N3319123R0054 Design-Build Renovate Kindergarten No. 2, Cahul, Moldova
Solicitation number
N3319123R0054
Issued by

About this file

This document is the solicitation for contract N3319123R0054 to design-build and renovate Kindergarten No. 2 in Cahul, Moldova. The solicitation involves renovating the frame roof, installing thermal insulation on the ceiling and facades. The Navy is the contracting agency seeking proposals to replace the existing wooden roof with a new wooden truss roof and metal tile covering. The project also includes replacing windows, insulating and finishing exterior walls, and landscaping. The renovation work is scheduled for completion within six months of award.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BLOCK

i=25° i=30°

BLOCK

BLOCK

i=30° i=60°

Signal. Date.

i=60°

BLOCK A

BLOCK A

BLOCK A

BLOCK A

Mode. part no. Sheet No. doc.

i=30°

BLOCK

i=30°

SRL "PROJECT-DESIGN"

3) The existing metal escape stairs are in satisfactory condition. It is planned to restore them -cleaning, priming, painting in 2 layers.

NOTE:

1) The existing roof is of the frame type with slate sheet coverings. It is in unsatisfactory condition and does not meet the standards. It is intended for disassembly.

4) The old (wooden) windows are dismantled.

2) The existing ventilation ducts are made of brick. It is planned to dismantle them up to the existing floor. The dimensions and location of the ventilation ducts to be determined on site.

BENEFICIARY:

Cahul City Hall

11/20

11/20

FACADE IN AXES 3b-1b - EXISTING SC.1:200

FACADE IN AXES 1b-3b - EXISTING SC.1:200

FACADE IN CA AXES - EXISTING SC.1:200

FACADE IN AC AXES - EXISTING SC.1:200

Flat Phase

THAT

ON 6

A

A.ÿ.P.

3b A

Prepared Prepelita A.

1b

2. 3

Existing facades sc. 1:200

C

1b

3b boards

2b

BLOCK "B"

Limbas S.

13,000

12,500

2,700

4,000

13,000

4,000

0.700

6,050

6 100 6,400

11,140

11,140

10,100

3,300

0.000

-0.650

10,100

6,000

2,700

2,700

0.700

12,500

6,000

GSPublisherVersion 0.49.100.100

Major repair of the frame roof with thermal insulation of the ceiling, thermal insulation and finishing of the facades of the Creÿei building - Kindergarten No. 2

"Licurici" in the municipality of Cahul, str. Ion Luca Caragiale no. 12, no. cadastral 1701114.086

No. 055984 from 08.09.17

License Series A MMII

The existing truss type roof with slate sheathing is being removed

6,500

The wooden windows are dismantled

4,000

6,200

6,000

2,900

The wooden drum is dismantled

The wooden windows are dismantled

11,140

-0.050

The existing truss type roof with slate sheathing is being removed

5,200

2,700

0.700

-0.600

The existing truss type roof with slate sheathing is being removed

The existing metal staircase

-0.900

The wooden windows are dismantled

0.700

The existing truss type roof with slate sheathing is being removed

4,000

The wooden drum is dismantled

2,700

The existing metal staircase

6,000

The existing truss type roof with slate sheathing is being removed

2,700

11,140

-0.050

6,000

0.000

The existing truss type roof with slate sheathing is being removed

4,655 i=12°

Existing metal railing

1,900

10-12/20 - 2 - Sat

Machine Translated by Google

4 400 two hundred

9,700

1 400 1 800 1 550 two hundred

1 000 550

2 000 1 500

1 300

3 100

2,800

12,500

2 250

3 300

13,550

3 400

9,200

7,900

1 800

5,950

2,800

9,200

2 350

3 650 3 300 two hundred

150 1 400

13 000 9 700

13,000

2,800

1 600

2 250

SRL "PROJECT-DESIGN"

±0.000

-1,600

10-12/20 - 2 - Sat

11/20

11/20

EXISTING BASEMENT PLAN (relief) elevation -1,600 SC.1:100

6,400 6 100 12,500

EXISTING GROUND PLAN (survey) elevation 0.000 SC.1:100

Group

1b

B

A

3b

B

C

A

1b 2b

C

3b2b

Limbas S.

Flat Phase

BLOCK "B"

Prepared Prepelita A.

Existing basement plan (relief) elevation -1,600. Existing ground floor plan (survey) elevation 0.000 boards

A.ÿ.P.

7ON

BLOCK "A"

2. 3

BLOCK "A"

GSPublisherVersion 0.49.100.100

Date.Mode. part no. Sheet No. doc. Signal.

License Series A MMII

No. 055984 from 08.09.17

5,900

6 100

1 950

1 800

1 800

1 7003 100

500550

2 150

3 100

BENEFICIARY:

Cahul City Hall

5,600

5,900

1 700 1 800 9,600

12,500

5,600

1 600

6,400

3 950

5,900

5,600

6,400

6,400

Major repair of the frame roof with thermal insulation of the ceiling, thermal insulation and finishing of the facades of the Creÿei building - Kindergarten No. 2

"Licurici" in the municipality of Cahul, str. Ion Luca Caragiale no. 12, no. cadastral 1701114.086

BLOCK "B"

Prepared Prepelita A.

boards

A.ÿ.P.

8ON

Existing floor plan (relief) elevation +3,300.

Existing roof plan

2. 3

BLOCK "A"

Flat Phase

11/20

11/20

3 400

14,80013,000

900 7

4,850

2,800

1 300

13,000

14,800

2 250

3 300

1 800 i = 30°

9,700 i = 30°

1 800 1 550 two hundred two hundred

4 400

Limbas S.

Group

EXISTING FLOOR PLAN (survey) elevation +3,300 SC.1:100 i=30°

EXISTING ROOF PLAN SC.1:100

i=30°

1b

C

A A

3b1b3b

C

2b

B

GSPublisherVersion 0.49.100.100

Mode. part no. Sheet No. doc. Signal. Date.

1 825

14 250

14 250

No. 055984 from 08.09.17

License Series A MMII

Major repair of the frame roof with thermal insulation of the ceiling, thermal insulation and finishing of the facades of the Creÿei building - Kindergarten No. 2

"Licurici" in the municipality of Cahul, str. Ion Luca Caragiale no. 12, no. cadastral 1701114.086

SRL "PROJECT-DESIGN"

NOTE:

2 150

BENEFICIARY:

Cahul City Hall

500 5,600

3 100

Wood that is in satisfactory condition will be reused for the new roof. 3) The existing roof -

6,787 m3 4) The existing roof is of the roof type with slate sheets. It is in unsatisfactory condition and does not meet the standards. It is intended for dismantling - 242.40 m2.

3 100

5,900

1 800

1 700

1) The existing floor is made of prefabricated panels. The condition of the floor is satisfactory. 2) As a result of wetting, the wooden frame partially rotted - it is dismantled.

6,400

12,500

10-12/20 - 2 - Sat

+3,300

6 100

12,500

Wooden carpentry (windows) (pcs.) 14

1 Drum (plank) (m2) 6.04

GSPublisherVersion 0.49.100.100

License Series A MMII

No. 055984 from 08.09.17

PIC. THE AMOUNT

BOARD OF DISMANTLING WORKS

items NOTES

+3,300

6 1006,400

±0.000

12,500

SRL "PROJECT-DESIGN"

11/20

11/20

GroupGroup

2b

A

3b

A

C

B

2b 3b

B

C

1b 1b

Limbas S.

3 100

1 800

1 600 2000

6 100

5,600

1 600

1 800

5,600

1 7002000

2 150

3 950

5,600

1 950

6,400

2 100

6,400

3 100 3 1001 700

12,500

5,900

5,900

3 100

5,900

2 150

Signal. Date.Mode. part no. Sheet No. doc.

Major repair of the frame roof with thermal insulation of the ceiling, thermal insulation and finishing of the facades of the Creÿei building - Kindergarten No. 2

"Licurici" in the municipality of Cahul, str. Ion Luca Caragiale no. 12, no. cadastral 1701114.086

BLOCK "A"

9 2. 3ON

Prepared Prepelita A.

Ground plan (dismantling) quota 0.000. Floor plan

(dismantling) elevation +3,300

BLOCK "B"

Flat Phase

A.ÿ.P.

boards

BLOCK "A"

2 250

1 800 1 550 two hundred

9,700

3 650 3 300

1 600

2 250

3 400

2,800

1 800

5,950

1 300

1 400

13,000

7,900

2,800 two hundred

1 800 two hundred

4,850

1 300

9,200

1 800 1 550

4 400

2 250

3 100

13,000 two hundred

150 1 400

9,700 two hundred

4 400

2,800

900 7

2 350

3 400

3 300

2 000 1 500

10-12/20 - 2 - Sat

3) The old (wooden) windows are dismantled.

2) The existing metal escape stairs are in satisfactory condition. Their renovation is planned; they will be scraped, primed and painted in 2 layers.

4) During the execution of the dismantling work on the existing eaves , protection measures for the existing windows must be provided. Dismantling works to be carried out on small sectors.

BENEFICIARY:

Cahul City Hall

NOTE:

1) The existing drum is made of wood. His condition is unsatisfactory. It is planned to dismantle it.

GROUND PLAN (dismantling) elevation 0.000 SC.1:100 FLOOR PLAN (dismantling) elevation +3,300 SC.1:100

GROUND PLAN (new constructions) elevation 0.000 SC.1:100

Group

FLOOR PLAN (new constructions) elevation +3,300 SC.1:100

Group

1b

B

C

B

A

2b 3b1b 2b

A

C

3b

Mode. part no. Sheet No. doc. Date.Signal.

Limbas S.

2 250

150 1 400

F 2

3 400

F 2

1 400

1 300

7,900

2 250

F1

F 2

9,700

1 800 1 550

5,950

4 400

3 300 two hundred two hundred

13,000

1 800

3 100

2 000 1 500

2,800

U1

13,000

2 250 two hundred

1 800 1 550 two hundred

F1 two hundred

900 7 9,200

2,800

1 600

4 400

2 350

3 400

4,850

2,800

1 300

3 650 3 300

F 2

9,700

1 800

SRL "PROJECT-DESIGN"

6 100

12,500

+3,300

6,400

10-12/20 - 2 - Sat

±0.000

11/20

11/20

License Series A MMII

No. 055984 from 08.09.17

2 150

6,400

3 100 800 1 700

6,400

PIC. NOTESTHE AMOUNT

6 100

3 100 3 100

BOARD OF NEW BUILDING WORKS

5,900

1 800

2 150

12,500

5,600

800 800

5,900

1 800 items

3 100 1 700

1 600

5,600

3 950 1 950

5,900

BENEFICIARY:

Cahul City Hall

2 100

5,600

Major repair of the frame roof with thermal insulation of the ceiling, thermal insulation and finishing of the facades of the Creÿei building - Kindergarten No. 2

"Licurici" in the municipality of Cahul, str. Ion Luca Caragiale no. 12, no. cadastral 1701114.086

F3

BLOCK "B"

2. 3

F1

Flat Phase11.20

A.ÿ.P.

F3 boards

PVC carpentry (windows) (pcs.)

24.00

F3 F2

Metal railing (ml) Galvanized sheet apron b=200mm (m/l)

F3

F1

Basement awnings - corrugated board (m2) 2.00

Prepared Prepelita A.

BLOCK "A"

ON

Ground plan (new construction) elevation 0.000. Floor plan

(new construction) elevation +3,300 see pl. 12

BLOCK "A"

9.80

F2

Window awnings - technonikoli (m2)

274.40 kg see pl.12

Galvanized sheet dripper b=200mm (m/l)

24.00 GSPublisherVersion 0.49.100.100

Resume

1 300

4 4304 430

2,800

2 100

Dormer L1 entrance to the attic

Existing parapet h=800mm

Resume

Resume

12,300

New belt on perimeter h=200mm

3 440

Resume

Sm2

12,300

SRL "PROJECT-DESIGN"

4 300

13,000

12,750

4 300

13,000 12,750

8,050

4 400

400 400

11/20

11/20

C

1b

A

3b

C

A

1b 3b

Limbas S.

h=150mm see "C" h=50mm Mode. part no. Sheet No. doc.

see pl. 14

Signal.

h=4.00m

Date.

see pl. 15

DESIGNED CERDAC PLAN (elevation +6,600) SC.1:100 EXISTING CERDAC PLAN elevation +6,600 SC.1:100

Major repair of the frame roof with thermal insulation of the ceiling, thermal insulation and finishing of the facades of the Creÿei building - Kindergarten No. 2

"Licurici" in the municipality of Cahul, str. Ion Luca Caragiale no. 12, no. cadastral 1701114.086

10-12/20 - 2 - Sat

38,40

BLOCK "B"

Cement-plast thermal insulation (m3)

23.50

NOTES

THE AMOUNT

Metal ladder Sm2 (pc.)

Flat Phase

A.ÿ.P.

Ventilation channel (pcs.)

Existing cerdac plan. Plan cerdac designed elevation + 6,600.

Mortar screed (m2)

2. 3 boards

Reinforced concrete belt (m3)

156.80 see "C"

ON

PIC.

Prepared Prepelita A.

items

Galvanized profiles (m2)

4 Skylight L1 (pc.)

GSPublisherVersion 0.49.100.100

BENEFICIARY:

Cahul City Hall

6) Details on L1 dormers see pl. 14.

5) The dimensions and location of the ventilation ducts to be determined on site.

NOTE:

1) The existing floor is made of prefabricated panels.

The condition of the floor is satisfactory.

7) Details on the metal scale see comp. "C".

2) On the perimeter of the building to be executed, the monolithic reinforced concrete belt h=200mm (see comp. "C").

BORDEROU MATERIALS

3) It is recommended to perform thermal insulation on the entire surface of the floor: a layer of cement plaster - 150

mm. Above to execute the h-50mm mortar screed.

4) The existing ventilation ducts to be raised above the roof level, to be executed according to the project

(see compartment "C").

12,500 12,500

No. 055984 from 08.09.17

License Series A MMII

+10,300

10-12/20 - 2 - Sat

12,500

+10,060

+10,400

+10,400

3 300

SRL "PROJECT-DESIGN"

Mode. part no. Sheet No. doc.

see "C"

Signal.

Existing wall

Date.

L=1000mm zinc 275gr/m2 thick.0.45mm

TECHNONICOLI

zinc metal tile 275gr/ m2 thick.0.45mm

Exterior finish insulation see pl. 19

Galvanized sheet apron

Galvanized sheet dripper

Window see pl. 15

Existing floor (at windows)

11/20

11/20 trough trough

BP1

pipe

5. The joints and junctions of the roof elements to be executed with nailed studs at a distance of 20 cm from the edge (posts, diagonals).

8. Specifying the ventilation ducts as planimetric dimensions will be established on site.

pipe pipe

The snow guard

3. Under the elements resting on the wall or slab, lay 2 layers of ruberoid on bitumen mastic on the leveled surface with 20mm mortar.

Resume

14 640

7 320

Sm2

1. For roof truss structures, the wood should be softwood (pine), the humidity of which should not exceed 20%. Type of wood - II. The dimensions of the elements must be according to GOST 8486-86.

pipe trough

6 820

BENEFICIARY:

Cahul City Hall

EXECUTION NODE

BP1

6 820 pipe

6. Roof construction works to be performed according to ÿÿÿÿ II-25-80 "ÿÿÿÿÿÿÿÿÿÿ ÿÿÿÿÿÿÿÿÿÿÿ". 7. The frame will be made of corrugated sheet metal on the wooden case.

4. After installing and aligning with nails the load-bearing elements of the frame to be reinforced later with bolts.

Resume trough pipe

L1

2. All wooden elements of the frame to be subjected to antiseptic and fireproof treatment according to CHÿÿ 2.03.11-85.

7 320

WINDOW CANOPIES

pipe

5 280

BORDEROU ROOFING MATERIALS

2 770

14,750

4 pl.

4 pl.

i = 20°

13,000 i = 20°

Major repair of the frame roof with thermal insulation of the ceiling, thermal insulation and finishing of the facades of the Creÿei building - Kindergarten No. 2

"Licurici" in the municipality of Cahul, str. Ion Luca Caragiale no. 12, no. cadastral 1701114.086

BLOCK "B"

NOTES

59.00

55.00 m/l

THE AMOUNT

Flat Phase

Gutter (m/l)

A.ÿ.P.

Skylight L1 (pc.)

Corrugated board (roof eaves (m2))

2. 3

Projected roof boards

PIC.

ON

items

235.90

Prepared Prepelita A.

47.00

Metal ladder (pcs.)

Downspout (pc.)

Roof block "B" (m2)

Snow guard (pc.)

41.30

GSPublisherVersion 0.49.100.100

Limbas S.

Guard rail Bp-1 (ml)

License Series A MMII

No. 055984 from 08.09.17 floors i=25°

PROJECTED ROOF PLAN SC.1:100

Note:

floors i=25°

A

1b

C

3b

Composition I

BENEFICIARY:

Cahul City Hall

12,500

Composition IV

Metal tile (red color) Slats 100x30 pitch 250...350mm

Counterslats 50x50 on the rafters Diffuse waterproofing membrane

120g/m2 Rafters 160x50 pitch 800mm

Composition III

Cement-sand mortar leveling screed M100 - 50mm

Composition II

6 1006,400

License Series A MMII

No. 055984 from 08.09.17

Major repair of the frame roof with thermal insulation of the ceiling, thermal insulation and finishing of the facades of the Creÿei building - Kindergarten No. 2

"Licurici" in the municipality of Cahul, str. Ion Luca Caragiale no. 12, no. cadastral 1701114.086

SRL "PROJECT-DESIGN"

C

pl. 16

III

N

D

pl. 17

Resume

A

pl. 16

B pl. 16

SECTION 3 - 3 DESIGN SC.1: 100

A

pl. 16

L2 yl and

1b 2b 3b

11/20

11/20

10,300

6,600

7,600

6,000

2,700

-1,600

10-12/20 - 2 - Sat

4,000

-0.450

3,300

-0.600

2,100

0.700

10,400

6,800

0.000

Limbas S.

GSPublisherVersion 0.49.100.100

2. 3 boards

Mineral wool thermal insulation - 50mm

Mesh glue

Finishing the ceiling

ON

Klinker brick cladding

Fiberglass net

Vertical linochrome waterproofing - 1 layer

Prepared Prepelita A.

Cyclopean concrete

Decorative plaster

BLOCK "A"

Vapor barrier - ruberoid on bituminous mastic

Plastic dowels for fixing polystyrene

Mesh glue

BLOCK "B"

Fiberglass net

Mesh glue

A.ÿ.P.

Mesh glue

Plastic dowels for fixing polystyrene Adhesives for fixing polystyrene Cement-based plaster

Limestone blocks M.35 on mortar M.50 Interior plaster

Existing precast concrete slab floor - 160 mm

Glue for fixing polystyrene

Interior plaster

Flat Phase

Thermal insulation with cementoplast Ø200 h=150 mm

- it is a solution for thermal insulation of the attic

Thermal insulation from extruded polystyrene - 80mm

Bitumen-based primer

Section 3-3 projected

Mode. part no. Sheet No. doc. Signal. Date.

3 300

Composition IV

Metal tile (red color) Slats 100x30 pitch 250...350mm

Counterslats 50x50 on the rafters Diffuse waterproofing membrane

120g/m2 Rafters 160x50 pitch 800mm

Composition I

BENEFICIARY:

Cahul City Hall

Composition II

Composition III

Cement-sand mortar leveling screed M100 - 50mm

No. 055984 from 08.09.17

License Series A MMII

Major repair of the frame roof with thermal insulation of the ceiling, thermal insulation and finishing of the facades of the Creÿei building - Kindergarten No. 2

"Licurici" in the municipality of Cahul, str. Ion Luca Caragiale no. 12, no. cadastral 1701114.086

SRL "PROJECT-DESIGN"

yl

III

SECTION 4 - 4 DESIGN SC.1:100

ResumeL1 N and

D

pl. 17

C

pl. 16

A

pl. 16

Sm2

B C

11/20

11/20

6,600

0.000

6,800

10-12/20 - 2 - Sat

-0.600

2,100

7,600

10,30010,060

-1,600

5,400

-1,850

0.000 -0.400

3,300

Limbas S.

GSPublisherVersion 0.49.100.100

Finishing the ceiling

ON

Mesh glue

Prepared Prepelita A.

Glue for fixing polystyrene

Vapor barrier - ruberoid on bituminous mastic

Klinker brick cladding

Cyclopean concrete

Thermal insulation from extruded polystyrene - 80mm

Mesh glue

BLOCK "B"

Mesh glue

Fiberglass net

A.ÿ.P.

BLOCK "A"

Existing precast concrete slab floor - 160 mm Flat Phase

Vertical linochrome waterproofing - 1 layer

Thermal insulation with cementoplast Ø200 h=150 mm

- it is a solution for thermal insulation of the attic

Plastic dowels for fixing polystyrene

Mineral wool thermal insulation - 50mm

Interior plaster

Section 4-4 projected

Fiberglass net

2. 3

Mesh glue

Bitumen-based primer boards

Decorative plaster

Plastic dowels for fixing polystyrene Adhesives for fixing polystyrene Cement-based plaster

Limestone blocks M.35 on mortar M.50 Interior plaster

Mode. part no. Sheet No. doc. Signal. Date.

1 100

1 100

1 560

1 100

9 0

1 700

40 45

Limbas S.

45°

Mode. part no. Sheet No. doc. Signal. Date.

License Series A MMII

No. 055984 from 08.09.17

10-12/20 - 2 - Sat

11/20

11/20

1 - 1 m3 m3

Major repair of the frame roof with thermal insulation of the ceiling, thermal insulation and finishing of the facades of the Creÿei building - Kindergarten No. 2

"Licurici" in the municipality of Cahul, str. Ion Luca Caragiale no. 12, no. cadastral 1701114.086

All wood

50°

GOST 8486-86

Sash BLOCK "B"

6.65

Prepared Prepelita A.

variable

8.50

GOST 8486-86

ON

variable

Sash

2. 3

8.80

GOST 8486-86

Attic L1. Details

3 030

0.02

10.00

Sash

GOST 8486-86

0.05

Total dormer wood (L1) 1 pieces

Door

0.03

50°

Slat (garnish)

0.01

3 030 boards

A.ÿ.P.

Flat Phase

45° mm4

GSPublisherVersion 0.49.100.100 fascia

RIDGE

SCALE 1:20

WALL GLASS

mourning

BENEFICIARY:

Cahul City Hall

LOFT L1

ml VolumeName dimensions, BORDEROU SKYLIGHT (L1)

0.10

IndicationPos.

0.10

SRL "PROJECT-DESIGN"

ventilation duct

(150) variable variable

Rafter 150x50 6

-4x40 on the sealing perimeter3 step 500mm

5 6 variable

-4x40 pitch 250mm

Date.Mode. part no. Sheet No. doc. Signal.

2. 3

Major repair of the frame roof with thermal insulation of the ceiling, thermal insulation and finishing of the facades of the Creÿei building - Kindergarten No. 2

"Licurici" in the municipality of Cahul, str. Ion Luca Caragiale no. 12, no. cadastral 1701114.086

Scale 1:20 Execution detail of the ventilation channel

10-12/20 - 2 - SatBENEFICIARY:

Cahul City Hall

GSPublisherVersion 0.49.100.100

Node C

6,460 variable

6,600

No. 055984 from 08.09.17

License Series A MMII

SRL "PROJECT-DESIGN"

14- Dropper

22- Thermal insulation

2- Galvanized profile

6- Diffuse membrane

25- Protective railing

2- Existing belt

12- Sort gutter

20- The new belt

NOTES:

10- Self-tapping screw

5- Galvanized sheet

8- Slat 100x30 mm

17- Mane

15- Burlan

23- Sandrama covered with corrugated sheet

3- Bituminous cardboard

3- Wooden bars 50x60mm

5- Deer

21- Vapor barrier

13- Gutter

1- Metal corner

NOTES:

19 - Existing precast concrete slab

1- Existing parapet/ Existing wall

11- The snow guard

9- Metal tile

18- Mane element

6- Mineral wool

24- Board casing

4- Galvanized metal plate

4- Grooved 150x100mm

16- Thermal insulation

7- Plywood 50x50 mm

Limbas S.

11/20

11/20

20° two hundred

Flat Phase

2. 3

Nodes A, B, C. Execution detail of the ventilation channel

BLOCK "B"

Prepared Prepelita A.

A.ÿ.P.

boards

16ON

Major repair of the frame roof with thermal insulation of the ceiling, thermal insulation and finishing of the facades of the Creÿei building - Kindergarten No. 2

"Licurici" in the municipality of Cahul, str. Ion Luca Caragiale no. 12, no. cadastral 1701114.086

SRL "PROJECT-DESIGN"

h=100mm

11/20

11/20

PVC - profile 5 chambers, 2 layers of glass, with ventilation

6 36

5. It is important to determine who is responsible for protecting the installed windows against possible damage until the time of reception. It is recommended to agree with the beneficiary on taking individual measures, for example, on protection in case of removing the excess foam. When carrying out masonry repairs, the profiles must be covered.

800×800

Material

BENEFICIARY:

Cahul City Hall mark

F1 and

2. In case of installation at temperatures below 5 degrees Celsius, the specific properties of the materials used will be taken into account. Direct hits on the profile frame and on the wings will be avoided. 3. For all profiles, the protective film must be removed immediately after assembly.

1. The windows must be mounted horizontally, perpendicularly, and according to the measurements.

opening elements.

Schematic of the element yl

PVC - profile 5 chambers, 2 layers of glass, with ventilation

F2

4 36

NoteThe amount

4. Residues left on the profile will be removed immediately after the foam has hardened.

1800×2000

F3

Deviations from this request must be agreed in writing.

-1,600

Empty dimensions, LxH mm

4 11

NOTE: Details for compositions I and II see pl. 13-14.

PVC - profile 5 chambers, 2 layers of glass, with ventilation

2000×2000

6. After finishing the assembly, the functionality of everything will be checked and verified in writing

Joinery borderou (windows)

10-12/20 - 2 - Sat

General installation instructions

Limbas S.

Mode. part no. Sheet No. doc. Date.Signal.

1 800

GSPublisherVersion 0.49.100.100

ON 2. 3

BLOCK "B"

Flat Phase

Prepared Prepelita A.

boards

A.ÿ.P.

Node D. Borderou carpentry (windows) No. 055984 from 08.09.17

License Series A MMII

(fraction 20-40) existing

10 -12 /20 - 2 - SA

Limbas S.

GSPublisherVersion 0.49.100.100

BENEFICIARY:

Cahul City Hall

Flat Phase

BLOCK "B"

boards

Prepared Prepelita A.

A.ÿ.P.

18ON 2. 3

Rules for fixing windows License Series A MMII

No. 055984 from 08.09.17

Mode. part no. Sheet No. doc. Signal. Date.

SRL "PROJECT-DESIGN"

Major repair of the frame roof with thermal insulation of the ceiling, thermal insulation and finishing of the facades of the Creÿei building - Kindergarten No. 2

"Licurici" in the municipality of Cahul, str. Ion Luca Caragiale no. 12, no. cadastral 1701114.086

11/20

11/20

A

B

B A

View A

View B

Limbas S.

20 30 20

Welding height h=6mm two hundred

1 200

Hole Ø10

BENEFICIARY:

Cahul City Hall

ON 2. 3

Guard rail Bp-1

Flat Phase

BLOCK "B"

Prepared Prepelita A.

A.ÿ.P.

boards

1-1

A

Signal. Date.Mode. part no. Sheet No. doc.

Major repair of the frame roof with thermal insulation of the ceiling, thermal insulation and finishing of the facades of the Creÿei building - Kindergarten No. 2

"Licurici" in the municipality of Cahul, str. Ion Luca Caragiale no. 12, no. cadastral 1701114.086

Guard rail BP-1 ml ml ml

10-12/20 - 2 - Sat

GSPublisherVersion 0.49.100.100

1 1.21

Item

Ø 16 AI GOST 2590-71*

l=1370

47.00

United

Table.

Ø 14 AI GOST 2590-71*

The amount

2.16

Remarks

Guard rail

The element's name

SRL "PROJECT-DESIGN"

License Series A MMII

No. 055984 from 08.09.17

Border of protective railing elements

11/20

11/20

-0.600

6,000

5. Details of L1 attic see pl.15.

10,060

0.700

2,700

10,400

2,700

3. Mealic scales Sm1 are existing and restored.

10,300

1. Details on ventilation ducts see pl. 16.

1,900

4,000

10,300 10,400

5,200

6,000 6,100 5,676

9,825

2. Brand new PVC windows.

4. Details of metal ladders Sm2 and Sm3 see compartment "C".

0.700

2,700

10,060 i=20°

BENEFICIARY:

Cahul City Hall

10,400

4,000

6,000

SRL "PROJECT-DESIGN"

Major repair of the frame roof with thermal insulation of the ceiling, thermal insulation and finishing of the facades of the Creÿei building - Kindergarten No. 2

"Licurici" in the municipality of Cahul, str. Ion Luca Caragiale no. 12, no. cadastral 1701114.086

11/20

11/20

F2

F3

Resume

BP1

F2

L2

BLOCK

i=25°

F3

BP1

Sm2

F1

FACADE IN AC AXES - DESIGNED SC.1: 100

Sm1

F2

BP1

F1

F3

U1

Resume

Resume

L1 trough

F2

F3 pipe

BLOCK

F2

Sm 1

Note:

Sm2

L1

F2

FACADE IN AXES 1b-3b - DESIGN SC.1: 100

A 3b1b

C

Limbas S.

10-12/20 - 2 - Sat

12,500

13,000

GSPublisherVersion 0.49.100.100

BLOCK "B"

2. 320

Flat Phase

Facades between axes 1b-3b; CA designed

A.ÿ.P.

ON

boards

Prepared Prepelita A.

No. 055984 from 08.09.17

License Series A MMII

1 600

Date.Mode. part no. Sheet No. doc. Signal.

10,060

4,000

13,000

10,300

4,000

0.700

3,300

10-12/20 - 2 - Sat

6,050

2,700

6 100

10,400

6,400

10,40010,300

2,700

6,000

10,400

6,000

2,700

0.700

12,500

0.000

-0.650

6,100

No. 055984 from 08.09.17

License Series A MMII

Date.Mode. part no. Sheet No. doc. Signal.

SRL "PROJECT-DESIGN"

F1 i=20°

BLOCK

Note:

i=25°

BLOCK

BP1

Resume

FACADE IN AC AXES - DESIGNED SC.1: 100

trough

BLOCK A

pipe

FACADE IN AXES 3b-1b - DESIGN SC.1: 100

F1

BP1

BP1

Sm1

BLOCK A

Resume

L1 Resume

Sm2

Major repair of the frame roof with thermal insulation of the ceiling, thermal insulation and finishing of the facades of the Creÿei building - Kindergarten No. 2

"Licurici" in the municipality of Cahul, str. Ion Luca Caragiale no. 12, no. cadastral 1701114.086

11/20

11/20

THAT

1b

A 2b3b

Limbas S.

GSPublisherVersion 0.49.100.100

3. Mealic scales Sm1 are existing and restored.

1. Details on ventilation ducts see pl. 16.

0.000

2,900

BENEFICIARY:

Cahul City Hall

2. Brand new PVC windows.

4. Details of metal ladders Sm2 and Sm3 see compartment "C".

-0.900

6,200

5. Details of L1 attic see pl.15.

boards

2. 3

Facades between AC axes; 3b-1b designed

Flat Phase

ON

A.ÿ.P.

Prepared Prepelita A.

BLOCK "B"

- Plywood from tiles and tiles.

10-12/20 - 2 - Sat

Preparatory operations:

- Cement mortar plasters

- Smoothed plasters:

GSPublisherVersion 0.49.100.100

Flat Phase

ON

A.ÿ.P.

General instructions for finishing work - start boards

Prepared Prepelita A.

BLOCK "B"

2. 3

License Series A MMII

No. 055984 from 08.09.17

General instructions for finishing works

Date.Mode. part no. Sheet No. doc. Signal.

SRL "PROJECT-DESIGN"

Major repair of the frame roof with thermal insulation of the ceiling, thermal insulation and finishing of the facades of the Creÿei building - Kindergarten No. 2

"Licurici" in the municipality of Cahul, str. Ion Luca Caragiale no. 12, no. cadastral 1701114.086

11/20

11/20

The application of the smoothing trowel will be done with trowel trowel, in layers of 1 mm thickness or using and those with the following irregularities:

that the plating is performed to be protected from the action of atmospheric precipitation;

them under pressure.

The flatness of the surface of the blade will be checked, using the metal ruler.

The installation of the plywood will be done with tiles or tiles with adhesive paste as specified

The materials can only be introduced into the work if it has been verified in advance by the site management that they were delivered with certificates of conformity, which confirm that they comply with the respective norms.

The work will not start until the works already executed (the floor) are satisfactorily protected.

Before starting the tiling works, a surface inspection will be made of what is to be tiled. Work will not begin until any irregularities found have been rectified (vertical and horizontal deviations, as well as possible defects or apparent degradation).

paint available for walls and ceilings).

the other finishing works as follows:

Before starting the cladding works, the following operations will be performed: -removal of possible mortar remains, dust, grease stains, etc. - the masonry joints

(horizontal and vertical) must be thoroughly cleaned to a depth of about 1 cm, BENEFICIARY:

Cahul City Hall

*Large dents (up to max. 3 mm) and deep scratches formed during chipping, on the coating layer.

The tiles will have the following physical-chemical characteristics: - water absorption coefficient: max. 18% for tiles and max. 2.5% for tiles. - when testing resistance to fine cracking, the samples will not show any such cracking; - during the chemical resistance test, the finish (glaze) will remain undamaged.

- Plastering of ceilings and non-cladding surfaces, in the rooms where cladding will be done.

- Execution of cold floors (cast mosaic, mosaic tiles, tiles, marble, etc.).

Any existing cracks in the masonry will be injected with cement milk to restore continuity.

Any local irregularities will not exceed 10 mm (bumps or depressions).

The smoothing will be done manually, with a trowel (the trowel steel).

aspect can be checked at any time, after the completion of the entire object.

- The specified execution technology was not respected, which led to damage to the works.

- It does not comply with the indications provided in the project regarding the thickness, layout, coverage, flatness, non-formity (as processing), the connecting edges of the walls with the ceiling, the jambs, the edges of the door or window openings, spalls.

the producer (designer).

- Installation of window frames and door frames and linings, except for window sills

The obtained surface must be perfectly smooth to the touch, any asperities will be cleaned and smoothed with fine glass paper. For the surfaces of the walls made of bca blocks, with thin joints of 2-3 mm, apply the smoothing putty based on sand and fine sand with a composition of 1:2:0.5 (sand sand DP 25; fine sand 0.2 mm; water) in volumes.

Installation of dowels or devices for fixing sanitary objects, any holes the manual or electric painting device, or the plastering gun.

The thickness of the screed layer of 1-3 mm is obtained through two or three successive applications and leveling.

The screed layer will be executed by spreading and smoothing the paste with the screed steel, on surfaces of max.

1 m in order to be able to achieve the smoothing before the paste hardens.

so that the fixing mortar adheres as well as possible to these surfaces.

- The envelope of the building, with the execution of the leaks in the solution will be defined, so that the surfaces on

During the work, it is necessary to check if the execution technology is respected, the use of the type and composition of the mortar, as well as the application of successive layers without exceeding the maximum thicknesses.

Measures will be taken against too fast drying (wind, sunshine), washing by rain or frost.

The tiles will not have dark spots with an area larger than max. 1.5 mm2 at max. 2% of the sample, cracks in the glaze, thickening of the glaze or insufficiently glazed areas, "ice cream" or crystalline appearance and rough areas.

Before starting any tiling operations with tiles or tiles, they will be executed

The grout will be provided as a support layer for the realization of superior quality finishes (ex.: paints with

- Installation of sanitary, electrical and heating pipes buried under plywood and testing

- The execution of warm floors (parquet, PVC, etc.) that degrade at high humidity, will be done only after installing the tile.

Works that do not comply with the provisions of these specifications will be classified as defective, such as

If these deviations are exceeded, the surface will be straightened by completing with

Defects that do not allow the following defects:

*Swellings, dents, pinches (lime shots), stains, efflorescence, cracks, cracks, missing window frames, window sills, plinths, technical-sanitary objects.

Considering that the plasters are works intended to remain visible, their quality from the point of view of

The verification of the quality of the support on which the plaster is applied is done during the verification of the execution of this support. It is absolutely forbidden to apply the plaster over a support that has not been received according to the specific instructions. Before the execution of the plasters, it is necessary to check whether all the works designed to protect them or works that, through subsequent execution, would cause damage to the plasters have been received: coverings, floors, balconies, installations, carpentry on the frame, etc. It will be checked if all the parts necessary for each carpentry or installations have been installed once the supports have been executed.

It is absolutely necessary to reduce the general humidity of the building, which negatively influences its structure.

they will mount after the execution of the plywood.

subsequent ones to be given only with the drill.

The application of tiles or sandstone will be done only on dry surfaces, prepared in advance and which fall within deviations from flatness between 3 mm/ m vertically and 2 mm/ m horizontally.

mortar or putty. The thickness of the mortar layer should not exceed 1-2 cm.

- It does not respect the verticality and horizontality of the surface and edges, the flatness of the plastered surface.

- Painters and painters.

Painters and painters being works intended to remain visible, their quality from the point of view of appearance can be checked at any time, even after the completion of the entire objective, and consequently it is not necessary to conclude minutes of hidden works.

10-12/20 - 2 - Sat

SRL "PROJECT-DESIGN"

Mode. part no. Sheet No. doc. Signal. Date.

11/20

11/20

Major repair of the frame roof with thermal insulation of the ceiling, thermal insulation and finishing of the facades of the Creÿei building - Kindergarten No. 2

"Licurici" in the municipality of Cahul, str. Ion Luca Caragiale no. 12, no. cadastral 1701114.086

GSPublisherVersion 0.49.100.100

Limbas S.

- The plywood must have a uniform color over the entire surface; tone differences are not allowed between the mounted panels, nor within the same panel; dirt stains, visible places with defective enamel, etc. are not allowed.

- After finishing the drawing operations, you can proceed to the execution of the plywood application in the next one

The site manager must check all materials before they are introduced into the work.

through rain or frost.

- The installation of the boards will be done by applying the mortar or adhesive paste with a trowel on the back of the board, as the case may be, and applying the boards by pressing them on the support layer.

During the execution of the works, it is necessary to check the execution technology, provided in the technical prescriptions, the use of the recipes and the composition of the indicated mixtures, as well as the application of successive layers in the order and at the prescribed time intervals.

- The surface of the plywood will be checked with a 1.20 m ruler, and at most one wave with an arrow will be allowed

It is forbidden to start the execution of any painting, painting or wallpapering work, before the support has been carefully checked by the site managers, regarding the fulfillment of the quality conditions of the support layer.

* Failure to respect the continuity and dimensions of the joints in the two directions.

- The following will be considered defects that must be repaired locally or completely: *Non-compliance with these specifications.

The marking will be done with a wooden straightedge of a maximum length of 2 m and with the help of repenes made of pieces of tiles or sandstone provisionally fixed with plaster mortar on the respective surface of the plaster, in the immediate vicinity of the surface to be tiled. The lead wire, left in front of the markers, must represent the line of the plywood surface to be executed.

After this operation, the joints will be filled with white cement paste, if not specified otherwise, at a time interval of 6-8 hours after finishing the execution of the plywood on the entire surface of the respective room.

- Placing the boards will start from the floor level, taking care to match the joints of the floor with those of the plywood if not specified otherwise and correlating the plywood (perfectly adjusted horizontally) with the floor whose level can be tilted.

At the preliminary reception, the same checks are carried out directly by the commission, but with a frequency of at least 1/5 of the previous frequency.

- It is checked every time with the right hand.

- During the warm season, the surfaces exposed to the sun will be covered with sackcloth sheets in strips or sheets that will be permanently moistened for 2 days.

BENEFICIARY:

Cahul City Hall

- Allowed deviations for the finished surfaces will be +/- 2 mm below the 1.20 m long rectangle.

Checking the quality of the paints and varnishes is done only after their complete drying and has the main purpose of detecting defects that exceed the permissible deviations in order to carry out repairs and eliminate the possibility that these defects will be repeated in the future.

cracks in the plates, separation of the plates from the support layer, stains, etc.

glazed, or corner profiles.

sequence of operations.

The materials must be delivered with a certificate of conformity to confirm that they are

The following measures will be taken to protect the plywood works: - The spaces in which the tile or sandstone veneers were executed will be closed and kept like this until the work is completely dry.

- The rows of boards must be regular, with continuous or alternate rectilinear joints, wide

The application of protective measures against sudden drying (wind, sunlight), washing will be followed of maximum 2 mm.

*Applying to the edges of the walls or pillars some normal boards and not the special boards with the edge

The execution of cladding works will be carried out in compliance with the following requirements:

After placing each row of tiles, the excess mortar will be cleaned and poured into the remaining voids

The verification of the quality of the support on which the paints and varnishes are applied is done within the verification of the execution of this support (plasters, masonry, concrete, grouts, carpentry elements, installations).

Before starting painting works, it is necessary for painters to check whether all works intended to protect them (students) or whose subsequent execution could cause their damage (installation pipes, carpentry) have been executed and received, as well as whether they have been all auxiliary parts installed: (dowels, brackets, supports for sanitary objects or heating elements).

corresponding to the respective norms.

The receipt verification of the works is carried out as follows:

*Faulty positioning of the boards with deviations from the vertical and horizontal.

The checks that are carried out during the verification of a work phase are done at least one for each room and at least one for every 100 square meters.

The drawing of the surfaces to be tiled will be done both horizontally and vertically.

- Wet tiles will not be used for cladding.

After approx. 5-6 hours after finishing the plywood, the joints between the boards will be cleaned by rubbing.

*Damage to the plywood resulting from inadequate protection of the works until reception:

- Tiles or sandstone tiles will be cleaned of dust and impurities, they will be kept in water for 10-15 minutes before the start of tiling and then they will be drained from the water for 5-10 minutes.

behind the boards, cement milk.

- The plywood will be protected from damage until the work is received.

uniform and well filled with white cement milk.

License Series A MMII

No. 055984 from 08.09.17

ON

A.ÿ.P.

BLOCK "B"

boards

Prepared Prepelita A.

General instructions for finishing work - end

2. 3 2. 3

Flat Phase

SRL,,PROJECT-DESIGN''

Cahul, str. Ion Luca Caragiale no. 12, no. cadastral 1701114.086

Major repair of the frame roof with thermal insulation of the ceiling, thermal insulation and finishing of the facades of the Kindergarten /Nursery No. 2 "Licurie" Municipality of

License series A MMII

No. subject: 10-12/20

Beneficiary: Cahul City Hall

No. 055984 of 08.09.17

Chisinau 2020

Department: Organization of construction works - OLC

Website - Proiectmd.com.

Address: Chisinau municipality, 49 Alexandru cel Bun str.

Email: proiectmd001@mail.md, Tel. 067677606.

GSPublisherVersion 0.49.100.100

Execution project

In cases of road crossings by temporary pipes or cables, they will be

Free access will be ensured to all buildings under construction and those under construction, including temporary ones. The construction of the road and the access to the building under construction must be completed before the foundation works start.

The following documents were used to develop the "OLC" construction work organization project norms:

1. Norms and rules in construction "Organization of production in construction" СНиП 3.01-85;

2. The designer's guide "Organization of construction works";

3. СНиП III-4-80* "Work safety in construction". The administration of the construction unit is obliged to provide the workers with overalls and shoes of appropriate sizes, as well as with means of individual protection, corresponding to the specifics of the workplace.

About the performance of repair works, or about the temporary closure of roads, a

ORGANIZATION OF CONSTRUCTION WORKS

No. 098/1 of 04.12.2020 ISP: Para V. Certificate series 2019-P no. 0264 of 26.06.2019

BENEFICIARY:

Cahul City Hall

General data They served as initial data for the development of the construction site organization project

Placards with inscriptions and warnings will be installed in all construction sectors, on machinery and equipment, on access roads and in any other place where this is required.

The total term of the execution works will be carried out within 6 months.

Builders are obliged to strictly comply with fire safety requirements at all stages of construction, starting with preparatory work, in accordance with the "Rules of fire safety when carrying out construction-assembly works".

LIST OF EXECUTION DRAWINGS IN THE COMPARTMENT

the location of the fire hydrant.

LABOR PROTECTION

FIRE SAFETY

Characterization of the designed construction:

The construction land is located in the municipality of Cahul, str. Ion Luca Caragiale no. 12, no. cadastral 1701114.086.

On that lot, capital repair of the frame-type roof with thermal insulation is expected the ceiling, thermal insulation and finishing of the facades of the Crèche - Kindergarten No. 2 "Licurici" building.

The designed object constitutes a combined construction:

- Constructive scheme: Frame filled with bearing masonry;

- Foundations - continuous from FS prefabricated blocks with t=400mm;

- Longitudinal and transversal load-bearing walls made of small M35 limestone blocks on M50 cement mortar;

- Partition walls - Small M35 limestone blocks on M50 mortar with t=200mm and brick with t=120mm in sanitary groups;

- Plansee - from prefabricated boards with holes with t=220mm;

- The existing roof - wooden Sarpanta type with slate sheets.

- The new roof - wooden Sarpanta type with metal tile covering.

Basing the methods of carrying out the main works

1. Site preparation works

- installation of the temporary protective fence (during construction);

- demolition of existing buildings;

- installation of temporary drinking and technological water supply pipes (fire protection);

2. Concreting works

3. The concrete will be brought to the construction site with special concrete mixers and will be unloaded within the reach of a concrete pump. For the compaction of freshly poured concrete, the compaction vibrator a concrete IV-47.

- All heavy work, for formwork and reinforcement casings, will be carried out with the help of truck cranes.

- All constructions made of concrete and reinforced concrete will be carried out in accordance with the requirements of NCM F.02-2006 and related technology books.

4. Construction-assembly works

- The construction-assembly work and lifting to other levels will be carried out with the help of the car crane and with the help of special machinery and equipment.

5. Peculiarities of carrying out works in winter conditions.

- Construction-assembly work at the average daily temperature below +5°C and at the average temperature on day below 0° C, to be carried out in accordance with "Instructions for carrying out work during the winter" (ВСН-150-179).

The rules for storing and keeping easily flammable and explosive materials will be followed.

and free for access and entry to them and illuminated at night.

Urban certificate

During the construction, manufacture and operation of temporary electrical installations and the site electrical network, the requirements indicated in the "Rules for the manufacture of electrical devices" and in the "Rules of safety techniques for the operation of electrical devices in industrial enterprises" must be observed.

Design task project Project documentation Expert report 155/19.09.2020 executed by Technical Expert: Dohmilÿ Iurii certificate no. 035 of 22.06.2020.

For the needs of the construction works, the existing water and sewage networks on the territory of the construction site will be used.

Blocking accesses, passages, entrances and exits from the building, as well as access paths to the inventory

Safety in terms of labor protection includes measures taken to ensure the safety technique, the sanitary-epidemiological situation and the fire-fighting situation. In order to prevent accidents, construction-assembly works must be carried out in strict accordance with ÿÿÿÿ III-4-80* "Work safety in construction". The organization of work with the necessary equipment is elaborated in the technological books and falls under the competence of the project of execution of the works, according to ÿÿÿÿ 3.01.03-85.

On the construction site, a fire-fighting board will be installed with the necessary inventory and an indicator of and fire fighting equipment, hydrant and means of communication are prohibited.

crossings or access roads must be urgently notified to the Local Authorities.

All accesses, roads, fire hydrants must be in good working order protected with decks or temporary bypass.

The execution works will be carried out in stages (roof, facade, landscaping).

ASP: Limbas S. Certificate series 2019-P no. 0195 of 11.04.2019

Major repair of the frame roof with thermal insulation of the ceiling, thermal insulation and finishing of the facades of the Creÿei building - Kindergarten No. 2 "Licurici" in the municipality of Cahul, str. Ion Luca Caragiale

no. 12, no. cadastral 1701114.086 Capital repair of the frame roof and facades of Kindergarten No. 2 "Licurici"

GSPublisherVersion 0.49.100.100

Prepared Prepelita A.

boards

I.ÿ.P. Para V.

ONA.ÿ.P. Limbas S.

Flat Phase

General data

11/20

11/20

11/20

10-12/20 - OLC

Date.Signal.Mode. part no. Sheet No. doc.

SRL "PROJECT-DESIGN"

General data

Exhibit

Construction work organization plan. Construction site temporary fencing scheme. List of materials for temporary constructions.

General indications

Instructions for the execution of works on the site (end)

Notes

Instructions for the execution of works on the site (start)

The name

License Series A MMII

No. 055984 from 08.09.17

Major repair of the frame roof with thermal insulation of the ceiling, thermal insulation and finishing of the facades of the Creÿei building - Kindergarten No. 2 "Licurici" in the municipality of Cahul, str. Ion Luca Caragiale

no. 12, no. cadastral 1701114.086 Capital repair of the frame roof and facades of Kindergarten No. 2 "Licurici"

2A.ÿ.P. ON

Construction work organization plan

Para V.

Flat Phase

Prepared Prepelita A.

Limbas S.

boards

I.ÿ.P.

10-12/20 - OLC

CONSTRUCTION WORK ORGANIZATION PLAN SC.1:500

Ion Luca Caragiale str 1

Fire panel

Information panel

A - resistance and stability;

Well for concrete

Senior Construction Specialist:

CONVENTIONAL SIGNS

C - fire safety;

Site illuminator

Para V.

No. 098/1 of 04.12.2020

E - thermal insulation, water repellency and energy saving;

Give way indicator

Temporary fencing

Principal specialist architect:

ISP: Para V. Certificate series 2019-P no. 0264 of 26.06.2019

Existing fence

BENEFICIARY:

Cahul City Hall

Concrete

Limbas S.

The project is developed in compliance with the documents in force and ensures the level of quality corresponding to the essential requirements:

Transformer

NOTES

B - operational safety;

ASP: Limbas S. Certificate series 2019-P no. 0195 of 11.04.2019

Urban certificate

D - hygiene and people's health;

F - protection against noise;

p p

11/20

11/20

11/20

REPRESENTED

Date.Mode. part no. Sheet No. doc. Signal.

License Series A MMII

No. 055984 from 08.09.17

SRL "PROJECT-DESIGN"

No.

NOTESEXPLANATION

BORDERO OF TEMPORARY BUILDINGS AND CONSTRUCTIONS

Completed construction

Room for site supervisors and workers Room for tools and equipment Fire panel

Organic toilet Storage of limestone and sand blocks Well for concrete

Place wheel wash

Site entrance

Scheme of temporary construction site fencing. List of materials for temporary constructions.

Major repair of the frame roof with thermal insulation of the ceiling, thermal insulation and finishing of the facades of the Creÿei building - Kindergarten No. 2 "Licurici" in the municipality of Cahul, str. Ion Luca Caragiale no. 12, no. cadastral 1701114.086 Capital repair of the frame roof and facades of Kindergarten No. 2 "Licurici" boards

ON

Flat Phase

THE POSITION

Prepared Prepelita A.

A.ÿ.P.

NOTES

Para V.

EXPLANATION

I.ÿ.P.

Scheme of temporary construction site fencing. List of materials for temporary constructions.

HA

FIRE HYDRANT SCHEME

4. The indicator is installed on the temporary fence of the construction site or on the pole

Steel pipe (Ø 200 mm)

Metal profile fence h=2000 mm

Letters according to GOST 10807-78. The hydrant number inscription is applied in orange or dark pink with fluorescent enamel AC-564 (TU6-10-722-74);

unity

8 Sandbox

Sand

Flame extinguisher

Fire hydrant

NOTES

1. The fire hydrant indicator (IHA) is made of 1.5 mm thick metal sheet; 2. The surface of the sheet is painted with nitro enamel 3 times; 3. The inscription is applied on the painted surface of the sheet with in color 3 times.

Gate in 2 wings ml ml

Axe

EXPLANATION OF THE FIRE PROTECTION PANEL

Row

THE NAME

Ø 50

THE AMOUNT

8.00

Pole Ø 150 mm unity temporary temporary temporaryFire panel

DIAGRAM OF THE FIRE PROTECTION PANEL

Canga with curling iron

Crowbar

No.

8.00

LIST OF MATERIALS FOR TEMPORARY CONSTRUCTION

2 ... 2.5 m high;

6 temporary temporary

Gate (opening 4000 mm)

BENEFICIARY:

Cahul City Hall

Asbestos pee

9 Container with water (min 200 L) crushed stone

Boiler

10-12/20 - OLC

p

UNIT

TO MEASURE

Signal.Mode. part no. Sheet No. doc. Date.

11/20

11/20

11/20

0.9

2.46

SRL "PROJECT-DESIGN"

units m3 m3

1.8

1.44

No. 055984 from 08.09.17

License Series A MMII

Kindergarten No. 2 "Licurici" in the municipality of Cahul, str. Ion Luca Caragiale

no. 12, no. cadastral 1701114.086 Capital repair of the frame roof and facades of Kindergarten No. 2 "Licurici"

SRL "PROJECT-DESIGN"

10-12/20 - OLC

11/20

11/20

11/20

In all production, administrative, storage and auxiliary rooms, in visible places

The fuel supply of the roof units must be carried out in a special place,

- the ventilation of the room where the heat-producing installations are installed must ensure a triple exchange of air.

1 m, fenced on both sides with railings, with a height of at least 1.1 m, with a continuous lining below the brush with a height of 0.15 m from the platform and with an additional fencing strip at a height of 0.5 m.

their organization, in order to prevent work accidents and occupational diseases. When performing work at height in the lower part, below the workplace, it is necessary to mark the dangerous areas.

These deformations must be rectified daily.

It is not allowed to store fuel for fueling aggregates and packaging on the roof.

in rolls must not exceed what is needed for a single work shift.

All types of paints and varnishes prepared and diluted in separate rooms next to the wall

Installation work of building elements with combustible thermal insulation or use

New means of mechanization, leased or after capital repair, are admitted for operation only after the technical review and verification by the responsible person.

technical specifications issued by the manufacturing plant; - the burners must work stably without the flame breaking out and without their bursting into site preparation and organization work, necessary to ensure the security of the construction process, including:

The access roads, the sidewalks of the production territories, as well as the work areas, the places of

At the entrance to the construction site, plans must be installed (displayed), in which the buildings and installations under construction, the entrances, the access ways, the location of the water sources, the…