BL 95 Renovation Contract Number: --

NSA Souda, Crete, Greece

SMALL PROJECT TEMPLATE - PART 3 STATEMENT OF WORK / PROJECT PROGRAM - Page 1

Part 3 Statement of Work / Project Program Table of Contents

CHAPTERS

1. PROJECT DESCRIPTION

2. PROJECT OBJECTIVES

3. SITE ANALYSIS

4. BUILDING REQUIREMENTS

5. ROOM REQUIREMENTS................................................ Not Used

6. ENGINEERING SYSTEMS REQUIREMENTS

B20 Exterior Closure B30 Roofing C10 Interior Construction C30 Interior Finishes D10 Conveying Systems D20 Plumbing

D30 HVAC

D40 Fire Protection Systems D50 Electrical Power and Lighting E10 Equipment E20 Furnishings F10 Special Construction F20 Selective Building Demolition G30 Site Mechanical Utilities

1.0 PROJECT DESCRIPTION

Building 95 is a 17 KSF multi-functional pre-engineered building built in 1994. It houses the FM&S and

UEM portion of the PD as well as NAVSUP FLC administration and storage spaces. This project will address necessary repairs to the aging building envelope, correct fire related deficiencies, and improve the efficiency of the HVAC system.

Given the stated objectives above, provide design and construction services for the following:

Architectural Works

The exterior works will include the following:

a. Remove existing roof system, replace with insulated roofing panels.

b. Remove existing side panels, replace with insulated panels.

c. Install a roof drainage system.

SMALL PROJECT TEMPLATE - PART 3 STATEMENT OF WORK / PROJECT PROGRAM - Page 2

d. Removal and replacement of existing exterior doors. Replacement of removed doors with approved egress doors with panic hardware. Ensure locksets are consistent with Base standards

e. Remove and replace roll up doors with electric doors. Operation of roll up doors shall be available via exterior of building via keypad entry system at each door.

f. Removal and replacement in kind of exterior windows.

g. Add a new means of egress from the FLC warehouse.

Electrical Works

a. Install exterior security lighting with motion and daylight detection. All lighting specified for replacement shall be modernized with LED fixtures meeting IES LM-79, IES LM-80 and be European CE listed designed to meet UFC 3-530-01 Interior and Exterior Lighting Systems and Controls.

b. Upgrade building wide 110 volt transformer

Mechanical Works

HVAC

Existing Conditions

Currently Building 95 has 17 split type heating and air conditioning units which serve the office spaces.

These systems are stand-alone and lack central temperature controls. Condensate from these systems is collected in rudimentary collection systems (buckets and bottles) and must be managed manually. Areas such as workshops, restrooms, the laundry room and the electrical room are not air-conditioned and are limited only to ventilation or exhaust systems.

Description The project will upgrade the HVAC system for buildings 95 by removing the existing split-units and installing dedicated outdoor air systems (DOAS) which include a Total Energy Recovery

(TER) exhaust air system as well as terminal units for individual room temperature control. The project will provide for new air supply, return/exhaust air ducts, associated HVAC piping with support fittings, drainage for condensates and electrical connections. New terminal heating/cooling units shall be controlled by DDC thermostats integrated to the building’s energy management control system (EMCS).

The EMCS will enable building operators to control, monitor and optimize functions of each individual room and all building mechanical systems through a wired network connected to DDC controllers.

Finally the project will combine heat recovery HVAC components with a solar hot water system to deliver 60% of the buildings total annual requirement for domestic hot water.

General Guidelines

The workshop areas shall be only ventilated and in accordance to Industrial Ventilation. Ventilation is achieved using transfer air from adjoined space and intake louver with pressure-relief damper and exhaust fan on wall. High Volume Low Speed airfoil fans will be provided in every workshop area.

The Laundry Room shall be a separate zone. For Laundry room, provide outdoor supply air directly to a central air plenum behind the dryers. Do not utilize conditioned air for dryer supply air. Supply air and

SMALL PROJECT TEMPLATE - PART 3 STATEMENT OF WORK / PROJECT PROGRAM - Page 3 exhaust air shall be provided as a separate and self-contained zone. Restrooms including showers shall be separate zones and ventilated only. Electrical room may be ventilated if feasible.

Provide a drainage system for fan coil unit condensates with an adequate number of floor drains to avoid running condensate and drain piping across open floor space. Sanitary cleanouts shall not be installed within occupied spaces, except for toilet and janitor spaces.

The main focus of the HVAC system design will be the safety, convenience, reliability, and comfort of the building occupants. All components of the HVAC systems will be easily accessible for maintenance and adjustments, and the design will include provisions for easy removal and replacement in the future. The systems will be reliable and stable in their operation and configured for ease of control and adjustment.

Requirements

Assess current conditions and provide the most cost-effective solution taking into account the following project goals and requirements:

Effective Temperature and Humidity Control: space temperature must be controlled within specific range for cooling and heating that is between 68°F (20°C) and 75°F (25°C), Indoor

Relative Humidity (RH) must be maintained between 30% and 60%. Provide positive room air pressure against the outside air to prevent moisture and unconditioned air penetration directly into the room. Consider high-efficiency dedicated outdoor air systems (DOAS) Air Handing Units for pre-cooling/pre-heating which includes a Total Energy Recovery (TER) exhaust air system to handle the ventilation requirements and the latent (moisture) load in the spaces. Consider

Desiccant wheel energy recovery unit(s) and Air Economizer features. Consider new supply and exhaust air system with fiber-free elastomeric duct liner for spiral ducts (thermal & acoustical insulation) to ensure constant air exchanges with respect to the Air Indoor Quality AHSRAE standards at a minimum. If air re-heat is required along distribution to maintain humidity levels, provide reheat via mechanical means rather than electric.

Energy Reduction and Metering: Reduce energy consumption by 25% compared to the FY15 baseline consumption verified through energy savings calculations in the design. Provide individual energy thermal and electric meters for the HVAC and Domestic Hot Water systems as part of the Measurement & Verification process, in accordance with base metering standards

(AMI). All new components must be high-efficiency, variable-speed pumps and EC super premium motor fans should be used throughout the HVAC system.

Energy Management Control System: Provide a system to include terminal unit/room controllers, DDC components and an operator’s workstation with a graphical interface located within the building. The energy management system shall interface via LonWorks® or BACnet® protocol with all mechanical systems installed and shall be part of the approved package of the

HVAC manufacturer (3rd party software and DDC components shall not be accepted)

SMALL PROJECT TEMPLATE - PART 3 STATEMENT OF WORK / PROJECT PROGRAM - Page 4

Design Criteria

Project design shall adhere to the following standards:

Unified Facilities Guide Specifications (UFGS) for the Naval Facilities Engineering Command

(NAVFAC)

American Society of Heating, Refrigerating and Air-Conditioning Engineers (ASHRAE) and the

International Energy Conservation Code (IECC) for commercial building standards

All HVAC equipment shall be Energy Star rated and labeled or European equivalent standard A++ rated and labeled

10 CFR 433 (July 9, 2013): Energy Efficiency Design Standards for New Federal Commercial and

Multi-Family High-Rise Residential Buildings

ASHRAE 90.1-2013 benchmarks shall be referenced for the energy intensity reduction goal.

The HVAC systems for this facility will be developed based on proven design techniques that utilize state-of-the-art, readily available equipment, hardware, and systems.

Noise levels shall comply with the requirements for each type of spaces in the ASHRAE Applications

Handbook. The design shall provide noise level control by requiring maximum noise levels as well as noise separation areas for the office areas, workshops, laundry, etc. The drawings shall specify the maximum equipment noise level. Design the HVAC and mechanical systems to minimize vibration and noise to the facility. Provide vibration isolation of mechanical equipment so as to minimize vibration transmission to the interior spaces and the facility complying to UFC 3-450-01 noise and vibration control.

Provide air conditioning, cooling and heating for spaces as indicated and for the following Design conditions:

Provide Ventilation rates and systems per the latest edition of ASHRAE Standard 62, Ventilation for Acceptable Indoor Air Quality.

Inside Conditions

Summer 23.8 Degrees C dry bulb Winter 20 Degrees C

75 Degrees F dry bulb 68 Degrees F

50 %RH

Outside Conditions

Summer 33 Degrees C dry bulb Winter 6 Degrees C

91 Degrees F dry bulb 42 Degrees F

21 Degrees C wet bulb

70 Degrees F wet bulb

SMALL PROJECT TEMPLATE - PART 3 STATEMENT OF WORK / PROJECT PROGRAM - Page 5

Provide protective coatings on casings and coils which come in contact with outside air.

Air Circulation: In each space and zone, provide for air circulation of a minimum of four (4) complete air changes per hour. Some spaces and zones may require more air circulation depending on the design.

Provide an air circulation of a minimum of four (4) air changes per hour for each space. The HVAC system for building 95 shall provide each zone with the choice of heating or cooling year round unless otherwise indicated. Each zone shall have its own limited range of control, as allowed by the control system central workstation.

The HVAC control system for this project will be provided in accordance with UFGS 23 09 23.13 20

BACnet® Direct Digital Control Systems for HVAC. HVAC controls will be capable of future connection with a base wide control system seamless. DDC system shall provide monitoring of energy usage for reporting purposes. The operator workstation computer with graphics built-in will be provided for this project.

The HVAC equipment selected must meet the highest industry standards in terms of energy efficiency

(COP, SEER) and system design will include additional features such as air heat exchanging/ heat recovery to maximize energy savings. The HVAC system selected for this type of facility must take into account the purpose of use, building occupancy, and hours of operation.

Prior to ordering, the Contractor shall provide manufacturer's documentation to certify materials and equipment provided meet or exceed Energy Star or FEMP requirements for categories where a classification exist. ASHRAE Climate Zone 3shall be used. All electric motors shall be NEMA Premium or the European equivalent. Categories or materials for which NEMA Premium or the European equivalent motors, Energy Star or FEMP minimum requirements are known to exist and shall be provided include, but are not limited to:

Exhaust air systems, Ventilations systems, Energy recovery units, Domestic Hot Water/Solar Hot Water, Doors (Energy Star South-Central Climate), Windows (Energy Star South-Central Climate), Roofing Products, Split type heating and air conditioning units, Variable refrigerant flow (VRF) cooling and heating systems.

"The Contractor shall provide documentation to show that all HVAC parts have been dipped or sprayed with a protective coating rated at 5500 hours or more in ASTM Test B117 "Standard Practice for

Operating Salt Spray (Fog) Apparatus" with no corrosion. The protective coating shall applied by an air conditioning manufacturer certified licensed applicator. All existing air conditioning related hardware and fittings shall be replaced. The Contractor shall provide documentation to show that all hardware and fittings, including but not limited to, mounting brackets, concrete anchors, screws, nut, bolts and washers shall be SAE Grade 316 marine grade stainless steel."

Fire Protection

SMALL PROJECT TEMPLATE - PART 3 STATEMENT OF WORK / PROJECT PROGRAM - Page 6

a. Replace existing Conventional FACP system with an addressable type system with voice evacuation.

b. Replacement of fire protection hardware (detectors, strobes, horns, etc.) with addressable type.

c. Installation of 2 hour rated firewall separating Alpha Shop and FLC Warehouse.

d. Upgrade existing sprinkler system to include storage area in Builders Shop.

e. Installation of lateral type sprinklers in FLC Warehouse.

2.0 PROJECT OBJECTIVES

2.1 APPLICABLE CODES AND STANDARDS

In addition to the codes and standards listed in Part 4, the design and construction shall be in accordance with the latest revision/edition of the following referenced codes and standards. The term "Latest Revision/Edition" is defined as the version as of the project award date.

International Codes

1. International Building Code IBC, Latest Version

2. International Mechanical Code, Latest Version

3. International Plumbing Code, Latest Version

American Society of Heating Refrigeration and Air Conditioning Engineers - ASHRAE

1. ASHRAE Handbooks

2. ASHRAE Standard 90.1-2013 Energy Standard for Buildings Except Low-Rise Residential Buildings

3. ASHRAE Standard 62.1-2013 Ventilation for Acceptable Indoor Air Quality

4. ASHRAE Standard 55-2013 Thermal Environmental Conditions for Human Occupancy

5. ASHRAE Standard 111-2008 Measurement, Testing, Adjusting and Balancing of Building Heating, Ventilation and Air-Conditioning Systems.

6. ASHRAE Standard 135-2010 BACnet – A Data Communication Protocol for Building Automation and Control Networks

Unified Facilities Criteria – UFC

1. UFC 1-200-01 - General Building Requirements

2. UFC 1-200-02 - High Performance and Sustainable Building Requirements

3. UFC 1-300-07A Design Build Technical Requirements

4. FC 1-300-09N Navy and Marines Corps Design Procedures

5. UFC 3-101-01 Architecture

6. UFC 3-110-03 Roofing

7. UFC 3-110-04 Roofing Maintenance and Repair

8. UFC 3-400-01 Energy Conservation Including Change 4, (August 2008)

9. UFC 3-400-02 Engineering Weather (February 2003)

10. UFC 3-401-01 Mechanical Engineering (July 2013)

11. UFC 3-410-01 Heating, Ventilating and Air Conditioning (July 2013)

12. UFC 3-420-01 Plumbing Systems

13. UFC 3-440-01 Facility-Scale Renewable Energy Systems

14. UFC 3-501-01 Electrical Engineering, with Change 2

SMALL PROJECT TEMPLATE - PART 3 STATEMENT OF WORK / PROJECT PROGRAM - Page 7

15. UFC 3-530-01: Design: Interior, Exterior Lighting and Controls

16. UFC 3-520-01 Interior Electrical Systems

17. UFC 3-600-01, Fire Protection Engineering for Facilities

18. UFC 4-010-01 DoD Minimum Antiterrorism Standards for Buildings

19. UFC 4-022-01 Security Engineering: Entry Control Facilities / Access Control Points

Hellenic Technical Chamber Technical Guidance – TOTEE

1. TOTEE 2425/86 Guide on load calculation for building spaces Air Conditioning.

2. TOTEE 2411/86 – Technical Instructions of the Technical chamber of Greece: Hot and Cold

Water distribution

3. TOTEE 2412/86 – Installations in buildings and sites-Waste systems

National Fire protection Association

1. NFPA 13: Standard for the Installation of Sprinkler Systems, 2016 Edition

2. NFPA 70®, National Electrical Code®, 2014 Edition

3. NFPA 72: National Fire Alarm and Signaling Code, 2016 Edition

Hellenic Organization for Standardization

1. ELOT HD 384 Electrical Installations of Buildings

2.2 SUSTAINABLE DESIGN

Design and construct project per sustainability requirements identified in Section 01 33 29.05 20, Sustainability Requirements For Design-Build. Additional specific sustainability requirements are found in this document.

2.3 STORMWATER MANAGMENT - LOW IMPACT DEVELOPMENT (LID)

Provide a design that incorporates low impact development strategies complying with UFC 3-210-10 Low Impact Development. If the project footprint exceeds 5000 SF (464.5 SM) and does not maintain the predevelopment hydrology to the maximum extent technically feasible (METF), these constraints must be documented on the NAVFAC Sustainable Energy Data Record Card (NSEDRC) and approved by the Government's civil reviewer. The NSEDRC can be found at:

http://www.wbdg.org/pdfs/navfac_sustainable_energy_data_record_card.pdf .

For Navy and Marine Corps projects, comply with Navy LID Policy (commonly referred to as the Penn Memo). The Navy LID policy sets a goal of no net increase in stormwater and sediment or nutrient loading from major renovation projects and construction projects. Major renovation projects are defined as having a storm water component and exceeding $5 million and major construction projects are defined as exceeding $750,000. If LID is not implemented to the METF as defined in UFC 3-210-10, a waiver must be obtained from the Regional Engineer.

Coordinate waiver review and approval with civil Technical Discipline Coordinator (TDC).

These policies are in addition to State or Local storm water management program permit requirements. The DOR must balance all requirements, Federal, State, Local and the above stated policies, and acquire required regulatory permits when managing stormwater generated.

3.0 SITE ANALYSIS

3.1 EXISTING SITE CONDITIONS

http://www.wbdg.org/pdfs/navfac_sustainable_energy_data_record_card.pdf

SMALL PROJECT TEMPLATE - PART 3 STATEMENT OF WORK / PROJECT PROGRAM - Page 8

The site is located on NSA Souda Bay, Crete, Greece. It contains an existing Building 95, which currently houses the FM&S and UEM portion of the PWD as well as NAVSUP FLC administration and storage spaces.

4.0 BUILDING REQUIREMENTS

Not used.

5.0 ROOM REQUIREMENTS

Not used.

6.0 ENGINEERING SYSTEMS REQUIREMENTS (ESR)

B20 Exterior Closure B30 Roofing C30 Interior Finishes D10 Conveying Systems D20 Plumbing

D30 HVAC

D40 Fire Protection Systems D50 Electrical Power and Lighting E10 Equipment E20 Furnishings F10 Special Construction F20 Selective Building Demo G30 Site Civil/Mechanical Utilities

B20 EXTERIOR ENCLOSURE

B2010 EXTERIOR WALLS

The primary exterior material of the building shall be prefinished insulated metal panels, in accordance with relevant ASHRAE Standards.

Exterior Screens Provide exterior screens, where required, that match the finish of the existing windows and are detailed to integrate with the architecture of the building, as appropriate to the design of the building.

Exterior Coatings Provide field applied exterior coatings for all items that are not prefinished, and to prefinished items when required to provide a color other than a standard prefinished color. All paint shall be in accordance with the Master Painter Institute (MPI) standards for the exterior architectural surface being finished. Ensure color is in accordance with Installation Appearance Plan.

B2020 EXTERIOR WINDOWS

SMALL PROJECT TEMPLATE - PART 3 STATEMENT OF WORK / PROJECT PROGRAM - Page 9

As much as practical, windows shall be provided in each area of the building that is regularly occupied, to enhance the working environment, without compromising visual acuity and comfort. Natural daylighting is preferred. Exterior windows shall be prefinished aluminum. New window installations and planned window replacement projects shall meet antiterrorism requirements. Provide windows meeting thermal performance required by RFP Part 4.

Windows Windows will be aluminum sliding and will be provided with an integral insect screen.

Provide a mockup of one combination window unit for the project to be used for a field mockup test of compliance with AAMA 502 Method A and Method B.

Exterior Glazing

Glazing color shall match existing adjacent buildings.

Glazing shall be laminated - tempered glass according to AT/FP requirements.

B2030 EXTERIOR DOORS

Exterior doors and frames shall be non-corroding prefinished steel. Glazing, and door frames shall meet antiterrorism requirements. Provide doors meeting thermal performance required by RFP Part 4.

Doors shall be Standard Duty Doors - Level 1, physical performance Level C, Model 1 for entrance-exit door.

Door hardware finish shall be satin stainless steel. They will receive new locksets consistent with Base standards and panic hardware where needed.

Door color shall be consistent with Installation Appearance Plan.

Solid Doors

Provide solid steel doors assemblies painted prefinished heavy-duty, non-corroding, insulated doors with steel frames and hardware. Provide solid steel doors assemblies painted prefinished heavy-duty, non-corroding, insulated doors with insulated glass panels, steel frames and hardware, where applicable. Provide solid steel door assembly painted prefinished heavy-duty, non-corroding, insulated door with steel frames and hardware, 90min Fire Rated. Openings in exterior flush doors shall be flashed with aluminum flashings at the bottom of the openings. Also provide exit device bar.

Roll-up Doors

SMALL PROJECT TEMPLATE - PART 3 STATEMENT OF WORK / PROJECT PROGRAM - Page 10

Roll-up doors shall be NAGDM 102 Industrial designation.

Doors shall have manual and automatic operation.

Exterior Door Hardware Provide the services of a certified door hardware consultant to prepare the door hardware schedule.

Provide hardware keying compatible with the existing base-wide keying system.

B30 ROOFING

Provide a complete new insulated roof system for the entire facility including all necessary ancillary and incidental work necessary for a complete, new, and watertight roof system installation.

B3010 ROOF COVERINGS

Remove all the existing roof metal sheeting, insulation, gutters and downspouts and replace with new prefinished insulated metal roof panels, in accordance with relevant ASHRAE Standards and Installation Appearance Plan.

B3020 PERFORMANCE REQUIREMENTS

The installed roof system shall be watertight; free of defects in materials and workmanship; free of damage, including blisters, delaminations, cuts, scratches, abrasions, and patchwork; provide for positive drainage of the roof surface area; and suitable for the climatic and service conditions of the installation. The provided insulated roof system shall have a warranty of minimum 20 years.

Provide roof system with thermal emittance and total thermal performance as prescribed by ASHRAE 90.1, Chapter 5 for project climate zone and as required by other project sustainability goals.

B3030 WIND UPLIFT AND FIRE RESISTANCE REQUIREMENTS

The roof system shall be designed and attached to resist wind uplift pressures calculated in accordance with ASCE 7. Uplift resistance shall be validated by applicable Factory Mutual (FM) uplift testing, or calculations based on standard engineering practice and applicable recommendations of FM.

Sheet metal perimeter and flashing components shall be designed, attached, and installed to provide for wind resistance equivalent to or greater than that required for the roof membrane system, and in accordance with applicable codes or other applicable industry standard recommendations.

The roof system shall provide Class A or Class B fire resistance, as tested by standard ASTM, FM, SMALL PROJECT TEMPLATE - PART 3 STATEMENT OF WORK / PROJECT PROGRAM - Page 11 or UL procedures.

B3040 ROOF WARRANTY

According to the Construction Product Regulation (1-July-2013) each product must be supported by the Declaration of Performance (DoP) expressing the performance of construction products to their essential characteristics of those products.

Manufacturer’s warranty shall provide for full removal and replacement of failed, defective, and damaged roof system materials or installation workmanship in the event of water intrusion into or through the roof system, and repair of defects such as blistering, delamination, open seams, cracking, splitting, and excessive weathering. Warranty of corrective action shall not be limited in dollar value.

Provide minimum two-year contractor warranty against defects in installation workmanship in accordance with referenced requirements of Construction Product Regulation (1-July-2013).

Contractor warranty shall provide for full removal and replacement of failed or defective workmanship and damaged materials, including sheet metal flashings. The provided insulated roof system shall have an overall warranty of minimum 20 years.

B3050 ROOF SPECIFICATION AND DETAILING

All work, materials, installation and details shall be in accordance with the Declaration of Performance (DoP) and comply with all applicable Unified Facilities Guide Specification (UFGS) materials and installation requirements.

All details shall be in accordance with recommendations and guidelines of Eurocodes as required by the RFP.

The roof system shall comply with the applicable requirements of the International Building Code. Refer to UFC 3-110-03, Roofing, and UFC 3-100-10, Architecture for additional technical requirements for the roof system to be installed.

B3060 ROOF DESIGNER REQUIREMENTS

Provide materials specification, installation requirements, and system detailing to include all flashings, penetrations, closures, corners, intersections, terminations, transitions, interfaces, joint, and lap conditions to provide for a watertight installation.

The Contractor shall utilize the services of a Registered Professional Architect or Professional Engineer either of which is knowledgeable and experienced in roof investigation, inspection, and design and specializes in roof design and roof consulting services. Consultant shall be thoroughly familiar with the field conditions and prepare the design or provide design review and approval prior to design acceptance by the Contracting Officer. The consultant shall validate in writing familiarity with field conditions and that the design for the project is complete, in accordance with the RFP, and provides for a complete and effective roof system solution and

SMALL PROJECT TEMPLATE - PART 3 STATEMENT OF WORK / PROJECT PROGRAM - Page 12 design.

B3070 QUALITY CONTROL PROGRAM

Contractor shall establish a quality control program to assure adherence to the RFP design and construction requirements and to report on the installation quality.

C10 INTERIOR CONSTRUCTION

C1010 PARTITIONS

Fixed Partitions

Interior fixed partitions shall be metal studs with triple layer of fire rated gypsum board on each side with acoustical insulation.

C30 INTERIOR FINISHES

Finishes and color schemes will be chosen to either match or complement the existing color scheme. All painted walls will have one prime coat and two finish coats, finish coats of paint to be at the minimum, cleanable, low luster finish. All interior finishes to be submitted to FEAD for approval prior to commencing of related works

D10 CONVEYING SYSTEMS

D20 PLUMBING

D2010 PLUMBING FIXTURES

No plumbing fixtures are added or removed from the facility.

D2020 DOMESTIC WATER EQUIPMENT

Provide a complete domestic hot water system, combining heat recovery HVAC components with a solar hot water system, including heating panels, roof supports, piping, pumps, insulated hot water storage tanks, heat exchange systems, controls and circulating systems according to the design requirements, to deliver 60% of the building’s total annual requirement for domestic hot water.

Remove existing electrical hot water generators and return to the Government.

Provide reduced pressure principle type backflow preventers according to NAVFAC specifications for the HVAC and Solar Hot Water System.

Provide all appropriate piping, insulation, connections, pumps, filters, valves, gauges and thermal meter for the domestic hot water generator and distribution system.

Insulation & Identification

SMALL PROJECT TEMPLATE - PART 3 STATEMENT OF WORK / PROJECT PROGRAM - Page 13

Provide insulation on domestic hot and cold water supply.

Other Domestic Water Supply Provide piping supports in accordance with the IPC. Provide inspections, disinfection, and testing in accordance with the IPC.

D2030 SANITARY WASTE

Provide drainage piping for HVAC condensation and indicate discharge points (e.g. floor drains).

Provide condensate pumps where required.

D2040 RAIN WATER DRAINAGE

Pipe & Fittings

Provide painted, galvanized steel, or hot-dip galvanized cast-iron or ductile iron rain water drain pipe and splash blocks at points to be indicated in the design package.

Roof Drains Provide roof drains that are compatible with the roofing system. Roof drains to be equipped with grate, for blockage protection from leaves and debris.

Insulation & Identification No insulation or identification for the rain water piping provided all piping is located on the exterior of the building.

D2090 OTHER PLUMBING SYSTEMS

Special Piping Systems

No Special Piping Systems are added or affected.

D30 HVAC

HVAC System Requirements Provide air conditioning and heating for spaces as indicated and for the following Design conditions:

Outside Conditions

Summer

Degrees C dry bulb

Winter

Degrees C

91.4

Degrees F dry

37.4

Degrees F

Degrees C wet

SMALL PROJECT TEMPLATE - PART 3 STATEMENT OF WORK / PROJECT PROGRAM - Page 14

Degrees F wet

Inside Conditions

Summer

23.8

Degrees C dry

Winter

Degrees C

Degrees F dry

Degrees F

%RH

Provide Ventilation rates and systems per the latest edition of ASHRAE Standard 62, Ventilation for Acceptable Indoor Air Quality.

Provide ventilation for all habitable spaces in the building.

The HVAC system shall provide heating or cooling year round unless otherwise indicated. Each zone shall have its own limited range of control, as allowed by the control system central workstation.

Zone the HVAC system as follows:

Each office space shall be a separate zone.

Each workshop area shall be a separate zone.

Each storage space shall be a separate zone.

Provide protective coatings on casings and coils which come in contact with outside air.

D3010 ENERGY SUPPLY

Heating Supply No fuel oil, natural gas or propane system is required for this project. All heating will be generated by electrical heat pump units.

D3020 HEAT GENERATING SYSTEMS

Boilers No boiler fuel fired boiler system is required for this project.

Furnaces No furnaces to be used.

Fuel-fired Unit Heaters

SMALL PROJECT TEMPLATE - PART 3 STATEMENT OF WORK / PROJECT PROGRAM - Page 15

No fuel fired unit heaters to be used for this project.

Equipment Thermal Insulation Provide Insulation for hot and chilled water pumps and equipment.

D3030 COOLING GENERATING SYSTEMS

The system shall consist of heat pump units, branch circuit controllers, fan coil units, and associated controls. Each fan coil shall be controlled by a zone thermostat.

Dedicated Outdoor Air System (DOAS) Provide a Dedicated Outdoor Air System (DOAS) for heating, cooling, ventilating and air conditioning system to serve the requirements of the facility.

The system shall be designed to provide a total energy recovery for exhaust air and ventilation.

D3040 DISTRIBUTION SYSTEMS

Air Distribution, Ventilation

Provide insulated, galvanized steel ductwork.

Provide aluminum grilles, registers, and diffusers.

Water Distribution Systems No chilled-hot water system is required for this project.

Exhaust Systems Provide ducted exhaust ventilation systems and exhaust fans to serve all ventilated zones of the facility.

Air Handling Units Provide with 85 % filters.

D3050 TERMINAL & PACKAGE UNITS

Fan Coil Units

Provide VRF type fan coil units of various types wall mounted, floor standing etc. and controls.

Package units

Provide 100% Outside Air Makeup Air Conditioning Units to precondition outside air prior to distributing to terminal units.

D3060 CONTROLS AND INSTRUMENTATION

HVAC Controls

Provide a complete Direct Digital Control (DDC) system to comply with UFGS 23 09 23.13 20 BACnet Direct Digital Control Systems for HVAC for the facility.

SMALL PROJECT TEMPLATE - PART 3 STATEMENT OF WORK / PROJECT PROGRAM - Page 16

D3070 SYSTEMS TESTING AND BALANCING

Provide complete Testing and Balancing (TAB) of all air and water distribution systems and HVAC equipment.

D40 FIRE PROTECTION SYSTEMS

D4010 FIRE ALARM AND DETECTION SYSTEMS

Remove existing conventional type fire alarm system throughout building 95.

Design and install new addressable combined mass notification/fire alarm and detection system.

Provide speakers for combined mass notification/fire alarm systems.

Provide a remote annunciator with alarm acknowledge, alarm silence, and reset functions. The remote annunciator shall be located as directed by the Contracting Officer in conjunction with the cognizant NAVFAC Fire Protection Engineer.

All fire alarms, supervisory alarms and trouble conditions indicated at the fire alarm control panel shall be transmitted to the fire alarm receiving station through existing safenet system as the existing installation.

D4020 FIRE SUPPRESSION WATER SUPPLY AND EQUIPMENT

Base hydraulic calculations on the latest flow test result to be provided by the government.

D4040 SPRINKLERS

Redesign existing wet pipe automatic sprinkler protection system for complete coverage throughout building. New design shall extend existing sprinkler system into storage area in Builders Shop and shall provide lateral type sprinklers in FLC Warehouse as required.

D4090 OTHER FIRE PROTECTION SYSTEMS

Provide portable fire extinguishers and cabinets as required.

D50 ELECTRICAL

The electrical design shall comply with the design criteria specified in UFC 3-501-01, Electrical Engineering, ELOT HD 384 Electrical Installations of Buildings and referenced documents.

D5010 ELECTRICAL SERVICE & DISTRIBUTION

All electrical systems that are attached on existing structures affected by renovation works shall be removed and reinstalled at same locations except exposed conduits located at the exterior of the building which shall be replaced with interior mounted conduits. Repair any deficiencies on electrical systems affected by renovation works

SMALL PROJECT TEMPLATE - PART 3 STATEMENT OF WORK / PROJECT PROGRAM - Page 17

Provide an insulated equipment grounding conductor in all raceways for systems operating at greater than 50 volts.

D5020 LIGHTING & BRANCH WIRING

Existing building exterior lighting consists of seven wall mount luminaires and four wall mount floodlights. All existing fixtures shall be removed and returned to the government.

Design and install new building exterior security lighting with motion and daylight detection. New design shall meet the requirements of UFC 3-530-01 Interior and Exterior Lighting Systems and Controls and its referenced documents. All new lighting fixtures shall be modernized LED type, CE listed, meeting IES LM-79, IES LM-80 and UFC 3-530-01 Interior and Exterior Lighting Systems and Controls requirements.

All conductors for lighting circuit shall be copper.

D5030 COMMUNICATIONS & SECURITY

Not used

D5090 OTHER ELECTRICAL SERVICES

There is an existing 20KVA 400/208V 3 phase transformer serving 120V system throughout building 95.

Upgrade by replacement existing transformer. Size of new transformer shall be in accordance to UFC 3-501-01. New transformer shall comply with the requirements of UFC 3-520-01 and ASHRAE 90.1. For bidding purpose assume that new transformer is rated 20KVA same size as the existing.

E10 EQUIPMENT

E20 FURNISHINGS

All existing furnishings affected by construction works shall be removed, protected, stored and reinstalled after completion of works

F10 SPECIAL CONSTRUCTION

F1010 SPECIAL STRUCTURES: PRE-ENGINEERED METAL BUILDINGS

Building envelope shall have thermal resistance to comply with the ASHRAE 90.1 standards for its use.

F20 SELECTIVE BUILDING DEMOLITION

F2020 HAZARDOUS COMPONENT ABATEMENT

SMALL PROJECT TEMPLATE - PART 3 STATEMENT OF WORK / PROJECT PROGRAM - Page 18

A report for the following: asbestos, lead based paint, paint: lead, cadmium, chromium, mercury and low level radioactive components, PCBs, ozone depleting substances is not provided to support this project.

Prior to the start of the work the ECATTS trained contractor is required to inspect the work area with the designer of record, and government representative to address existing potentially hazardous components as part of the work. The contractor is required to provide a list of hazardous components, locations and quantities that must be addressed as part of the work.

Remove and dispose of the following hazardous materials: asbestos, lead based paint, paint:

lead, cadmium and chromium, mercury and low level radioactive components, PCBs, ozone depleting substances according to applicable national and international environmental laws and standards.

Asbestos

Remove and dispose of any asbestos-containing materials or debris found during inspection.

Paint Related Work

Remove and dispose of any paint containing lead, cadmium, and chromium found during inspection

Mercury & LLR Components

Remove all existing fluorescent light tubes, electronic and compact fluorescent light bulbs, smoke detectors as mercury vapor containing or LLR components.

PCB's

Remove all existing light ballasts, transformers, without markings regarding PCB content (e.g., "NO PCB", "NON PCB") as PCB containing.

Ozone Depleting Substances (ODS)

Remove the following equipment which contains ODS: air conditioning equipment. Contractor shall follow manufacturer procedures for refrigerant recovery, disconnection and removal. All equipment shall be returned to the government.

Disposal

All waste materials shall become the property of the Contractor and shall be transported, disposed of or recycled in accordance with local legislation. Any intact items removed during construction shall be approved by FEAD prior to disposal.

G10 SITE PREPARATION

SMALL PROJECT TEMPLATE - PART 3 STATEMENT OF WORK / PROJECT PROGRAM - Page 19

G20 SITE IMPROVEMENTS

G30 SITE CIVIL/MECHANICAL UTILITIES

G3010 WATER SUPPLY

The new water system implemented is an alternation of the existing domestic hot water system.

Any queries regarding anticipated work on existing water system serving the project site shall be communicated to FEAD for further processing.

Where backflow prevention is required, backflow preventers will not be allowed aboveground outside the building. If allowed, provide enclosure

G3020 SANITARY SEWER

No work on the existing sanitary sewer system is anticipated as the project does not include any installation of new fixtures or the modification of the existing.

A wastewater pump station will not be required.

G3030 STORM SEWER

G40 SITE ELECTRICAL UTILITIES