This document contains an amendment to a solicitation for the design and construction of a new storage facility in Jinja, Uganda.

The amendment provides responses to 30 pre-proposal inquiries to clarify requirements and specifications. Key clarifications include revising the water storage requirement to a single 10,000 liter elevated tank if Option 001 is selected. Four pedestrian access gates at 1.5 meters wide are required for the perimeter fence. Bathroom specifications in Room 006 were revised. Exterior security lighting and a brushed concrete finish for the vehicle ramp are specified. Electrical conduit types for different uses are identified. The septic tank and drain field described are not project requirements.

The solicitation is for a design-build project to construct the new storage facility for the Department of the Navy Naval Facilities Engineering Command. The contractor will be responsible for all design, permitting, and construction to complete the project in Jinja, Uganda.

View the file

Other files for this federal contract opportunity

Other files attached to D-B Construct Storage Facility, Jinja, Uganda, newest first.
File Type Posted
N3319121R9001 Amend 0001 Jinja.pdf PDF
N3319121R9001 Jinja Attach 8 - PPQ.docx DOCX document
N3319121R9001 Jinja Attach 1 - PTS.pdf PDF
N3319121R9001 Jinja RFP.pdf PDF
N3319121R9001 Jinja Attach 4 - 52.204-26.docx DOCX document
N3319121R9001 Jinja Attach 3 - Price Schedule.doc DOC document
N3319121R9001 Jinja Attach 5 - 252.229-7001.docx DOCX document
N3319121R9001 Jinjaa Attach 7 - Safety Checklist.docx DOCX document
N3319121R9001 Jinjaa Attach 6 - Data Sheet.docx DOCX document
N3319121R9001 Jinja Attach 2 - PPI.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

N3319121R9001 D-B Construct Storage Facility, Jinja, Uganda

Seee Page 2 for description of amendment.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 9

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 22-Dec-2020

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N3319121R9001

X 9B. DATED (SEE ITEM 11)

23-Nov-2020

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

22-Dec-2020

CODE

NAVFAC EUROPE AFRICA CENTRAL

VIALE PORTO CAPODICHINO

NAPOLI 80144

N33191 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

N3319121R9001

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been added by full text:

The purpose of this amendment to the solicitation is to respond to the Pre-Proposal Inquiries.

PRE-PROPOSAL INQUIRY 009

SECTION G30: SITE CIVIL/MECHANICAL UTILITIES [08/06]

Paragraph G301003 Potable Water Storage on page 99

“Provide a water storage facility consisting of 3, 2500 liter cisterns on elevated stands, and an onground fill tank located aboveground.” is specified. On the other hand, SECTION 1.2 SCOPE OF PROJECT

Paragraph CLIN 003 - OPTION 001 – Elevated Rainwater Storage Tank Feeding on page 10

“One (1) 10,000 litter plastic water storage tank installed on elevated cistern,” is specified.

Please clarify that which one will be our objective.

PRE-PROPOSAL RESPONSE 009

In Section G301003 Potable Water Storage on page 99, the sentence “Provide a water storage facility consisting of 3, 2500 liter cisterns on elevated stands, and an onground fill tank located aboveground” shall be replaced with “Provide a water storage facility consisting of 10,000 litter plastic water storage tank on elevated cistern if Option 001 is executed.”

PRE-PROPOSAL INQUIRY 010

SECTION 1.2 SCOPE OF PROJECT

Paragraph CLIN 002 – New Perimeter Security Fence for Adjacent Training Field on page 10

“One (1) pedestrian access entrance & exit gate, approximately 1.5 Meters wide.” is specified.

On the other hand, SECTION 4. BUILDING REQUIREMENTS

Paragraph 4.2 PERIMETER FENCES/CLIN 002 on page 30

“The fence shall also contain at least approx. 4 pedestrian access gates approximately 1.5 meters wide in order to access the training area from each side.” is specified.

Please clarify that which one will be our objective.

PRE-PROPOSAL RESPONSE 010

İn SECTION 1.2 SCOPE OF PROJECT, Paragraph CLIN 002 – New Perimeter Security Fence for Adjacent Training Field on page 10, the sentence “One (1) pedestrian access entrance & exit gate, approximately 1.5 Meters wide” shall be replaced with “Four (4) pedestrian access entrances/exit gates, approximately 1.5 meters wide in order to access the training area from each side.”

PRE-PROPOSAL INQUIRY 011

SECTION 5. ROOM MINIMUM REQUIREMENTS

Paragraph CLIN 001 New Storage Building - ROOM 006 – Bathroom on page 34 and 35

Quantities of window, door, lighting, lighting switches and outlets seems mistakenly copied from CLIN 001 New Storage Building - ROOM 005 – Entry Hallway on page 34. Those quantities exceeds the room size and design, please advise.

PRE-PROPOSAL RESPONSE 011

In SECTION 5. ROOM MINIMUM REQUIREMENTS Paragraph CLIN 001 New Storage Building - ROOM 006 – Bathroom on page 34 and 35, the room requirements for the bathroom are revised as follows:

Function Special Dimensions Occupancy Access Other Uniformat Uniformat Title Description QTY Remarks

B2020 Exterior Windows Standard Window System 2 Double paned with security bars.

One window on each exterior wall.

C1030 Interior Doors

Standard Door System

Access to Entry hallway Room 005.

C3020 Floor Finishes Floor final finish As indicated

None Slip Ceramic Tile

C303001

Acoustical Ceiling Tiles

Ceiling Tiles Install suspended ceiling tiles and necessary supports.

D2010 Plumbing Fixture

Toilet 1 European-style sit down toilet water closet.

D2010 Plumbing Fixture

Washbasin/Lavatory 1 Washbasin and facet

D3030 Package HVAC

Units Exhaust Fan 1 Independent exhaust fan powered by separate switch in bathroom.

D40 Fire Protection Systems Break Glass Unit 1 Break Glass Unit located next to reception entrance

D40 Fire Protection Systems Smoke Detector 1 D5020 Lighting and Branch Wire Lighting 2 T8 1x22W 1200mm SINGLE surface mounted LED luminaire as LG T4B22BD5FEA or equal approved.

D5020 Lighting and Branch Lighting Switch 1 3-gang 1-way D5020 Lighting and Branch Wire Outlets 2 13A 2-gang switched socket outlet.

PRE-PROPOSAL INQUIRY 012

SECTION 7. ENGINEERING SYSTEMS REQUIREMENTS

Paragraph D201004. Sinks on page 50

“Provide countertop sinks in the spaces identified in Section 5 Room Requirements.” is specified.

But, there is no sink provided in any rooms. Will be sinks required for countertops at testing rooms?

PRE-PROPOSAL RESPONSE 012

In SECTION 7. ENGINEERING SYSTEMS REQUIREMENTS Paragraph D201004, Sinks on page 50 where it is indicated to “Provide countertop sinks in the spaces identified in Section 5 Room Requirements”, this is specific to the washbasin/lavatory for Room 006 Bathroom. This washbasin/lavatory shall be a countertop sink.

PRE-PROPOSAL INQUIRY 013

SECTION 3.3 SITE DEVELOPMENT REQUIREMENTS

Paragraph Approximate Locations of Existing Site Utilities on page 22

Dashed red lines on site utilities layout shows drainage lines, will this line be used for sewer? or we need to provide a septic tank and a drain field which is described in section G30 SITE CIVIL/MECHANICAL UTILITIES/G302003 Septic Systems Tanks on page 55.

And also, in section 1.2 SCOPE OF PROJECT/ CLIN 001 - Build New Storage Facility mentions existing sewer lines on page 9.

Please clarify that is there any sewer lines that we can use?

PRE-PROPOSAL RESPONSE 013

In SECTION 3.3 SITE DEVELOPMENT REQUIREMENTS, Paragraph Approximate Locations of Existing Site Utilities on page 22, the brown (may look red) dashed lines for “Drainage Line” are intended as the Sewage line. No septic tank and drain field is intended for this project and the bathroom sewage lines are intended to drain to the existing site sewage utility line.

G30 SITE CIVIL/MECHANICAL UTILITIES/G302003 Septic Systems Tanks on page 55 is intended as a requirement only if sewage lines were not identified in Section 1. Since sewage lines are called out in Section 1 as Drainage Lines, a septic tank and drain field are not required.

PRE-PROPOSAL INQUIRY 014

SECTION G10: SITE PREPARATION

Paragraph G103011 Other Site Earthwork on page 93

If any historic artifacts are encountered, then work will be stopped. Will the non-working days will be added to construction time?

PRE-PROPOSAL RESPONSE 014

If there is work stoppage due to encountering historic artifacts per section G103011 Other Site Work, the non-working days will be added to the construction period of performance through a modification to the contract.

PRE-PROPOSAL INQUIRY 015

There is no mention about exterior lighting? Should we include any exterior lights? Please advise.

PRE-PROPOSAL RESPONSE 015

Provide exterior security lighting to illuminate the main entrance to the open bay storage area as well as exterior security lighting to illuminate the pedestrian main entrance. Exterior lighting shall have motion activated sensor function.

PRE-PROPOSAL INQUIRY 016

SECTION C30 INTERIOR FINISHES

Paragraph C3010. WALL FINISHES on page 49

What will be the ceiling height and finish at Room 006 – bathroom?

If the ceiling height is over 200cm, what will be the remaining wall finishes?

PRE-PROPOSAL RESPONSE 016

In SECTION C30 INTERIOR FINISHES Paragraph C3010, WALL FINISHES on page 49, the sentence “Provide ceramic tile in all toilet rooms to 200 cm height of all walls” shall be replaced with “Provide ceramic tile in all toilet rooms up to the full height of the wall to the ceiling”.

PRE-PROPOSAL INQUIRY 017

Do you expect any concrete finishing method for non-described concrete finishes? (For example, pavements;

helicopter, brushed concrete finishing etc.)

PRE-PROPOSAL RESPONSE 017

The designs for this project shall not be required to adhere to United States (US) code. The applicable codes for this design shall be local Ugandan Code as well as the International Building Code (IBC).

PRE-PROPOSAL INQUIRY 018

What is the existing waste water main line elevation according to existing ground level?

PRE-PROPOSAL RESPONSE 018

The existing waste water main line elevation is not known. For the purpose of bidding, offerors shall assume that the existing waste water main line is between 1-2 meters in depth below existing ground level.

PRE-PROPOSAL INQUIRY 019

Do you expect any concrete finishing method for non-described concrete finishes? (For example, pavements;

helicopter, brushed concrete finishing etc.)

PRE-PROPOSAL RESPONSE 019

For the forklift vehicle ramp into the open bay storage area, the concrete ramp shall have brushed concrete finish to provide better traction in the case that the surface is wet.

PRE-PROPOSAL INQUIRY 020

SECTION B20 EXTERIOR ENCLOSURE

Paragraph B203007. Gates on page 47

Are the gates expected to be electric driven or manual?

PRE-PROPOSAL RESPONSE 020

All gates for this project shall be manual operation.

PRE-PROPOSAL INQUIRY 021

On page 8 of 40 of the RFP solicitation documents, under Factor 1 Corporate Experience reads: “

(ii) Basis of Evaluation: To receive an acceptable rating in this factor, the offeror MUST provide a minimum of one

(1) relevant project meeting the following requirements:

1. Design and construction of new construction of a new facility; and

2. New construction shall include grading and/or paving of an undeveloped site by Design-Build (MUST show experience in design or design management as well as construction); and

3. Performed in the country of Uganda within the last 10 years of the date this RFP was issued; and

4. Similar in magnitude with a value of at least $500,000; and

5. Construction must be at least 70% complete by the date this RFP was issued.

An offeror will be rated UNACCEPTABLE if the offeror does not submit the minimum number of relevant projects (one (1)).

Then on page 10 of 40 of the RFP, under Factor 3 Past Performance reads:

In the case of an offeror without a record of relevant past performance or for whom information on past performance is not available or so sparse that no meaningful past performance rating can be reasonably assigned, the offeror may not be evaluated favorably or unfavorably on past performance. Therefore, the offeror shall be determined to have unknown past performance. In the context of acceptability/unacceptability “unknown” shall be considered “acceptable”.

Please clarify that acceptability or non-acceptability ratings for both sections, and if we were to not submit a “relevant” project, or submit a partially relevant project, could we receive an acceptable for both Factor 1 and Factor 2?

PRE-PROPOSAL RESPONSE 021

Yes.

Corporate Experience - The offeror must provide a project that meets all of the relevancy requirements to receive an acceptable rating for Corporate Experience.

Past Performance - if the offeror submits a partially relevant project they would be considered not to have a past performance submittal and would be found to be "acceptable" based on unknown past performance.

PRE-PROPOSAL INQUIRY 022

(Include RFP Section, page number, and paragraph if applicable) On page 5 of 40 of the RFP solicitation documents, the last paragraph #5 says:

All items listed below are required for the offeror to be found responsive and the offer to be considered forward.

Any unrequested information will not be considered as part of the offer and will not be reviewed.

The solicitation requires the evaluation of price and the following non-price factors:

Factor 1 – Corporate Experience Factor 2 – Safety Factor 3 – Past Performance The RFP and the PTS (scope of work) make no mention of any other documents that should be submitted prior to contract award such as a schedule, technical execution plan, etc.

Please confirm whether a technical execution plan and schedule are required as part of the bid proposal, and even if not, we would normally include this level of detail to demonstrate our competence and capability to successfully complete the project on time and to the level of quality the Navy requires?

PRE-PROPOSAL RESPONSE 022

That is correct they are not required. As stated above any unrequested information will not be reviewed.

PRE-PROPOSAL INQUIRY 023

As per the requirement of the project and as per your answer in the amendment 001 about the environmental HVAC equipment, the temperature should be between 15- & 35-degree Celsius.

Can you please confirm this requirement because 15 degree means we should install special HVAC units not available usually in the market.

PRE-PROPOSAL RESPONSE 023

The equipment to be stored in the storage area may require temperature conditions as low as 15 degrees Celcius, therefore it is confirmed that the temperatures in the storage area should have a range as low as 15 degrees Celsius.

PRE-PROPOSAL INQUIRY 024

On page 10 of the PTS (Performance Technical Specifications), it says “All new construction shall adhere to the Accessibility Standards outlined by the Uganda National Action on Physical Disability).

Could you please provide this document, method of obtaining it or accept using American standards for disability accessibility?

The tender documents refer to EM 385. Please also provide document.

PRE-PROPOSAL RESPONSE 024

The Accessibility Standards outlined by the Uganda National Action on Physical Disability can be obtained at the website https://unapd.org/accessibility-standards/

PRE-PROPOSAL INQUIRY 025

In a previous inquiry, the Navy made it clear that power is coming from existing utility line. Please provide the scope of the electrical distribution works, if we are to provide any transformers, switches, etc.

Please provide a description of the current power available for use, if coming from electrical pole and if contractor or Navy will coordinate with utility company, and responsible for any fees.

PRE-PROPOSAL RESPONSE 025

The contractor shall provide all electrical utility equipment, including transformer and switches, to tie into the existing electrical utility lines to provide power to the new facility. Site is adjacent to electrical power poles with lines as indicated on page 22 Site Utilities Layout. It his highly recommended that offeror’s visit site to verify utility connections points.

It is the contractor's responsibility to coordinate with the local utility company in order to connect to existing electrical utility as well as take responsibility for necessary fees.

PRE-PROPOSAL INQUIRY 026

On page 40, the safety officer is required to have OSHA certs, does this need to be submitted prior or after contract award?

PRE-PROPOSAL RESPONSE 026

The site safety officer qualifications and training certs may be submitted after contract award as part of the Project Safety Plan / Accident Prevention Plan (APP).

PRE-PROPOSAL INQUIRY 027

Page 50 of 103, above ground water piping for cold water use asks for “copper piping” and we ask if we can use galvanized steel or any other approved water pipe since copper is expensive, or confirm copper is what Navy wants.

PRE-PROPOSAL RESPONSE 027

Copper piping shall be used for refrigerant piping and distribution related to HVAC equipment and as prescribed by the equipment manufacturer. All other above ground water piping shall be appropriate for service type and may be galvanized steel or other equivalent for service.

PRE-PROPOSAL INQUIRY 028

On page 52, what time of conduit should the electrical wire be in? Galvanized steel, EMT, PVC, rigid or? We suggest the following:

a. Schedule 80 PVC for underground roads and ground

b. Schedule 40 PVC for inside concrete and concrete encased

c. Rigid metal for stub-ups

d. EMT or galvanized or PVC for walls (surface mounted)

e. Cable rack or cable trays for above drop ceiling

We recommend using non-certified because the local materials are good quality and less expensive. Please either specify type of conduit for each use or confirm the above as required for all in order to bid equivalently.

PRE-PROPOSAL RESPONSE 028

For electrical wire conduit pertaining to this project, the following non-certified conduit types are considered acceptable:

Schedule 80 PVC for underground roads and ground Schedule 40 PVC for inside concrete and concrete encased Rigid Metal for stub-ups EMT or Galvanized or PVC for walls surface-mounted Cable rack or cable trays for above drop ceiling

PRE-PROPOSAL INQUIRY 029

On page 55 out of 103, PTSG30 and ESR30 refer to a septic tank which shall discharge into a drain field. Please confirm if this is a requirement for this project, and if so, please provide any details, if the drain field is natural ground, sloped, concrete or else.

PRE-PROPOSAL RESPONSE 029

The septic tank and drain field described on page 55 of 103 PTS G30 and ESR 30 is not a requirement for this project since existing sewage lines are identified in section 1. These lines are called out as drainage lines and are intended for the bathroom to drain sewage and wastewater to.

PRE-PROPOSAL INQUIRY 030

Due to our site visit on 12/16/2020, The person of contact mentioned the construction of a canal to protect the school below of the construction site from flooding. Should we consider the cost of such an improvement?

PRE-PROPOSAL RESPONSE 030

No.