractor Performance Assessment Reporting System (CPARS), Electronic Contract Management System (eCMS), etc.
(b) Basis of Evaluation:
The Government is seeking to determine that the Offeror has consistently demonstrated a commitment to safety and that the Offeror plans to properly manage and implement safety procedures for itself and its subcontractors.
The Government will evaluate the Offeror’s technical approach to safety for its employees, as well as its plan to select and monitor subcontractors.
The Government may consult additional sources of information for evaluating safety including, but not limited to, Government agencies, OSHA, NAVFAC’s Facility Accident and Incident Reporting (FAIR) and Contractor Incident Reporting System (CIRS) databases, and other related resources. While the Government may elect to consider data from other sources, the burden of providing detailed, current, accurate and complete safety information regarding these submittal requirements rests with the Offeror.
The Safety Factor will be rated on an Acceptable/Unacceptable basis.
Factor 4, Technical Solution:
Provide a narrative describing the technical solution to the project that meets the requirements of the RFP. Include the following:
(1) Summary of the technical approach, including the means/methods, material and tools to be utilized to complete the work; mitigation plans for anticipated problems; logistical challenges and site constraints;
communication flow and coordination with the Government and key stakeholders; and an explanation of the proposed project schedule that explains the proposed contract duration and consideration of weather/climate on construction activities.
Provide a project organizational chart that shows the key positions (Project Manager, Site Safety & Health Officer, Construction QCM, Superintendent), general project organization by trade, subcontractors (if any), and the communication flow with the U.S. Government representatives. The organizational chart shall also clearly identify the lines of authority between the entities. If the experience of a subcontractor is being claimed in Factor 1, the firm must be named in the above (Factor 4) narrative and organizational chart otherwise any projects listed that are attributed to that subcontractor will not be considered.
Provide a project schedule with a Gantt chart. Include the contract duration, all major submittals and all major aspects of construction project. The contract timeframe identified in the RFP defines the acceptable contract duration. Provide a narrative that explains the proposed contract duration.
Narrative shall not exceed five (5) double-sided pages (or ten (10) single-sided pages). In addition, provide one
(1) single-sided schedule Gantt chart to graphically present the contract duration. The Gantt chart may be on a single 11” x 17” page that will not count against the page limitations for the narrative.
The Government will evaluate the narrative, organizational chart, and schedule considering the extent to which the Offeror demonstrates a clear understanding of the requirements of the project. The Government will evaluate the effectiveness of the technical solution to determine the likelihood that the work will be performed in accordance with the technical requirements of the RFP.
The Government will evaluate a comparison of the contractor’s proposed contract duration to the contract duration stated on the SF1442 and in clause 52.211-10. The Government’s evaluation of the contractor’s proposed schedule is a means of determining whether the contractor understands the scope of work and approaches the tasks in a logical and effective manner.
A higher rating may be provided for a shorter overall schedule that clearly identifies realistic and achievable construction durations.
In addition, if the contractor proposes a shorter duration, the contractor’s proposed contract duration shall become an enforceable part of the contract and will be reflected in the awarded Contract Completion Date (CCD) to the successful Offeror.
Price:
The Offeror shall submit one (1) PDF file via email, with the following characteristics:
• Include a cover page with Solicitation Number, Solicitation Title, Prime Contractor Name, Address, Phone Number, Fax Number, Unique Entity ID, Cage Code, Point of Contact, Phone Number, and E-mail Address;
• Completed SF-1442 signed with all amendments acknowledged;
• Completed Attachment 4, Price Proposal Form;
• Copy of Representation and Certifications from System for Award Management (SAM);
• Completed Solicitation Section 00 45 00 - Representations and Certifications;
• Completed DFARS 252.229-7001 Tax Relief
• Required Responsibility Determination Information; and
• If the prime Offeror is a JV, provide a copy of the JV Agreement as well as any legal document that establishes the JV.
ADDITONAL INFORMATION TO BE SUBMITTED WITH PRICE PROPOSAL PACKAGE:
RESPONSIBILITY DETERMINATION INFORMATION - In order to be eligible for award, the Offeror must be determined responsible in accordance with FAR Part 9, specifically 9.104-1, General Standards. No purchase or award shall be made unless the Contracting Officer makes an affirmative determination of responsibility. To be determined responsible, a prospective contractor must have adequate financial resources to perform the contract, or the ability to obtain them. The Contracting Officer shall require acceptable evidence of the prospective contractor’s current sound financial status, as well as the ability to obtain required resources if the need arises. In regard to resources, the contractor must be prepared to present acceptable evidence of subcontracts, commitments or explicit arrangements that will be in existence at the time of contract award, to rent, purchase or otherwise acquire the needed facilities, equipment, services, materials, other resources or personnel. Consideration of a prime contractor’s compliance with limitations on subcontracting shall be taken into account for the time period covered by the contract base period or quantities, plus option periods or quantities, if such options are considered when evaluating offers for award. Pursuant to FAR 9.104-4, the Contracting Officer reserves the right to request adequate evidence of responsibility on the part of any prospective subcontractor(s). In the absence of information clearly indicating that the prospective contractor is responsible, the Contracting Officer shall make a determination of non-responsibility. As a minimum requirement, all Offerors are requested to submit, as part of the price proposal submissions, the following:
In a separate Tab, in the English language, the Offeror shall provide the following information in the price proposal package:
1. One (1) Signed Bank Reference demonstrating adequate financial resources. If the Offeror’s firm has a line of credit – provide information on how many figures Offeror can borrow against the line of credit (i.e. medium 6 figures – exact line of credit is not required).
2. The Offeror shall provide the latest three complete fiscal year financial statements for the prime contractor, certified by an independent accounting firm, if practicable, or signed by an authorized officer of the organization.
Submit evidence of availability of working/operating capital, which will be used for the performance of the resultant contract. For Joint Venture arrangements, submit the latest three complete fiscal year financial statements for each company in the Joint Venture and discuss the financial responsibilities among the companies. The Government may also utilize Dun & Bradstreet reports to evaluate the financial capacity of the Offeror.
3. Point of contact from a bank or any financial institution with which the Offeror transacts business.
Although required to be submitted with Offeror’s price proposal, this information will not be evaluated as part of the price proposal. This information forms part of the basis of your firm’s responsibility determination should your firm be considered for award. Proposal packages from unsuccessful Offerors will not be returned to the Offeror, but shall be destroyed by the Contracting Officer. No certificate of destruction will be issued.
The Government will evaluate price based on the total price. Total price consists of the basic requirements and all option items. The Government intends to evaluate all options and has included the provision FAR 52.217-5, Evaluation of Options (JUL 1990) in the solicitation. In accordance with FAR 52.217-5, evaluation of options will not obligate the Government to exercise the option(s). Analysis will be performed by one or more of the following techniques to ensure a fair and reasonable price:
(i) Comparison of proposed prices received in response to the RFP.
(ii) Comparison of proposed prices with the IGCE.
(iii) Comparison of proposed prices with available historical information.
(iv) Comparison of market survey results.
B. BASIS FOR AWARD
1. The Government reserves the right to eliminate from consideration for award any or all offers at any time prior to award of the contract; to negotiate with Offerors in the competitive range; and to award the contract to the Offeror submitting the proposal determined to represent the best value—the proposal most advantageous to the Government, price and other factors considered.
2. As stated in the solicitation, the Government intends to evaluate proposals and award a contract without discussions with Offerors (except clarifications as described in FAR 15.306(a)). The Government reserves the right to conduct discussions if the Contracting Officer later determines them to be necessary.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .