Amendment_0004.pdf

PDF 83 KB Posted

Attached to
Base Operations Support Contract, Naval Station Rota, Spain Federal contract opportunity
Solicitation number
N33191-14-R-1010
Issued by
Department of the Navy Naval Facilities Engineering Command

About this file

Amendment 0004

View the file

Other files for this federal contract opportunity

Other files attached to Base Operations Support Contract, Naval Station Rota, Spain, newest first.
File Type Posted
Amendment_0006.pdf PDF
04_CBA_JARDINERA_ESTATAL_2010-2013.pdf PDF
BOS_CBAs.rar RAR file
Technical_Library_Notice.pdf PDF
Amendment_0005.pdf PDF
BOS_Labor_Information_Redacted.pdf PDF
Amendment_0003.pdf PDF
Attachment_J_0200000-06_ELINs_REV_6.24.14.xlsx XLSX spreadsheet
Amendment_0002.pdf PDF
Attachment_J_0200000-06_ELINs_REV_6.23.14.xlsx XLSX spreadsheet
Amendment_0001.pdf PDF
ECR_ROTA_BOS_CONTRACT_REVISED_6.23.14.zip ZIP file
Attachment_C_PPI_Form.doc DOC document
Attachment_A_PPQ_Rota_BOSC.docx DOCX document
ECR_ROTA_BOS_CONTRACT.zip ZIP file
Attachment_B_Contract_Data_Sheet.doc DOC document
Attachment_J_B-1_0200000_J_J_0200000-06_ELINs.xlsx XLSX spreadsheet
N33191-14-R-1010_Solicitation_ROTA_BOSC.pdf PDF
Attachment_1_Country_Clearance.doc DOC document
Attachment_2_Spanish_Contractor_Request_for_Site_Visit_Pass.xls XLS spreadsheet
Show all 20

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

Amendment 0004 to N33191-14-R-1010 is issued to incorporate the follow ing changes to the RFP.

1. The prosposal due date has been extended to July 7, 2014 9:00 A.M. Central European Summer Time.

2. Base Operations Support Contract, Naval Station Rota, Spain, labor information is attached.

3. Pre-proposal Inquiries 66-140 have been answ ered.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 14

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 02-Jul-2014

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N33191-14-R-1010

X 9B. DATED (SEE ITEM 11)

02-Jun-2014

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

02-Jul-2014

CODE

NAVFAC EUROPE AFRICA SOUTHWEST ASIA

PSC 817 BOX 51

FPO AE 09622-0051

N33191 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

N33191-14-R-1010

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been added by full text:

PRE PROPOSAL INQUIRIES 66-140

66. Backflow Preventer: In document: ATTACHMENT J 1502000-19 FACILITY INVESTMENT under IRRIGATION SYSTEM the requirement is to service and maintain Backflow Preventer based on manufacturers’ recommended procedures, standards. Based on manufacturer’s recommendation and HOST NATION regulations no special certification is needed for technicians performing this type of service. Could you confirm this? If not what type of certification do you require?

See Par. 3.3.33 Plumbing of Section 1502000 C Facility Investment.

67. Conflicting Information: In Attachment J-1503050-04, there is a difference between “prestige areas”, “all improved areas” and “recurring service areas only”. On the grounds maintenance site map, there is a difference between “improved grounds (COL 4)” and “unimproved grounds (COL4)”. Please identify, which type of area in Attachment J-1503050-04 relates to which of the areas on the grounds maintenance site map.

Prestige Areas are indicated as improved areas (green color) an unimproved grounds COL 4 (yellow color). See Grounds Inventory.

68. Reference ATTACHMENT J-1503010-03, page 7 of 15, COMMON OUTPUT LEVEL

STANDARDS. What does “4Y5” mean?

4Y5 Mean 4Y. See Note 5.

69. Reference ELIN A007AA. Is it a Government requirement to have the COL3 Additional Measures Level 1 services for region facilities performed at the COL 4 Base Measures frequencies? Or does the Government require the COL 3 Base Measures frequencies?

Provide additional services for Region Facilities from COL 3 to Level 1. Custodial COL3 Add Measures Level 1 (FX)

70. Reference ELIN A005 (REGION (CNRE) Grounds Maintenance & Landscaping) there are two ELINs for Improved Grounds and Unimproved Grounds, A005AA and A005AC. In ELIN A014 (Bureau of Medicine and Surgery (BUMED)) there is only one ELIN for Improved Grounds, ELIN A014AA, but no ELIN for unimproved Grounds. In the grounds inventory however there are unimproved grounds in the Bureau of Medicine and Surgery (BUMED). Same situation with ELIN A044 (USAF 725th Air Mobility Squadron (AMS)). Please clarify.

ELINs for Hospital, USAF 725th included one total cost for Grounds Maintenance Services (Improved Grounds and Unimproved Grounds).

71. Identify the Prestige Areas. Are the Prestige Areas all areas which are green in the Grounds Maintenance Map, called by the Government “Improved Grounds (COL 4)”?

All green areas are prestige areas.

72. Identify the areas in the grounds inventory list belonging to ELIN A0081AA (NAVFAC NWCF, Grounds Maintenance & Landscaping (Spec Items 3.1, 3.2)).

UEM (NAVFACNWCF) and ADMIN (NAVFAC NWCF).

73. Please confirm that the buildings on page 1, 2 , 3 and on page 4 “Rascals access road” to “facility no.

611 & 624” in the grounds inventory list are all belonging to ELIN A005 (REGION (CNRE)).

Confirmed.

74. Reference the ground inventory. UEM with building 64 and 3201 have 9700 SM ground to be maintained. What ELIN is UEM associated with?

UEM (NAVFAC NWCF).

75. Reference the ground inventory, ADMIN with building 59 has 4980 SM ground to be maintained.

What ELIN is ADMIN associated with?

ADMIN (NAVFAC NWCF).

76. How many tonnes of waste are collected in a year?

2,039,710 kgs

Proposal Due Date: The last day for submittal of PPIs is 29 June 2014. Government response will come after that date, i.e. less than one week before proposal due date on 06 July 2014. This does not allow offerors enough time to incorporate changes and prepare adequate pricing for a complex procurement requirement as this BOS Rota is. This timeframe significantly limits opportunities for fair competition of a public procurement vehicle. We kindly request an extension of the proposal due date till 30 days after the site visit (on 25 June) to allow offerors the needed time to complete their proposals.

The U.S. Government has extended the proposal due date to July 7, 2014, 9:00 a.m. Central European Summer Time.

77. Birthday List. Referencing Amendment #002 the Government responded that current contractor would provide the list of employees subject to transfer upon individual request. At the site visit today the Government said that this list will be provided by the Government. Please clarify, and if the first one applies please provide contact information to the current contractor.

Attached.

78. Custodial service: In cases restroom cleaning is made with a frequency of once per shift, how many shifts per day do we have to consider depending on the COL?

During regular hours, it is one shift per day.

79. Custodial service: According to J-1503010-4, upper floor plan (1047sqm) of the Air terminal has to be cleaned 7days/week (freq A) and ground floor plan (1358sqm) of the Air terminal has to be cleaned with a frequency of COL3? Isn´t it the same frequency for both floors.

Level A has a different frequency than COL 3. See Section J.

80. Custodial service: We need the hospital area (21.315 sqm) disaggregated in: high risk, medium risk and low risk.

See provided hospital drawings.

81. Custodial service: We need the current contractor provides us the Host Nation Labor Law that applies in NAS Rota and the list of employees to transfer.

82. Custodial service: 1503010C- The dust mop covers need to be removed from the hospital site and taken off base for laundering. Is the cost of the Laundering included in custodial service cost?

Yes.

83. Facility investment: We need the current contractor provides us the Host Nation Labor Law that applies in NAS Rota and the list of employees that currently provide the service.

84. Facility investment: We need a comprehensive inventory of all facilities to maintain.

Facilities for the functional areas are specified in Section J.

85. Facility investment: We need the number, brand and technical specifications of lifts.

VTE are specified in Section J. No other information is available.

86. Facility investment: Is Lift maintenance a fully comprehensive model (including spare parts) of a basic model (only preventive maintenance)?

No spare parts are provided by the U.S. Government.

87. Facility investment: Does Colding tower maintenance include products (corrosion inhibitors, biocides) and analytics?

Yes, in accordance with Section J.

88. Facility investment: Are products for water pools and jacuzzi conditioning included in the maintenance.

89. Facility investment: Does UPS maintenance include spare parts or batteries changing.

90. Facility investment: What is included in the concept of Liquid Fuels Maintenance: the replacement of fuel storage tanks or only the maintenance of them?

Only maintenance, in accordance with Section C.

91. Custodial service: In attachment J-1503010-03 (Common Output Level Standards) we need to know the meaning of the following frequencies: W2, W4, M5, 4Y5 W2 means weekly, See Note 2. Same for the other frequencies.

92. We have seen that the proposal due date is a Sunday so we asked whether this is a mistake and if given the festive July 4th may delay the delivery date.

The U.S. Government has extended the proposal due date to July 7, 2014, 9:00 a.m. Central European Summer Time.

93. On the other hand still has not published the list of current workers so we estimate it is necessary to delay a few day the date of bid submission.

94. To evaluate facility investment costs we need current occupancy data base housing and occupancy data scheduled for the coming months and 2015.

CHOCs will be ordered as needed by housing. No additional information is available.

95. Subject: Proposal Due Date Amendment 0002 changes the proposal due date from July 2nd to July 6th

.Since July 6th is a Sunday, we would like to ask if the proposal due date could be scheduled on a working day.

The U.S. Government has extended the proposal due date to July 7, 2014, 9:00 a.m. Central European Summer Time.

96. Subject: Housing Occupation Information At the site visit held on June 25th 2014 we noticed that the Housing Area is mostly unoccupied. It is unclear whether the houses are going to be renovated or not, and if so, when. Therefore we deem it necessary for a correct proposal preparation to know the accurate statistics of the occupancy rates throughout the last 24 months and the forecast for the next five years.

No additional information is available.

97. At the “Integrated Solid Waste Inventory”, Facility No. Region. “Various, General Purpose Containers”: Quty: 120; Size CM: 19; No. of Weekly: As requested.

We would like to clarify if we have to collect 120 containers of 19 CM per week or per year.

Per year.

98. We request: Host Nation Labor Law and Employee Transfer Right.

99. Facility Investment: Do replacements include the spare part (material) cost?

Yes, in accordance with Section C.

100. Subject: Spanish Law: This Solicitation is clearly stating in several occurrences that offerors shall comply with the Spanish laws for any matters related to this offer and the performance of the contract.

We would like to ask confirmation that, to be acceptable, proposals shall additionally be prepared in compliance with Spanish Law 30/2007 de Contratos.

Proposals shall be prepared in accordance with the instructions in the solicitation.

101. Solid Waste Management, Pest Control and Custodial: Type of waste. Provide quantities by type of waste.

No additional information is available.

102. Do you collect and centralize the waste in a clean point into the base?

No.

103. Pickup frequency?

As specified in Section J.

104. Equipment used in the waste operation.

Contractor shall submit equipment to be used.

105. Labor liabilities in this activity (in the site visit you talk about a labor agreement for waste collection but we need also the list of workers)

106. We need to know the scope of the task ‘subterranean termite treatment? ` See Pest Control Section.

107. Labor liabilities in other custodial activities (in the site visit you talk about a labor agreement for custodial and other for hospital custodial but we need too the list of workers).

108. We need also to know the type of surfaces in bedrooms, bathrooms, kitchens, terraces.

Ceramic tiles.

109. Ground Maintenance and Landscaping: Maintenance's surfaces. Are the maintenance areas exclusively those which are shaded in the “Grounds Maintenance Map Location”?

Areas are identified in Map and Inventory.

110. Ground Maintenance and Landscaping: Unimproved Grounds. Is the maintenance area all surface shaded in the map location or is only the area in 10 meters from the edge of roads and 20 meters from the edge of building’s walls?

Areas are identified in Map and Inventory.

111. Ground Maintenance and Landscaping: Document Attachment_J_0200000-06_ELINs: Cell A005AC.

COL 3 (Spec Item 3.3). What is the option, Additional measures level 2 or Base measures?

Information not available.

112. Ground Maintenance and Landscaping: Document Attachment_J_0200000-06_ELINs: Cell A014AA.

Grounds Maintenance & Landscaping (Spec Item 3.1). Does the area include improved and unimproved areas?

113. Ground Maintenance and Landscaping: Document Attachment_J_0200000-06_ELINs: Cell A044AA.

Grounds Maintenance & Landscaping (Spec Item 3.1). Does the area include improved and unimproved areas?

114. Ground Maintenance and Landscaping: Document Attachment_J_0200000-06_ELINs: Cell A003AA, Cell A006AA and Cell A008AA, Grounds Services (Spec Item 3.1). Are included in these areas improved and unimproved areas or only improved areas?

A003AA is for Pest Control. A006AA and A008AA are reserved for future use.

115. Facility Investment: Please supply features (electrical and thermal Pot.) of the equipment included in

Attachment J-1502000-03 Boilers.

No additional information.

116. Facility Investment: Please, supply features (volume/capacity) of the equipment (facilities number

1851, 1802 A, 135, 1800, 1989, 83, 600) included in Attachment J-1502000-10 Aviation Fuel and POL Systems.

Available information is provided in Section J.

117. Facility Investment: Please, supply features of the equipment included in Attachment J-1502000-13

Aircraft Refueling Hydrant System Electrical Controls.

Available information is provided in Section J.

118. Facility Investment: Please, supply features of the Air Conditioned, Solar panels and Dehumidifiers equipment included in Attachment J-1502000-15 Family Housing Equipment.

Available information is provided in Section J.

119. Facility Investment: Please, supply features (electrical Pot., voltage, brand, model, etc.) of Dry type transformer included in Hospital inventory Building 1802.

120. Facility Investment: Please, supply a list with data (number of facility, use and surface) of the facilities included in the scope of Specification 1502000 Facility Investment.

121. Facility Investment: Please, what is the number of facility DeCA building (Defense Commissary Agency)?

3300.

122. Facility Investment: In Firm Fixed Price Sheet, price is requested for Service Request Urgent Service Calls for Galley (ELIN/SubELIN A070AB), but there is not number of calls included in Attachment J- 1502000-20 Service Requests Historical data. Could you give us an estimated number of calls?

No additional information available.

123. Facility Investment: In Firm Fixed Price Sheet it is not requested price for BUMED Service Request Urgent Service Calls but in Attachment J-1502000-20 Service Requests Historical data there are 950 calls. Please confirm it is not a mistake.

BUMED is only 300 Emergency Service Calls.

124. Facility Investment: Please confirm that cost of legal inspections by “Organismo de Control

Autorizado (OCA)” of all the equipment included in the scope of Specification 1502000 Facility Investment will be assumed by Client.

Inspections will be assumed by the Contractor.

125. Facility Investment: Please confirm that high voltage equipment (above 1000V) or hot line works are not included in the scope of Specification 1502000 Facility Investment.

126. Facility Investment: Please, confirm that firefighting equipment “extinguishers” are not included in the scope of Specification 1502000 Facility Investment.

127. Facility Investment: Please, supply the quantity of weekly grease to remove included in the scope of attachment number J-1502000-11 Grease Traps.

128. Facility Investment: Please, supply the quantity of weekly waste water to remove included in the scope of attachment number J-1502000-12 Septic tank.

129. Facility Investment: Are the Executive Housekeeper and the Assistant Executive Housekeeper new positions for the new contract?

130. Transportation Service: Could you provide the vehicle specifications? Brand and model?

Regular taxi. No additional information available.

131. Transportation Service: Is a garage needed for the berlina? Where will it be placed?

No.

132. Transportation Service: Could you enumerate the extraordinary services?

No extraordinary services.

133. Transportation Service: Is it possible to get into the Base through El Puerto gate?

Yes.

134. Transportation Service: Is the driver required for any other services at any time?

No.

135. List of Personnel currently hired by the incumbent Reference is made to the subject, to emphasize the importance for contractors to receive a detailed List of Personnel currently hired by the incumbent with the required information to allow transparency among all bidders, compliance with Spanish labor laws, and time to make a precise evaluation of proposal costs. We kindly request that provision of this list be at least one working week before the deadline of proposals.

136. Bidding Currency: In both Amendment 02 and 03 the bidding currency is stated to be in US Dollars, Why? Which is the reasoning to have a Dollar based contract in Europe when all costs will be in Euros?

This is a U.S. Government contract.

137. Correctness of Information: In section J-1502000-20 Service Requests Historical Data seem to have

Emergency/ Urgent Service Requests numbers versus Routine Service Requests reversed. For instance Family Housing 250 Emergency, 0 Routine; Region 126 Emergency, 25 Urgent and 25 Routine. Can you confirm the table is correct?

138. Grounds Maintenance. The frequency of palmers pruning is not specified. Please provide the frequency that the Government will require.

Annually.

139. MFT Core Maintenance Crew. Para. 2.7.1.8 Amended section C 0200000 Management &

Administration (page 15 of 41) states, “The Core Maintenance Crew shall be assigned no other duties other than those specified by the Naval Hospital Facilities Department and be available to render maintenance, alteration and repair services to facilities, buildings, ground structures, personal property equipment, facilities connected minor property, medical equipment and systems, and other installed equipment and systems. All jobs performed by the Core Maintenance Crew shall have no labor cost associated with the work performed. The core shall be sufficient to manage assigned workload and service calls in a timely manner.” Can you please clarify and quantify assigned workload so to be able to determine size of Core Maintenance Crew?

Workload will be required as needed.

140. Service Request Limit of Liability. Why is this $3,000 limit so high especially when some workload data is not available? These unknowns transfer to higher offers. The Government will get better offers if this risk is lowered to a more normal and realistic limit of $1,500 per event. Will the Government lower this limit to benefit by receiving lower offers?

No.

SECTION A - SOLICITATION/CONTRACT FORM

The required response date/time has changed from 06-Jul-2014 02:00 PM to 07-Jul-2014 09:00 AM.

SECTION M - EVALUATION FACTORS FOR AWARD

The following have been modified:

BASIS OF EVALUATION

The U.S. Government (Government) reserves the right to eliminate from consideration for award any or all offers at any time prior to award of the contract; to negotiate with offerors in the competitive range; and to award the contract to the offeror submitting the lowest priced, technically acceptable offer.

The Government intends to evaluate proposals and award a contract without discussions with offerors (except clarifications as described in FAR 15.306(a)). The Government reserves the right to conduct discussions if the Contracting Officer later determines them to be necessary. In addition, if the Contracting Officer determines that the number of proposals that would otherwise be in the competitive range exceeds the number at which an efficient competition can be conducted, the Contracting Officer may limit the number of proposals in the competitive range to the greatest number that will permit an efficient competition among the most highly rated proposals.

The LPTA process is selected as appropriate for this acquisition because the most advantageous is expected to result from selection of the technically acceptable proposal with the lowest evaluated price.

An overall non-price factors rating must be at least “ACCEPTABLE” in order to be eligible for award. An “UNACCEPTABLE” rating in any factor results in the overall non-price factors proposal being rated “UNACCEPTABLE” unless corrected through discussions. An overall non-price factors rating of “UNACCEPTABLE” makes a proposal ineligible for award.

1. The solicitation requires the evaluation of price and the following non-price factors:

Factor 1 – Corporate Experience Factor 2 – Past Performance Factor 3 – Management Approach Factor 4 – Safety

The distinction between corporate experience and past performance is corporate experience pertains to the types of work and volume of work completed by a contractor that are comparable to the types of work covered by this requirement, in terms of size, scope and complexity. Past performance pertains to both the relevance of recent efforts and how well a contractor has performed on the contracts.

2. Basis of Evaluation and Submittal Requirements for Price and Each Factor.

a. Price Evaluation:

(i) Solicitation Submittal Requirements

i. Cover letter in accordance with FAR 52.215-1(c)(2), including solicitation number;

name, address, telephone, facsimile, and email address of the Offeror; in case the Offeror is a joint venture (JV), the name of the JV must be clearly identified; name, title, and signature of the person authorized to sign the proposal; DUNS Number and CAGE or NCAGE Code of the Offeror, in case the Offeror is a JV, provide a DUNS Number for the JV and each member of the JV.

ii. Completed Price Schedule for Contract Line Item Numbers (CLINs) 0001, 0002, 0003, 0004, 0005, 0006, 0007, 0008, 0009, and 0010. (Section B)

iii. Completed Exhibit Line Item Numbers (ELINS). The submitted ELINS must have proposed prices for each ELIN.

iv. Acknowledgement of all amendments in Block 14 of the SF33.

v. Joint Venture (JV) Agreement, if applicable.

For the purposes of this solicitation, a Joint Venture (JV) refers to a U.S.-Styled formal legal entity in the nature of a partnership comprised of two or more persons or companies. Each JV must provide one CAGE/NCAGE code, one DUNS number for the JV and one DUNS number for each member comprising the JV. Each JV must be registered in SAMs using the name of the JV.

Joint Venture Offerors (JV) offerors, shall provide with their proposal a notarized legal document that establishes the JV. The JV Agreement shall take effect upon the submission of the proposal and remain irrevocable until one year after the work has been finally inspected and accepted by the Government. Submission of the notarized legal document that establishes the JV shall be furnished with the proposal in its original language version along with a certified English translation of the notarized JV document. The Joint Venture must be formed and valid at the time of submission of the proposal. The validated notarized legal document must include language that each member of the JV will be jointly and severably liable for the performance of the whole contract and will be incorporated into the contract award if award is made to the JV.

1. The Joint Venture Agreement shall include, at a minimum, the following:

a. Name of firms that form the JV and the name of the JV.

b. Name and title of the corporate officials signing on behalf of each party.

c. Solicitation number.

d. Description of the responsibilities in terms of work category for each member (for example: Firm A performing 100% of C-2-d.)

e. The statement "The composition and structure of the JV will remain unchanged from award to one year after the work has been finally inspected and accepted by the Government.”

f. Date of issuance of the agreement and notarized signature of the corporate officials signing in behalf of each party.

g. Statement under oath stating that the Joint Venture(JV) is in compliance at the time of proposal submission with all applicable laws, rules, and regulations. This statement must be signed under oath by all members comprising the Joint Venture.

vi. The Government intends to pay invoices in accordance with the clause for Wide

Area Work Flow. To do this, the offeror must have a U.S. Bank or a U.S. bank affiliate associated with its local bank. The offeror shall identify its local bank and the name of its U.S. bank or a U.S. bank affiliate. The offeror shall provide the American Bankers Association (ABA) number that identifies a specific United States federal or state chartered bank or savings institution with their proposal.

vii. The offeror shall submit the amount of available working/operating capital from an independent financial institution, which will be used for the performance of the resultant contract.

(ii) Basis of Evaluation:

The Government will evaluate price based on the total price. Total price consists of the basic requirements and all option items (see Section B of the solicitation). The Government intends to evaluate all options and has included the provision FAR 52.217-5, Evaluation of Options (JUL 1990) in the solicitation. In accordance with FAR 52.217-5, evaluation of options will not obligate the Government to exercise the option(s). Analysis will be performed by one or more of the following techniques to ensure a fair and reasonable price.

i. Comparison of proposed prices received in response to the RFP.

ii. Comparison of proposed prices with the IGCE.

iii. Comparison of proposed prices with available historical information.

iv. Comparison of market survey results.

b. Non-Price / Technical Evaluation Factors:

(1) Factor 1 – Corporate Experience:

(i) Solicitation Submittal Requirements:

Offerors shall submit three relevant and recent contracts performed by the offeror as a prime contractor or joint venture member. For each project the offeror shall complete the Contract Data Sheet included as Attachment B. All information shall be provided as requested on the form.

For purposes of this evaluation, a relevant project is defined as a United States (US) Government Department of Defense Base Operations support services contract having at least:

1) Two technical specifications other than Technical Specification 0100000 - General Information and Technical Specification 0200000 - Management and Administration listed in this Solicitation's Performance Work Statement, such as (for example only) Technical Specification 1502000 - Facility Investment and Technical Specification 1503010 - Custodial Services. Be advised that a project submitted with only Technical Specification 0100000 - General Information and Technical Specification 0200000 - Management and Administration shall not be considered to demonstrate relevant corporate experience.

2) One year of contract performance completed;

3) A contract value of $3,000,000 US Dollars or greater per year; and

4) Be performed in the past eight years from the proposal due date.

Joint Venture offerors must include at least one relevant contract for each partner, where each partner performed as the prime contractor by itself or as part of a joint venture.

IMPORTANT: It is the offeror’s responsibility to clearly explain and demonstrate to the Government how its work experience, and the experience of each teaming partner (if applicable) in each submitted project is relevant to the performance work statement in this solicitation. If the offeror does not clearly explain how its experience(s) are relevant to the contract requirements in this specification, the Government may interpret that to mean that the submitted contract experience is not relevant.

The contracts may be contracts completed only for the U.S. Government. Each contract submission shall not exceed two 8.5” x 11” or equivalent page sizes, single-sided, 11 point font, in addition to the Contract Data Sheet, Attachment B.

To receive an acceptable rating for this factor each of the three contracts submitted for this factor shall::

� Demonstrate corporate experience in two of the technical specifications in the Performance Work Statement excluding 0100000 – General Information, and 0200000 – Management and Administration for each contract.

� Be performed for at least one year.

� Have a contract value of $3,000,000 USD or greater per year (or the equivalent foreign currency.)

� Be performed in the past eight years from the proposal due date.

(2) Factor 2 – Past Performance:

The Offeror shall submit three past performance questionnaires or CPARS evaluations for the same three contracts submitted for Factor 1, Corporate Experience. If there is not a completed CPARS evaluation, the Past Performance Questionnaire (PPQ), Attachment A, included in the solicitation is provided for the offeror or its team to submit to the client for each project the offeror includes in its proposal for Factor 1, Corporate Experience. An offeror shall not submit a PPQ when a completed CPARS is available.

If a CPARS evaluation is not available, ensure correct phone numbers and email addresses are provided for the client point of contact. Completed PPQs should be submitted with your proposal. If the offeror is unable to obtain a completed PPQ from a client for a project(s) before proposal closing date, the offeror should complete and submit with the proposal the first page of the PPQ (Attachment A), which will provide contract and client information for the respective project(s). Offerors should follow-up with clients/references to ensure timely submittal of questionnaires. If the client requests, questionnaires may be submitted directly to the Government's point of contact, Kathryn Balonek, via email at kathryn.balonek@eu.navy.mil prior to proposal closing date. Offerors shall not incorporate by reference into their proposal PPQs or CPARS previously submitted for other RFPs.

However, this does not preclude the Government from utilizing previously submitted PPQ information in the past performance evaluation.

In addition to the above, the Government may review any other sources of information for evaluating past performance. Other sources may include, but are not limited to, past performance information retrieved through the Past Performance Information Retrieval System (PPIRS) using all CAGE/DUNS numbers of team members (partnership, joint venture, teaming arrangement, or parent company/subsidiary/affiliate) identified in the offeror’s proposal, inquiries of owner representative(s), and any other known sources not provided by the offeror.

While the Government may elect to consider data from other sources, the burden of providing detailed, current, accurate and complete past performance information rests with the Offeror.

The degree to which past performance evaluations and all other past performance information reviewed by the Government (e.g., PPIRS, Federal Awardee Performance and Integrity Information System (FAPIIS), Electronic Subcontract Reporting System (eSRS), performance recognition documents, and information obtained from any other source) reflect a trend of satisfactory performance considering:

- A pattern of successful completion of tasks;

- A pattern of deliverables that are timely and of good quality;

- A pattern of cooperativeness and teamwork with the Government at all levels (task managers, contracting officers, auditors, etc.);

- Recency of tasks that are identical to, similar to, or related to the task at hand.

To be rated acceptable, all three of the past performance ratings must be satisfactory or higher. Any one rating of marginal or lower will give the offeror an unacceptable rating for this factor. Offerors lacking relevant past performance history will not be evaluated favorably or unfavorably in past performance. In the context of acceptability/unacceptability, “unknown” shall be considered “acceptable.”

(3) Factor 3 – Management Approach:

The offeror shall clearly demonstrate its understanding of current industry standards, policies, procedures, and processes utilized in accomplishing the complexity and magnitude of service requirements set forth in the performance objectives and standards of the Performance Work Statement. The offeror shall address each of the following components separately:

1) Describe staffing levels and contract effort for the base year. The offeror must provide an organizational chart that demonstrates the total effort to include the prime contractor and all subcontractors for the base period for all technical specifications.

2) Subcontracting Plan – Provide a plan describing how you will manage subcontractor(s) across all technical specifications.

3) Describe your general strategy to accomplish the performance requirements to achieve performance objectives. Offerors must address at the minimum: 1) the requirement for Facilities Investment and 2) provide a summary for the training and certification requirements for the facility investment personnel.

4) Quality Control Management – Provide a summary “Quality Control Plan” that describes the methods to be used to document, measure, and control and improve the quality processes. The summary must also describe the plan for training employees in the quality processes.

5) Provide a phase-in plan limited to no more than 90 calendar days. The plan shall include: (a) a schedule for all key events; (b) personnel actions and responsibilities regarding employees at all levels; (c) acquisition, delivery, storage, inventory and disposal of equipment, working stock, and materials (to include inbound items as applicable).

The management approach submittal shall be limited to ten single sided 8-1/2” x 11” or equivalent page sizes, 11 point font, not including the organization chart in Item 1 and the schedule in Item 5(a)).

To receive an acceptable rating, the offeror’s management approach must demonstrate and provide the information required in the elements one through five as listed in the solicitation submittal requirements above. Offerors that do not demonstrate and provide the information required in all five elements will be rated unacceptable.

(4) Factor 4 – Safety:

The Offeror shall submit a narrative addressing the following information: (For a partnership or joint venture, the following shall address each contractor who is part of the partnership or joint venture; only one safety narrative is required.)

(a) Technical Approach for Safety:

Describe the offeror’s technical approach to safety for its employees as well as the plan that the offeror will implement to evaluate and measure safety performance of potential subcontractors, as a part of the selection process for all levels of subcontractors. The safety narrative shall be limited to two single sided 8-1/2” x 11” or equivalent page sizes, 11 point font.

The Government is seeking to determine if the offeror has consistently demonstrated a commitment to safety and that the offeror plans to properly manage and implement safety procedures for itself and its subcontractors. The Government will evaluate the offeror’s overall safety record and the Offeror’s plan to select and monitor subcontractors. The Government’s sources of information for evaluating safety may include, but are not limited to, Government agencies, OSHA, Contractor Incident Reporting System (CIRS) databases, and other related resources. While the Government may elect to consider data from other sources, the burden of providing detailed, current, accurate and complete safety information regarding these submittal requirements rests with the Offeror. The evaluation will collectively consider the following:

-Offeror’s technical approach to safety -Other sources of information available to the Government

(a) Offeror’s technical approach to safety narrative:

The Government will evaluate the narrative to determine the degree to which subcontractor safety performance will be considered in the selection of all levels of subcontractors on the upcoming project.

The offeror’s technical approach to safety narrative will be evaluated as acceptable if the following criteria are addressed in the narrative:

a. A comprehensive approach to safety for its employees.

b. An implementation plan to evaluate and measure safety performance of potential subcontractors.

(End of Summary of Changes)

File details come from the government source that posted it. Updated .