About this file

This document is a Questions and Answers (Q&A) file for Solicitation N32253-26-Q-0010, focused on a Canvas Mobile Shelter System (MSS) located at Joint Base Pearl Harbor Hickam. Multiple potential bidders submitted questions seeking additional details about the shelter, including requests for photos, technical specifications, manufacturer information, and site configuration. The government's responses consistently indicate that photo and detailed documentation approvals are pending security clearance.

A site visit is scheduled for FRIDAY, 14 NOVEMBER 2025 at 9:00am HST, with interested parties required to email their name and contact information to primary and secondary points of contact by MONDAY, 03 NOVEMBER 2025 at 9:00am HST. While specific technical details about the canvas shelter remain restricted, the document suggests the solicitation involves replacing or modifying an existing mobile shelter system, with potential crane usage requirements and specific logistical considerations for the project.

View the file

Other files for this federal contract opportunity

Other files attached to Dismantle and Package Canvas Mobile Shelter System for Disposal, newest first.
File Type Posted
Questions and Answers-v4.pdf PDF
N32253-26-Q-0010-0001.pdf PDF
N32253-26-Q-0001 SF 30.pdf PDF
Image 09.JPG JPG image
Image 02.JPG JPG image
Image 04.JPG JPG image
Image 05.JPG JPG image
Image 01.JPG JPG image
Image 03.JPG JPG image
Image 08.JPG JPG image
Questions and Answers-v3.pdf PDF
Image 06.JPG JPG image
Image 07.JPG JPG image
Questions and Answers-v2.pdf PDF
User Manual-Installation Guide.pdf PDF
N32253-26-Q-0010-0001.pdf PDF
N32253-26-Q-0010.pdf PDF
Performance Work Statement.pdf PDF
PWS Appendix I.pdf PDF
Wage Determination.pdf PDF
PWS Appendix II.pdf PDF
PWS Appendix III.pdf PDF
PWS Appendix IV.pdf PDF
PWS Appendix V.pdf PDF
Show all 24

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Questions and Answers for Solicitation N32253-26-Q-0010

Question 1: Are there photos of the structure? I did see documents pertaining to crane usage, but I did not see sizes nor photos of what needs to be done.

ANSWER: Requested approval to post photos, pending security clearance.

Question 2: To ensure our proposal accurately reflects the scope and site conditions, may I respectfully request any available pictures or videos related to the work area or existing shelter configuration? Visual references would be greatly helpful in confirming equipment needs, logistical planning, and disposal preparation methods.

ANSWER: Requested approval to post photos, pending security clearance.

Question 3: Could you please send me a picture of the canvas shelter and surrounding area?

ANSWER: Requested approval to post photos, pending security clearance.

Question 4: Could we please schedule a site visit this week or at your earliest convenience?

ANSWER: Site visit scheduled for FRIDAY, 14 NOVEMBER 2025 at 9:00am HST on Joint Base Pearl Harbor Hickam. All interested parties for the site visit must email name and contact information to both the primary and secondary points of contact by MONDAY, 03 NOVEMBER 2025 at 9:00am HST.

Question 5: How possible can I view the work area of where the canvas mobile shelter is located at?

ANSWER: Site visit scheduled for FRIDAY, 14 NOVEMBER 2025 at 9:00am HST on Joint Base Pearl Harbor Hickam. All interested parties for the site visit must email name and contact information to both the primary and secondary points of contact by MONDAY, 03 NOVEMBER 2025 at 9:00am HST.

Question 6: Can you provide the manufacturer, make, and model (or any identifying markings) of the current Canvas Mobile Shelter System (MSS).

ANSWER: Requested for approval to post, pending security clearance.

Question 7: Can you provide any available photos, drawings, or installation records that reflect the shelter’s configuration and connection details.

ANSWER: Requested approval to post photos, pending security clearance.

Question 8: Can you provide a copy of the as-built or data-plate information showing dimensions, frame type, or panel specifications.

ANSWER: Requested for approval to post, pending security clearance.