N3319123R0054 Kindergarten Cahul Moldova _Attach 1 PTS (Part 2 of 5).pdf

PDF 9 MB Posted

Attached to
N3319123R0054 Design-Build Renovate Kindergarten No. 2, Cahul, Moldova
Solicitation number
N3319123R0054
Issued by

About this file

This package of documents includes design and construction plans for renovating Kindergarten No. 2 in Cahul, Moldova. The project involves a major repair of the frame roof, including thermal insulation of the ceiling and finishing of exterior facades. Key work items include dismantling the existing truss roof and replacing it with a new wooden structure covered in metal tiles, installing insulation and exterior finishes on the walls, replacing windows with new PVC units, upgrading interior finishes, and developing the surrounding land. The project is funded by the U.S. Navy through contract N3319123R0054 and will be executed according to Moldovan building codes and standards by a contractor selected through this competitive solicitation process. Completion is required by dates specified in the design documentation.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SRL,,PROJECT-DESIGN''

Cahul, str. Ion Luca Caragiale no. 12, no. cadastral 1701114.086

Major repair of the frame roof with thermal insulation of the ceiling, thermal insulation and finishing of the facades of the Kindergarten /Nursery No. 2 "Licurici". Municipality of

No. subject: 10-12/20

Beneficiary: Cahul City Hall

License series A MMII

No. 055984 of 08.09.17

Chisinau 2020

Department: General Plan - PG

Address: Chisinau municipality, 49 Alexandru cel Bun str.

Email: proiectmd001@mail.md, Tel. 067677606.

Website - Proiectmd.com.

GSPublisherVersion 0.49.100.100

Execution project

Machine Translated by Google it

N.W

E

Para V.

ON

General data. Situational scheme

A.ÿ.P. 3 I.ÿ.P.

Prepared Prepelita A.

Limbas S.

10-12/20 - PG

Major repair of the frame roof with thermal insulation of the ceiling, thermal insulation and finishing of the facades of the Creÿei building -

Kindergarten No. 2 "Licurici" in the municipality of Cahul, str. Ion Luca Caragiale

SW

Date.Signal.Mode. part no. Sheet No. doc.

GENERAL DATA

EXPECTED WORKS The project, regarding the capital repair of the frame-type roof with thermal insulation of the ceiling, thermal insulation and finishing of the facades of the building of the Nursery - Kindergarten No. 2 "Licurici" in the municipality of Cahul, str. Ion Luca Caragiale no. 12, no. cadastral 1701114.086, provides for the following stages in the development of the related territory:

SITUATION DIAGRAM sc. 1:5000 w

S

11/20

11/20

11/20

N

Object of the work: The given project is intended for the "Major repair of the frame-type roof with thermal insulation of the ceiling, thermal insulation and finishing of the facades of the Creÿei - Kindergarten building No.

2 "Licurici"" in the municipality of Cahul, str. Ion Luca Caragiale no. 12, no. cadastral 1701114.086, based on the Urban Planning Certificate for design No. 098/1 of 04.12.2020 issued by the City Hall of the municipality of Cahul.

SRL "PROJECT-DESIGN"

3. The asphalted areas damaged after the demolition will be repaired (if necessary).

No. 098/1 of 04.12.2020

Senior Construction Specialist:

Beneficiary: City Hall of Cahul City

Planning Certificate No. 098/1 of 04.12.2020 issued by the City Hall of the municipality of Cahul

ISP: Para V. Certificate series 2019-P no. 0264 of 26.06.2019 p

Location: Cahul municipality, str. Ion Luca Caragiale no. 12, no. cadastral 1701114.086

Designer: SRL "PROIECT-DESIGN", License: No. 055984 from 08.09.17

Exhibit

The project is developed in compliance with the documents in force and ensures the level of quality corresponding to the essential requirements:

The land requested for design with no. cadastral 1701114086

General data. Situational scheme p

B - operational safety; C - fire safety;

Para V.

General plan sc.1:500

2. A new wall will be built (h=1000mm), see pl.3.

Principal specialist architect:

Urban certificate

F - protection against noise;

ASP: Limbas S. Certificate series 2019-P no. 0195 of 11.04.2019

4. New paving will be executed according to the development plan.

Layout plan sc.1:500

Limbas S.

The name

Technical expertise report: 155/19.09.2020 executed by Technical Expert: Dohmilÿ Iurii certificate

no. 035 of 22.06.2020.

Name of the object: "Capital repair of the frame-type roof with thermal insulation of the ceiling, thermal insulation and finishing of the facades of the building of the Nursery - Kindergarten No. 2 "Licurici""

Notes

BENEFICIARY:

Cahul City Hall p

A - resistance and stability;

1. Dismantling detiorized constructions (stairs, existing wall, etc.).

D - hygiene and people's health; E - thermal insulation, water repellency and energy saving;

BORDERO OF PLANS PG

TECHNICAL-ECONOMIC INDICES OF THE BUILDING

No. 055984 from 08.09.17

License Series A MMII

GSPublisherVersion 0.49.100.100

US

The built surface (on the ground)

Characteristics of the building measure

0.62

22.55

Notes

Ha

Calculation values m²

Lot area

Coefficient of land use (CUT)

The percentage of land occupation (POT) m²

Unit of

The total surface of the building

1,000

1,963.40

3,643.60

Signal. Date.Mode. part no. Sheet No. doc.

US

2A.ÿ.P. 3

I.ÿ.P.

Prepared Prepelita A.

Limbas S.

ON

General plan sc.1:500

Para V.

11/20

11/20

11/20

LEGEND GENERAL PLAN

N.W it

SRL "PROJECT-DESIGN"

License Series A MMII

No. 055984 from 08.09.17

IN PLAN

OF THE CONSTRUCTION LAND

- RECONSTRUCTED LENS (S+P)

- RECONSTRUCTED OBJECTIVE (S+P+E)

- MARKING OF OBJECTS

- THE LEGAL BOUNDARY

- EXISTING OBJECTIVE (P)

Existing objective

The number of levels

The existing children's playground3

Existing objective

No d/o Notes

Building characteristics p

Land for design

Internal access road

S+P

S+P+E

The project is developed in compliance with the documents in force and ensures the level of quality corresponding to the essential requirements:

Urban certificate

Principal specialist architect:

A - resistance and stability;

No. 098/1 of 04.12.2020

Senior Construction Specialist:

Limbas S.

B - operational safety; C - fire safety;

D - hygiene and people's health; E - thermal insulation, water repellency and energy saving;

Para V.

BENEFICIARY:

Cahul City Hall

F - protection against noise;

GSPublisherVersion 0.49.100.100

N

E

SW

GENERAL PLAN SC.1:500 CONVENTIONAL SIGNS

w A

1 c

1 d

7th

S

Ion Luca Caragiale str

Designed

Designed

Access road

ASP: Limbas S. Certificate series 2019-P no. 0195 of 11.04.2019

ISP: Para V. Certificate series 2019-P no. 0264 of 26.06.2019

10-12/20 - PG

Major repair of the frame roof with thermal insulation of the ceiling, thermal insulation and finishing of the facades of the Creÿei building - Kindergarten No. 2 "Licurici" in the municipality of Cahul, str. Ion Luca Caragiale l

Reinforced concrete with mesh 4Bp-200x200

Mixture of cement and sand h=60mm

Compacted soil Gravel (fraction 20-40) h=100mm

Pavement no. 1

Concrete roadway (parking lot, road,)

License Series A MMII

No. 055984 from 08.09.17

Ion Luca Caragiale str

US

S m2 m2 m2 m2

Liquid STST 11955-82

Cement and sand with medium grain size 1:3-50mm

100150 100

Broken stone, fraction ( M300 ) 40-70 STST 8267-82

Medium-grained sand STST 8736-82 -200

Broken stone, fraction 20-40 M 300 STST 8267-82

Fine-grained asphalt concrete STST 9128-84-60

Compacted soil

Compacted soil

Vibro-pressed pavement 40mm

Underpriming with bitumen

50 5050 it

N.W newly built

GSPublisherVersion 0.49.100.100

100100 30

150 20 i = 2°

Signal. Date.Mode. part no. Sheet No. doc.

11/20

11/20

11/20 w

Expanded polystyrene thermal insulation

Level ground

Sidewalk curb

E renovated4 252.00

The amount

The project indicates the systematization solution of the land with the concrete location of the reconstructed buildings, neighboring constructions and landscaping elements.

No d/o

BENEFICIARY:

Cahul City Hall

650.00 renovated

Asphalt 1 432.00

Playground for children pitching 440.00

The name existing

After finishing the construction works, the development works of the proposed lot will be carried out. It is proposed to plant fruit trees, decorative trees of various species and perennial decorative shrubs.

existing piece

Unit of measurement

LAYOUT PLAN SC.1:500

The given project is intended for the capital repair of the frame-type roof with thermal insulation of the ceiling, thermal insulation and finishing of the facades of the Creÿei - Kindergarten No. 2 "Licurici" building in the municipality of Cahul, str. Ion Luca Caragiale no. 12, no. cadastral 1701114.086 according to the Urban Planning Certificate for design No. 098/1 of 04.12.2020 The project is developed in accordance with the compositional, sanitary-hygienic, fire prevention and operating conditions of residential buildings in force and in accordance with the specifications developed by the beneficiary.

renovated ml

Green spaces (lawn) pitching

Pavement border 100x150mm

Notes

1 180.00

SW

Concrete B15

Concrete B15

10-12/20 - PG

CONVENTIONAL SIGNS

N

- Lawn

- Pavement

I.ÿ.P.

ON

- Target intended for repair

Prepared Prepelita A.

- Deciduous

Para V.

- Conifers

A.ÿ.P.

Layout plan sc.1:500

(children's playground)

- Paved road

Major repair of the frame roof with thermal insulation of the ceiling, thermal insulation and finishing of the facades of the Creÿei building - Kindergarten No. 2 "Licurici" in the municipality of Cahul, str. Ion Luca Caragiale no. 12, no. cadastral 1701114.086 Capital repair

Limbas S.

- Existing objective - Fruit trees

SRL "PROJECT-DESIGN"

LEGEND LAYOUT PLAN

Pavement

Address: Chisinau municipality, 49 Alexandru cel Bun str.

Email: proiectmd001@mail.md, Tel. 067677606.

Website - Proiectmd.com.

Department: Architectural solutions - SA (1)

BLOCK A

Chisinau 2020

No. subject: 10-12/20

Beneficiary: Cahul City Hall

No. 055984 of 08.09.17

License series A MMIISRL,,PROJECT-DESIGN''

Major repair of the frame roof with thermal insulation of the ceiling, thermal insulation and finishing of the facades of the Kindergarten/Nursery No. 2 "Licurici" in Municipality of Cahul, str. Ion Luca Caragiale no. 12, no. cadastral 1701114.086

Execution project

GSPublisherVersion 0.49.100.100

BLOCK "E1"

BLOCK "D2"

BLOCK "B"

BLOCK "D1"

U1

BLOCK "C2"

BLOCK "E2"

F3

BLOCK "C1"

11/20

11/20

SW

Major repair of the frame roof with thermal insulation of the ceiling, thermal insulation and finishing of the facades of the Cre÷ei building - Kindergarten No. 2 "Licurici" in the municipality of Cahul, str. Ion Luca Caragiale no. 12, no. cadastral 1701114.086

SRL "PROJECT-DESIGN"

Limbas S.

Flat Phase

General data

A.÷.P.

ON

boards including annexes

BLOCK "A"

Prepared Prepelita A.

15 100

E

Ñ0.000

Ñ0.000

10-12/20 - 1 - Sat

Ñ0.000

Ñ0.000

-0.200

Ñ0.000

Ñ0.000

Ñ0.000

US

GSPublisherVersion 0.49.100.100

No. 055984 from 08.09.17

License Series A MMII

N.W it d

A

N w

Architectural solutions "D1"; "D2" blocks

Album 1

Number of "A" block levels

CHARACTERISTICS OF THE BUILDING

Album 1

Color sheet mĮ

BOARD OF MAIN SETS OF EXECUTION DRAWINGS

SA(1)

CHARACTERISTICS OF THE BUILDING

Urban certificate

Album 1

NOTES

Level 8

BENEFICIARY:

Cahul City Hall

Window scheme

The surface of the existing roof block "A" p

Bearing walls made of small limestone blocks

Principal specialist architect: Limbas S.

Album 1

Door scheme

Construction class mĮ

ACCORDING TO THE DESIGN THEME

General plan

Block "A" architectural solutions

CHARACTERISTICS OF THE PROJECTED BUILDING

No. 098/1 of 04.12.2020

Album 1

MEASURING VALUES CALCULATING NOTES

SA(2)

Axes of the building

The project is developed in compliance with the documents in force and ensures the level of quality corresponding to the essential requirements:

The total surface of the existing roof

SA(4)

OLC

Brick partition walls

II

II

Album 2

The total surface of the building

Ñ0.000 Floor elevation;

711.70

639.50

769.50

Organization of construction works

Block "B" architectural solutions

Degree of durability

CONSTRUCTION SCHEME

ASP: Limbas S. Certificate series 2019-P no. 0195 of 11.04.2019

SA(3)

SCHEME OF BLOCK "A" SC.1:500

Album 1

The calculated seismicity of the construction

ME

SA(5)

Para V.

CONVENTIONAL SIGNS

Degree of fire resistance

Architectural solutions "E1"; "E2" blocks

TECHNICAL-ECONOMIC INDICES OF THE BUILDING

MARK

Album 1

Il

Explanatory memo

Architectural solutions "C1"; "C2" blocks

Construction elements

ISP: Para V. Certificate series 2019-P no. 0264 of 26.06.2019

S+P

Album 1 mĮ

A - resistance and stability; B - operational safety; C - fire safety;

D - hygiene and people's health; E - thermal insulation, water repellency and energy saving;

F - protection against noise;

C (1-5)

AND SYMBOLS

FC

30,500

UNIT

THE NAME

Album 1

Senior Construction Specialist:

CALCULATION VALUES NOTES

Mode. part no. Sheet No. doc. Date.

BLOCK "A"

Signal.

S

The protocol of reception of the thermal insulation of the facades.

The protocol of reception of the anticorrosive protection works of metal constructions.

The minutes of reception of the concreting and reinforcement works of all monolithic reinforced concrete elements (anti-seismic belts, stairs).

The protocol of reception of the works of the execution of the roof and covering.

All wooden elements will be processed with fireproof solutions according to CHÿÿ 2.01.08-85.

The record of receipt of the thermal insulation of the shed.

- The wooden details will be processed with special solutions; metal elements and constructions will be painted with fire-resistant paint.

The receipt report of the thermal insulation of the roof.

Mode. part no. Sheet No. doc. Signal. Date.

BOARD OF EXECUTION DRAWINGS SA(1) BLOCK "A"

Plan cerdac designed elevation +3,400

The bill of execution drawings notes

5.Existing roof plan.

Attic L1. Details

Existing facades sc.1:200 1.

The designed facade in axes 3b-1e

Projected roof plan

2. 3

Explanatory memo

BENEFICIARY:

Cahul City Hall

no. crt.

Nodes A; B. Borderou carpentry (windows and doors)

General instructions for finishing work - start

List of determined phases of the construction works for which verification minutes must be drawn up with the participation of the designer and the ISC representative (Form Code C-2; CP A.08.01-96).

Attic L2. Details

The designed facade in axes 6a-1a

2.Existing basement plan (relief) elevation -2,800/-1,850.

Exhibit

Safety technique and labor protection

Node C,D. Composition details I, II, III.20

General instructions for finishing work - end

Ground plan (dismantling) quota 0.000

1. Reception of the construction works of the belt;

2. Reception of the roof execution works;

3. Commissioning of the roof.

General data

Minutes of receipt of works that become hidden

3.

The facade in AD axes designed

The name

Existing floor plan (survey) elevation +0.000

6.

Section 1-1 designed

Photofixation

Rules for fixing windows

GENERAL DATA The given project is intended for the capital repair of the frame-type roof with thermal insulation of the ceiling, thermal insulation and finishing of the facades of the Creÿei - Kindergarten building No. 2 "Licurici" in the municipality of Cahul, str. Ion Luca Caragiale no. 12, no. cadastral 1701114.086 Urban planning certificate No. 098/1 of 04.12.2020 issued by the City Hall of the municipality of Cahul.

Technical expertise report: No. 155/19.09.2020 executed by Technical Expert: Dohmilÿ Iurii certificate no.

035 of 22.06.2020.

Ground plan (new construction) elevation 0.000

The facade in axes DA designed

Notes

4.

Existing cerdac plan (relief) elevation +3,300

Section 2-2 designed

7.

SRL "PROJECT-DESIGN"

License Series A MMII

No. 055984 from 08.09.17

11/20

11/20

ANTI-CORROSION PROTECTION.

To ensure the necessary durability, all metal elements not covered with concrete will be painted with anti-corrosion protection varnish. All works are executed according to CHÿÿ 3.04.03-85.

PROTECTION OF WOODEN BUILDINGS AGAINST ROT.

All wooden elements will be antisepticized and insulated with a layer of compliant bituminous cardboard of the provisions of CHiÿ 2.03.11-85.

The load-bearing wooden constructions (beams, rafters, joists, slats, etc.) will be superficially processed with combined protection solutions made of salts and special pastes.

PROTECTION OF WOODEN BUILDINGS AGAINST BURNING.

10-12/20 - 1 - Sat

Major repair of the frame roof with thermal insulation of the ceiling, thermal insulation and finishing of the facades of the Creÿei building - Kindergarten No. 2

"Licurici" in the municipality of Cahul, str. Ion Luca Caragiale no. 12, no. cadastral 1701114.086

Limbas S.

The protocol of reception of the protection works of wooden constructions.

boards

Prepared Prepelita A.

BLOCK "A"

Flat Phase

The bill of execution drawings

ON 2

A.ÿ.P.

GSPublisherVersion 0.49.100.100

Machine Translated by Google

The works that become hidden will be received through minutes of verification of the quality of these works in accordance with the provisions of Form Code C-2; CP A.08.01-96.

Major repair of the frame roof with thermal insulation of the ceiling, thermal insulation and finishing of the facades of the Creÿei building - Kindergarten No. 2 "Licurici" in the municipality of Cahul, str. Ion Luca Caragiale no. 12, no. cadastral 1701114.086

11/20

11/20

0.8 m

3. Building construction materials: ÿ Constructive scheme: Frame filled with bearing masonry; ÿ Foundations -continuous from FS prefabricated blocks with t=400mm; ÿ Longitudinal and transverse load-bearing walls made of small M35 limestone blocks on M50 cement mortar; ÿ Partition walls - Small blocks of limestone M35 on M50 mortar with t=200mm and of brick with t=120mm in sanitary groups;

7. Damaged areas after demolition will be repaired, if necessary.

12. The ladder for technical service and access to the attic will be installed in all blocks

The project is developed in accordance with the compositional, sanitary-hygienic, fire prevention and operating conditions of residential buildings in force and in accordance with the specification issued by the beneficiary.

Calculation values

-16°C and the requirements in force.

proposes on slopes with different inclinations. (see roof plan).

13. The existing metal escape stairs will be restored (scraped, primed, painted in 2

18. The plinth of the building will be covered with clinker brick according to the details in the project (see comp.

2. Dismantling detiorized constructions (stairs, existing roof, masonry - partially, etc.).

layers).

9. Ventilation will be carried out through the eaves towards the ridge and through the skylights (see compartment

"TO").

Calculation temperature of the outdoor air during winter

0.30 kPa

4. The existing ventilation ducts will be demolished up to the top level of the existing floor and will be built from galvanized sheet, thermally insulated with mineral wool and raised up to the level indicated in the project. They will be isolated according to the details in the project (see compartment "C").

ÿ Floors - from prefabricated boards with holes with t=220mm; ÿ The existing roof - wooden Sarpanta type with slate sheets. ÿ The new roof - wooden Sarpanta type with metal tile coverings.

15. The thermal insulation and screed of the existing flat roof will be executed (the floor at

BENEFICIARY:

Cahul City Hall

Wind pressure

The standard frost depth of the earth

1. Documentation recognition data 1.1 Name of the documentation - Capital repair of the truss type roof with thermal insulation of the ceiling, thermal insulation and finishing of the facades of the Creÿei building - Kindergarten No. 2 "Fireflies" from the municipality of Cahul, str.

Ion Luca Caragiale no. 12 , no. cadastral 1701114.086 1.2 Beneficiary: Cahul City Hall 1.3 Designer - SRL "PROIECT- DESIGN" License No. 055984 from 08.09.17; Administrator Domentiuc Iu.

(the existing upper perimeter belt) will be processed to increase the rigor (with beto-contact primer).

11. According to CP C.01.03-2004, the protective barrier will be executed according to the details of the

"SA" compartment.

16. The old carpentry (wooden) will be replaced with PVC carpentry with a 5-chamber profile,

2. Object and purpose of the documentation

This documentation for object No. 10-12/20 Major repair of the frame-type roof with thermal insulation of the ceiling, thermal insulation and finishing of the facades of the Creÿei - Kindergarten building No. 2 "Licurici" in the municipality of Cahul, str. Ion Luca Caragiale no. 12, no. cadastral 1701114.086 is fulfilled at the request of the beneficiary according to the specifications.

6. The new belt (h200mm) will be made with embedded anchors (AI) for fixing the basket (see compartment

"C").

4. General characteristics:

Climate zone - zone II; Seismic zone - 8 degrees; Seismic validity of the building - 8 degrees; Calculation wind pressure -

30kgs/m²; Calculation weight of the snow layer - 50kgs/m²; The critical frost depth of the ground - 0.8m; Construction -category II; Durability - grade II; Fire resistance - grade II; Construction category - normal;

2 layers of glass and ventilation.

Climatic characteristics

8 degrees

8. The truss will be fixed and all the frame elements will be assembled. The new roof se

(see compartment "C").

1. Organization of the construction site before starting the works according to the rules

17. The entire facade of the building will be thermally insulated according to the details in the project (see comp."SA").

Notes

0.50 kPa

3. The existing ventilation ducts will be inspected and, if necessary, cleaning and repair work will be carried out.

"TO").

14. The stormwater drainage system will be installed.

19. The related land will be developed.

The mass of the snow layer

The project, regarding the capital repair of the frame-type roof with thermal insulation of the ceiling, thermal insulation and finishing of the facades of the building of the Nursery - Kindergarten No. 2 "Licurici" in the municipality of Cahul, str. Ion Luca Caragiale no. 12, no. cadastral 1701114.086, provides for the following stages:

5. According to the expert report no. 155/19.09.2020 surfaces of monolithic elements

10. The installation of the metal tile will be performed by qualified specialists.

cerdac) according to det. compartment "SA".

The degree of seismicity of the construction site

SRL "PROJECT-DESIGN"

Limbas S.

EXPECTED WORKSEXPLANATORY MEMORY

10-12/20 - 1 - Sat

A.ÿ.P.

boards

Prepared Prepelita A.

BLOCK "A"

Flat Phase

Explanatory memo

27ON

CLIMATE CHARACTERISTICS OF THE CONSTRUCTION AREA

Mode. part no. Sheet No. doc. Signal. Date.

GSPublisherVersion 0.49.100.100

License Series A MMII

No. 055984 from 08.09.17

SRL "PROJECT-DESIGN"

Mode. part no. Sheet No. doc. Signal. Date.

GSPublisherVersion 0.49.100.100

- liars going up or down stairs without protective railings;

3. Workers must be admitted to work on the basis of an order after their induction training regarding security techniques and labor protection. Persons over the age of 18 are admitted to work, based on the medical certificate, which confirms the worker's fitness for work with an increased degree of danger.

- throwing tools or construction materials from a height; - finding workers on beams or slabs that have not been reinforced - reinforced preventively; - carrying out demolition works of walls, parapets, ventilation ducts during storms, at wind speeds greater than 12m/s, on ice, snow, etc.;

- carrying out works on the same vertical where demolition works are carried out on the upper levels.

6. Signs with inscriptions must be hung near the installation site, informing the staff

10. Moving along the protective cable, more than two workers is prohibited, transmission

7. The workers who carry out the installation work must be trained in safety techniques, have the right to work at height and equip themselves with protective helmets and safety belts, which in turn will be attached to the load-bearing elements of the structure resistance, (of the place from the time provided).

1. During the manufacture and installation of construction materials, it is necessary to comply with the requirements of ÿÿÿÿ III-4-80* "Technology of safety in construction", as well as the provisions below:

work tools, or some other objects will be carried out by means of ropes, in special packages.

of resistance, without the execution of scaffolding, is prohibited, regardless of the type and category of works.

2. The workers who carry out installation must be informed about the order and consecutiveness of the works.

4. During the demolition of the walls, the workers working from the scaffolding must be attached with a safety belt to the load-bearing elements or safety cables. It is prohibited to hang the safety belt from the element being demolished, or from unreinforced elements.

4. The hanging of construction materials with the crane hanging device will be done only by

Workers must work in appropriate special clothing and use personal protective equipment. 6. During the performance of the demolition works, it is forbidden: - to carry out work in rooms or work levels not equipped with working platforms, stairs, slopes,

1. When demolishing construction elements, it is necessary to comply with the requirements of ÿÿÿÿ III-4-80* "Security technique in construction", The correctness of the assembly must be checked after each operation.

the building, leaving objects on the wall, windowsills, etc.;

floor, at a distance of 200-300mm, they approach and direct it to the position marked in time.

11. Carrying out work on random scaffolding (crates, barrels, etc.) or on structural elements workers about the order of the works and the possible dangers that may arise during the work.

9. The work platforms but also the floor where assembly work is carried out must be kept in order, throughout the duration of the execution, the work places will be cleared of snow or ice during the winter, (measures will be taken against the formation poleiului) will be cleaned of mollusc waste and material remnants.

In the process of training the workers, it will be explained to them: - the consecutiveness of the performance of the works; - harmless methods of execution and ways to prevent accidents; - routes for leaving work areas or dangerous areas; - the behavior of each team member in the event of unforeseen situations and first aid;

7. Regardless of the type of work that is performed, it must exclude blows, shocks or vibrations.

Demolition works must be carried out carefully without causing subsequent shocks, blows, or vibrations, 8.

Demolition of the above-listed constructive elements by collapse is prohibited.

BENEFICIARY:

Cahul City Hall

5. It is forbidden to interrupt the works by leaving unfixed elements or their component parts.

3. The installation is carried out under the direction of the engineering staff or those in charge of the works.

lugs specially made for this purpose, or with universal load handling cables. 5. During the transport of the materials with the crane to the installation site, the installers will be in a safe place (see the workplace organization diagram), only after it is close to

- climbing or descending the liars directly on the construction elements without a ladder; -workers coming in through the window openings, exiting or finding them on the walls and the parapet

8. The access of foreign persons to the places where the installation work takes place must be closed.

2. In connection with the performance of high-responsibility works with an increased degree of danger, all workers in the teams must have the appropriate specialty and qualification category higher than III. All demolition work must be carried out under the supervision of the person responsible for the execution.

railings, etc.;

11/20

11/20

License Series A MMII

No. 055984 from 08.09.17

Major repair of the frame roof with thermal insulation of the ceiling, thermal insulation and finishing of the facades of the Creÿei building - Kindergarten No. 2 "Licurici" in the municipality of Cahul, str. Ion Luca Caragiale no. 12, no. cadastral 1701114.086

1. General notions

2. Security technique

CONSTRUCTION WORKS

3. Fire fighting measures

SECURITY TECHNIQUE AND WORK PROTECTION DURING PERFORMANCE

Limbas S.

10-12/20 - 1 - Sat

Prepared Prepelita A.

BLOCK "A"

Flat Phase

27ON 4

A.ÿ.P.

Safety technique and labor protection boards

3. Temporary buildings and structures are equipped with fire extinguishers, workers are trained

9. The construction site must be equipped with a fire hydrant, as well as fire extinguishers on each level of the building, according to fire protection regulations.

regarding fire protection measures at workplaces and within the construction site.

6. It is forbidden to keep flammable and easily fusible liquids in open packages, as well as

4. All paths and roads to the designed fire hydrants must be in a condition of of insulating material (foam) and fibrous materials together with flammable substances.

functioning and free for movement, and at night they must be illuminated.

1. The execution of construction and installation works will be governed by the law of the Republic of Moldova "Regarding fire protection" of 09.11.94. "Rules of fire protection during the execution of construction and assembly works"; "Fire protection rules for the execution of welding works on construction sites", approved by the Government of the Republic of Moldova Decision No. 552 of 12-07-2017, as well as the requirements of

GOST 12.1.004 - 76.

7. Until the beginning of the works on the site, by order of the head of the construction organization, a person responsible for fire protection is appointed, the site is secured by telephone, having a person at the reception.

2. On the territory of the construction site, fire-fighting panels must be placed, with the following composition of the fire-fighting inventory set: - 2 ax axes; - crowbar 2 pcs.; - shovel 2 pcs.; - 2 boilers; - bag with hook 2 pcs.; - water container with a volume of 200lt.; sandbox -1 pc.

8. There are places for smoking on the construction site. In rooms or workplaces with open fire, warning inscriptions on fire prevention topics are hung. Welding machines, electrical transformers as well as their location within a radius greater than 3000 mm must be cleaned of flammable materials.

5. The construction site must be kept clean, smoking is allowed only in specially arranged places.

The wooden joinery is dismantled and replaced with PVC joinery

The existing wall is in a deplorable condition - it is being dismantled

The existing roof is being dismantled

The existing metal tile roof is not dismantled

The existing slate roof is being removed The wooden joinery is dismantled and replaced with PVC joinery

The facade will be thermally insulated The rafters are in satisfactory condition, after dismantling they will be reused

The existing roof is being dismantled

The plinth is damaged and will be covered with clinker

Existing plaster destroyed - partially dismantled

The existing roof is being dismantled

The existing roof is being dismantled

GSPublisherVersion 0.49.100.100

PHOTOFIXATION

No. 055984 from 08.09.17 License Series A MMII

BENEFICIARY: Cahul City Hall

Sheet No. doc.

Flat Phase

Major repair of the frame roof with thermal insulation of the ceiling, thermal insulation and finishing of the facades of the Creÿei building - Kindergarten No. 2 "Licurici" in the municipality of Cahul, str. Ion Luca Caragiale no. 12, no. cadastral 1701114.086

10-12/20 - 1 - Sat

Prepared Prepelita A.A.ÿ.P.

SRL "PROJECT- DESIGN"

Limbas S.

11/20 boards

BLOCK "A"

part no. Mode.

Date.

Photofixation

Signal.

ON

11/20

NOTE:

A

1e

3) The old (wooden) windows are dismantled.

A

2) The existing rear patio roof is newly constructed with metal tile sheathing. Does not

BENEFICIARY:

Cahul City Hall disassemble.

1) The existing roof is of the frame type with slate sheet coverings. It is in unsatisfactory condition and does not meet the standards. It is intended for disassembly.

Major repair of the frame roof with thermal insulation of the ceiling, thermal insulation and finishing of the facades of the Creÿei building - Kindergarten No. 2 "Licurici" in the municipality of Cahul, str. Ion Luca Caragiale no. 12, no. cadastral 1701114.086

15 100

18,650

30,500

12,500 12,500

15 100

10-12/20 - 1 - Sat

GSPublisherVersion 0.49.100.100

No. 055984 from 08.09.17

License Series A MMII

1,800

3,780

The wooden door is dismantled

6,000 i=12°

-0.050

7,720

2,800

11,140

7,720

2,600

7,100

10,550

2,000

7,100

11,070

6,500

The existing truss type roof with slate sheathing is being removed

6,500

5,200

0.000

The existing metal staircase

The existing truss type roof with slate sheathing is being removed

The wooden windows are dismantled

6,500

2,900

6,500

2,900

-0.050

The existing truss type roof with slate sheathing is being removed

11,070

2,700

5,900

7,720

The wooden windows are dismantled

7,720

0.800

0.000

7,100

4,655

0.900

Existing metal railing

11,140

The existing truss type roof with slate sheathing is being removed

5,100

1,900

The wooden windows are dismantled d

Flat Phase

A.ÿ.P.

ON

Prepared Prepelita A.

d

BLOCK "A" 6

Existing facades sc.1:200 boards

3b

11/20

11/20

BLOCK C2

i=60°

Gallery

BLOCK A

Gallery

Gallery i=25°

Signal. Date.

BLOCK E2

BLOCK A

BLOCK A

i=60°

BLOCK

i=25° i=25° i=30°

BLOCK D1

BLOCK D2

i=15° i=30°

BLOCK E2

BLOCK A

BLOCK

Gallery i=25°

Mode. part no. Sheet No. doc.

BLOCK C2

SRL "PROJECT-DESIGN"

Limbas S.

FACADE IN AXES AD - EXISTING SC.1:200

FACADE IN AXES YES - EXISTS SC.1:200FACADE IN AXES 6a-1a - EXISTING SC.1:200

FACADE IN AXES 3b-1e - EXISTING SC.1:200

EXISTING BASEMENT PLAN (relief) elevation -2,800/-1,850 SC.1:200

-1,600

-1,850 -1,600

-2,800

-1,850

-1,600

-1,600

BLOCK "C2"

BLOCK "E1"BLOCK "B"

BLOCK "D2"

11/20

5,600 part no. Mode.

10-12/20 - 1 - Sat

1 900

BENEFICIARY: Cahul City Hall

2 700 550

12,500

11/20

550 2 700 4 400

Sheet No. doc.

500 2 800 500

BLOCK "A"

Existing basement plan (relief) elevation -2,800/-1,850.

License Series A MMII

9,850

13,550

15 100

Limbas S.

8,600

6 250 550

8,600

9,200

13 100

Major repair of the frame roof with thermal insulation of the ceiling, thermal insulation and finishing of the facades of the Creÿei building - Kindergarten No. 2 "Licurici" in the municipality of Cahul, str. Ion Luca Caragiale no. 12, no. cadastral 1701114.086

No. 055984 from 08.09.17

6 400 550

A.ÿ.P.

Signal.

ON

11 100

12,000

5,600

SRL "PROJECT- DESIGN"

12,000

1 700 900

8,500

6,850

3 650

Date.

7,200

Prepared Prepelita A.

boards

Flat Phase

5 450

21,800

5 450

3a

C d second1 5a 6

A

B

4a

GSPublisherVersion 0.49.100.100

5,600

5,500

6 100

10,900

5,600

16,700

1 800 9 600 6 100

5,600

1 800 1 400

6 100

12,000

6,400

14,500

5,900

1 300 6 100

400 900

1 300

5,600

1 800 10 000 6 100

-2,800 5 200

5,600

5,600

5 450 7 400 900

5,600

1 100 550 550

5,600

BLOCK "C1" 500

10,700

1 700

5,600

30,500

±0.000

6 1006 100 6 100

±0.000

-0.200

6 1006 100

30,500

±0.000

±0.000

±0.000

11/20

11/20

3 100

8002000

1 800 1 400

4 050 200 1 350 550

6,500

1 350

3 100

1 800

5,500

3,800

1 800

5,600

1 900

1 800 1 400

4 300

5,850

1 800

1 200 200

6,800

17,650

3,800

1 450 150 4 000 550

Resume

1 800

7,850

3 100 800 3 500

3 200

3 650

6 150

18,750

Resume

1 400

1 850

3,800

150 3 200 200 2 000 200 3 550 550

1 600

3,800

150 2 100

1 800

2 650

1 700

3,800

2 150

Group 1503 950

1 400 1 800

17,700

5,200

5,900

3 450

3 100

2 200

2 850

200 200 200 1 800 1 650

2 250

5,900 5,600

9,000

1 600

1 800 1 800

3 450 150

1 950

3,800

6,400

1 450 150 4 000

5,200

2,800

Resume

2 100

Group

Signal.

Boiler

Medical point

Kitchen

BLOCK "D2" Group

Group

Group

Terrace

Group

Mode. part no. Sheet No. doc.

Ballroom ±0.000

Gallery

Administration

Laundry

Date.

Gallery

SRL "PROJECT-DESIGN"

EXISTING GROUND PLAN (survey) elevation 0.000 SC.1:200

10-12/20 - 1 - Sat

F9

2 350

3 100

F1

F8

2 000 1 500

2 300

F10

F2

2 350 two hundred

F3

2,800

14,950

15,200

4,200

1 800 1 550

1 600

1 600

2 150

200 3 600 200

F9

F3

1 700

2 100

5,950

2,800

1 950

3 150

2 850

8,800

1 300

F2

F9

F6 two hundred

3 650

12,000

1 700 2 000

2 650

F8 1 150 1 000

F1

F7

F9

F9

BLOCK "C1"

F1

F3

5,600

3 450 200

9,200

15 100

7,200 two hundred

2 150 150 3 600

1 400

3 400

4,200

2 250

2 250

2 200

F3

150 1 400

450 200 150 1 250

1 800

5,600

1 900

1 600

7,900

4 400 800

6,200

1 400

1 950 1 550

4 300

5 450

1 400

14,000

1 800 two hundred

2 600 1 300

2 100

2,000 1,575 2,000

1 800

1 150

3 150

F2

2 100

4 400

F5

U1

1 350 2 000

2,600

1 600

F5

2 150

U2

3 300 200

4 300

7,700

Major repair of the frame roof with thermal insulation of the ceiling, thermal insulation and finishing of the facades of the Creÿei building - Kindergarten No. 2 "Licurici" in the municipality of Cahul, str. Ion Luca Caragiale no. 12, no. cadastral 1701114.086

Limbas S.

F4

F3

F1

F3

F1

F4

F1

F2 F3

F3

F3

BENEFICIARY:

Cahul City Hall

6second

C

ON

5a

A

4a

Flat Phase

BLOCK "A"

boards

BLOCK "C2" ±0.000

B

BLOCK "E1"

Existing floor plan (survey) elevation +0.000

BLOCK "E2"

BLOCK "B"

d

Prepared Prepelita A.

3a

A.ÿ.P.

No. 055984 from 08.09.17

License Series A MMII

Limbas S.

2 150

5,600

2,800

30 250

800 3 600

1 700

1 800

1 800

1 800

4 100

2 850

7,850

3 100

Resume

5,600

1 800

1 400 1 800

5,600

3 900 100 2 000

3 450 150

1 800

1 800 1 400

2,800

5,600

Resume

4 350

2 300

6,500

7,500

5,900

9,000

7,500

Resume

7,800

1 700 1 800

2,800

3,800

3 100

1 800

1 800

5,500

5,850

SRL "PROJECT-DESIGN"

3 400 200

2 100

15 100

3 150

1 600

1 400 2 000

1 800 1 350

8,750

1 800 1 550

2 050 200

2 000 1 600 2 000 1 600

2 250 200

300 1 150

1 300

2 000 950

2,600

5,600

4,850

8,900

2,800

2 300

1 600 1 800 two hundred

4 400

900 7

1 700

16,900

1 150 i = 5°

5,600

1 800 2 000

6,200

3 400

7,600

1 700 2 000 two hundred

7,600

7 650

7 450

Major repair of the frame roof with thermal insulation of the ceiling, thermal insulation and finishing of the facades of the Creÿei building - Kindergarten No. 2 "Licurici" in the municipality of Cahul, str. Ion Luca Caragiale no. 12, no. cadastral 1701114.086

11/20

11/20

+3,300

+3,300

+3,300

+3,300

EXISTING CERDAC PLAN (relief) elevation +3,300 SC.1:200

10-12/20 - 1 - Sat

GSPublisherVersion 0.49.100.100

BLOCK "E2"

i=5° 3 800

ON

32 250 d i=5°

30,500

BLOCK "C2"

Flat Phase

BLOCK "A"

BLOCK "D2"

+3,300 boards

BLOCK "B"

A

Existing cerdac plan (relief) elevation +3,300

BLOCK "C1"

Prepared Prepelita A.

BLOCK "E1"

+3,300

A.ÿ.P.

No. 055984 from 08.09.17

License Series A MMII i=5°

BENEFICIARY:

Cahul City Hall i=12° i=15°

Metal tile roof

Group

Group

Group

Group

Mode. part no. Sheet No. doc.

Group

Date.

Group

Signal.

5 430 i=25° 5 430 15 100

16,900

BLOCK "C1"

i=25°

SRL "PROJECT-DESIGN"

+3,300

+3,300

+3,300

+3,300

+3,300

Major repair of the frame roof with thermal insulation of the ceiling, thermal insulation and finishing of the facades of the Creÿei building - Kindergarten No. 2 "Licurici" in the municipality of Cahul, str. Ion Luca Caragiale no. 12, no. cadastral 1701114.086

11/20

11/20

1) The existing floor is made of prefabricated panels. The condition of the floor is satisfactory. 2)

As a result of wetting, the wooden frame partially rotted - it is dismantled.

NOTE:

3) The existing roof - 17.21 m3

4) The existing roof is of the roof type with slate sheets. It is in unsatisfactory condition and does not meet the standards. It is intended for dismantling - 769.50 m2.

i=30° i=5°

Wood that is in satisfactory condition will be reused for the new roof.

BENEFICIARY:

Cahul City Hall

5) The existing rear patio roof is newly constructed with metal tile sheathing. It does not disassemble.

i=30° i=15° i=12°

EXISTING ROOF PLAN (survey) SC.1:200

10-12/20 - 1 - Sat

GSPublisherVersion 0.49.100.100

Signal.

Metal tile roof

Date.Mode. part no. Sheet No. doc.

License Series A MMII

No. 055984 from 08.09.17

Resume

Resume

Resume

"B"

18,300

BLOCK "E1"

BLOCK "A"

i=5°

32 250

3 230

Existing roof plan.

A.ÿ.P.

BLOCK "E2"

Flat Phase

BLOCK "D2"

A

6 975

BLOCK "C2"

i=5° boards

6 975

30,500 d

2 540 3 115

Prepared Prepelita A.

3 115 2 540

BLOCK

ON

Resume

2 150

3 200

1 450 150 4 000

17,700

5,900

3,800

4 300

2 650

3 100

6 150

3 100

1 850

1 700

5,600

1 800

3,800

Resume

6,400

2 250 150 3 200 200 2 000 200 3 550 550

4 050 200 1 350 550

3 950

5,900

18,750

5,600

1 200 200

5,200

3 650

1 600

Resume

17,650

3,800

1 950

1 800

3,800

200 200 200 1 800 1 650 1 900

1 350

800 3 500

1 450 150 4 000 550

3 100

1 600

Sheet No. doc.

2 100

11/20

10-12/20 - 1 - Sat

Ground plan (dismantling) quota 0.000

2 100

7,700

3 150

2,800

3 450 200

Flat Phase

1 950

2 150

1 400

11/20

BLOCK "A"

License Series A MMII

1 300

1 400

2 850

1 900

5 450

2 600 1 300

A.ÿ.P.

Signal.

450 200 150 1 250

2 150

1 600

BENEFICIARY: Cahul City Hall

1 800

2 150

No. 055984 from 08.09.17

9,200 part no. Mode.

2 250

2 650

2 200 two hundred

Prepared Prepelita A.

2 250 200 boards

1 950 1 550

200 3 600 200

15 100

150 1 400

3 300 200 two hundred

5,600

2 000 1 500

3 100

Limbas S.

7,200

15,200

SRL "PROJECT- DESIGN"

2 350

1 400

1 600

1 800

2,800

Major repair of the frame roof with thermal insulation of the ceiling, thermal insulation and finishing of the facades of the Creÿei building - Kindergarten No. 2 "Licurici" in the municipality of Cahul, str. Ion Luca Caragiale no. 12, no. cadastral 1701114.086

Date.

ON

150 3 600

GSPublisherVersion 0.49.100.100

Administration

Kitchen

Gallery

Group

Terrace

Group

Gallery

Medical point

Laundry

Boiler

GROUND PLAN (dismantling) elevation 0.000 SC.1:150

1) The old (wooden) windows are dismantled.

THE AMOUNT

BOARD OF DISMANTLING WORKS

NOTE:

PIC.

to provide protection measures for the existing windows .

Dismantling works to be carried out on small sectors.

items NOTES

2) During the execution of dismantling works on the existing eaves

BLOCK "C1"

Existing eaves (m3)

BLOCK "D2"

17.21

Wooden carpentry (windows) (pcs.)

BLOCK "E2"BLOCK "B"

Wooden carpentry (doors) (pcs.)

3a 4a d

C

5a

B

A

1 6second

±0.000

6 100

Ballroom ±0.000

30,500

±0.000

6 1006 100 6 1006 100

-0.200

±0.000

6 150

3 950

5,900

3,800

2 150

2 200

1 600

5,900

200 200 200 1 800 1 650

4 050 200 1 350 550

1 700

2 250

1 200 200

3 100

3,800

3 650

1 950

18,750

17,650

1 600

150 3 200 200 2 000 200 3 550 550

Resume

6,400

4 300

5,200

1 900

2 650 550

1 450 150 4 000 550

3,800

5,600

Resume

800 3 500

3 2003 100

1 850

5,600

1 800

1 450 150 4 000

3 450

Resume

1 350

1 800

3,800

17,700

3 100 two hundred

3 300 200

15,200

2 650

450 550 200 150 1 250

2 150

A.ÿ.P.

150 1 400

2 250

9,200

Major repair of the frame roof with thermal insulation of the ceiling, thermal insulation and finishing of the facades of the Creÿei building - Kindergarten No. 2 "Licurici" in the municipality of Cahul, str. Ion Luca Caragiale no. 12, no. cadastral 1701114.086

2 100

F6

2 600 1 300

2,800

U1

F1

License Series A MMII

2 150

F10

Date.

Sheet No. doc.

F9

3 450 200

15 100

Prepared Prepelita A.

boards

200 3 600 200

2 200

1 400

1 950

2 150 150 3 600

2 350

3 150

No. 055984 from 08.09.17

1 400

5,600 two hundred

5 450

2 250

1 950 1 550

SRL "PROJECT- DESIGN"

F9

1 300

11/20

1 800

1 400

Ground plan (new construction) elevation 0.000

F9

ON

2 000 1 500 two hundred part no. Mode.

1 600

BLOCK "A"

F7

Signal.

3 100

1 900

F3

11/20

2 850

1 600

1 800

Limbas S.

2 100

10-12/20 - 1 - Sat

Flat Phase

U2

F9

BENEFICIARY: Cahul City Hall

F1

7,200

F9

7,700

2,800

PIC.

BOARD OF NEW BUILDING WORKS

THE AMOUNT NOTESitems

Medical point

Gallery

Kitchen

Group

Administration

Terrace

Group

Laundry

Boiler Gallery

GROUND PLAN NEW BUILDINGS (elevation 0.000) SC.1:150

F3

F4

F3 F3

F1

F2 F3

PVC carpentry (windows) (pcs.)

PVC carpentry (doors) (pcs.)

BLOCK "C1"

BLOCK "B"

201.60 kg

3 Metal railing (ml)

BLOCK "E2"

7.20

BLOCK "D2"

B

A second 63a 4a

C d

5a

-0.200

±0.000

30,500

Ballroom ±0.000

6 1006 100

±0.000

±0.000

6 100 6 1006 100

11/20

10-12/20 - 1 - Sat

License Series A MMII

No. 055984 from 08.09.17 d

A F1

Limbas S.

SRL "PROJECT-DESIGN"

4Skylight L2 (pc.)

Flat Phase boardsSkylight L1 (pc.)

BLOCK "A"

67.60

Plan cerdac designed elevation +3,400 see "C"Reinforced concrete belt (m3)

PIC.

Prepared Prepelita A.

THE AMOUNT

A.ÿ.P.

items

Mortar screed (m2) 450.70

ON

Cement-plast thermal insulation (m3)

NOTES

Reinforced concrete belt h=200mm

CERDAC PROJECTED PLAN SC.1:100

h=150mm

Signal.

h=50mm see pl. 17 see pl. 18

Mode. part no. Sheet No. doc. Date.

2 175 2 175

4) Details on L1 dormers see pl. 17.

L2

5,500

4 090

L2

1 800 2400

3) It is recommended to perform thermal insulation on the entire surface of the floor: a layer of cement plaster - 150 mm. Above to execute the h-50mm mortar screed.

L2L2

5 185

NOTE:

5) Details on L2 dormers see pl.18.

30 250400

BOARD OF MATERIALS

2) On the perimeter of the building to be executed reinforced concrete belt h=200mm (see compartment "C").

BENEFICIARY:

Cahul City Hall

L1

5,500

1) The existing floor is made of prefabricated panels. The condition of the floor is satisfactory.

GSPublisherVersion 0.49.100.100

Major repair of the frame roof with thermal insulation of the ceiling, thermal insulation and finishing of the facades of the Creÿei building - Kindergarten No. 2 "Licurici" in the municipality of Cahul, str. Ion Luca Caragiale no. 12, no. cadastral 1701114.086

3 970

14,900

3 970

24003 150

15 100

3 970

L2

Resume

L1

8. Specifying the ventilation ducts as planimetric dimensions will be established on site.

Resume

1. For roof truss structures, the wood should be softwood (pine), the humidity of which should not exceed 20%. Type of wood - II. The dimensions of the elements must be according to GOST 8486-86.

Resume i=5° with 20mm mortar.

BORDEROU ROOFING MATERIALS

6. Roof construction works to be performed according to ÿÿÿÿ II-25-80 "ÿÿÿÿÿÿÿÿÿÿ ÿÿÿÿÿÿÿÿÿÿÿ". 7. The frame will be made of corrugated sheet metal on the wooden case.

i=20° i=5°

L2

2. All wooden elements of the frame to be subjected to antiseptic and fireproof treatment according to CHÿÿ 2.03.11-85.

i=5° i=5°

L2

3. Under the elements supported on the wall or slab, lay 2 layers of ruberoid on bitumen mastic on the level surface

4. After installing and aligning with nails the load-bearing elements of the frame to be reinforced later with bolts.

5. The joints and junctions of the roof elements to be executed with nailed studs at a distance of 20 cm from the edge (posts, diagonals).

i=15° i=20°

L2 i=15°

+3,300

+3,300+3,300

+3,300

+3,300

+3,300

GSPublisherVersion 0.49.100.100

+6,100

+6,100

701.30

32 350

110.00

PIC.

BLOCK "C2"

BLOCK "E1"

NOTES

BLOCK "E2"

BLOCK "D2"

Downspout (pc.)

+7,320

+6,100

40.00 m/l

Snow guard (pc.)

80.00

BLOCK "B"

items

Existing roof-terrace (m2)

THE AMOUNT

The roof (m2)

71.50

+6,500

Corrugated sheet (roof eaves (m2)

Gutter (m/l)

+6,100

BLOCK "C1"

PROJECTED ROOF PLAN SC.1:100

Note:

6,400

12 020

12 020 12 020 trough trough pipe pipe zinc metal tile 275gr/ m2 thick.0.45mm pipe trough trough

15 350 pipe

2 260 snow fence snow fence pipe pipe pipe

3 360

L=1000mm zinc 275gr/m2 thick.0.45mm snow fence snow fence pipe trough snow fence trough d

A

30,500

Limbas S.

A.ÿ.P.

17,000

Major repair of the frame roof with thermal insulation of the ceiling, thermal insulation and finishing of the facades of the Creÿei building - Kindergarten No. 2 "Licurici" in the municipality of Cahul, str. Ion Luca Caragiale no. 12, no. cadastral 1701114.086 part no. Mode.

15 100

3 375

10-12/20 - 1 - Sat

3 360 i = 20°

Signal.

Flat Phase i = 20°

11/20

BENEFICIARY: Cahul City Hall

No. 055984 from 08.09.17 boards i=20°

BLOCK "A"

SRL "PROJECT- DESIGN"

Prepared Prepelita A.

ON

Date.

Sheet No. doc.

License Series A MMII

Projected roof plan insulation and finishing of the facades of the Creÿei building - Kindergarten No. 2 "Licurici" in the municipality of Cahul, str. Ion Luca Caragiale no. 12, no. cadastral 1701114.086

GSPublisherVersion 0.49.100.100

6 100

10,400

30,500

0.000

Composition III Cement-sand mortar leveling screed M100 - 50mm

6,500

10,260

3,300

6 100

2,900

6,100

-1,850

-0.600

Composition IV Metal tile (red color) Slats 100x30 pitch 250...350mm Counterslats 50x50 on the rafters Diffuse waterproofing membrane 120g/m2 Rafters 160x50 pitch 800mm

0.900

4,600

BLOCK

6 100

10,400 variable

4,600

10,300

6 100

4,100

3,500

NOTE: For the explanation of composites I and II see pl.21

-2,800

2,800

BLOCK E2

BENEFICIARY:

Cahul City Hall

0.800

6 100

11/20

11/20

License Series A MMII

No. 055984 from 08.09.17

10-12/20 - 1 - Sat

Resume

N A

pl. 19

SECTION 1 - 1 DESIGN SC.1: 100

L2

A

pl. 19

II -0.600

Resume

L2

Resume

L2

D

pl. 20

L1

III

and yl

L2

Limbas S.

* ON

Finishing the ceiling

Prepared Prepelita A.

A.ÿ.P.

Existing precast concrete slab floor - 160 mm Flat Phase boards

15 27BLOCK "A"

Vapor barrier - ruberoid on bituminous mastic

- it is a solution for thermal insulation of the attic

Thermal insulation with cementoplast Ø200 h=150 mm

Section 1-1 designed

Date.Mode. part no. Sheet No. doc. Signal.

6 5a 3a 14a second insulation and finishing of the facades of the Creÿei building - Kindergarten No. 2 "Licurici" in the municipality of Cahul, str. Ion Luca Caragiale no. 12, no. cadastral 1701114.086

GSPublisherVersion 0.49.100.100

NOTE: For the explanation of composites I and II see pl.21

BLOCK C2

4,100

-0.050

3,300

-0.200

BENEFICIARY:

Cahul City Hall

-0.650

2,500

6,100

10,300

0.700

-2,800

Composition III Cement-sand mortar leveling screed M100 - 50mm

0.000

4,655

1 900

15 100

BLOCK

0.000

3,500

7,320

Composition IV Metal tile (red color) Slats 100x30 pitch 250...350mm Counterslats 50x50 on the rafters Diffuse waterproofing membrane 120g/m2 Rafters 160x50 pitch 800mm

-0.650

2,100

-1,850

10,200

7,200

11/20

11/20

License Series A MMII

No. 055984 from 08.09.17

10-12/20 - 1 - Sat

D

pl. 20

L2 L2 yl

B pl. 19

C

pl. 20

III

SECTION 2 - 2 DESIGN SC.1: 100

N

Limbas S.

Prepared Prepelita A.

27BLOCK "A"

- it is a solution for thermal insulation of the attic

Thermal insulation with cementoplast h=150 mm

Section 2-2 designed

* ON

Finishing the ceiling

A.ÿ.P.

Existing precast concrete slab floor - 160 mm Flat Phase

Vapor barrier - ruberoid on bituminous mastic boards

Signal.Mode. part no. Sheet No. doc. Date.

dA B insulation and finishing of the facades of the Creÿei building - Kindergarten No. 2 "Licurici" in the municipality of Cahul, str. Ion Luca Caragiale no. 12, no. cadastral 1701114.086

10-12/20 - 1 - Sat

License Series A MMII

No. 055984 from 08.09.17

1 - 1

11/20

11/20

1 100

1 100

1 100

9 0

40 45

50 90

1 560

1 700

Limbas S.

45°

Mode. part no. Sheet No. doc. Signal. Date.

GSPublisherVersion 0.49.100.100

Total dormer wood (L1) 1 pieces

0.05

0.03

Sash

GOST 8486-86

+6,300

A.ÿ.P.

Flat Phase

All wood

3 030

0.01

Slat (garnish) boards

Prepared Prepelita A.

6.65

Door

8.50

GOST 8486-86

Sash

50°

BLOCK "A"

3 030

0.02

10.00

GOST 8486-86

Attic L1. Details

+4,600

Sash

GOST 8486-86

ON

8.80

50°

45° ml VolumeName dimensions, BORDEROU SKYLIGHT (L1)

0.10

IndicationPos.

0.10

SRL "PROJECT-DESIGN"

mm4

RIDGE

LOFT L1

BENEFICIARY:

Cahul City Hall

WALL GLASS

fascia

SCALE 1:20

mourning m3 m3 insulation and finishing of the facades of the Creÿei building - Kindergarten No. 2 "Licurici" in the municipality of Cahul, str. Ion Luca Caragiale no. 12, no. cadastral 1701114.086

License Series A MMII

No. 055984 from 08.09.17

45° mm4

11/20

11/20

GSPublisherVersion 0.49.100.100

Name

0.10

SKY BOARD (L2)

Indication

0.40

Pos. ml Volumedimensions, SRL "PROJECT-DESIGN"

Signal. Date.Mode. part no. Sheet No. doc.

m3 m3

9 0

116 0

116 0

116 0

Limbas S.

SCALE 1:20

RIDGE

LOFT L2

WALL GLASS

BENEFICIARY:

Cahul City Hall

1 - 1 fascia mourning

10-12/20 - 1 - Sat

Total skylight wood (L2) 4 pieces

Flat Phase

All wood

BLOCK "A"

GOST 8486-86

Sash

A.ÿ.P.

+5,900

ON

GOST 8486-86

Sash

+4,600

6.65

4 8.50

50°

Prepared Prepelita A.

50°

Sash 8.80

GOST 8486-86

Attic L2. Details

0.02

10.00Slat (garnish)

0.01 boards

0.05

GOST 8486-86 0.03

"Licurici" in the municipality of Cahul, str. Ion Luca Caragiale no. 12, no. cadastral 1701114.086

2. 3

2 1 2 4

1 922

GSPublisherVersion 0.49.100.100

Signal.

Mode. part no. Sheet No. doc.

Date.

19 - Existing precast concrete slab

18- Mane element

10- Self-tapping screw

21- Vapor barrier

22- Thermal insulation

9- Metal tile

17- Mane

23- Sandrama covered with corrugated sheet

4- Grooved 150x100mm

3- Bituminous cardboard

12- Sort gutter

24- Board casing

11- The snow guard

1- Existing parapet/ Existing wall

14- Dropper

6- Diffuse membrane

NOTES:

5- Deer

13- Gutter

8- Slat 100x30 mm

16- Thermal insulation

20- The new belt

15- Burlan

2- Existing belt

7- Plywood 50x50 mm

SRL "PROJECT-DESIGN"

No. 055984 from 08.09.17

License Series A MMII

2 0

Limbas S.

20°

11/20

11/20

5. It is important to determine who is responsible for protecting the installed windows against possible damage until the time of reception. It is recommended to agree with the beneficiary on taking individual measures, for example, on protection in case of removing the excess foam.

When carrying out masonry repairs, the profiles must be covered.

BENEFICIARY:

Cahul City Hall

Material

Carpentry borderou (windows)

800 × 2000

Deviations from this request must be agreed upon in writing.

Empty dimensions, LxH mm

PVC - profile 5 chambers

2 layers of glass

PVC - profile 5 chambers

2 layers of glass, with ventilation

900×900

PVC - profile 5 chambers

2 layers of glass, with ventilation

U1

The amount

Schematic of the element

Material

2. In case of installation at temperatures below 5 degrees Celsius, the specific properties of the materials used will be taken into account. Direct hits on the profile frame and on the wings will be avoided. 3.

This is the start of the file's text. The full file is on GovTribe.