Attachment_J_0200000-06_ELINs_REV_6.24.14.xlsx
XLSX spreadsheet 190 KB Posted
- Solicitation number
- N33191-14-R-1010
About this file
Attachment J 0200000-06 ELINs REV 6.24.14
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment_0006.pdf | ||
| 04_CBA_JARDINERA_ESTATAL_2010-2013.pdf | ||
| BOS_CBAs.rar | RAR file | |
| Technical_Library_Notice.pdf | ||
| Amendment_0005.pdf | ||
| Amendment_0004.pdf | ||
| BOS_Labor_Information_Redacted.pdf | ||
| Amendment_0003.pdf | ||
| Amendment_0002.pdf | ||
| Attachment_J_0200000-06_ELINs_REV_6.23.14.xlsx | XLSX spreadsheet | |
| Amendment_0001.pdf | ||
| ECR_ROTA_BOS_CONTRACT_REVISED_6.23.14.zip | ZIP file | |
| N33191-14-R-1010_Solicitation_ROTA_BOSC.pdf | ||
| Attachment_J_B-1_0200000_J_J_0200000-06_ELINs.xlsx | XLSX spreadsheet | |
| Attachment_A_PPQ_Rota_BOSC.docx | DOCX document | |
| Attachment_C_PPI_Form.doc | DOC document | |
| Attachment_B_Contract_Data_Sheet.doc | DOC document | |
| ECR_ROTA_BOS_CONTRACT.zip | ZIP file | |
| Attachment_2_Spanish_Contractor_Request_for_Site_Visit_Pass.xls | XLS spreadsheet | |
| Attachment_1_Country_Clearance.doc | DOC document |
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ELIN-BASE PERIOD FFP
| ATTACHMENT J-020000-06 | |
| EXHIBIT LINE ITEM NUMBERS | |
| SOLICITATION NO. N33191-14-R-1010 | |
| Firm Fixed-Price - Base Period | |
| PROVIDE PRICES TO PERFORM FACILITY SERVICES - FIRM FIXED PRICE - PER SECTION C, SPEC ITEM 3 | |
| SubELINs A001 thru A180 |
| ELIN/ SubELIN | Description | Quant | Unit of Issue | Unit Price (USD) | Total (USD) | |
| REGION (CNRE) FFP Work (SLIN 0001AA) | ||||||
| A001 | Specification 1502000 Facility Investment (ST) | |||||
| A001AA | Emergency Trouble Calls (Spec Item 3.1.1) | |||||
| mergency Trouble Service Requests (Spec Item 3.1.1) | 12 | MO | 0.00 | 0.00 | ||
| A001AB | Urgent Service Requests (Spec Item 3.1.2) | 12 | MO | 0.00 | 0.00 | |
| A001AC | Routine Service Requests (Spec Item 3.1.3) | 12 | MO | 0.00 | 0.00 | |
| A001AD | Preventive Maintenance (PM) Program (Spec Item 3.2) | 12 | MO | 0.00 | 0.00 | |
| A002 | Specification 1503010 Custodial | |||||
| A002AA | Custodial Services (Spec Item 3.1) | 12 | MO | 0.00 | 0.00 | |
| A003 | Specification 1503020 Pest Control | |||||
| A003AA | Pest Control (Spec Items 3.1, 3.2, 3.3, 3.4) | 12 | MO | 0.00 | 0.00 | |
| A004 | Specification 1503030 Integrated Solid Waste Management (ISWM) | |||||
| A004AA | Solid Waste Collection and Disposal (Spec Items 3.1, 3.2, 3.3, 3.4) | 12 | MO | 0.00 | 0.00 | |
| A005 | Specification 1503050 Grounds Maintenance & Landscaping | |||||
| A005AA | Improved Grounds (Spec Item 3.1) | 12 | MO | 0.00 | 0.00 | |
| A005AC | COL3 (Spec Item 3.3) | 12 | MO | 0.00 | 0.00 | |
| A006-A009 | Reserved | |||||
| Region--CNREURAFSWA Subtotal | 0.00 | |||||
| Bureau of Medicine and Surgery (BUMED) FFP Work (SLIN 0001AB) | ||||||
| A010 | Specification 1502000 Facility Investment (Sustainment) | |||||
| A010AA | Emergency Service Requests (Spec Item 3.1.1) | 12 | MO | 0.00 | 0.00 | |
| A010AB | Integrated Maintenance Program (IMP) (Spec Item 3.3) | 12 | MO | 0.00 | 0.00 | |
| A011 | Specification 1503010 Custodial | |||||
| A011AA | Custodial Services (Spec Items 3.1, 3.2) | 12 | MO | 0.00 | 0.00 | |
| A012 | Specification 1503020 Pest Control | |||||
| A012AA | Scheduled Services (Spec Items 3.1, 3.2) | 12 | MO | 0.00 | 0.00 | |
| A013 | Specification 1503030 Integrated Solid Waste Management (ISWM) | |||||
| A013AA | Solid Waste Collection and Disposal (Spec Items 3.1, 3.2, 3.3, 3.4) | 12 | MO | 0.00 | 0.00 | |
| A014 | Specification 1503050 Grounds Maint & Landscaping | |||||
| A014AA | Grounds Maintenance & Landscaping (Spec Item 3.1) | 12 | MO | 0.00 | 0.00 | |
| A015 | Specification 1800000 Environmental | |||||
| A015AA | Regulated Medical Waste Collection and Disposal (Spec Item 3.1) | 12 | MO | 0.00 | 0.00 | |
| A016-A019 | Reserved | |||||
| BUMED Subtotal | 0.00 | |||||
| Family Housing FFP Work (SLIN 0001AC) | ||||||
| A020 | Specification 1502000 Facility Investment (ST) | |||||
| A020AA | Emergency Service Requests (Spec Item 3.6) | 12 | MO | 0.00 | 0.00 | |
| A020AB | Integrated Maintenance Program (IMP) (Spec Item 3.6) | 12 | MO | 0.00 | 0.00 | |
| A021 | Specification 1503010 Custodial | |||||
| A021AA | Custodial Services (Spec Item 3.1) | 12 | MO | 0.00 | 0.00 | |
| A022 | Specification 1503020 Pest Control | |||||
| A022AA | Scheduled Services (Spec Items 3.1, 3.2) | 12 | MO | 0.00 | 0.00 | |
| A023 | Specification 1503030 Integrated Solid Waste Management | |||||
| A023AA | Solid Waste Collection and Disposal Las Palmeras (Spec Items 3.1, 3.2, 3.3, 3.4) | 12 | MO | 0.00 | 0.00 | |
| A023AB | Solid Waste Collection and Disposal Las Flores (Spec Items 3.1, 3.2, 3.3, 3.4) | 12 | MO | 0.00 | 0.00 | |
| A024 | Specification 1503050 Grounds Maint & Landscaping | |||||
| A024AA | Grounds Maintenance & Landscaping (Spec Item 3.1) | 12 | MO | 0.00 | 0.00 | |
| A025-A029 | Reserved | |||||
| Family Housing Subtotal | 0.00 | |||||
| Air Operations FFP Work (SLIN 0001AD) | ||||||
| A030 | Specification 0501030 Aviation Fuel Support (AO) | |||||
| A030AA | Cryogenic Storage & Distribution Operations (Spec Item 3.1) | 12 | MO | 0.00 | 0.00 | |
| A031-A039 | Reserved | |||||
| Air Ops Subtotal | 0.00 | |||||
| USAF 725th Air Mobility Squadron (AMS) FFP Work (SLIN 0001AE) | ||||||
| A040 | Specification 1502000 Facility Investment (ST) | |||||
| A040AA | Preventive Maintenance (PM) Program (Spec Item 3.2) | 12 | MO | 0.00 | 0.00 | |
| A041 | Specification 1503010 Custodial | |||||
| A041AA | Custodial Services (Spec Item 3.1) | 12 | MO | 0.00 | 0.00 | |
| A042 | Specification 1503020 Pest Control | |||||
| A042AA | Scheduled Services (Spec Items 3.1, 3.2) | 12 | MO | 0.00 | 0.00 | |
| A043 | Specification 1503030 Integrated Solid Waste Management | |||||
| A043AA | Solid Waste Collection and Disposal (Spec Items 3.1, 3.2, 3.3, 3.4) | 12 | MO | 0.00 | 0.00 | |
| A044 | Specification 1503050 Grounds Maint & Landscaping | |||||
| A044AA | Grounds Maintenance & Landscaping (Spec Item 3.1) | 12 | MO | 0.00 | 0.00 | |
| A045-A049 | Reserved | |||||
| USAF 725 AMS Subtotal | 0.00 | |||||
| USAF 521st Air Mobility Operations Group (AMOG) FFP Work (SLIN 0001AF) | ||||||
| A050 | Specification 1503010 Custodial | |||||
| A050AA | Custodial Services (Spec Items 3.1, 3.2) | 12 | MO | 0.00 | 0.00 | |
| A051-A059 | Reserved | |||||
| USAF 521 AMOG Subtotal | 0.00 | |||||
| Defense Commissary Agency (DeCA) FFP Work (SLIN 0001AG) | ||||||
| A060 | Specification 1502000 Facility Investment (ST) | |||||
| A060AA | Emergency Service Requests (Spec Item 3.1.1) | 12 | MO | 0.00 | 0.00 | |
| A061 | Specification 1503020 Pest Control | |||||
| A061AA | Scheduled Services (Spec Items 3.1, 3.2) | 12 | MO | 0.00 | 0.00 | |
| A062 | Specification 1503030 Integrated Solid Waste Management | |||||
| A062AA | Solid Waste Collection and Disposal (Spec Items 3.1, 3.2, 3.3, 3.4) | 12 | MO | 0.00 | 0.00 | |
| A063-A069 | Reserved | |||||
| DeCA Subtotal | 0.00 | |||||
| Galley FFP Work (SLIN 0001AH) | ||||||
| A070 | Specification 1502000 Facility Investment (Sustainment) | |||||
| A070AA | Emergency Service Requests (Spec Item 3.1.1) | 12 | MO | 0.00 | 0.00 | |
| A070AB | Urgent Service Requests (Spec Item 3.1.2) | 12 | MO | 0.00 | 0.00 | |
| A070AC | Routine Service Requests (Spec Item 3.1.3) | 12 | MO | 0.00 | 0.00 | |
| A070AD | PM Program (Spec Item 3.5) | 12 | MO | 0.00 | 0.00 | |
| A071-A079 | Reserved | |||||
| Galley Subtotal | 0.00 | |||||
| NAVFAC NWCF FFP Work (SLIN 0001AJ) | ||||||
| A080 | Specification 1503030 Integrated Solid Waste Management | |||||
| A080AA | Solid Waste Collection and Disposal (Spec Items 3.1, 3.2, 3.3, 3.4) | 12 | MO | 0.00 | 0.00 | |
| A0081 | Specification 1503050 Grounds Maintenance & Landscaping | |||||
| A0081AA | Grounds Maintenance & Landscaping (Spec Items 3.1, 3.2) | 12 | MO | 0.00 | 0.00 | |
| A082-A089 | Reserved | |||||
| NAVFAC NWCF Subtotal | 0.00 | |||||
| Utilities FFP Work (SLIN 0001AK) | ||||||
| A090 | Specification 1502000 Facility Investment (Sustainment) (UT) | |||||
| A090AA | PM Program (Spec Item 3.5) | 12 | MO | 0.00 | 0.00 | |
| A091-A099 | Reserved | |||||
| Utilities Subtotal | 0.00 | |||||
| NCTAMS LANT FFP Work (SLIN 0001AL) | ||||||
| A100 | Specification 1502000 Facility Investment (Sustainment) (UT) | |||||
| A100AA | Preventive Maintenance (PM) Program (Spec Item 3.2) | 12 | MO | 0.00 | 0.00 | |
| A101 | Specification 1503010 Custodial | |||||
| A101AA | Custodial Services (Spec Items 3.1, 3.2) | 12 | MO | 0.00 | 0.00 | |
| A102 | Specification 1503050 Grounds Maint & Landscaping | |||||
| A102AA | Grounds Maintenance & Landscaping (Spec Item 3.1) | 12 | MO | 0.00 | 0.00 | |
| A103-A109 | Reserved | |||||
| NCTAMS LANT Subtotal | 0.00 | |||||
| Base Support Vehicles & Equipment (BSVE) FFP Work (SLIN 000A1M) | ||||||
| A110 | Specification 1503030 Integrated Solid Waste Management | |||||
| A110AA | Solid Waste Collection and Disposal (Spec Items 3.1, 3.2, 3.3, 3.4) | 12 | MO | 0.00 | 0.00 | |
| A110AB | Add ISWM Refuse and Tires | 12 | MO | 0.00 | 0.00 | |
| A111 | Specification 1700000 BSVE (TR) | |||||
| A111AA | Scheduled Passenger Transportation Services (Spec Item 3.1) | 12 | MO | 0.00 | 0.00 | |
| A112-A119 | Reserved | |||||
| BSVE Subtotal | 0.00 | |||||
| Defense Reutilization Management Office (DRMO) FFP Work (SLIN 000A1N) | ||||||
| A0120 | Specification 1503010 Custodial | |||||
| Custodial Services (Spec Items 3.1, 3.2) | 12 | MO | 0.00 | 0.00 | ||
| A121 | Specification 1503030 Integrated Solid Waste Management | |||||
| A121AA | Solid Waste Collection and Disposal (Spec Items 3.1, 3.2, 3.3, 3.4) | 12 | MO | 0.00 | 0.00 | |
| A122-A129 | Reserved | |||||
| DRMO Subtotal | ||||||
| Department of Defense Schools (DoDDS) FFP Work (SLIN 0001AP) | ||||||
| A130 | Specification 1503030 Integrated Solid Waste Management | |||||
| A130AA | Solid Waste Collection and Disposal (Spec Items 3.1, 3.2, 3.3, 3.4) | 12 | MO | 0.00 | 0.00 | |
| A131-A139 | Reserved | |||||
| DoDDS Subtotal | 0.00 | |||||
| Naval Criminal Investigative Service (NCIS) FFP Work (SLIN 0001AQ) | ||||||
| A140 | Specification 1503010 Custodial | |||||
| A141AA | Custodial Services (Spec Items 3.1, 3.2) | 12 | MO | 0.00 | 0.00 | |
| A142 | Specification 1503030 Integrated Solid Waste Management | |||||
| A142AA | Solid Waste Collection and Disposal (Spec Items 3.1, 3.2, 3.3, 3.4) | 12 | MO | 0.00 | 0.00 | |
| A143-A149 | Reserved | |||||
| NCIS Subtotal | ||||||
| Credit Union FFP Work (SLIN 001AR) | ||||||
| A150 | Specification 1503010 Custodial | |||||
| A150AA | Custodial Services (Spec Items 3.1, 3.2) | 12 | MO | 0.00 | 0.00 | |
| A151-A159 | Reserved | |||||
| Credit Union Subtotal | 0.00 | |||||
| AIR OPS N327 FFP Work (SLIN 0001AS) | ||||||
| A160 | Specification 1503010 Custodial | |||||
| A161AA | Custodial Services (Spec Items 3.1, 3.2) | 12 | MO | 0.00 | 0.00 | |
| A162 | Specification 1503030 Integrated Solid Waste Management | |||||
| A162AA | Solid Waste Collection and Disposal (Spec Items 3.1, 3.2, 3.3, 3.4) | 12 | MO | 0.00 | 0.00 | |
| A163 | Specification 1503050 Grounds Maint & Landscaping | |||||
| A163AA | Grounds Maintenance & Landscaping (Spec Item 3.1) | 12 | MO | 0.00 | 0.00 | |
| A164-A169 | Reserved | |||||
| AIR OPS N327 Subtotal | 0.00 | |||||
| NEPMU7 FFP Work (SLIN 0001AT) | ||||||
| A170 | Specification 1503030 Integrated Solid Waste Management | |||||
| A170AA | Solid Waste Collection and Disposal (Spec Items 3.1, 3.2, 3.3, 3.4) | 12 | MO | 0.00 | 0.00 | |
| A171-A179 | Reserved | |||||
| NEPMU7 Subtotal | 0.00 | |||||
| Defense Logistics Agency (DLA) FFP Work (SLIN 0001AU) | ||||||
| A180 | Specification 1502000 Facility Investment (Sustainment) | |||||
| A180AA | Preventive Maintenance (PM) Program (Spec Item 3.2) | 12 | MO | 0.00 | 0.00 | |
| A180AB | Integrated Maintenance Program (IMP) (Spec Item 3.6) | 12 | MO | 0.00 | 0.00 | |
| A181-A189 | Reserved | |||||
| DLA Subtotal |
| TOTAL LINE ITEM 001 FFP WORK (SubELINs A001 thru A180) | TOTAL | |
| Line Item 002 Firm Fixed Price - Base Period OPTION (COL4 Additional Measures Level 1) | ||
| PROVIDE PRICES TO PERFORM FACILITY SERVICES - FIRM FIXED PRICE - PER SECTION C, SPEC ITEM 3 |
| ELIN/ SubELIN | Description | Quant | Unit of Issue | Unit Price (USD) | Total (USD) |
| REGION FFP Work (SLIN 0001) | |||||
| A002 | Specification 1503010 Custodial COL4 Additional Measures Level 1 (FX) | ||||
| A002AA | Custodial Services (Spec Item 3.1)--Services for Region facilities/spaces identified in the Custodial Inventory provided in J-1503010 performed at the COL4 Base Measures frequencies specified per the Common Output Level Standards listed in J-1503010. | 12 | MO | ||
| REGION Subtotal | |||||
| TOTAL LINE ITEM 0002 FFP WORK (SubELIN A002AA) | TOTAL |
| Line Item 003 Firm Fixed Price - Base Period OPTION (COL4 Additional Measures Level 2) |
| PROVIDE PRICES TO PERFORM FACILITY SERVICES - FIRM FIXED PRICE - PER SECTION C, SPEC ITEM 3 |
| ELIN/ SubELIN | Description | Quant | Unit of Issue | Unit Price (USD) | Total (USD) |
| REGION FFP Work (SLIN 0001) | |||||
| A003 | Specification 1503050 Grounds Maint COL4 Additional Measures Level 2 (FX) | ||||
| A003AA | Grounds Services (Spec Item 3.1)--Services for Region facilities/spaces identified in the Grounds Inventory provided in J-1503050 performed at the COL4 Base Measures frequencies specified per the Common Output Level Standards listed in J-1503050. | 12 | MO | ||
| REGION Subtotal | |||||
| TOTAL LINE ITEM 0003 FFP WORK (SubELIN A003AA) | TOTAL |
| Line Item 004 Firm Fixed Price - Base Period OPTION (COL4 Additional Measures Level 3) |
| PROVIDE PRICES TO PERFORM FACILITY SERVICES - FIRM FIXED PRICE - PER SECTION C, SPEC ITEM 3 |
| ELIN/ SubELIN | Description | Quant | Unit of Issue | Unit Price (USD) | Total (USD) |
| REGION FFP Work (SLIN 0001) | |||||
| A004 | Specification 1503010 Custodial COL4 Addl Measures Level 3 (FX) | ||||
| A004AA | Custodial Services (Spec Item 3.1)--Services for Region facilities/spaces identified in the Custodial Inventory provided in J-1503010 performed at the COL4 Base Measures frequencies specified per the Common Output Level Standards listed in J-1503010. | 12 | MO | ||
| REGION Subtotal | |||||
| TOTAL LINE ITEM 0004 FFP WORK (SubELIN A004AA) | TOTAL |
| Line Item 005-006 Firm Fixed Price - Base Period OPTION (COL3 Base Measures) |
| PROVIDE PRICES TO PERFORM FACILITY SERVICES - FIRM FIXED PRICE - PER SECTION C, SPEC ITEM 3 |
| ELIN/ SubELIN | Description | Quant | Unit of Issue | Unit Price (USD) | Total (USD) |
| REGION FFP Work (SLIN 0001) | |||||
| A005 | Specification 1503010 Custodial COL3 Base Measures (FX) | ||||
| A005AA | Custodial Services (Spec Item 3.1)--Services for Region facilities/spaces identified in the Custodial Inventory provided in J-1503010 performed at the COL4 Base Measures frequencies specified per the Common Output Level Standards listed in J-1503010. | 12 | MO | ||
| A006 | Specification 1503050 Grounds Maint COL3 Base Measures (FX) | ||||
| A006AA | Grounds Services (Spec Item 3.1)--Services for Region facilities/spaces identified in the Grounds Inventory provided in J-1503050 performed at the COL4 Base Measures frequencies specified per the Common Output Level Standards listed in J-1503050. | 12 | MO | ||
| REGION Subtotal | |||||
| TOTAL LINE ITEM 005 FFP WORK (SubELINs A005AA thru A006AA) | TOTAL |
| Line Item 007 Firm Fixed Price - Base Period OPTION (COL3 Additional Measures Level 1) |
| PROVIDE PRICES TO PERFORM FACILITY SERVICES - FIRM FIXED PRICE - PER SECTION C, SPEC ITEM 3 |
| ELIN/ SubELIN | Description | Quant | Unit of Issue | Unit Price (USD) | Total (USD) |
| REGION FFP Work (SLIN 0001) | |||||
| A007 | Specification 1503010 Custodial COL3 Addl Measures Level 1 (FX) | ||||
| A007AA | Custodial Services (Spec Item 3.1)--Services for Region facilities/spaces identified in the Custodial Inventory provided in J-1503010 performed at the COL4 Base Measures frequencies specified per the Common Output Level Standards listed in J-1503010. | 12 | MO | ||
| REGION Subtotal | |||||
| TOTAL LINE ITEM 007 FFP WORK (SubELIN A007AA) | TOTAL |
| Line Item 008 Firm Fixed Price - Base Period OPTION (COL3 Additional Measures Level 2) |
| PROVIDE PRICES TO PERFORM FACILITY SERVICES - FIRM FIXED PRICE - PER SECTION C, SPEC ITEM 3 |
| ELIN/ SubELIN | Description | Quant | Unit of Issue | Unit Price (Euros) | Total Price (Euros) |
| REGION FFP Work (SLIN 0001) | |||||
| A008 | Specification 1503050 Grounds Maint COL3 Additional Measures Level 2 (FX) | ||||
| A008AA | Grounds Services (Spec Item 3.1)--Services for Region facilities/spaces identified in the Grounds Inventory provided in J-1503050 performed at the COL4 Base Measures frequencies specified per the Common Output Level Standards listed in J-1503050. | 12 | MO | ||
| REGION Subtotal | |||||
| TOTAL LINE ITEM 008 FFP WORK (SubELIN A008AA) | TOTAL |
| Line Item 009 Firm Fixed Price - Base Period OPTION (COL3 Additional Measures Level 3) |
| PROVIDE PRICES TO PERFORM FACILITY SERVICES - FIRM FIXED PRICE - PER SECTION C, SPEC ITEM 3 |
| ELIN/ SubELIN | Description | Quant | Unit of Issue | Unit Price (Euros) | Total Price (Euros) |
| REGION FFP Work (SLIN 0001) | |||||
| A009 | Specification 1503010 Custodial COL3 Addl Measures Level 3 (FX) | ||||
| A009AA | Custodial Services (Spec Item 3.1)--Services for Region facilities/spaces identified in the Custodial Inventory provided in J-1503010 performed at the COL4 Base Measures frequencies specified per the Common Output Level Standards listed in J-1503010. | 12 | MO | ||
| REGION Subtotal | |||||
| TOTAL LINE ITEM 008 FFP WORK (SubELIN A009AA) | TOTAL |
| Line Item 010 Firm Fixed Price - Base Period OPTION (Optional CLINs which can be deleted to decrease Las Flores Area by zones in a total of 5 zones. Contractor shall submit a unit cost per unit house and frequency.) |
| PROVIDE PRICES TO PERFORM FACILITY SERVICES - FIRM FIXED PRICE - PER SECTION C, SPEC ITEM 3 |
| ELIN/ SubELIN | Description | Quant | Unit of Issue | Unit Price (Euros) | Total Price (Euros) |
| Family Housing FFP Work (SLIN 0003) | |||||
| A010AA | Solid Waste Collection and Disposal Las Flores (Spec Items 3.1, 3.2, 3.3, 3.4) | 320 | EA | ||
| Family Housing Subtotal | |||||
| TOTAL LINE ITEM 010 FFP WORK (SubELIN A010AA) | TOTAL |
Amendement #0001 &N
ROTA ELIN-BASE PERIOD IQ
| ATTACHMENT J-0200000-06 |
| EXHIBIT LINE ITEM NUMBERS |
| SOLICITATION NO. N33191-14-R-1010 |
| EXHIBIT A - CLIN 0002 |
| PROVIDE UNIT PRICES FOR INDEFINITE DELIVERY INDEFINITE QUANTITY WORK |
| PER SECTION C, SPEC ITEM 4, ELINs A700 through A867 |
| Base Period - Indefinite Quantity Work |
| ELIN | SHORT DESCRIPTION | FULL DESCRIPTION | EST | |
| QTY | UNIT OF | |||
| ISSUE | Unit Price (USD) | Total (USD) | ||
| UNIT PRICED TASK (UPT) WORK | ||||
| Specification 1502000 | Facility Investment | |||
| A700 | Change of Occupancy Maintenance (COM) at Las Palmeras and Las Flores | The Contractor shall be responsible to repair or replace any and all items on the check list provided in J-1502000-15. The Contractor shall ensure that housing units are clean, fully equipped, operable and habitable. | ||
| The Contractor shall perform identified work requiring up to 16 man hours labor and 700 Dollars in material costs for any single item of repair. | 424 | EA | 0.00 | 0.00 |
| A701 | Change of Occupancy Maintenance (COM) at Las Palmeras Type 'G' & 'H' Units | The Contractor shall be responsible to repair or replace any and all items on the check lis provided in J-1502000-15. The Contractor shall ensure that housing units are clean, fully equipped, operable and habitable. | ||
| The Contractor shall perform identified work requiring up to 16 man hours labor and 700 Dollars in material costs for any single item of repair. | 40 | Each | 0.00 | 0.00 |
| A702 | Change of Occupancy Maintenance (COM) at Family Housing Barracks Type A for Bedrooms | The Contractor shall be responsible to repair or replace any and all items on the check list provided in J-1502000-15. The Contractor shall ensure that BQ's units are clean, fully equipped, operable and habitable. | ||
| The Contractor shall perform identified work requiring up to 150 Euros in labor and material costs for any single item of repair. | 450 | EA | 0.00 | 0.00 |
| A703 | Change of Occupancy Maintenance (COM) at BQ's Type A for kitchen & Bathrooms | The Contractor shall be responsible to repair or replace any and all items on the check lis provided in J-1502000-04. The Contractor shall ensure that BQ's units are clean, fully equipped, operable and habitable. | ||
| The Contractor shall perform identified work requiring up to 150 Euros in labor and material costs for any single item of repair. | 450 | EA | 0.00 | 0.00 |
| A704 | Change of Occupancy Maintenance (COM) at Family Housing Barracks Type B for Bedrooms | The Contractor shall be responsible to repair or replace any and all items on the check list provided in J-1502000-15. The Contractor shall ensure that BQ's units are clean, fully equipped, operable and habitable. | ||
| The Contractor shall perform identified work requiring up to 150 Euros in labor and material costs for any single item of repair. | 450 | EA | 0.00 | 0.00 |
| A705 | Change of Occupancy Maintenance (COM) at Family Housing Barracks Type B for kitchen& Bathrooms | The Contractor shall be responsible to repair or replace any and all items on the check list provided in J-1502000-15. The Contractor shall ensure that BQ's units are clean, fully equipped, operable and habitable. | ||
| The Contractor shall perform identified work requiring up to 150 Euros in labor and material costs for any single item of repair. | 450 | EA | 0.00 | 0.00 |
| A706 | Fireplace & Chimney Maintenance for Housing | (a) Inspect the outside parts of chimney and any connection points or any visible structural damage. |
(b) Inspect the firebox for loose refractory bricks and degraded mortar or any other visible structural damage.
(c) Inspect the mortar crown for cracks, breaks or missing/damaged steel screen. If any deficiency is detected, they shall be repaired immediately.
(d) Check damper for proper operation.
(e) Inspect and check the flue pipe for cracks and breaks or is blocked by debris or creosote build up.
(f) Clean the flue pipe, firebox, smoke shelf, elbows, and connector pipes to remove harmful products, creosote and soot. This shall be done from both outside and inside the house. If occasionally there is creosote buildup that cannot be removed by brushing, authorized chemicals may be used to alter the composition of the hardened creosote and turn it into a powdery substance that can be easily removed. Use of a vacuum to clean up ashes is not permitted due to live coals may remain in those ashes.
(g) After cleaning, check chimney has enough draft to pull smoke out quickly and provide enough oxygen for hot and complete burning of wood to occur. Check excessive heat carries away from combustible items.
| The Contractor shall notify in writing any deficiency found. | 20 | EA | 0.00 | 0.00 | |||
| A707 | Complete Painting Interior for empty units with no furniture. - LAS PALMERAS TYPE A-1 UNIT | The Contractor shall paint in accordance with UFGS 09 90 00 Paints and Coatings (08-2008). Paint shall be special anti mold paint and matching exiting colors. Unit measurement is provided in J. | 12 | EA | 0.00 | 0.00 | |
| A708 | Complete Painting Interior for empty units with no furniture. - LAS PALMERAS TYPE A-2 UNIT | The Contractor shall paint in accordance with UFGS 09 90 00 Paints and Coatings (08-2008). Paint shall be special anti mold paint and matching exiting colors. Unit measurement is provided in J-1502000-15. | 12 | EA | 0.00 | 0.00 | |
| A709 | Complete Painting Interior for empty units with no furniture - LAS PALMAS TYPE B-1 UNIT | The Contractor shall paint in accordance with UFGS 09 90 00 Paints and Coatings (08-2008). Paint shall be special anti mold paint and matching exiting colors. Unit measurement is provided in J. | 12 | EA | 0.00 | 0.00 | |
| A710 | Complete Painting Interior for empty units with no furniture - LAS PALMERAS TYPE B-2 UNIT | The Contractor shall paint in accordance with UFGS 09 90 00 Paints and Coatings (08-2008). Paint shall be special anti mold paint and matching exiting colors. Unit measurement is provided in J-1502000-15. | 12 | EA | 0.00 | 0.00 | |
| A711 | Complete Painting Interior for empty units with no furniture -LAS PALMERAS TYPE D-1 UNIT | The Contractor shall paint in accordance with UFGS 09 90 00 Paints and Coatings (08-2008). Paint shall be special anti mold paint and matching exiting colors. Unit measurement is provided in J-1502000-15. | 20 | EA | 0.00 | 0.00 | |
| A712 | Complete Painting Interior for empty units with no furniture - LAS PALMERAS TYPE D-2 UNIT | The Contractor shall paint in accordance with UFGS 09 90 00 Paints and Coatings (08-2008). Paint shall be special anti mold paint and matching exiting colors. Unit measurement is provided in J-1502000-15. | 50 | EA | 0.00 | 0.00 | |
| A713 | Complete Painting Interior for empty units with no furniture - LAS PALMERAS TYPE E-2 UNIT | The Contractor shall paint in accordance with UFGS 09 90 00 Paints and Coatings (08-2008). Paint shall be special anti mold paint and matching exiting colors. Unit measurement is provided in J-1502000-15. | 8 | EA | 0.00 | 0.00 | |
| A714 | Complete Painting Interior for empty units with no furniture -LAS PALMAS TYPE F UNIT | The Contractor shall paint in accordance with UFGS 09 90 00 Paints and Coatings (08-2008). Paint shall be special anti mold paint and matching exiting colors. Unit measurement is provided in J-1502000-15. | 2 | EA | 0.00 | 0.00 | |
| A715 | Complete Painting Interior for empty units with no furniture- LAS FLORES TYPE 3 BEDROOMS | The Contractor shall paint in accordance with UFGS 09 90 00 Paints and Coatings (08-2008). Paint shall be special anti mold paint and matching exiting colors. Unit measurement is provided in J-1502000-15. | 70 | EA | 0.00 | 0.00 | |
| A716 | Complete Painting Interior for empty units with no furniture - LAS FLORES TYPE 4 BEDROOMS | The Contractor shall paint in accordance with UFGS 09 90 00 Paints and Coatings (08-2008). Paint shall be special anti mold paint and matching exiting colors. Unit measurement is provided in J-1502000-15. | 12 | EA | 0.00 | 0.00 | |
| A717 | Complete Painting Interior for empty units with no furniture -LAS PALMAS TYPE G UNIT | The Contractor shall paint in accordance with UFGS 09 90 00 Paints and Coatings (08-2008). Paint shall be special anti mold paint and matching exiting colors. Unit measurement is provided in J-1502000-15. | 12 | EA | 0.00 | 0.00 | |
| A718 | Complete Painting Interior for empty units with no furniture -LAS PALMAS TYPE H UNIT | The Contractor shall paint in accordance with UFGS 09 90 00 Paints and Coatings (08-2008). Paint shall be special anti mold paint and matching exiting colors. Unit measurement is provided in J-1502000-15. | 12 | EA | 0.00 | 0.00 | |
| A719 | Replace Housing Water Heaters | Electrical water heaters included flexors shall be replaced by new electrical water heaters and new flexors. New units shall be of the same capacity and general characteristics as the existing. They shall be efficiency Class A, 240 volts | 200 | EA | 0.00 | 0.00 | |
| A720 | Replace Housing Main Door | Aluminum Doors shall conform to NTE, and shall be of the same types and of the same existing finishes. Replacement shall include aluminum doors complete with necessary hardware, fastenings, clips, fins, anchors, glazing beads, glass parts and other appurtenances. | 25 | EA | 0.00 | 0.00 | |
| A721 | Replace Housing Sliding Screen Door (back Patios Entrance) | Doors shall conform to NTE, and shall be of the same types and of the same existing finishes. Replacement shall include doors complete with necessary hardware, anchors, screening material and rollers and other appurtenances necessary for complete installation. | 30 | EA | 0.00 | 0.00 | |
| A722 | Replace Housing Sliding Screen Windows | Screen windows shall conform to NTE, and shall be of the same types and of the same existing finishes. Replacement shall include screen windows complete with necessary hardware, anchors, screening material and other appurtenances necessary for complete installation. | 15 | EA | 0.00 | 0.00 | |
| A723 | Replace Laundry Room Door | Doors shall conform to NTE, and shall be of the same types and of the same existing finishes. Replacement shall include doors complete with necessary hardware, fastenings, clips, fins, anchors, glazing beads, and other appurtenances necessary for complete installation. | 10 | EA | 0.00 | 0.00 | |
| A724 | Replace Closet Doors in Housing Units | Replacement shall be performed in accordance with NTE -PPM. “Replacement” shall include replacement of the door and all hardware, of the same type as existing, and all required painting. Doors and surfaces damaged during the work performance shall be painted and repaired matching original condition. | 70 | EA | 0.00 | 0.00 | |
| A725 | Replace interior wooden doors in Housing Units | Replacement shall be performed in accordance with NTE -PPM. “Replacement” shall include replacement of the door and all hardware, of the same type as existing, and all required painting. Doors and surfaces damaged during the work performance shall be painted and repaired matching original conditions. | 75 | EA | 0.00 | 0.00 | |
| A726 | Replace Housing Actual Window Types | Aluminum Windows shall conform to NTE, and shall be of the same types and of the same existing finishes. Replacement shall include aluminum windows/doors complete with necessary hardware, fastenings, clips, fins, anchors, glazing beads, roll up shutter (only windows) and other appurtenances necessary for complete installation and proper operation. | 24 | EA | 0.00 | 0.00 | |
| A727 | Replace Housing Patio Gates | Patio gates shall conform to NTE, and shall be of the same types and of the same existing finishes. Replacement shall include doors complete with necessary hardware, fastenings, clips, fins, anchors, glazing beads, and other appurtenances necessary for complete installation. | 30 | EA | 0.00 | 0.00 | |
| A728 | Replace Housing Actual Rolling Persianas Type | Replace rolling persianas by new matching existing including mechanisms and cords. | 30 | EA | 0.00 | 0.00 | |
| A729 | Replace Housing Actual Rolling Screen Types | Aluminum Windows Screens shall be made to exact window measurements. Insect screening material and system shall be equal or approved greater quality. | 30 | EA | 0.00 | 0.00 | |
| A730 | Replace Housing Kitchen Countertop | Replace granite kitchen countertop. Type, Color and pattern shall match existing. | 15 | EA | 0.00 | 0.00 | |
| A731 | Replace Housing Mixing Valves (Faucets) | Mixing valves shall be replaced as per existing with Spanish made replacements. Mixing valves shall be “RS” brand or equal approved. Installation shall include the complete mixing valve with all connectors and other appurtenances necessary for complete installation. | 12 | EA | 0.00 | 0.00 | |
| A732 | Replace Housing Shower Basin | New porcelain vitrified shower basin shall be installed on a cement mortar bed. Drain line shall be connected to the drainage system. Glazed tiles shall be installed around new basin and on shower stall walls. The top of the installed basin shall not exceed 15 centimeters. Shower basin shall be “Roca” brand or equal approved. nstallation shall include shower basin complete with all connectors and other appurtenances necessary for complete installation and proper operation. Installation shall be performed in accordance with the U.S. National Standard Plumbing Code. | 20 | EA | 0.00 | 0.00 | |
| A733 | Replace Bathtub at LAS PALMERAS & LAS FLORES | 1. Remove existing wash hand-basin to be reinstalled when this work has been finished. |
2. Remove existing soap dish and water mixer, located beside existing bathtub.
3. Remove existing bathtub (1.70 m x 0.70 m) and demolish small brick wall (1.73 x 0.40 lm) situated under bathtub and remove the debris from the jobsite.
4. Build two small walls (approx.0.70 m x 0.40 m) on bathroom walls, as needed. These walls shall support new bathtub.
5. Install new bathtub "Continental" model (170 x 70 cm) by ROCA.
6. Repair damaged walls with wall ceramic tiles (approx. 1.75 sqm) matching the existing ones around the new bathtub.
7. Install the existing water mixer and soap dish.
8. Repair damaged walls (approx. 0.40sqm) due to the installation of water mixer hose shower and soap dish, as needed.
9. Install existing wash hand basin.
| 10. Clean up job site. | 50 | EA | 0.00 | 0.00 | |||
| A734 | Replace Housing Kitchen Sinks | Kitchen sinks shall conform to ASME/ANSI A112.19.3M, 20-gage stainless steel with integral mounting rim, two compartments with ledge back and undersides coated with sound dampening material. Provide top-mounted \ASME A112.18.1M\ copper alloy faucets 1.5 gal/min, swing spout with aerator, and stainless steel drain outlets with cup strainers. Kitchen sinks shall be “TEKA” brand Model E60-2C or equal approved. Replacement shall include kitchen sinks complete with all connectors and other appurtenances necessary for complete installation and proper operation. Installation shall be performed in accordance with the U.S. National Standard Plumbing Code. Sinks shall be with garbage disposal mounting opening matching existing. | 6 | EA | 0.00 | 0.00 | |
| A735 | Pleated retractable side pull screen door | The works will consist in the installation of a pleated retractable side pull screen door at kitchen/laundry door. All frame hardware (cassette, tracks, handles, etc) shall be white baked enamel aluminum and all mounting hardware (bolts, screws, etc) shall be stainless steel. Mesh shall be fiberglass made. | 50 | EA | 0.00 | 0.00 | |
| A736 | Remove General Carpeting | The Contractor shall remove the existing floor covering as required by the Government. The government will annotate on the task order when the carpet is to be retained by the government. The Contractor shall dispose of the old carpet off base. If the Government elects not to install new carpet, the Contractor shall leave the floor clean and free of debris after removing existing carpet. Furniture shall be moved and reinstalled by the Contractor after complete the work. | 2,500 | SM | 0.00 | 0.00 | |
| A737 | Install General Carpeting | Installation shall be in accordance with UFGS 09 68 00 Carpet. Carpet shall match existing carpet. Furniture shall be moved and reinstalled by the Contractor after complete the work. | 2,500 | SM | 0.00 | 0.00 | |
| A738 | Remove Carpeting for empty units with no furniture | The Contractor shall remove the existing floor covering as required by the Government. The government will annotate on the task order when the carpet is to be retained by the government. The Contractor shall dispose of the old carpet off base. If the Government elects not to install new carpet, the Contractor shall leave the floor clean and free of debris after removing existing carpet. Furniture shall be moved and reinstalled by the Contractor after complete the work. | 11,000 | SM | 0.00 | 0.00 | |
| A739 | Install Carpeting units with no furniture | Installation shall be in accordance with UFGS 09 68 00 Carpet. Carpet shall match existing carpet. | 11,000 | SM | 0.00 | 0.00 | |
| A740 | Remove Vinyl Floor Tiles units with no furniture | The Contractor shall remove the existing floor covering as required by the Government. The government will annotate on the task order when the vinyl is to be retained by the government. The Contractor shall dispose of the old vinyl off base. If the Government elects not to install new floor, the Contractor shall leave the floor clean and free of debris after removing existing vinyl floor. | 5,100 | SM | 0.00 | 0.00 | |
| A741 | Install Vinyl Floor Tiles units with no furniture | Installation shall be in accordance with UFGS 09 65 00 Resilient Flooring | 5,100 | SM | 0.00 | 0.00 | |
| A742 | Remove Ceramic Floor Tiles units with no furniture | The Contractor shall remove all existing ceramic floor tiles, base tiles, and chip off old cement mortar when so requested from the location marked on the sketch and/or drawing provided. | 2,500 | SM | 0.00 | 0.00 | |
| A743 | Install Ceramic Floor Tiles units with no furniture | Install in accordance with UFGS 09 30 00 Ceramic Tile, Quarry Tile and Paver Tile. Material shall match existing. | 2,500 | SM | 0.00 | 0.00 | |
| A744 | Exterior Housing Surfaces: Replace Breda Tiles Regular Tile (33x33 cm) | Install in accordance with UFGS 09 30 00 Ceramic Tile, Quarry Tile and Paver Tile. Material shall match existing. Including all different existing installation layouts. | 2,500 | SM | 0.00 | 0.00 | |
| A745 | Exterior Housing Surfaces: Cenefa Tile | Install in accordance with UFGS 09 30 00 Ceramic Tile, Quarry Tile and Paver Tile. Material shall match existing. | |||||
| 150 | LM | 0.00 | 0.00 | ||||
| A746 | Exterior Housing Surfaces: Step Tile | Install in accordance with UFGS 09 30 00 Ceramic Tile, Quarry Tile and Paver Tile. Material shall match existing. | 150 | LM | 0.00 | 0.00 | |
| A747 | Exterior Housing Surfaces: Baseboards | Install in accordance with UFGS 09 30 00 Ceramic Tile, Quarry Tile and Paver Tile. Material shall match existing. | 150 | LM | 0.00 | 0.00 | |
| A748 | Exterior Housing Surfaces: Window Sill Tile | Install in accordance with UFGS 09 30 00 Ceramic Tile, Quarry Tile and Paver Tile. Material shall match existing in any format and quality. | 150 | LM | 0.00 | 0.00 | |
| A749 | Interior Housing Surfaces: Replace Wall Tiles | Install in accordance with UFGS 09 30 00 Ceramic Tile, Quarry Tile and Paver Tile. Material shall match existing. | 250 | SM | 0.00 | 0.00 | |
| A750 | Repair Wall Cracks in Las Palmeras Units | Repair joints and cracks with elastomeric caulking and wipe smooth. Repair wall crack pick wall 20 cm wide along crack, install construction mesh and plaster to match existing wall surface. | 500 | LM | 0.00 | 0.00 | |
| A751 | Repair Damaged Walls in Las Palmeras Units | Damaged masonry unit (brick or concrete block) shall be repaired. The mortar and plaster shall be completely removed and the cavity cleaned and all debris removed. The masonry unit (brick) shall be reseated in mortar and the remaining cavity packed with mortar. | 500 | LM | 0.00 | 0.00 | |
| A752 | Repair Gypsum Walls in Housing Units | Gypsum Board shall be repaired by replacing the existing gypsum board with new gypsum board, including finish paint matching the existing. All work shall be performed in accordance with the manufacturer recommendations and above mentioned applicable standards. | 450 | SM | 0.00 | 0.00 | |
| A753 | Complete Painting Exterior - Las Palmeras Type A-1 Unit for empty units with no furniture | The Contractor shall paint in accordance with UFGS 09 90 00 Paints and Coatings (08-2008). Paint shall be special anti mold paint and matching existing colors. Unit plan is provided in J. All equipment shall be otherwise properly protected against damages. | 12 | EA | 0.00 | 0.00 | |
| A754 | Complete Painting Exterior - Las Palmeras Type A-2 Unit for empty units with no furniture | The Contractor shall paint in accordance with UFGS 09 90 00 Paints and Coatings (08-2008). Paint shall be special anti mold paint and matching existing colors. Unit plan is provided in J. All equipment shall be otherwise properly protected against damages. | 10 | EA | 0.00 | 0.00 | |
| A755 | Complete Painting Exterior - Las Palmeras Type B-1 Unit for empty units with no furniture | The Contractor shall paint in accordance with UFGS 09 90 00 Paints and Coatings (08-2008). Paint shall be special anti mold paint and matching existing colors. Unit plan is provided in J. All equipment shall be otherwise properly protected against damages. | 5 | EA | 0.00 | 0.00 | |
| A756 | Complete Painting Exterior - Las Palmeras Type B-2 Unit for empty units with no furniture | The Contractor shall paint in accordance with UFGS 09 90 00 Paints and Coatings (08-2008). Paint shall be special anti mold paint and matching existing colors. Unit plan is provided in J. All equipment shall be otherwise properly protected against damages. | 5 | EA | 0.00 | 0.00 | |
| A757 | Complete Painting Exterior - Las Palmeras Type D-1 Unit for empty units with no furniture | The Contractor shall paint in accordance with UFGS 09 90 00 Paints and Coatings (08-2008). Paint shall be special anti mold paint and matching existing colors. Unit plan is provided in J. All equipment shall be otherwise properly protected against damages. | 15 | EA | 0.00 | 0.00 | |
| A758 | Complete Painting Exterior - Las Palmeras Type D-2 Unit for empty units with no furniture | The Contractor shall paint in accordance with UFGS 09 90 00 Paints and Coatings (08-2008). Paint shall be special anti mold paint and matching existing colors. Unit plan is provided in J. All equipment shall be otherwise properly protected against damages. | 25 | EA | 0.00 | 0.00 | |
| A759 | Complete Painting Exterior - Las Palmeras Type E-2 Unit for empty units with no furniture | The Contractor shall paint in accordance with UFGS 09 90 00 Paints and Coatings (08-2008). Paint shall be special anti mold paint and matching existing colors. Unit plan is provided in J. All equipment shall be otherwise properly protected against damages. | 10 | EA | 0.00 | 0.00 | |
| A760 | Complete Painting Exterior - Las Palmeras Type F Unit for empty units with no furniture | The Contractor shall paint in accordance with UFGS 09 90 00 Paints and Coatings (08-2008). Paint shall be special anti mold paint and matching existing colors. Unit plan is provided in J. All equipment shall be otherwise properly protected against damages. | 2 | EA | 0.00 | 0.00 | |
| A761 | Complete Painting Exterior - Las Palmeras Type G Unit for empty units with no furniture | The Contractor shall paint in accordance with UFGS 09 90 00 Paints and Coatings (08-2008). Paint shall be special anti mold paint and matching existing colors. Unit plan is provided in J. All equipment shall be otherwise properly protected against damages. | 12 | EA | 0.00 | 0.00 | |
| A762 | Partial Painting Interior | The Contractor shall paint in accordance with UFGS 09 90 00 Paints and Coatings (08-2008). Paint shall be special anti mold paint and matching existing colors. The Contractor shall remove, relocate and reinstall all furniture and equipment, as necessary, during performance of the contract requirements. All furniture and equipment shall be otherwise properly protected against damages. Equipment adjacent to walls shall be disconnected by the Contractor, moved to permit the wall surfaces to be painted and replaced and reconnected following completion of the work. | 100,000 | SM | 0.00 | 0.00 | |
| A763 | Partial Painting Exterior | The Contractor shall paint in accordance with UFGS 09 90 00 Paints and Coatings (08-2008). Paint shall be special anti mold paint and matching existing colors. The Contractor shall remove, and relocate all equipment, as necessary. | 100,000 | SM | 0.00 | 0.00 | |
| A764 | Duct Cleaning | The cleaning is base on the combined action of two circuits: suction and dust collection and the cleaning by means of pressurized air. |
DUCTS:
The clearing will be executed through the TECNONET-AIR System or Mechanical Brushing and complying at every moment the UNE 100012 Norm.
The joint action of the compressed air and quick mechanical action combined with the suction, guarantee the total drop and elimination of the dust adhered in the interior side of ducts, which is lead and disposed in vacuum cleaners.
DIFFUSERS AND GRILLES
During the cleaning process of the interior of ducts, element by element will be disassembled, managing to a revision, cleaning, disinfection and later assembly.
CLEANING CERTIFICATE
Once cleaning is completed a certificate must be issued which guarantee the system sanitation through the pertinent lab report.
| Environmental inspections in the interior of ducts will be carried out before and after works performance. | 60 | EA | 0.00 | 0.00 | |||
| A765 | Safety Playground Repairs | Cut, prepare existing damaged floor as needed. | |||||
| Melt in place elastic PVC solflex-inc2 by “Miracle Play” or similar with an approximate lower layer of five cms in black base color and an upper layer of one cm approx. in the appropriate color to match existing. | 100 | SM | 0.00 | 0.00 | |||
| A766 | Replace Bathroom & Kitchen Wall Tiles at "Las Palmeras" | Remove and replace ceramic wall tiles to match type and kind of the existing construction in bathrooms and kitchens at Las Palmeras. | 1,500 | SM | 0.00 | 0.00 | |
| A767 | Install "Alcudia" Model Ceramic Floor Tiles | Install in accordance with UFGS 09 30 00 Ceramic Tile, Quarry Tile and Paver Tile. Material shall be Alcudia Model from Aparici. | 3,000 | SM | 0.00 | 0.00 | |
| A768 | Complete Ext Painting. - Las Flores 4 Units 3 Bdr. Block (Types A-4 or C-4) | Surfaces shall be prepared and painted in accordance with UFGS 09 90 00 Paints and Coatings (08-2008). Paint shall be special anti mold paint and matching existing colors. All equipment shall be removed and relocated, as necessary. | 30 | EA | 0.00 | 0.00 | |
| A769 | Complete Ext Painting. - Las Flores 2 Units 3 Bdr. Block (Types A-2 or C-2) | Surfaces shall be prepared and painted in accordance with UFGS 09 90 00 Paints and Coatings (08-2008). Paint shall be special anti mold paint and matching existing colors. All equipment shall be removed and relocated, as necessary. | 4 | EA | 0.00 | 0.00 | |
| A770 | Complete Ext Painting. - Las Flores 2 Units 4 Bdr. Block (Type B-2) | Surfaces shall be prepared and painted in accordance with UFGS 09 90 00 Paints and Coatings (08-2008). Paint shall be special anti mold paint and matching existing colors. All equipment shall be removed and relocated, as necessary. | 10 | EA | 0.00 | 0.00 | |
| A771 | Replace iron sewer line sections by PVC in housing units | Replace existing sewer line sections by PVC, several diameters in Housing Units. Work includes all associated plumbing and related works, as masonry and civil, except removal and installation of floor tiles, which are described with different ELIN items. | 15 | EA | 0.00 | 0.00 | |
| A772 | Replace screen doors at main entrance in Housing | Screen door shall be 40/40 aluminum profile, white/white blind panel with composite panel of 4mm. Handle shall be TESA type or similar. It shall be provided with interior latch and “retention power 3” door closer as per UNE-EN 1158:2003. Door and frame shall be white baked enamel aluminum. All bolts, screws or similar must be stainless steel. | 100 | EA | 0.00 | 0.00 | |
| A773 | Sewer Characterization and Gasses Measurement | Perform 3 samples per year at Rota Gate Sewer Manhole. |
Analyze all the Parameters Listed in table J-1502000-24.
Provide a report Filling Table Form, adding final conclusions in accordance with the Local Town Regulations.
Laboratory shall be certified by Spanish National Accreditation Body (ENAC).
| 1 | Each | 0.00 | 0.00 | |||
| A774 | COMPLETE EXTERIOR PAINTING. - LAS PALMERAS TYPES H for empty units with no furniture. | Surfaces will be prepared and painted in accordance with UFGS 09 90 00 Paints and Coatings (08-2008). Paint to be applied will be special anti-mold paint and matching existing colors. All equipment, will be removed, and relocated as necessary and protected against damages. | 30 | EA | 0.00 | 0.00 |
| A775 | Replace Awning Articulated Arm | The work includes the replacement of awning articulated arms located at "Las Palmeras" Housing Area. Manufacturer: "Llaza, S.A." & model: "Art System". | 20 | EA | 0.00 | 0.00 |
| A776 | Replace Awning Acrylic Fabric | The work includes the replacement of awning acrylic fabric located at "Las Palmeras" Housing Area. Manufacturer: "Sauleda" & model: "999". | 10 | EA | 0.00 | 0.00 |
| A777 | Replace Awning Valance | The work includes the replacement of awning valance located at "Las Palmeras" Housing Area. Manufacturer: "Sauleda" & model: "999". | 50 | EA | 0.00 | 0.00 |
| A778 | Replace Kitchen Range Hoods | Replace Kitchen Range Hoods matching existing. | 30 | EA | 0.00 | 0.00 |
| A779 | Replace bathroom fixtures/accessories | Replace bathroom fixtures/accessories matching existing. | 35 | EA | 0.00 | 0.00 |
| A780 | Replace bathroom exhaust fans | Replace bathroom exhaust fans matching existing. | 50 | EA | 0.00 | 0.00 |
| A781 | Gasses measurements at Las Flores Crawl Spaces | Perform Gasses measurements at Las Flores Crawl Spaces and report. | 10 | EA | 0.00 | 0.00 |
| A782 | Roof cleaning at Housing Units | Clean roof tiles. | 50 | EA | 0.00 | 0.00 |
| A783 | Replace damage floor and subfloor | Replace damage floor and subfloor including plywood and supporting woll joist. All replaced plywood and joist shall be coppertized | 500 | SM | 0.00 | 0.00 |
| A784 | Replace damage wall gypsum board and wall studs | Replace damage wall gypsum board and wall studs including but not limit to wall insulation and exterior wall elements | 500 | SM | 0.00 | 0.00 |
| A785 | Replace exterior wall joint and backing rod | Replace exterior wall joint and backing rod | 500 | LM | 0.00 | 0.00 |
| A786 | Replace existing iron water line system with polypropilene pipes | Replace existing iron water line system with polypropilene pipes for unit 1073, as follows: |
1. Chisel/cut 25m channel in wall at carpot and interior patio where existing iron pipes are presently installed.
2. Open plaster ceiling at the sites to remove the old water iron piping.
3. Remove existing iron water pipes and replace with same size of polypropilene pipes in accordance with European and US AFTM codes, with all necessary couplings, elbows and tees, and install elastomeric foam insulation UNE-EN-14304 on new cold and hot water lines.
4. Connect all the hot water and cold water pipes to the existing sanitary fixtures with new accessories and fittings required to perform new installation comforming with R.I.T.E. (Reglamento Instalaciones Termicas en los Edificacios, (Building Thermal Installations Code)), and industry standards, and to achieve proper function.5. Close and repair molding plaster ceiling and walls after water pipies are installed and tested.
6. Repair and paint all damaged walls.
| 7. Perform pipe testing prior to celing and walls repairs. | 10 | EA | 0.00 | 0.00 | |||
| A787 | Hospital Suspended Ceilings Replace Type 1 Ceiling Tile | Remove and replace standard ceiling tile. Ceiling tile standard throughout hospital except at main entrance lobby matching existing. | 1,850 | SM | 0.00 | 0.00 | |
| A788 | Replace Type 2 Hospital Ceiling Tile | Remove and replace entrance lobby ceiling tile. Ceiling tile at main hospital entrance lobby matching existing. | 70 | SM | 0.00 | 0.00 | |
| A789 | Complete Hospital Ceiling Replacement | Remove and replace suspended ceiling grid matching existing. | 1,920 | SM | 0.00 | 0.00 | |
| A790 | Replace Hospital Light Fixtures | Remove and replace fluorescent light fixtures. Match existing electrical characteristics. Provide energy efficient ballasts and lamps. Disposal of Fluorescent lamps. Dispose of lamps removed under other work of this contract. Dispose of lamps off base. | 460 | EA | 0.00 | 0.00 | |
| A791 | Feral Cats Services | Cat trapping (using specific cages). |
- Veterinary physical exam and testing for the main infectious diseases present in the area.
- Euthanasia and disposal of diseased animals.
- Healthy and disposal will receive:
a) Vaccination against rabies.
b) External & internal des-parasitation.
c) Surgically sterilization.
Dispose to Rota “SIEMPRE CONTIGO” Agency.
| 20 | EA | 0.00 | 0.00 | |||
| A792 | Runway Pavement Friction Test Inspection | The work includes the runway friction testing services. Testing will be conducted in two steps. (1) Shall be proceded by a thorough visual inspection of the pavement to indentify deficiencies. (2) Shall be proceded by a friction survey by a continuous friction measuring equipment (CFME). The testing with the CFME will be conducted, as it is indicated in FAA AC 150/5320-12C and ETL 04/10 Determining the Need of Rubber Removal. Submit written results not later than two (2) weeks after the tests have been performed. | 1 | EA | 0.00 | 0.00 |
| A793 | Replace window rubber seal at las palmeras housing units | Replace Window/Leaving Room Sliding Glass Door/Bedroom Door rubber seal at Las Palmeras Housing Units. New rubber seal quality shall be equal or better to existing [Rubber Bubble Gasket (“Goma de Burbuja”) first Quality]. Remove dust or dirt with a damp cloth around the seat where the old rubber seal was installed. |
Individual windows/doors requests must be considered as 1 unit no matter size or number of window leaves.
| 250 | EA | 0.00 | 0.00 |
| A794 | Replace gypsum ceiling at las palmeras at pantry closet | Install approx. 3m² per unit of new water-proofing suspended gypsum ceiling mod. WA13, 13mm thickness from Pladur, UNE EN 520 |
or approved equal at pantry closets. The installation of the new suspended ceiling does not require the perimeter ornamental gypsum moulding.
Install approx. 3m²/unit insulation felt blanket 80mm thickness above the new water-proofing suspended gypsum ceiling, mod.M0021 from Ursa Iberia UNE EN 13162 or approved equal.
Prime and paint on white color new gypsum suspended ceiling.
Clean the job site after completion of work.
| 80 | EA | 0.00 | 0.00 | |||
| A795 | Reserved nos. | 0.00 | 0.00 | |||
| A796 | Reserved nos. | 0.00 | 0.00 | |||
| A797 | Reserved nos. | 0.00 | 0.00 | |||
| Specification 1503020 | Pest Control | 0.00 | 0.00 | |||
| A798 | Subterranean Termite Treatment | Work to be performed in accordance with Pest Control Section | 20 | EA | 0.00 | 0.00 |
| A799 | Rodent Protection. | Rodent protection shall consist of rodent bands 1 mm. thick by 50cm wide galvanized metal rings installed at 1.5 meters from the ground level. | 100 | EA | 0.00 | 0.00 |
| A800 | Palm Tree red weevils treatment | Perform a minimum of 4 treaments a year for the Red weevils at the palm trees. | 875 | EA | 0.00 | 0.00 |
| A801 | Reserved nos. | 0.00 | 0.00 | |||
| A802 | Reserved nos. | 0.00 | 0.00 | |||
| A803 | Reserved nos. | 0.00 | 0.00 | |||
| A804 | Reserved nos. | 0.00 | 0.00 | |||
| A805 | Reserved nos. | 0.00 | 0.00 | |||
| Specification 1503030 | Integrated Solid Waste Management (ISWM) | 0.00 | 0.00 | |||
| A806 | Special Request Container Size - 3 CM | Provide container and remove as requested. | 90 | EA | 0.00 | 0.00 |
| A807 | Special Request Container Size - 5 CM | Provide container and remove as requested. | 300 | EA | 0.00 | 0.00 |
| A808 | Special Request Container Size - 19 CM | Provide container and remove as requested. | 50 | EA | 0.00 | 0.00 |
| A809 | Construction Material. Container Size - 6 CM | Provide container and remove as requested. | 300 | EA | 0.00 | 0.00 |
| A810 | Dispose of 100 Kgs of Used Tires | Provide container and dispose tires in accordance with local regulations as requested. | 1 | EA | 0.00 | 0.00 |
| A811 | Reserved nos. | 0.00 | 0.00 | |||
| A812 | Reserved nos. | 0.00 | 0.00 | |||
| A813 | Reserved nos. | 0.00 | 0.00 | |||
| A814 | Reserved nos. | 0.00 | 0.00 |
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .