Attachment 1 - PWS SAG UWILD Rev. 2.pdf

PDF 187 KB Posted

Attached to
Underwater Inspection in Lieu of Dry-docking (UWILD) and Hull Cleaning of the USNS SACAGAWEA
Solicitation number
N3220527Q7018
Issued by

About this file

This is a Performance Work Statement (PWS) for an Underwater Inspection in Lieu of Drydocking (UWILD) contract for the USNS SACAGAWEA, a T-AKE class vessel. The contract is designated as Item No. SOR 27-026, Category "A," with a scheduled completion date of August 22, 2026, and the port of performance (POP) is Guam from December 1-15, 2026. The vessel specifications are: length 688 feet 11 inches, breadth 654 feet, forward draft 22 feet 10 inches, aft draft 27 feet 9 inches, with one rudder and one propeller.

The primary objective is to conduct a comprehensive underwater inspection as an alternative to traditional drydocking survey in accordance with ABS Rules for Survey After Construction, Part 7, Appendix, Section 1. Key work requirements include: coordinating with ship's force to lock out/tag out associated equipment; conducting a pre-survey planning meeting with the OMT REP, Divers Rep, Master, Chief Engineer, and ABS Surveyor; performing underwater examination using an ABS-recognized diving contractor with closed-circuit television and two-way communication; inspecting sea chests, valves, rudder, propeller, tailshaft, anodes, cathodic protection systems, and hull plating; measuring stern bearing, rudder bearing, and pintle clearances; documenting findings with color photography/videography; and submitting three DVD copies of video documentation and condition reports within 24 hours of discovery of any deficiencies. Performance standards include 99 percent timeliness (with 1 percent contract value deduction per business day late, capped at 10 percent), no more than three errors per deliverable (with 1 percent deduction per returned deliverable, capped at 10 percent), and 100 percent compliance with FAR 52.222-50 and DFARS 252.203-7002 regarding trafficking in persons and whistleblower rights. The government furnishes no equipment or materials.

View the file

Other files

Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

0952 - 1

USNS SACAGAWEA

( TAKE-02 )

DRYDOCKING CONTRACT NO. XXXX-XXX

ITEM NO. SOR 27-026 CATEGORY "A" 2026-08-22

TAKE-CCSI-UNDERWATER INSPECTION IN

LIEU OF DRYDOCKING (UWILD) (5 YR)

Fulcher, Lee

1.0 ABSTRACT

The purpose of this item is to conduct an Underwater

Inspection in Lieu of Dry-docking (UWILD) as an alternate to the

Dry-docking Survey.

2.0 REFERENCES

NOTE: PPE verify and update references as required for the applicable vessel prior to submission.

2.1 NAVSEA Drawing No. 801-8388071, Capacity Plan

2.2 NAVSEA Drawing No. 801-8388177, Docking Plan

2.3 NAVSEA Drawing No. 085-7488873, Shell Expansion

2.4 NAVSEA Drawing No. 085-7488875, Scantling Plan Decks

and Profiles

2.5 NAVSEA Drawing No. 085-7488876, Scantling Plan –

Sections

NOTE: Certain references for this Performance Work Statement contain CUI. These references will not be electronically transmitted, emailed, or transferred to contractor-owned information systems. Upon request, the Government will provide access to these references as physical copies only at the performance location. All physical copies will remain onsite, in Government controlled spaces, and will be returned to the Government immediately upon completion of the daily task. No physical or electronic duplication of these materials is permitted.

3.0 ITEM LOCATION/DESCRIPTION

NOTE: PPE verify and update location, description (Nomenclature, Manufacturer, Model, Serial number) and quantities as required for the applicable vessel prior to submission.

3.1 Location/Quantity

3.1.1 Locations: Underwater hull

3.1.2 Quantity: One

0952 - 2

DRYDOCKING CONTRACT NO. XXXX-XXX

ITEM NO. SOR 27-026 CATEGORY "A" 2026-08-22

TAKE-CCSI-UNDERWATER INSPECTION IN

3.2 Item Description/Manufacturer’s Data

Vessel length: 688 ft 11 in

Vessel breadth: 654 ft

Vessel draft (fwd): 22 ft 10 in

0952 - 3

DRYDOCKING CONTRACT NO. XXXX-XXX

ITEM NO. SOR 27-026 CATEGORY "A" 2026-08-22

TAKE-CCSI-UNDERWATER INSPECTION IN

DEC 15, DEC 1

Vessel draft (aft): 27 ft 9 in

# of Rudders One

# of Propellers One

4.0 GOVERNMENT FURNISHED EQUIPMENT/MATERIAL/SERVICE: None

5.0 NOTES

5.1 The contractor and all subcontractors, regardless of

tier must consult the General Technical Requirements (GTR) to determine applicability to this work item. In performance of this work item, the contractor and all subcontractors regardless of tier must comply with the requirements of all applicable GTRs including but not limited to GTRs 1 through 7, 22, 23, 24, 28, and 29.

5.2 This work item is applicable to vessels who have

approval from ABS to conduct ABS Rules for Survey After

Construction, Part 7, Appendix, Section 1, Underwater

Inspections in Lieu of Drydocking Surveys. If a vessel has any outstanding recommendations for repairs to the propeller, rudder, stern frame, underwater structure, or sea valves it may not be eligible for UWILD.

5.3 THIS SHIP CONTAINS HIGH VOLTAGE (HV) ELECTRICAL

SYSTEMS. OBEY ALL POSTED AND VERBAL INSTRUCTIONS REGARDING

SAFETY AND EXCLUSION FROM HIGH VOLTAGE AREAS. AT NO TIME

APPROACH, WORK ON, OR ENTER A HIGH VOLTAGE AREA WITHOUT PROPER

AUTHORIZATION.

5.4 THE T-AKE CLASS ELECTRICAL COLOR CODING DOES NOT

FOLLOW CONSISTENT COLOR SCHEME. THE SHIP IS KNOWN TO HAVE

CURRENT CARRYING CONDUCTORS COLORED GREEN, BLUE, BLACK, AND

WHITE. ASSUME ALL ELECTRICAL CABLES ARE ENERGIZED UNTIL TESTED

AND PROVEN OTHERWISE. TEST ALL ELECTRICAL CABLES TO ENSURE THEY

ARE DE-ENERGIZED PRIOR TO WORKING ON THE ITEM.

5.5 POP LOCATION: GUAM - 2026

0952 - 4

DRYDOCKING CONTRACT NO. XXXX-XXX

ITEM NO. SOR 27-026 CATEGORY "A" 2026-08-22

TAKE-CCSI-UNDERWATER INSPECTION IN

6.0 QUALITY ASSURANCE REQUIREMENTS: None additional

7.0 STATEMENT OF WORK REQUIRED

7.1 Conduct an Underwater Inspection in Lieu of Drydocking

(UWILD) as an alternate to the Drydocking Survey using

References 2.1 through 2.5 as guidance.

7.2 Coordinate with ship’s force to have associated

equipment locked and/or tagged out per ship’s lock out/tag out policy. When the maintenance is complete, coordinate with ship’s force to have associated equipment unlocked and/or tagged in per ship’s lock out/tag out policy.

7.2.1 With assistance from the OMT REP tag out all

overboard discharges, pump suctions, cathodic protection systems, jacking gear, and other systems or equipment that could affect divers.

7.3 Conduct a Pre-Survey Planning Meeting with the OMT

REP, Divers Rep, Master, Chief Engineer, ABS Surveyor and OMT

REP in attendance. The meeting agenda and discussion shall, at a minimum, cover:

7.3.1 The vessel’s Master, Chief Engineer, or person in

charge, is to submit a signed letter to the ABS Surveyor stating the general overall condition of the vessel, level of maintenance, any known or suspected damage and cleanliness of the underwater body.

7.3.2 Confirm that the vessel has made no unapproved

repairs.

7.3.3 Confirm there is no record or indication of

abnormal deterioration, outstanding recommendations, or damage to underwater body, propeller, rudder, stern frame, underwater structure, or sea valves.

7.3.4 OMT REP is to provide the ABS Surveyor with the

most recent gaugings and gauging report from the last Special

Survey.

7.3.5 OMT REP is to provide the Shipyard Superintendent, Divers and ABS with plans and drawings showing the external

0952 - 5

DRYDOCKING CONTRACT NO. XXXX-XXX

ITEM NO. SOR 27-026 CATEGORY "A" 2026-08-22

TAKE-CCSI-UNDERWATER INSPECTION IN

details of the hull below the sheer strake, including the following items and their location:

a. All shell openings

b. All docking plugs

c. Bilge keels

d. Welded seams and butts

e. Appendages

f. Anodes, including methods of attachment

g. Rudder

h. Propeller

i. Reference points

j. Watertight and oil-tight bulkheads

7.3.6 Confirm there are hull markings or other means to

orient the in-water survey and identify photographs.

7.3.7 Identify the Diving contractor, the number of

divers to be employed and the type of dive equipment to be used.

Discuss their experience, training and qualifications in underwater photography and NDT.

7.3.8 Discuss means of communication between the bridge, dive team and engine room (direct communications via sound powered phones are preferred).

7.3.9 Discuss procedure/plan for emergencies.

7.3.10 Provide Divers with any reference data and

instructions necessary for underwater operations such as means of access to sea chests to inspect the external side of hull connections and sea valves, to rudder bearings to determine clearances of rudder bearings or to propeller shaft strut and stern bearings.

0952 - 6

DRYDOCKING CONTRACT NO. XXXX-XXX

ITEM NO. SOR 27-026 CATEGORY "A" 2026-08-22

TAKE-CCSI-UNDERWATER INSPECTION IN

7.3.11 Discuss method of installing blanks/plugs for sea

chests/valves.

7.3.12 Discuss means to take stern bearing and rudder

bearing clearances.

7.3.13 Determine which tanks and cargo holds are to be

internally examined as a representative sample.

7.3.14 Determine if underwater or internal thickness

measurements of suspect areas are required.

7.3.15 Discuss divers means to conduct underwater

nondestructive testing for fracture detection.

7.3.16 Discuss the in-water clarity (visibility) and the

current or spot cleaning will be necessary.

7.3.17 Discuss vessels anticipated drafts, pier side

clearance and under keel clearance at the time of the survey.

7.3.18 Discuss impact of tides and currents on divers and

the examination.

7.3.19 Discuss anticipated duration of the underwater

survey

7.4 Conduct an underwater examination of the entire vessel

by an in-water survey company recognized by ABS using closed-circuit television with two-way communication using ABS requirements as guidance. The in-water survey is to be monitored and conducted under the surveillance of the attending ABS

Surveyor and is to be supplemented with color photographic or video documentation. The ABS Surveyor is to be satisfied with the method of pictorial representation, and a good two-way communication between the Surveyor and divers is to be provided.

7.4.1 Items that must be recorded on the tape/photograph

include but are not limited to:

a. Vessel’s draft

b. Time at which dive commences

0952 - 7

DRYDOCKING CONTRACT NO. XXXX-XXX

ITEM NO. SOR 27-026 CATEGORY "A" 2026-08-22

TAKE-CCSI-UNDERWATER INSPECTION IN

c. Point of commencement

d. Time viewed

e. Conditions of hull markings

f. Random areas of plating

g. All sea chests

h. All inlets and discharges

i. Bow and stern thrusters

j. Fathometer, Speed Log and other transducers

k. Anodes and reference cells of cathodic protection system

l. Rudder(s)

m. Pintles

n. Propeller(s) to include rope guards and net and line cutters

o. Areas showing signs of damage and/or corrosion

p. Time and point of completion of the dive

7.4.2 Items that must be examined, measured and recorded

include but are not limited to:

a. Confirm that the sea suction openings are clear.

b. Ascertain that the shaft seal assembly remains intact on oil-lubricated bearings.

c. Determine stern bearing clearances. Verify that the clearance or weardown is within limits on the stern bearing.

d. Determine the rudder bearing clearances and condition.

e. Determine the rudder pintle clearances and

0952 - 8

DRYDOCKING CONTRACT NO. XXXX-XXX

ITEM NO. SOR 27-026 CATEGORY "A" 2026-08-22

TAKE-CCSI-UNDERWATER INSPECTION IN

condition.

f. Verify that all parts of the pintle and gudgeon assemblies are intact and secure.

g. This work may require removal of bolted access plates, threaded plugs, and a measuring arrangement.

7.5 Hinged gratings must be opened on all sea chests to

allow divers access into each sea chest to inspect the anodes, internal sides of through hull connections and sea valves.

7.6 Sea valves and their attachment to sea chests are to

be examined externally, including expansion pieces in sea water cooling and circulating systems.

7.7 Examine the outside of the shell plating above the

waterline and exposed portions of appendages, such as propeller, rudder and rudder bearings. Provide a small boat with operator to aid the ABS surveyor accomplish this inspection.

7.8 Upon completion of the survey, restore all access

cover plates, threaded plugs, suction grates, remove all blanks, leaving the vessel in a ready for service condition.

7.9 Reports

7.9.1 When examination and servicing reveal any

deficiency a condition report is to be submitted to the OMT REP with recommended repair and parts required. Submit one electronic copy in Portable Document Format (PDF) within 24 hours after discovery.

7.9.2 Submit three copies of a video tape with audio

commentary of all external areas of the underwater hull identified in 7.4 and 7.4.1, including rudder, propeller, tailshaft, hull protective system, and all other attached appurtenances. Publish the video on DVD in a format readily accessible/playable using Windows™ software applications such as

Windows Media Player, or others. Provide one copy to the OMT

REP, one copy to the ship, and one copy to the ABS Surveyor.

7.10 Painting: None additional

0952 - 9

DRYDOCKING CONTRACT NO. XXXX-XXX

ITEM NO. SOR 27-026 CATEGORY "A" 2026-08-22

TAKE-CCSI-UNDERWATER INSPECTION IN

7.11 Manufacturer’s Representative

7.11.1 Provide the services of a Diving contractor who is

an ABS recognized External Specialist for conducting In-Water

Surveys. The contractor is to perform all examinations, servicing, testing and photography/videography of the underwater hull in accordance with ABS, USCG and manufacturer’s requirements.

https://ww2.eagle.org/en/rules-and-resources/recognized external-specialists.html.

https://www.eagle.org/ABSEaglePrograms/es/es-search.jsp

7.11.2 Provide the OMT REP with a signed letter of

qualification and copy of the ABS Certificate prior to the start of any work.

7.12 Preparation of Drawings

7.12.1 Provide electronic copies of all revised

and/or updated technical documentation including drawings, technical manuals, service bulletins, parts lists, certification and test data associated with the work performed or parts supplied to the OMT REP.

8.0 Performance Standards: Services will be acquired under this contract as performance based in accordance with FAR Subpart.

The contractor shall be evaluated on its ability to provide quality service and deliverables in an efficient manner. Failure to meet a Performance Requirement Standard metric is a considered a major non-conformance that adversely impacts (or has the potential to) mission, safety of personnel and/or equipment, environment, performance (quality), schedule

(delivery), and/or cost. The government’s contracting officer will communicate major non- conformances to the contractor on a

Contract Discrepancy Report (CDR) form with a suspense date for the contractor’s corrective action plan.

https://ww2.eagle.org/en/rules-and-resources/recognized https://www.eagle.org/ABSEaglePrograms/es/es-search.jsp

0952 - 10

DRYDOCKING CONTRACT NO. XXXX-XXX

ITEM NO. SOR 27-026 CATEGORY "A" 2026-08-22

TAKE-CCSI-UNDERWATER INSPECTION IN

Deliverable and/or

Service

Requirement

Measurement

/Metric

Performance

Standards

Performance

Threshold

Method of

Surveillance

Incentives

(Negative)

Section 7 Timeliness The contractor completes the assigned task within the time prescribed.

99% of the work is completed in accordance with the contract.

Contracting

Officer

Tracking and

Customer

Feedback

Unsatisfactory

/Poor

Performance will be documented in

CPARS.

1% of the contract value shall be deducted from the total firm fixed price for every one

(1) business day late, up to a maximum of 10% of the contract value.

Section 7 Quality The contractor shall provide all complete and accurate deliverables.

No more than

3 errors per deliverable.

Customer

Review

Unsatisfactory

/Poor

Performance will be documented in

CPARS.

Deliverables received that have more than three (3) errors result in rejection of the deliverable as incomplete and returned to the

Contractor.

MSC shall not inspect the entire deliverable, rather MSC shall identify, if present, the first three errors and return the deliverable to the Contractor.

Errors shall be defined as transcription

0952 - 11

DRYDOCKING CONTRACT NO. XXXX-XXX

ITEM NO. SOR 27-026 CATEGORY "A" 2026-08-22

TAKE-CCSI-UNDERWATER INSPECTION IN

differences between markups and the final deliverable, as well as formatting errors.

Each time the deliverable is returned, 1% of the awarded

Contract dollar value shall be deducted from the total price for each instance in which a deliverable is determined to be incomplete, up to a maximum

(for all instances of returned documents) of

10% of the awarded contract dollar value.

Combating

Trafficking in Persons

Compliance Contract requirements must meet the terms of FAR

52.222-50.

100% compliance required as per US Zero tolerance policy.

Periodic

Surveillance of the requirements of FAR

52.222-50

Non-conformance will be documented in

CPARS.

Corrective action to be implemented.

Inform

Employees of

Whistleblower

Rights

Compliance Contractor must meet the terms of

DFARS

252.203-

100% compliance required as per US Zero tolerance policy.

Periodic

Surveillance of the requirement s of DFARS

252.203-

Non-conformance will be documented in

CPARS.

Corrective action to be implemented.

File details come from the government source that posted it. Updated .