This is a solicitation for a design-build renovation project at Kindergarten No. 2 in Cahul, Moldova. The Navy is seeking proposals to replace all roofs with new thermally insulated roofs, install a minimum 10 cm thick thermally insulated facade, provide a new structure and reinforcement elements, replace wooden windows and exterior doors, replace emergency metal stairs, excavate and hydro isolate basement walls, and make general exterior improvements within two meters of the building facade. An option is included to increase exterior pavement works to 2,500 square meters and provide new aboveground and underground drainage systems. Proposals are due no later than 2 March 2023 at 14:00 Central European Time. The work must be completed within 600 days of award. Liquidated damages of $150 per day will be assessed for delays.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

N3319123R0054 D-B Renovate Kindergarten #2, Cahul, Moldova.

Propsals shall be submitted electronically per the instructions in Block 13 and Section 00 10 00.

Please note: The deadline to submit proposals is 2 March 2023 at 14:00 Central European Time (CET).

In accordance w ith FAR 36.204, the magnitude of this project is expected to be betw een $250,000 and $500,000.

GLORIA LUCERO 39 0815685519

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS

NEGOTIATED

31-Jan-2023

(RFP)

(IFB)

X

CALL:

B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

See Item 7

2. TYPE OF SOLICITATION

SEALED BID

3. DATE ISSUED

9. FOR INFORMATION A. NAME

SOLICITATION

X

NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)

Prescribed by GSA

FAR (48 CFR) 53.236-1(e)

11. The Contractor shall begin performance w ithin _______10 calendar days and complete it w ithin ________600 calendar days after receiving aw ard, notice to proceed. This performance period is mandatory, negotiable. (See _________________________

12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES," indicate within how many calendar days after award in Item 12B.)

YES X NO

13. ADDITIONAL SOLICITATION REQUIREMENTS:

A. Sealed offers in original and __________1 copies to perform the w ork required are due at the place specif ied in Item 8 by ___________ local time ______________02 Mar 2023 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.

shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

B. An offer guarantee is, X is not required.

C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

D. Offers providing less than _______120 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

1. SOLICITATION NO.

IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

4. CONTRACT NO.

7. ISSUED BY CODE

NAVFAC EUROPE AFRICA CENTRAL

VIALE PORTO CAPODICHINO

NAPOLI 80144

N33191

PAGE OF PAGES

1 OF

CODE

(Title, identifying no., date):

12B. CALENDAR DAYS

02:00 PM (hour)

Sealed envelopes containing offers

5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.

8. ADDRESS OFFER TO (If Other Than Item 7)

39 081 568 7750FAX:TEL: 39 081 568 7750 TEL: FAX:

N3319123R0054 42

20B. SIGNATURE

(REV. 4-85)STANDARD FORM 1442 BACK

TO SIGN

NSN 7540-01-155-3212

SOLICITATION, OFFER, AND AWARD (Continued)

(Construction, Alteration, or Repair)

CODE FACILITY CODE

17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.

the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)

AMOUNTS SEE SCHEDULE OF PRICES

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT NO.

DATE

20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN

OFFER (Type or print)

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM

(4 copies unless otherwise specified)

CODE

(Insert any number equal to or greater than

20C. OFFER DATE

25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

10 U.S.C. 2304(c) 41 U.S.C. 253(c)

CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY

(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)

See Item 14

(Include only if different than Item 14)16. REMITTANCE ADDRESS

30B. SIGNATURE

29. AWARD (Contractor is not required to sign this document.)

document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .

gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.

30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)

30C. DATE

(Type or print)

TEL: EMAIL:

31B. UNITED STATES OF AMERICA 31C. AWARD DATE

BY

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

(Contractor is required to sign this28. NEGOTIATED AGREEMENT

(M ust be fully completed by offeror)OFFER

N3319123R0054

Section 00 10 00 - Solicitation

INSTRUCTION TO OFFERORS

** PLEASE READ ALL INSTRUCTIONS CAREFULLY**

I. INSTRUCTIONS FOR PREPARATION OF PROPOSALS

1. GENERAL

Proposals, as detailed below, shall be submitted electronically to Ms. Gloria Lucero at gloria.x.lucero.civ@us.navy.mil on or before the time specified in Block 13 of the Standard Form (SF) 1442.

Compliance with the submittal closing time and receipt of proposals shall be determined by using the time indicated on the receiving Contract Specialist’s computer. The offeror is responsible to verify that the

Government has received the proposals.

All documents submitted as part of the proposals shall be in English and sent in PDF format via email to the addresses stated above. Submit the Price Proposal and Non-Price Proposal in two separate PDF files. Total size per email shall not exceed 10 megabytes to ensure receipt by U.S. Government email systems.

2. SITE VISIT

The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the

Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors are urged and expected to visit the project site prior to submission of their offer to the US Government. The project site is open to the general public and the contractor can visit it without prior approval. In case they need to consult anything with the Municipality or any other Moldovan authority, the contractor shall coordinate with the representative and

Program Manager from the United States Office of Defense cooperation in Moldova as follows:

Vasile Pruteanu

Humanitarian Assistance Program Manager

U.S. Office of Defense Cooperation

Chisinau, Moldova

E-mail: vasile.pruteanu.ln@mail.mil

Office: +373 (22) 225- 173

3. AMENDMENTS

If necessary, any Amendment issued will be posted to Contract Opportunities on the website at https://sam.gov. It is the offeror’s responsibility to check the designated websites for any amendments to the solicitation.

4. INSTRUCTION FOR SUBMITTING PRE-PROPOSAL INQUIRIES

Offerors who determine that the technical and/or contractual requirements of this RFP require clarification(s) in order to permit submittal of a responsive proposal shall submit all questions in writing. Inquiries shall be submitted using the Pre-Proposal Inquiry (PPI) form provided as Attachment 2, via e-mail to Ms. Gloria Lucero at gloria.x.lucero.civ@us.navy.mil. Receipt will be acknowledged. The PPI shall reference the drawing/detail and/or the specification section, including the paragraph number and include only one question per form. Verbal queries will not be entertained. Responses to the PPI will be provided by Amendment and will be posted to https://sam.gov. Pre-proposal questions will be accepted ten (10) calendar days before the proposal due date, any inquiries made after that date may not be answered.

5. REQUIRED PROPOSAL DOCUMENTS

All items listed below are required for the offeror to be found responsive and the offer to be considered for mailto:gloria.x.lucero.civ@us.navy.mil mailto:vasile.pruteanu.ln@mail.mil https://sam.gov/ award. Any unrequested information will not be considered as part of the offer and will not be reviewed.

1. The solicitation requires the evaluation of price and the following non-price factors:

Factor 1 – Corporate Experience

Factor 2 – Safety

Factor 3 – Past Performance

The distinction between corporate experience and past performance is corporate experience pertains to the types of work and volume of work completed by a contractor that are comparable to the types of work covered by this requirement, in terms of size, scope, and complexity. Past performance pertains to both the relevance of recent efforts and how well a contractor has performed on the contracts

(A) Price Factor:

(1) Solicitation Submittal Requirements:

(a) STANDARD FORM 1442, SOLICITATION, OFFER, AND AWARD

The offeror MUST complete Blocks 14 through 20c.

In Block 14 provide a Point of Contact with a valid phone number and email address.

In Block 14, provide a Commercial and Government Entity (CAGE) Code (United States firm) or

NATO Commercial and Government Entity (NCAGE) Code (non United States firm).

In Block 14 provide the Unique Entity Identifier Code created through SAM.gov.

The offeror MUST acknowledge all amendments.

(b) SOLICITATION CONTRACT FORM/PRICE SCHEDULE

The offeror MUST fill in the dollar amount for Contract Line Item Number (CLIN) 0001 on

Attachment 3 Price Schedule to include the total amount to complete the construction for each CLIN exclusive of the Value Added Tax (VAT) as stated in DFARS 252.229-7001.

Offerors shall provide their Price Proposal in U.S. Dollars. Award will be made in U.S. Dollars, therefore, the offeror’s bank must be able to accept U.S. Dollars as payment.

(c) REPRESENTATIONS AND CERTIFICATIONS

The offeror MUST have an active registration with System for Award Management (SAM) at the time of proposal submission. If you do not have an active registration with SAM at the time of proposal submission, your proposal shall not be considered for award.

If proposing as a Joint Venture (JV) the offeror MUST provide the documents requested below under

“Joint Venture Requirements”.

(d) CONTRACT CLAUSES

The offeror MUST fill in the tax relief exemption rate in DFARS252.229-7001 TAX RELIEF (APR

2020) provided in this solicitation and submit with their proposal (Attachment 4)

(2) Basis of Evaluation: The Government will evaluate price based on the total price, EXCLUSIVE of the Value

Added Tax (VAT) in DFARS 252.229-7001.

Total price consists of CLIN 0001; analysis will be performed by one or more of the following techniques to ensure a fair and reasonable price:

(i) Comparison of proposed prices received in response to the solicitation.

(ii) Comparison of proposed prices with the Independent Government Estimate.

(iii) Comparison of proposed prices with available historical information.

(iv) Comparison of proposed prices with market survey results.

The Government reserves the right to conduct a price realism analysis of proposed prices it considers to be unrealistically low. If the Government elects to conduct a price realism analysis, it may consider offeror(s)’ understanding of the work, ability to perform the work, or proposed prices received in response to the solicitation, in this analysis and risk assessment. An unrealistically low price may result in the offeror(s)’ proposed price being rejected and the offeror(s)’ proposal being ineligible for award.

Proposals will be evaluated in the following manner: The number of proposals that will be technically evaluated will initially be limited to the lowest priced proposal. If the lowest priced proposal is not found to be technically acceptable, the next lowest priced proposal will be evaluated. This process will be repeated until the Government identifies a technically acceptable proposal.

(B) NON-PRICE FACTORS:

The Technical Proposal includes the following factors:

(1) Factor 1, Corporate Experience:

(i) Solicitation Submittal Requirements: The offeror MUST provide a minimum of one (1) but no more than two (2) relevant projects for which the Offeror was the prime contractor, sub-contractor or Joint Venture partner.

Relevant projects MUST meet the following requirements:

1. Design and construction or renovation of a building or facility owned by the Government of Moldova or any of it agents; and

2. New construction shall include façade thermal insulation and roofing works executed by Design-Build

(MUST show experience in design or design management as well as construction); and

3. Performed in the country of Moldova and at least 70% complete within the last 10 years of the date this RFP was issued; and

4. Similar in magnitude with a value of at least $300,000.

A project is defined as a construction project performed under a single task order or contract. For multiple award and indefinite delivery/indefinite quantity type contracts, the contract as a whole shall not be submitted as a project;

rather offerors shall submit the work performed under a task order as a project. Failure to submit one (1) relevant project will lead to the offeror being eliminated from competition for failing to submit a complete proposal. If more than two (2) projects are submitted, only the two (2) most recently completed projects will be evaluated.

Use the Contract Data Sheet (Attachment 5) to submit projects. In lieu of the Contract Data Sheet, offerors can provide relevant project information documentation separately. Whether submitted on the Contract Data Sheet or as separate documentation, project descriptions for each project shall explain the detailed scope of work performed and the relevancy to the project requirements of this solicitation. For each submitted project, the offeror shall include the contract number, project location, project description, building size, an explanation of -similarity to the current solicitation, dollar value, ending date of the contract, the date the work was completed, and a client point of contact.

Offerors must include sufficient information in their proposal to establish the relevancy of their submitted projects.

For each submitted project, the offeror shall include the following:

1. If the experience is for a Government contract include the contract number and the Government Point of

Contact of the Contracting Office or the Contracting Officer Representative.

2. If the corporate experience is not with the US Government, or is a subcontract, the offeror shall provide:

- An electronic copy (PDF or photocopy) of the original contract or subcontract signed by all parties to include: Project title, location by physical project address or coordinates, award value converted into

USD, beneficiary Point of Contact information, contract completion date, construction completion date, and a detailed copy of the scope or work translated into English,

- Pictures of the job site showing the construction sign or construction permit with the name, or logo, of the offeror clearly visible

Offerors must include sufficient information in their proposal to establish the relevancy of their submitted projects.

1. All submissions shall be in the English language, documents provided in another language will not be evaluated.

2. The total length for each project shall not exceed ten (10) pages, single sided, with a minimum font size of twelve (12). If more than ten (10) pages are submitted, only the first ten (10) pages will be evaluated.

3. All projects submitted that are outside of the specified time period indicated in paragraph (i) 3 above will not be considered relevant.

4. Proposals that fail to provide all requested data, an accessible point of contact, correct phone number and e-mail address, may result in the project not being evaluated or the project being found not relevant.

If the Offeror is a Joint Venture (JV), relevant project experience shall be submitted for projects completed by the

Joint Venture entity. If the Joint Venture does not have shared experience, projects should be submitted for one of the Joint Venture partners. Offerors are still limited to a total of two (2) projects combined

The offeror may utilize experience of a subcontractor that will perform major or critical aspects of the requirement to demonstrate construction experience under this evaluation factor. The Offeror must provide a letter of commitment and an explanation of the subcontractor’s role in the performance of this contract.

If an offeror is utilizing experience of affiliates/subsidiaries/parent/LLC/LTD member companies (name is not exactly as stated on the SF 1442), the proposal shall clearly demonstrate that the affiliate/subsidiary/parent firm will have meaningful involvement in the performance of the contract in order for the project of the affiliate/subsidiary/parent/LLC/LTD member companies to be considered. The proposal shall state the specific commitments of technical resources (e.g. personnel, equipment that the affiliate/subsidiary/parent/LLC/LTD member companies commit to the performance of this contract. In particular, the proposal will clearly state the specific commitments of resources of the affiliate/subsidiary/parent/LLC/LTD member that will be located at the worksites and company offices in the city/are of the project. The proposal shall also describe specific roles of the affiliate/subsidiary/parent/LLC/LTD member companies in terms of the work it will either self-perform or manage on behalf of the offeror in performance of the contract.

(ii) Basis of Evaluation: To receive an acceptable rating in this factor, the offeror MUST provide a minimum of one (1) relevant project meeting the following requirements:

1. Design and construction or renovation of a building or facility owned by the Government of

Moldova or any of it agents; and

2. New construction shall include façade thermal insulation and roofing works executed by

Design-Build (MUST show experience in design or design management as well as construction); and

3. Performed in the country of Moldova and at least 70% complete within the last 10 years of the date this RFP was issued; and

4. Similar in magnitude with a value of at least $300,000.

The offeror must demonstrate experience performing at least one (1) relevant project as defined in the solicitation submittal requirements or one (1) relevant project for one of the Joint Venture partners without shared experience together. The assessment of the offeror’s relevant experience will be used as a means of evaluating the capability of the offeror to successfully meet the requirements of the solicitation. The Government will review a maximum of two

(2) projects. An offeror will be rated UNACCEPTABLE if the offeror does not submit the minimum number of relevant projects (one (1)). Any projects submitted in excess of the two (2) for Corporate Experience will not be considered.

(2) Factor 2, Safety:

(i) Solicitation Submittal Requirements: The offeror MUST submit:

1. The company’s Safety Narrative.

2. The company’s SIGNED copy of the provided Safety Checklist Form, which is provided as

Attachment 6 to this solicitation.

Safety Narrative: The Safety Narrative shall describe the offeror’s safety management approach for its employees and subcontractors identifying the company’s commitment to safety and indicating how the offeror plans to properly manage and implement safety procedures for itself and its subcontractors. The Safety Narrative should pertain to this project solicitation and address specific safety hazards involved in the scope of work such as multiple project sites and/or high risk activities. It shall identify the authorities and responsibilities of the Site Safety and Health Officer

(SSHO), as well as provide a plan describing how the offeror will implement a safe working environment for all levels of subcontractors.

The Safety Narrative shall be limited to four (4) pages, single sided. Any pages submitted in excess of the four (4) page limitation will not be reviewed.

Safety Checklist Form: By signing the provided form the contractor is verifying that if awarded the contract, they will comply with the safety regulations, provide an acceptable safety plan within 30 days of contract award, appoint a competent employee as SSHO in accordance with this contract and the EM 385-1-1, and provide all required

Personal Protective Equipment (PPE) to their employees.

(ii) Basis of Evaluation: The Government is seeking to determine that the offeror has a commitment to safety and that the offeror plans to properly manage and implement safety procedures for itself and its subcontractors. To receive an acceptable rating for this factor the offeror MUST provide:

1. The Company’s Safety Narrative and

2. The company’s SIGNED copy of the provided Safety Checklist Form.

The Safety Checklist Form is provided as an Attachment to this RFP. Failure to submit a Safety Narrative and a completed Safety Checklist with the proposal will result in a rating of Unacceptable and you will not be eligible to be awarded the contract without discussions.

(3) Factor 3, Past Performance:

(i) Solicitation Submittal Requirements: The offeror shall provide a past performance evaluation for each project submitted under Factor 1 – Corporate Experience. If a completed Contractor Performance

Assessment Reporting system (CPARS) or DD2626 Performance Evaluation (Construction) is available, it shall be submitted with the proposal. If there is not a completed CPARS evaluation then the offeror shall submit the Past Performance Questionnaire for each project included in Factor 1- Corporate

Experience. An offeror shall not submit a PPQ when a completed CPARS is available.

If the offeror is unable to obtain a completed PPQ from a client for a project(s) before proposal closing date, the offeror should complete and submit with the proposal the first page of the PPQ (Attachment 7), which will provide contract and client information for the respective project(s). Offerors should follow-up with clients/references to ensure timely submittal of questionnaires. If the client requests, questionnaires may be submitted directly to the

Government's point of contact, Ms. Gloria Lucero, via email at gloria.x.lucero.civ@us.navy.mil prior to proposal closing date. Offerors shall not incorporate by reference into their proposal PPQs or CPARS previously submitted for other RFPs. However, this does not preclude the Government from utilizing previously submitted PPQ information in the past performance evaluation.

If the offeror is unable to obtain a completed PPQ from a client for a project(s) before proposal closing date, the offeror shall complete and submit with the proposal the first page of the PPQ, which will provide contract and client information for the respective project(s). The Government may make reasonable attempts to contact the client noted for that project(s) to obtain the PPQ information. However, offerors should follow-up with clients/references to help ensure timely submittal of questionnaires.

If the evaluation is in other than English, provide a translation of the evaluation into English. Documents provided in a language other than English, without an English translation will not be evaluated.

The Government may review any other sources of information for evaluating past performance. Sources may include, but are not limited to, past performance information retrieved through the Past Performance Information

Retrieval System (PPIRS) using all CAGE/DUNS numbers of team members (partnership, joint venture, teaming arrangement, or parent company /subsidiary/affiliate) identified in the offeror’s proposal, inquiries of owner representative(s), and any other known sources not provided by the offeror.

While the Government may elect to consider data from other sources, the burden of providing detailed, current, accurate and complete past performance information rests with the offeror.

Offerors may provide any information on problems encountered and the corrective actions taken on projects submitted under Factor 1 – Corporate Experience. Offerors may also address any adverse past performance issues.

Explanations shall not exceed four (4) pages in total.

Performance awards or additional information submitted will not be considered.

(ii) Basis of Evaluation: The degree to which past performance evaluations and all other past performance information reviewed by the Government (e.g., PPIRS, Federal Awardee Performance and Integrity

Information System (FAPIIS), Electronic Subcontract Reporting System (e-SRS), performance recognition documents, and information obtained from any other source) reflect a trend of satisfactory performance considering:

- A pattern of successful completion of tasks;

- A pattern of deliverables that are timely and of good quality;

- A pattern of cooperativeness and teamwork with the Government at all levels (task managers, contracting officers, auditors, etc.)

- How recently the tasks that are identical to, similar to or related to the task at hand were performed.

In the case of an offeror without a record of relevant past performance or for whom information on past performance is not available or so sparse that no meaningful past performance rating can be reasonably assigned, the offeror may not be evaluated favorably or unfavorably on past performance. Therefore, the offeror shall be determined to have unknown past performance. In the context of acceptability/unacceptability “unknown” shall be considered

“acceptable”.

II. BASIS OF AWARD

1. The Government reserves the right to eliminate from consideration for award any or all offers at any time prior to award of the contract; to negotiate with offerors in the competitive range; and to award the contract to the offeror submitting the lowest priced, technically acceptable offer.

2. As stated in the solicitation, the Government intends to evaluate proposals and award a contract without discussions with offerors (except clarifications as described in FAR 15.306(a)). The Government reserves the right to conduct discussions if the Contracting Officer later determines them to be necessary. In addition, if the

Contracting Officer determines that the number of proposals that would otherwise be in the competitive range exceeds the number at which an efficient competition can be conducted, the Contracting Officer may limit the number of proposals in the competitive range to the greatest number that will permit an efficient competition among the most highly rated proposals.

3. The LPTA process is selected as appropriate for this acquisition because the best value is expected to result from selection of the technically acceptable proposal with the lowest fair and reasonable evaluated price.

4. An overall non-price factors rating must be at least “ACCEPTABLE” in order to be eligible for award.

An “UNACCEPTABLE” rating in any factor results in the overall non-price factors proposal being rated

“UNACCEPTABLE” unless corrected through discussions. An overall non-price factors rating of

“UNACCEPTABLE” makes a proposal ineligible for award.

III. REQUIREMENTS FOR OFFERORS

It is the responsibility of the offeror to register and obtain the following:

Commercial and Governmental Entity (CAGE) Code for U.S. firms

NATO Commercial and Governmental Entity (NCAGE) Code for non U.S. firms.

(https://eportal.nspa.nato.int/AC135Public/scage/CageList.aspx)

System for Award Management (SAM) registration to include a Unique Entity Identifier Code.

(https://www.sam.gov/SAM/)

**Please contact the Federal Service Help Desk at https://www.fsd.gov/app/sam/ if you have any questions during the registration process**

ENGLISH SPEAKING REPRESENTATIVE

At all times when any performance of the work at the site is being conducted by any employee of the Contractor, the Contractor shall have a representative present on the site that is capable of explaining the work operations and receiving instruction in the English language. The Contracting Officer shall have the right to determine without appeal of such decision, whether the proposed representative has sufficient technical and lingual capabilities and the Contactor shall immediately replace any individual not acceptable to the Contracting Officer.

2. JOINT VENTURE REQUIREMENTS

Joint Venture (JV) offerors shall provide with their proposal a notarized legal document that establishes the JV. The

JV Agreement shall take effect upon the submission of the proposal and remain irrevocable until one (1) year after the work has been finally inspected and accepted by the Government. Submission of the notarized legal document that establishes the JV shall be furnished with the proposal in its original language version along with a certified

English translation of the notarized JV document. The Joint Venture MUST be formed and valid at the time of submission of the proposal. The offeror MUST include the CAGE code or NCAGE code and Unique Entity

Identifier Code of the JV on their proposal. The validated notarized legal document MUST include language that each member of the JV will be jointly and severally liable for the performance of the whole contract and will be incorporated into the contract award if award is made to the JV.

(a) Name of firms that form the Joint Venture and the name of the Joint Venture

(b) Name and title of the corporate officials signing in behalf of each party

(c) Solicitation number

(d) Description of the responsibilities in terms of work category for each partner

(e) The statement "The composition and structure of the Joint Venture will remain unchanged from award to one (1) year after the work has been finally inspected and accepted by the Government.”

(f) Date of issuance of the agreement and notarized signature of the corporate officials signing in behalf of each party.

(g) Statement under oath stating that the Joint Venture(JV) is in compliance at the time of proposal submission with all applicable laws, rules, and regulations. This statement MUST be signed under oath by all members comprising the Joint Venture.

The U.S. Government reserves the right to review the actual JV Agreement to determine its basis and compliance with the applicable laws. Any internal agreements affecting the internal composition of the existing JV and its potential liabilities in relation to the contract (bonds, insurance, etc.) will be sent to the Contracting Officer to provide notice of the same. Any change in the composition of the JV will require the JV to formally request a

Novation Agreement in accordance with FAR 42.12, which will be approved/disapproved at the discretion of the

Contracting Officer.

3. CERTIFICATIONS, LICENSES, PERMITS, FEES, ETC.

Offerors shall be responsible for determining and paying all fees associated with, and obtaining any required permits for proposed projects including, but not necessarily limited to permits for onsite and off-site hauling, demolition/disposal, storm water discharge, construction activity, temporary utilities, road improvements, communications, etc.

Offerors are responsible for acquiring any required professional certifications (licensing) as required by the country where the work is to be performed.

Offerors are responsible for complying with environmental laws, regulations and requirements.

All coordination with the local, regional, national authorities is the responsibility of the Offeror.

https://eportal.nspa.nato.int/AC135Public/scage/CageList.aspx https://www.sam.gov/SAM/ http://www.fsd.gov/app/sam/ http://www.fsd.gov/app/sam/

IV. ATTACHMENTS

Attachment 1: Performance Technical Specifications (PTS) and Drawings

Attachment 2: Pre-Proposal Inquiry Form

Attachment 3: Price Schedule

Attachment 4: DFARS 252.229-7001 Tax Relief

Attachment 5: Contract Data Form

Attachment 6: Safety Checklist Form

Attachment 7: Past Performance Questionnaire

**PLEASE RE-READ AND FOLLOW ALL INSTRUCTIONS TO ENSURE YOUR PROPOSAL

INCLUDES ALL REQUIRED SUBMITTALS**

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0001 1 Each Renovate Kindergarten #2

FFP

The contractor shall provide all labor, supervision, materials, equipment and applicable safety precautions necessary to replace all roofs including installation of new thermally insulated roof, thermally insulated facade with minimum thickness of 10 cm, provide new structure, reinforcement elements, roof accesses and railing, replacement of wooden windows and exterior doors, replacement of emergency metal stairs to access the second floor directly from the outside of the kindergarten, provide 8 exterior flood lights, excavation and exterior hydro isolation of basement walls, and general exterior improvements, extending 2 meters horizontally from the building facade according to the Performance Technical Specifications provided as

Attachment 1 to this Solicitation.

FOB: Destination

NET AMT

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0002 1 Each Option No. 1 - Renovate Kindergarten #2

FFP

The Contractor shall provide all labor, supervision, materials, equipment and applicable safety precautions necessary to increase exterior pavement works from 2 meters around the perimeter of the building to a total of 2,500 square meters and provide new aboveground and underground drainage system in the 2,500 square meter pavement, including new design to provide new elevations of the finished paved areas in accordance with the Performance Technical Specifications provided as Attachment 1 to this Solicitation.

FOB: Destination

NET AMT

DELIVERY INFORMATION

CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /

CAGE

0001 N/A N/A N/A N/A

0002 N/A N/A N/A N/A

CLAUSES INCORPORATED BY REFERENCE

52.202-1 Definitions JUN 2020

52.203-2 Certificate Of Independent Price Determination APR 1985

52.203-3 Gratuities APR 1984

52.203-5 Covenant Against Contingent Fees MAY 2014

52.203-6 Restrictions On Subcontractor Sales To The Government JUN 2020

52.203-7 Anti-Kickback Procedures JUN 2020

52.203-8 Cancellation, Rescission, and Recovery of Funds for Illegal or

Improper Activity

MAY 2014

52.203-10 Price Or Fee Adjustment For Illegal Or Improper Activity MAY 2014

52.203-12 Limitation On Payments To Influence Certain Federal

Transactions

JUN 2020

52.203-17 Contractor Employee Whistleblower Rights and Requirement

To Inform Employees of Whistleblower Rights

JUN 2020

52.204-2 Security Requirements MAR 2021

52.204-4 Printed or Copied Double-Sided on Postconsumer Fiber

Content Paper

MAY 2011

52.204-7 System for Award Management OCT 2018

52.204-8 Annual Representations and Certifications DEC 2022

52.204-13 System for Award Management Maintenance OCT 2018

52.204-16 Commercial and Government Entity Code Reporting AUG 2020

52.204-18 Commercial and Government Entity Code Maintenance AUG 2020

52.204-19 Incorporation by Reference of Representations and

Certifications.

DEC 2014

52.204-21 Basic Safeguarding of Covered Contractor Information

Systems

NOV 2021

52.204-22 Alternative Line Item Proposal JAN 2017

52.204-23 Prohibition on Contracting for Hardware, Software, and

Services Developed or Provided by Kaspersky Lab and Other

Covered Entities

NOV 2021

52.204-26 Covered Telecommunications Equipment or Services--

Representation.

OCT 2020

52.209-6 Protecting the Government's Interest When Subcontracting

With Contractors Debarred, Suspended, or Proposed for

Debarment

NOV 2021

52.209-10 Prohibition on Contracting With Inverted Domestic

Corporations

NOV 2015

52.209-13 Violation of Arms Control Treaties or Agreements --

Certification

NOV 2021

52.211-3 Availability of Specifications Not Listed in the GSA Index of

Federal Specifications, Standards, and Commercial Item

Descriptions

JUN 1988

52.214-34 Submission Of Offers In The English Language APR 1991

52.214-35 Submission Of Offers In U.S. Currency APR 1991

52.215-2 Audit and Records--Negotiation JUN 2020

52.217-5 Evaluation Of Options JUL 1990

52.222-1 Notice To The Government Of Labor Disputes FEB 1997

52.222-38 Compliance With Veterans' Employment Reporting

Requirements

FEB 2016

52.222-50 Alt I Combating Trafficking in Persons (NOV 2021) Alternate I MAR 2015

52.223-18 Encouraging Contractor Policies To Ban Text Messaging

While Driving

JUN 2020

52.225-1 Buy American--Supplies OCT 2022

52.225-14 Inconsistency Between English Version And Translation Of

Contract

FEB 2000

52.227-4 Patent Indemnity-Construction Contracts DEC 2007

52.229-6 Taxes--Foreign Fixed-Price Contracts FEB 2013

52.232-5 Payments under Fixed-Price Construction Contracts MAY 2014

52.232-17 Interest MAY 2014

52.232-23 Assignment Of Claims MAY 2014

52.232-27 Prompt Payment for Construction Contracts JAN 2017

52.232-33 Payment by Electronic Funds Transfer--System for Award

Management

OCT 2018

52.232-39 Unenforceability of Unauthorized Obligations JUN 2013

52.233-1 Disputes MAY 2014

52.233-3 Protest After Award AUG 1996

52.233-4 Applicable Law for Breach of Contract Claim OCT 2004

52.236-6 Superintendence by the Contractor APR 1984

52.236-7 Permits and Responsibilities NOV 1991

52.236-8 Other Contracts APR 1984

52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements

APR 1984

52.236-10 Operations and Storage Areas APR 1984

52.236-11 Use and Possession Prior to Completion APR 1984

52.236-12 Cleaning Up APR 1984

52.236-13 Accident Prevention NOV 1991

52.236-15 Schedules for Construction Contracts APR 1984

52.236-17 Layout of Work APR 1984

52.236-26 Preconstruction Conference FEB 1995

52.242-14 Suspension of Work APR 1984

52.243-4 Changes JUN 2007

52.243-5 Changes and Changed Conditions APR 1984

52.244-6 Subcontracts for Commercial Products and Commercial

Services

DEC 2022

52.246-1 Contractor Inspection Requirements APR 1984

52.246-12 Inspection of Construction AUG 1996

52.246-13 Inspection--Dismantling, Demolition, or Removal of

Improvements

AUG 1996

52.247-63 Preference For U.S. Flag Air Carriers JUN 2003

52.249-2 Termination For Convenience Of The Government (Fixed-

Price)

APR 2012

52.249-10 Default (Fixed-Price Construction) APR 1984

52.252-2 Clauses Incorporated By Reference FEB 1998

52.253-1 Computer Generated Forms JAN 1991

252.201-7000 Contracting Officer's Representative DEC 1991

252.203-7000 Requirements Relating to Compensation of Former DoD

Officials

SEP 2011

252.203-7001 Prohibition On Persons Convicted of Fraud or Other Defense-

Contract-Related Felonies

DEC 2008

252.203-7002 Requirement to Inform Employees of Whistleblower Rights SEP 2013

252.203-7003 Agency Office of the Inspector General AUG 2019

252.204-7003 Control Of Government Personnel Work Product APR 1992

252.204-7007 Alternate A, Annual Representations and Certifications MAY 2021

252.204-7008 Compliance With Safeguarding Covered Defense Information

Controls

OCT 2016

252.204-7012 Safeguarding Covered Defense Information and Cyber

Incident Reporting

DEC 2019

252.204-7015 Notice of Authorized Disclosure of Information for Litigation

Support

MAY 2016

252.209-7004 Subcontracting With Firms That Are Owned or Controlled By

The Government of a Country that is a State Sponsor of

Terrorism

MAY 2019

252.215-7008 Only One Offer JUL 2019

252.222-7002 Compliance With Local Labor Laws (Overseas) JUN 1997

252.225-7005 Identification Of Expenditures In The United States JUN 2005

252.225-7041 Correspondence in English JUN 1997

252.225-7042 Authorization to Perform APR 2003

252.225-7048 Export-Controlled Items JUN 2013

252.227-7022 Government Rights (Unlimited) MAR 1979

252.227-7023 Drawings and Other Data to become Property of Government MAR 1979

252.227-7033 Rights in Shop Drawings APR 1966

252.232-7008 Assignment of Claims (Overseas) JUN 1997

252.232-7010 Levies on Contract Payments DEC 2006

252.232-7011 Payments in Support of Emergencies and Contingency

Operations

MAY 2013

252.233-7001 Choice of Law (Overseas) JUN 1997

252.236-7000 Modification Proposals-Price Breakdown DEC 1991

252.236-7006 Cost Limitation JAN 1997

252.243-7001 Pricing Of Contract Modifications DEC 1991

252.244-7000 Subcontracts for Commercial Items JAN 2021

252.247-7023 Transportation of Supplies by Sea FEB 2019

CLAUSES INCORPORATED BY FULL TEXT

52.204-25 PROHIBITION ON CONTRACTING FOR CERTAIN TELECOMMUNICATIONS AND VIDEO

SURVEILLANCE SERVICES OR EQUIPMENT (NOV 2021)

(a) Definitions. As used in this clause--

Backhaul means intermediate links between the core network, or backbone network, and the small subnetworks at the edge of the network (e.g., connecting cell phones/towers to the core telephone network). Backhaul can be wireless (e.g., microwave) or wired (e.g., fiber optic, coaxial cable, Ethernet).

Covered foreign country means The People's Republic of China.

Covered telecommunications equipment or services means--

(1) Telecommunications equipment produced by Huawei Technologies Company or ZTE Corporation (or any subsidiary or affiliate of such entities);

(2) For the purpose of public safety, security of Government facilities, physical security surveillance of critical infrastructure, and other national security purposes, video surveillance and telecommunications equipment produced by Hytera Communications Corporation, Hangzhou Hikvision Digital Technology Company, or Dahua Technology

Company (or any subsidiary or affiliate of such entities);

(3) Telecommunications or video surveillance services provided by such entities or using such equipment; or

(4) Telecommunications or video surveillance equipment or services produced or provided by an entity that the

Secretary of Defense, in consultation with the Director of National Intelligence or the Director of the Federal Bureau of Investigation, reasonably believes to be an entity owned or controlled by, or otherwise connected to, the government of a covered foreign country.

Critical technology means--

(1) Defense articles or defense services included on the United States Munitions List set forth in the International

Traffic in Arms Regulations under subchapter M of chapter I of title 22, Code of Federal Regulations;

(2) Items included on the Commerce Control List set forth in Supplement No. 1 to part 774 of the Export

Administration Regulations under subchapter C of chapter VII of title 15, Code of Federal Regulations, and controlled--

(i) Pursuant to multilateral regimes, including for reasons relating to national security, chemical and biological weapons proliferation, nuclear nonproliferation, or missile technology; or

(ii) For reasons relating to regional stability or surreptitious listening;

(3) Specially designed and prepared nuclear equipment, parts and components, materials, software, and technology covered by part 810 of title 10, Code of Federal Regulations (relating to assistance to foreign atomic energy activities);

(4) Nuclear facilities, equipment, and material covered by part 110 of title 10, Code of Federal Regulations (relating to export and import of nuclear equipment and material);

(5) Select agents and toxins covered by part 331 of title 7, Code of Federal Regulations, part 121 of title 9 of such

Code, or part 73 of title 42 of such Code; or

(6) Emerging and foundational technologies controlled pursuant to section 1758 of the Export Control Reform Act of 2018 (50 U.S.C. 4817).

Interconnection arrangements means arrangements governing the physical connection of two or more networks to allow the use of another's network to hand off traffic where it is ultimately delivered (e.g., connection of a customer of telephone provider A to a customer of telephone company B) or sharing data and other information resources.

Reasonable inquiry means an inquiry designed to uncover any information in the entity's possession about the identity of the producer or provider of covered telecommunications equipment or services used by the entity that excludes the need to include an internal or third-party audit.

Roaming means cellular communications services (e.g., voice, video, data) received from a visited network when unable to connect to the facilities of the home network either because signal coverage is too weak or because traffic is too high.

Substantial or essential component means any component necessary for the proper function or performance of a piece of equipment, system, or service.

(b) Prohibition.

(1) Section 889(a)(1)(A) of the John S. McCain National Defense Authorization Act for Fiscal Year 2019 (Pub. L.

115-232) prohibits the head of an executive agency on or after August 13, 2019, from procuring or obtaining, or extending or renewing a contract to procure or obtain, any equipment, system, or service that uses covered telecommunications equipment or services as a substantial or essential component of any system, or as critical technology as part of any system. The Contractor is prohibited from providing to the Government any equipment, system, or service that uses covered telecommunications equipment or services as a substantial or essential component of any system, or as critical technology as part of any system, unless an exception at paragraph (c) of this clause applies or the covered telecommunication equipment or services are covered by a waiver described in FAR

4.2104.

(2) Section 889(a)(1)(B) of the John S. McCain National Defense Authorization Act for Fiscal Year 2019 (Pub. L.

115-232) prohibits the head of an executive agency on or after August 13, 2020, from entering into a contract, or extending or renewing a contract, with an entity that uses any equipment, system, or service that uses covered telecommunications equipment or services as a substantial or essential component of any system, or as critical technology as part of any system, unless an exception at paragraph (c) of this clause applies or the covered telecommunication equipment or services are covered by a waiver described in FAR 4.2104. This prohibition applies to the use of covered telecommunications equipment or services, regardless of whether that use is in performance of work under a Federal contract.

(c) Exceptions. This clause does not prohibit contractors from providing--

(1) A service that connects to the facilities of a third-party, such as backhaul, roaming, or interconnection arrangements; or

(2) Telecommunications equipment that cannot route or redirect user data traffic or permit visibility into any user data or packets that such equipment transmits or otherwise handles.

(d) Reporting requirement.

(1) In the event the Contractor identifies covered telecommunications equipment or services used as a substantial or essential component of any system, or as critical technology as part of any system, during contract performance, or the Contractor is notified of such by a subcontractor at any tier or by any other source, the Contractor shall report the information in paragraph (d)(2) of this clause to the Contracting Officer, unless elsewhere in this contract are established procedures for reporting the information; in the case of the Department of Defense, the Contractor shall report to the website at https://dibnet.dod.mil. For indefinite delivery contracts, the Contractor shall report to the

Contracting Officer for the indefinite delivery contract and the Contracting Officer(s) for any affected order or, in the case of the Department of Defense, identify both the indefinite delivery contract and any affected orders in the report provided at https://dibnet.dod.mil.

(2) The Contractor shall report the following information pursuant to paragraph (d)(1) of this clause:

(i) Within one business day from the date of such identification or notification: The contract number; the order number(s), if applicable; supplier name; supplier unique entity identifier (if known); supplier Commercial and

Government Entity (CAGE) code (if known); brand; model number (original equipment manufacturer number, manufacturer part number, or wholesaler number); item description; and any readily available information about mitigation actions undertaken or recommended.

(ii) Within 10 business days of submitting the information in paragraph (d)(2)(i) of this clause: Any further available information about mitigation actions undertaken or recommended. In addition, the Contractor shall describe the efforts it undertook to prevent use or submission of covered telecommunications equipment or services, and any additional efforts that will be incorporated to prevent future use or submission of covered telecommunications equipment or services.

(e) Subcontracts. The Contractor shall insert the substance of this clause, including this paragraph (e) and excluding paragraph (b)(2), in all subcontracts and other contractual instruments, including subcontracts for the acquisition of commercial products or commercial services.

(End of clause)

52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)

The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the

Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 600 days from contract award.

52.211-12 LIQUIDATED DAMAGES--CONSTRUCTION (SEP 2000)

(a) If the Contractor fails to complete the work within the time specified in the contract, the Contractor shall pay liquidated damages to the Government in the amount of $150 for each calendar day of delay until the work is completed or accepted.

(b) If the Government terminates the Contractor's right to proceed, liquidated damages will continue to accrue until https://dibnet.dod.mil/ https://dibnet.dod.mil/ the work is completed. These liquidated damages are in addition to excess costs of repurchase under the Termination clause.

52.216-1 TYPE OF CONTRACT (APR 1984)

The Government contemplates award of a Firm Fixed Priced contract resulting from this solicitation.

(End of provision)

52.217-7 OPTION FOR INCREASED QUANTITY--SEPARATELY PRICED LINE ITEM (MAR 1989)

The Government may require the delivery of the numbered line item, identified in the Schedule as an option item, in the quantity and at the price stated in the Schedule.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .