Request for Clarification Rev. 4 31 MAR 22.doc
DOC document 279 KB Posted
- Attached to
- USS FRANK CABLE ROHDD FY 23 Federal contract opportunity
- Solicitation number
- N3220522R0006
About this file
This solicitation is for repair, overhaul, and hull deficiency work to be performed on the USS Frank Cable. Key details include a requirement for various structural repairs, equipment overhauls, inspections, and material replacements. The period of performance is from November 2022 through May 2023. The Navy seeks bids due by April 12, 2022, with an intent to award the contract on or around July 4, 2022. The solicitation involves multiple work items requiring items like deck, bulkhead, and shell plate replacements; equipment servicing; inspections; and material procurement. Subcontractor involvement will be necessary for tasks like structural work, machinery repairs, and material fabrication.
View the file
Other files for this federal contract opportunity
Show all 24
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
N3220522R0006
USS FRANK CABLE (AS-40)
REQUEST FOR SPECIFICATION CLARIFICATION # 001
SPECIFICATION ITEM NO.: 561
PARAGRAPH / SECTION NO: 3.2 Quantity/Description: See enclosure 2.2.1
TITLE: GAUGE CALIBRATION (1 YR)
QUESTION:
3.0 ITEM LOCATION/DESCRIPTION/QUANTITY
1.1 Location:
Throughout the vessel
1.2 Quantity/Description: See enclosure 2.2.1
Please provide enclosure 2.2.1 ANSWER: WI 561 Enclosure 2.2.1 is included in Amendment 001.
REQUEST FOR SPECIFICATION CLARIFICATION # 002
SPECIFICATION ITEM NO.: 0580
PARAGRAPH / SECTION NO: 2.2
TITLE: REFRIGERATION PLANTS SERVICING AND REPAIRS (5 YR)
QUESTION:
2.2.
NAVSEA Drawing 501-4792621, List of Cooling Coils
Please provide. Reference missing DWG:
ANSWER: The referenced drawing is included in Amendment 001.
REQUEST FOR SPECIFICATION CLARIFICATION # 003
SPECIFICATION ITEM NO.: 0148
PARAGRAPH / SECTION NO: 3.1
TITLE: Vent Tube 6-146-1-V Replace (ABS)
QUESTION:
2.0 REFERENCES:
2.1 NAVSEA DWG 115-4791961 Rev J, Misc. Structural Vent Trunks and Plenums
2.2 NAVSEA DWG 111-4791990 Rev L, MISC Bulkheads Main Deck FR35-98
2.3 NAVSEA DWG 107-4791909 Rev E, Main Deck Pltg, Pillars, & Girders FR 37-6 The references provided for this item are not helpful.
Please provide type of materials, pipe size, footage & fittings required.
Photos would help.
ANSWER: Revised WI 0148 with correct reference 2.2 attached.
REQUEST FOR SPECIFICATION CLARIFICATION # 004
SPECIFICATION ITEM NO.: 502
PARAGRAPH / SECTION NO: 3.2
TITLE: 2-123-3-Q HP Air Piping Repair
QUESTION:
7.2 Mechanical/Fluid:
7.2.1 Renew and replace section of pipe and elbow identified in 3.2 located in 3.1.1.
7.2.2 Replace section of pipe, one (1) straight pin and elbow connector identified in 3.2.1 through 3.2.3.
Please provide pipe size & footage.
Photos would help.
ANSWER: Amendment 001 includes a revised WI 502 with photos, a new reference, and additional details.
REQUEST FOR SPECIFICATION CLARIFICATION # 005
SPECIFICATION ITEM NO.:0505
PARAGRAPH / SECTION NO: 3.1
TITLE: CHT SAS Manifold Repair
QUESTION:
2.0
REFERENCES:
2.1 NAVSEA Drawing AS39-505-4793712, Submarine Sewage Disposal Arrangement & L/M.
3.1 Location/Quantity: Various
3.1 Item Description/Manufacturer's Data:
3.1.1 SAS CHT Hoses and manifold, Starboard Side
Please provide a more detailed scope of work including pipe sizes, footage & fittings required.
Photos would help.
ANSWER: Amendment 001 includes a revised WI 505 with photos.
REQUEST FOR SPECIFICATION CLARIFICATION # 006
SPECIFICATION ITEM NO.: 0506
PARAGRAPH / SECTION NO: 3.2.1
TITLE: NR3 Fire Pump 6” Discharge Pipe Replace
QUESTION:
2.2 NAVSEA Dwg. 506-8389013, Firemain, 3rd Deck & Below
Please clarify:
Item title & first sentence in Para. 3.2.1 Describes 6”pipe tee but the remainder of Para. 3.2.1 describes 8”pipe & 90 degree ell, no tee is mentioned.
What is the correct pipe size 8”or 6” & is it a tee or 90 degree ell to renew?
Photo would help.
ANSWER: Amendment 001 includes a revised WI 506.
REQUEST FOR SPECIFICATION CLARIFICATION # 007
SPECIFICATION ITEM NO.: 517
PARAGRAPH / SECTION NO: 3.1
TITLE: Eductor Overboard Pipe Replace
QUESTION:
2.0
REFERENCES:
2.1 NAVSEA Dwg. No. 085-8390465 Damage Control Diagram
3.1 Location:
3.1.1 5’ Carbon Steel SW Eductor Overboard Piping past the final gate valve 6-124-1 before exiting the fireroom, has signs of rust and deterioration. This piping passes through PW Tank 8-123-1-W.
Please provide type of materials, pipe size & fittings required as this pipe is not shown on the references provided.
Photos would help.
ANSWER: Revised WI 0517 with photos attached including correct reference 2.1.
REQUEST FOR SPECIFICATION CLARIFICATION # 008
SPECIFICATION ITEM NO.:0521
PARAGRAPH / SECTION NO: 3.1.1, 3.1.2, 3.1.3
TITLE: Misc. Pipe Replace
QUESTION:
2.0
REFERENCES:
2.1 NAVSEA Dwg. No. 085-8390465 Damage Control Diagram
2.2 NAVSEA Dwg. 506-8388994, Firemain System 2nd Deck & Above
2.3 NAVSEA Drawing AS40-845-7362894 (AS-40 NUCLEAR/NON-NUCLEAR INTERFACE BOOKLET – FOUO) Para. 3.1.1 5”Vent Pipe
Please provide type of materials, footage & fittings required.
Para. 3.1.2 Stbd. Sea Chest Pipe
Please provide type of materials, pipe size, footage & fittings required.
Para. 3.1.3 Overboard Drain Pipe
Please provide type of materials, pipe size, footage & fittings required.
Photos of all three paragraphs would help.
ANSWER: Revised WI 0517 with photos attached.
REQUEST FOR SPECIFICATION CLARIFICATION # 009
SPECIFICATION ITEM NO.: 0526
PARAGRAPH / SECTION NO: 3.1.1, 3.1.2, 3.1.3, 3.1.4
TITLE: Firemain Piping Repairs
QUESTION:
2.0
REFERENCES:
2.1 NAVSEA Dwg. No. 085-8390465 Damage Control Diagram
2.2.1 NAVSEA Dwg. 506-8388994, Firemain System 2nd Deck & Above
2.3 NAVSEA Drawing AS40-845-7362894 (AS-40 NUCLEAR/NON-NUCLEAR INTERFACE BOOKLET – FOUO)
3.0
ITEM LOCATION/DESCRIPTION:
3.1 Location:
3.1.1 Engine Room lower level from fire pump 4/5 to header
3.1.2 Navy tool issue room
3.1.3 2nd deck, port side just forward of midship QD athwart ship Passageway
3.1.4 Weapons 4th deck on mag sprinkling line penetration Please provide type of materials, pipe size, footage & fittings required per paragraph.
Photos of all four paragraphs would help.
ANSWER: Revised WI 0526 attached to include pipe sizes and photos
REQUEST FOR SPECIFICATION CLARIFICATION # 010
SPECIFICATION ITEM NO.: 514
PARAGRAPH / SECTION NO: 7.5.1
TITLE: Sewage Pipe Replace
QUESTION:
Para. 7.5.1 Last sentence
The last sentence refers to an Item 548. WI 548 is not included in this specification.
Should estimate costs be included in this WI 514 as WI 548 is not included in this specification?
ANSWER: Revised WI 0514 attached.
REQUEST FOR SPECIFICATION CLARIFICATION # 011
SPECIFICATION ITEM NO.:0964
PARAGRAPH / SECTION NO: 3.2.1, 3.2.2, 3.2.3, 3.2.4
TITLE: SW EXPANSION JOINTS (5 YR)
QUESTION:
Request following information:
1) Please provide pictures for each items 3.2.1, 3.2.2, 3.2.3, 3.2.4.
2) For each items 3.2.1, 3.2.2, 3.2.3, 3.2.4 please advise:
a) Material of expansion joint (metal, rubber, if rubber type of rubber)
b) Temperature requirements
c) Flange diameter
d) If possible, manufacturer of flange. Pictures of any lay-line or description
e) Amount of flex required in expansion joint (by direction)
f) Identify the part # and manufacturer of the Monel Bellow Internal Sleeve
3.2.1 One (1) Main SW Circ Condensate Injection Inlet, 24” Expansion Joint Flange, CU-NI 90/10 Flanged, Monel Bellows Internal Sleeve 23-1/3 ID 15 PSI.
3.2.2 One (1) Main SW Circ Condensate Discharge, 30” Expansion Joint Flange, CU-NI 90/10 Flanged, Monel Bellows Internal Sleeve 23-1/3 ID 15 PSI.
3.2.3 One (1) Main SW Circ Condensate Pump Inlet, 18” Expansion Joint Flange, CU-NI 90/10 Flanged, Monel Bellows Internal Sleeve 23-1/3 ID 15 PSI.
3.2.4 One (1) Main SW Circ LO Cooler Inlet, 8” Expansion Joint Flange, CU-NI 90/10 Flanged, Monel Bellows Internal Sleeve 23-1/3 ID 15 PSI.
ANSWER: Revised WI 0964 with photos attached
REQUEST FOR SPECIFICATION CLARIFICATION # 012
SPECIFICATION ITEM NO.: 0801
PARAGRAPH / SECTION NO: 3.0
TITLE: Miscellaneous Vent Duct Replace
QUESTION:
3.0
ITEM LOCATION/DESCRIPTION: N/A
7.2.1 Accomplish a ship check of the vent duct in reference 2.2 and take detailed measurements required to fabricate new section of duct.
7.2.2 Fabricate and install new section of vent duct in accordance with 2.1.
Enclosure 2.2 - List of Ducting:
WI 801 has a long list of spaces needing duct repair with no description of sizes and footage.
Please provide DWGs & approximate sizes with lineal footage for estimating purposes.
Pictures would be appreciated as well.
ANSWER: Para 7.2.1 states take detailed measurements required to fabricate new section of duct. Actual sizes and dimensions shall be submitted via CFR.
REQUEST FOR SPECIFICATION CLARIFICATION # 013
SPECIFICATION ITEM NO.:0147
PARAGRAPH / SECTION NO: 2.1.7
TITLE: Cable Penetration Remediation (ABS)
QUESTION:
Please provide the following missing reference:
2.1.7 Cable Penetration Inspection- USS Frank Cable dated June 2021 ANSWER: June 2021 Report sent via DoD SAFE
REQUEST FOR SPECIFICATION CLARIFICATION # 014
SPECIFICATION ITEM NO.: 0409
PARAGRAPH / SECTION NO: CAT A?
TITLE: AIT Support CANES Install
QUESTION:
Amendment 0001 addresses WI 409 as CAT B
The attached WI 0409_A_AIT Support CANES Install is addressed as CAT A
Please advise as J-3+Category+B+Rev.1 lists WI 409 as CAT B.
Thank you ANSWER: WI 409 is CAT B. Revised SOW attached.
REQUEST FOR SPECIFICATION CLARIFICATION # 015
SPECIFICATION ITEM NO.:0580 & 0532
PARAGRAPH / SECTION NO: 2.0
TITLE: AS_CSI_REFRIGERATION PLANTS/ Refrigerant Valves Replace (VR21-0019)
QUESTION:
From OEM Johnson Controls Company:
Request Tech Manual S9516 AA MMO 000, latest Revision.
There is work for both the ACS (which is the manual S9514 FN MMA 010) and the reefers.
Without the reefer manual, which is the S9516 AA MMO 000, there is no way to correctly quote either 0532 or 0580.
ANSWER: TM S9516 AA MMO 000 attached.
REQUEST FOR SPECIFICATION CLARIFICATION # 016
SPECIFICATION ITEM NO.0569
PARAGRAPH / SECTION NO: 2.1.1
TITLE: FIRE AND SMOKE DETECTION AND ALARM SYSTEM
QUESTION:
Please provide missing DWG 401-8194168, Fire Detection System
Info needed:
Flame Detectors info.
Thermal Detectors appear to be LLTM
Smoke Detectors and Pull Stations are proving difficult to procure with the possibility of them becoming obsolete.
DWG may resolve these issues.
ANSWER: DWG 401-8194168 is a NOFORN. Known source for OEM materials:
SIEMENS Industry, Inc.
POC: Freddy Bermond/Jeffrey Bouton
500 Ala Moana Blvd.
Suite 7-429
Honolulu, HI, 96813, USA
Cell: (808)-222-4745 freddy.bermond@siemens.com/jeffrey.bouton@siemens.com
REQUEST FOR SPECIFICATION CLARIFICATION # 017
SPECIFICATION ITEM NO.: 0532
PARAGRAPH / SECTION NO: _7.2.6
TITLE: Refrigerant Valves Replace
QUESTION:
From OEM Johnson Controls:
Per Chapter 516, 516-8.8.7.2 General Notes for Brazing.
e. The temperature required for brazed joints will cause oxidation within the tubing. The scale or other products of this oxidation may be removed by the refrigerant flow after the system is in operation. The oxide can break up into a fine powder to contaminate the lubricant in the compressor and to plug the strainer and driers. To prevent this, provide an inert atmosphere within the tube being brazed. This can be done by purging dry nitro-gen gas through the tubing during the brazing operation.
For 7.2.6, if we follow the above, then this can be omitted.
Could contractor omit the requirement for 7.2.6 if we conduct brazing in accordance with Para E, above?
7.2.6 Accomplish a Flush of the Refrigerant System for refrigeration plant by temporarily connecting a contractor furnished flush rig to the Refrigerant System. Provide and install jumper hoses, adapters with hose fittings to tie flushing rig into system, clean refrigerant flushing rig and ten micron filter, (Muslin) bags.
7.2.6.1 Perform a refrigerant flush until a clean muslin bag is obtained (zero metallic particles) to the satisfaction of the MSCREP.
7.2.6.2 Upon completion of the flush, remove the flushing rig and restore the Refrigerant System for refrigeration Plant using new hardware, gaskets.
ANSWER: KTR shall to provide CFR during execution to address above recommendation. MSC N7 will review and response accordingly.
REQUEST FOR SPECIFICATION CLARIFICATION # 018
SPECIFICATION ITEM NO.: 0580
PARAGRAPH / SECTION NO: 2.2, 3.1.9, 3.2.5
TITLE: REFRIGERATION PLANTS SERVICING - # SCACs
QUESTION:
From OEM Johnson Controls:
2.2 NAVSEA Drawing 501-4792621, List of Cooling Coils
3.1.9 SCAC Units All throughout the ship
3.2.5 references 42 SCACs, but Reference 2.2 includes 76.
Please identify which 42 require service. Or will all 76 require service and the 42 mentioned possibly a typo?
ANSWER: Equipment to be service are listed in 3.0 of the SOW.
3.0 ITEM LOCATION/DESCRIPTION
| Description |
| Location |
Ship stores York
Marinepak 8-ton
464-44001 units
56 Krack coils
| Compressor/condensing unit #1 |
| 6-44-2-E |
Compressor/condensing unit #2
Compressor/condensing unit #3
| Chilled Stores #1 |
| 6-38-1-A |
| Chilled Stores #2 |
| 6-38-2-A |
| Freezer #3 (Ward Room) |
| 6-46-1-A |
| Freezer #1 |
| 5-38-0-A |
| Freezer #2 |
| 5-38-2-A |
Tecumseh CAJ 7465
McQuay PRA 045A
| Compressor/condensing unit |
| 1-38-01-L |
| Chill Room |
| 1-47-1-A |
Tecumseh CAJ 7465
McQuay PRA 045A
| Compressor/condensing unit |
| 1-54-1-Q |
| Thaw Room |
| 1-51-1-A |
REQUEST FOR SPECIFICATION CLARIFICATION # 019
SPECIFICATION ITEM NO.: 0654
PARAGRAPH / SECTION NO: 3.1.1
TITLE: RESCUE BOAT AND DAVIT SERVICE (5 YR)
QUESTION:
From Allied Systems Service Rep.
We received your RFQ for WI 0654 for the Frank Cable. Just to let you know, we recently (just last month) replaced a davit on the ship with a brand new one (davit arm only from pedestal up). This davit would not need the 5 year inspection like the starboard side would. Our recommendation would be to quote a 0653 WI for filter changes etc. for the new davit and do a 0654 WI on the port davit which is more in depth. This would get the davits on the same schedule as of next year so there would be no offset.
Please reach out to the ship and see if this is acceptable to them.
Please advise.
ANSWER: Regardless of recent servicing, OEM shall accomplish as per WI 0654.
REQUEST FOR SPECIFICATION CLARIFICATION # 020
SPECIFICATION ITEM NO.: 0956
PARAGRAPH / SECTION NO: 2.2.1
TITLE: OVERHAULING SEA VALVES
QUESTION:
Please provide missing Enclosure 2.2.1 – Sea Valve List ANSWER: Enclosure 2.2.1 is in the last page of the SOW.
Enclosure 2.2.2 ADDITIONAL OVERBOARD VALVE LIST – USS FRANK CABLE
1. #1 CHT Overboard 5 in. pipe - FR 31 - STBD. - 4-26-0 - Crew Berthing Space - 4 in. Navy scupper Valve
2. #1 CHT Overboard 5 in. pipe - FR 32 - PORT - 4-26-0 - Crew Berthing Space - 4 in. Navy scupper Valve
3. #1 CHT (3 in. Waste Water Overboard) - FR 41 - STBD. - 4-38-0 - Crew Berthing Space - 3 in. Navy scupper Valve
4. #1 CHT (3 in. Waste Water Overboard) - FR 41 - PORT - 4-38-0 - Crew Berthing Space - 3 in. Navy scupper Valve
5. #1 CHT (3 in. Grey Water Overboard) - FR 15 - STBD. - 4-14-0 - Female Berthing 4-14-0 - 3 in. Navy scupper Valve
6. #2 CHT (5 in. Waste Water Overboard) - FR 53 - PORT - 5-50-2-A - Ship store (5-50-2-A) - 4 in. Navy scupper Valve (in space 4-50-0-A)
7. #2 CHT (5 in. Waste Water Overboard) - FR 53 - STBD. - 5-50-0-1 - Ship store (5-50-0-1) - 4 in. Navy scupper Valve (in space 4-50-0-A)
8. #2 CHT Overboard 4 in. pipe - FR 53 - STBD. - 5-50-0-1 - Ship Store (5-50-0-1) - 4 in. Navy scupper Valve (in space 4-50-0-A)
9. #2 CHT Sewer Waste Drain - FR 53 - STBD. - 4-50-0 - 1-1/4 in. Globe
10. #3 CHT Waste Water Overboard 5 in. pipe - FR 99 - STBD. - 5-98-5 - Valve is located in CHT #3 - 5 in. Navy scupper Valve
11. #3 CHT Overboard 4 in. pipe - FR 102 - STBD. - 5-101-0-A - Store Room 5-101-0-A - 4 in. Navy scupper Valve (in DC shop 4-98-0)
12. #4 CHT Overboard 4 in. pipe - FR 100 - PORT - 5-98-2 - Pump Room #4 (5-98-2-Q) - 4 in. Navy scupper Valve (in Store Room 4-98-2-Q)
13. #6 CHT Overboard 5 in. pipe - FR 141 - PORT - 4-141-2 - CHT Pump Room #6 - 4 in. Navy scupper Valve
14. #6 Waste Water Overboard 3 in. Pipe - FR 140 - STBD. - 4-134-0-A - Located in Store Room 4-134-0-A - 3 in. scupper Valve
15. NSF Space Waste Water Discharge 2 in. - FR 93 - PORT - 4th Deck - NSF SD STORE ROOM - ORIGINAL DWG IS NOFORN
16. NSF Space Waste Water Discharge 2 in. - FR 91 - STBD. - 4th Deck - NSF SD STORE ROOM - ORIGINAL DWG IS NOFORN
17. Refer OVBD 5 in. pipe - FR 60 - 2-60-2-L - MSC CPO SR 2-60-2-L - 5 in. WAFFER CHECK VALVE
18. CHT receiving from sub Pump room #4 - FR 107 - 3-107-2-Q - Ship fitter office - 3 in. check valve
19. CHT receiving from sub Pump Room #4 - FR 107 - 3-98-0-Q - Ship fitter shop - 3 in. check valve.
20. Salt Water cooling Ovbd - frame 134 - 3-124-1 - Carpenter shop - 3 in. Globe
21. Small AC unit Cooling water overboard - Frame 82 (S) - 2-82-1-Q - Server Room 2 in. globe
22. Deck Drain Vent - FR 15 (P) - 3-14-2-Q - Fan Room - 3/4 in. globe
23. Condensate Drain - FR 27 - 5-26-1-A - Storeroom - 1-1/4 in. globe
24. Distiller Overboard - FR 120 (P) - 7-110-0-E - Engine Room - 3 in. Gate
25. Drain Overboard - FR 94 - 4-86-3-A - Storeroom -
26. Drain Overboard - FR 90 - 4-86-3-A - Storeroom -
27. Overboard - FR 14 - 3-14-2-Q - Fan Room - 1-1/2 globe
28. Solid Waste Pulper 4 in. overboard - 5-38-4-A - 5-38-4-A - Dry provision Storeroom - 4 in. swing check valve
REQUEST FOR SPECIFICATION CLARIFICATION # 021
SPECIFICATION ITEM NO.: 688
PARAGRAPH / SECTION NO: 3.3.2
TITLE: RESCUE BOAT ENG AND DRIVE
QUESTION:
From Willard Marine Mfg. of Rescue Boats:
3.3.2 & 3.3.3 Subject boats are equipped with Steyr SE series engines, not Cummins.
WI 654: 3.2.2 Subject boats are equipped with Steyr SE series engines, not Cummins.
Specifications do not cover applicable work to Steyr SE series engines.
Some of the work scope is duplicated in both specifications and some work is N/A.
Please advise
ANSWER:
1.1 Item Description/Manufacturer’s Data:
1.1.1 Rescue Boats
Manufacturer: Willard Marine
1.1.2 Diesel Engine
Turbocharged, Four Cycle
Manufacturer: Steyr Engine Co., Inc.
Model: Q5B5.9, 230 HP, E5, Int
1.1.3 Outdrive
Manufacturer: Hamilton
Model: HJ274 Jet Drive
REQUEST FOR SPECIFICATION CLARIFICATION # 022
SPECIFICATION ITEM NO.: 0801
PARAGRAPH / SECTION NO: 7.2.1 Accomplish a ship check of the vent duct in reference 2.2 and take detailed measurements required to fabricate new section of duct.
7.2.2 Fabricate and install new section of vent duct in accordance with 2.1.
Ref 2.2 Enclosure (1) List of Ducting
TITLE: _ 0801_A_Miscellaneous Vent Duct Replace (ABS LLS)
QUESTION: The specification directs the contractor to conduct a ship check and survey the ventilation ducts using 2.2 Enclosure for guidance. The spaces listed and surveyed, contain multiple ducts and most of the ducts are covered with insulation. Contractor was unable to complete the survey with any confidence.
Please provide pictures and all applicable drawings of all Ducts listed 2.2 Enclosure with size/length to be used for estimating purposes.
| 01-125-1 |
| Load Line: 01-125-1, Vent intake found with 75% surface rust, hard scale and pitting. |
| 01-125-2 |
| Load Line: 01-125-2, Vent intake interior found with 100% surface rust and hard scale. |
| 01-88-1 |
| Load Line: 01-88-1, Vent interior found with metal loss with 75% surface rust and hard scale. |
| 02-44-1 |
| Load Line: 02-44-1, Vent intake interior found with 60% surface rust and loose scale. |
| 02-75-1 |
| Load Line: 02-75-1, Vent intake interior found with 50% surface rust and loose scale. |
| 04-62-2 Natural Air Vent |
| Wasted on FWD lower end |
| 1-101-1 |
| Load Line: 1-101-1 to Fr 103, ventilation duct (topside of duct) found with 80% surface rust and hard scale |
| 1-101-1 |
| Load Line: 1-101-1, Ventilation duct couplings (bolted sections) found with surface rust and scale. |
| 1-107-2 |
| Load Line: 1-107-2 Vent interior holed steel with scattered rust. |
| 1-107-2 Ext. Fan Room |
| Load Line: 1-107-2, Exterior fan room ducting was found corroded, metal loss (holed). |
| 1-108-2 |
| Load Line: 1-108-2 Vent duct interior found with rust and scale, > 10% |
| 1-108-2 |
| Load Line: 1-108-2, Vent duct exterior metal loss at opening. |
| 1-126-2 |
| Load Line: 1-126-2, Vent duct interior found with flaking paint with rust and hard scale, > 25%. |
| 1-76-2 |
| Load Line: 1-76-2, Vent duct found with significant metal loss (holed). |
| 1-94-1 |
| 1 deck stbd MIRS lab 1-94-1 vent plating found holed |
| 02 Deck |
| 02 deck STBD Fr 37, vent cover fasteners corroded and parts missing |
| 2-40-1-L MSC Crew Berth |
| MSC crew berth 2-40-1-L found with corroded and holed supply ventilation ducting, as well as molded piping insulation |
| 3-74-4-Q Technical Library |
| Air supply vent corroded |
| 4-134-0-A |
| 01 deck STBD side vent 4-134-0-A considered suspect |
ANSWER: Para 7.2.1 states take detailed measurements required to fabricate new section of duct. Actual sizes and dimensions shall be submitted via CFR.
REQUEST FOR SPECIFICATION CLARIFICATION # 023
SPECIFICATION ITEM NO.: 0099
PARAGRAPH / SECTION NO: 3.1
TITLE: Lead Paint Testing
QUESTION:
Enclosure 2.2.1 was not provided. Provide KTR with Enclosure.
ANSWER: Revised WI 099 attached.
REQUEST FOR SPECIFICATION CLARIFICATION # 024
SPECIFICATION ITEM NO.: 0101
PARAGRAPH / SECTION NO: 3.0
TITLE: 01 Underdeck Structural Repair
QUESTION:
What Deck are the below paragraphs located
3.23 UDT FR 41 IWO UDL Nos. 19 to 21 POC
3.24 UDL No. 19 POC FRs 41 to 47
3.25 UDL No. 21 POCFRs 44 to 45
3.26 UDL No. 19 POC FRs 50 to 58
3.27 UDL No. 19 POC FRs 62 to 65
3.28 UDTs FRs 65 and 66-1/2 IWO UDL Nos. 19 to 21 POC
ANSWER: All locations are in the main deck overhead port and STBD.
REQUEST FOR SPECIFICATION CLARIFICATION # 025
SPECIFICATION ITEM NO.: 0101
PARAGRAPH / SECTION NO: Header TITLE: 01 Underdeck Structural Repair
QUESTION:
Can Customer provide copies of (ABS CoC 216 & 335 AND VR17-0147?)
ANSWER: 1. Latest International Inspection LLC UT readings and recommended repair plan attached.
REQUEST FOR SPECIFICATION CLARIFICATION # 026
SPECIFICATION ITEM NO.: 957
PARAGRAPH / SECTION NO: 2.1.3
TITLE: AS_CCSI_PROPELLER CLEAN AND POLISH - ON DOCK (5 YR)
QUESTION:
Can you please provide Reference 2.1.3 NAVSEA Dwg No. 4796696, Propeller Shaft Details?
ANSWER: NAVSEA Dwg No. 4796696 attached.
REQUEST FOR SPECIFICATION CLARIFICATION # 027
SPECIFICATION ITEM NO.: 0147
PARAGRAPH / SECTION NO: 2.1.7
TITLE: Cable Penetration Remediation (ABS)
QUESTION:
Can Reference 2.1.7 Cable Penetration Inspection- USS Frank Cable dated June 2021 please be provided?
ANSWER: Question was answered in RFC #13; Report was sent DOD Safe. If report was not received please email raymond.f.gardner.civ@us.navy.mil.
REQUEST FOR SPECIFICATION CLARIFICATION # 028
SPECIFICATION ITEM NO.: 0281
PARAGRAPH / SECTION NO: 7.8.1.1
TITLE: AS_CSI_BOILER INSPECTION AND HYDRO (2.5 YR)
QUESTION:
Para 7.8.1.1 Directs KTR to install CFM (Contractor Furnished Materials) but Para 4.1 List it as GFM (Government Furbished Material.
Is the Material CFM or GFM for Para 7.8.1.1 ANSWER: Only materials listed in 4.1 are GFM. Any other required materials will provided as CFM.
4.1 Government Furnished Material (GFM):
(5 gal) High Heat Aluminum Paint (Provided from Ship’s Stock)
List of Boiler Header and Drum Boiler Gaskets:
| Description |
| NSN P/N |
| Qty |
| Steam Drum Manway Gasket, 12 in. x 16 in. x 3/4 in. thick, MIL-G-15342, Cl. 2 Flexitallic (72433) F-167-556 (Plan A-23) (11440) |
| 5330-01-379- 5982 |
| 2 Ea. |
| Water Drum Manway Gasket, 12 in. x 16 in. x 3/4 in thk, MIL-G-15342, Cl. 2, Flexitallic (72433) F-167-561 (Plan A-27) |
| 5330-01-379-5982 |
| 1 Ea. |
| Economizer Gasket, Handhole, oval, (29R) (for PC no. 578) F-167-574 (Plan A-39) |
| 5330-01-393-7133 |
| 1 Ea. |
| Superheater Header Inlet, Outlet & Intermediate Header Hand Hole Gaskets, (29N) F-167-571 (Plan A-36) |
| 5330-01-392-5158 |
| 30 Ea. |
| Screen Wall Header Hand Hole Gaskets, Flexitallic (33N), MIL-G-15342, Class a (72433) F-167-562 (Plan A-29) |
| 5330-00-599-5782 |
| 9 Ea. |
| Desuperheater Flange Gasket (Inside Steam Drum), Flexitallic (CG-6H) F-167-560 (Plan A-27) |
| 5330-01-082-6045 |
| 2 Ea. |
| Burner Assembly Outer Casing Gasket D-42100 (Plan F-1) D-42101 (Plan F-2) |
| APL 300080122 |
| 3 Ea. |
| Side Wall Header Hand Hole Gaskets, Oval, Spiral Wound |
| 5330-00-599-5782 |
| 9 Ea. |
| Rear Wall Header Hand Hole Gaskets, Oval, Spiral Wound |
| 5330-00-599-5782 |
| 10 Ea. |
1.1.1 List of Boiler Casing Gasket
| Description |
| NSN P/N |
| Qty |
Boiler Air Casing Door Tadpole Ribbon Gasket. Fiberglass, 3/8" diameter bulb with 2 2" Tail, Bulb will be made of 1/4" twisted fiberglass cord and the tail will be 1/8" thick overall. The material shall be provided in one continuous 500 ft. length.
500 ft.
REQUEST FOR SPECIFICATION CLARIFICATION # 029
SPECIFICATION ITEM NO.: 0956
PARAGRAPH / SECTION NO: 2.2.1
TITLE: AS_CCSI-OVERHAULING SEA VALVES (ABS) (5YR)
QUESTION:
Can the Sea Valve List from Para 2.2.1 be provided?
ANSWER: Enclosure 2.2.1 is in the last page of WI 0956.
REQUEST FOR SPECIFICATION CLARIFICATION # 030
SPECIFICATION ITEM NO.: 0957
PARAGRAPH / SECTION NO: 7.2
TITLE: AS CCSI Propeller Clean and Polish - on dock (5 yr.) Rev A
QUESTION:
Records indicate that the vessel has one (1) 6-bladed fixed pitch propeller.
The current specification lists the propeller as being CPP blades and is requiring a bid for machining of the CPP Blades.
Did the propeller type change on this ship?
ANSWER: Blades: Six, fixed pitch, right hand
REQUEST FOR SPECIFICATION CLARIFICATION # 031
SPECIFICATION ITEM NO.: 0101
PARAGRAPH / SECTION NO: 2.0, 3.0, 3.29, 7.1.1, 7.1.2, 7.1.6, 7.2.1, 7.2.2
TITLE: 01 Underdeck Structural Repair
QUESTION:
2.1
REFERENCES
2.1.1 ABS Rules for Building and Classing Steel Vessels, 2015
2.1.2 MSC PAINT HANDBOOK
2.2 ENCLOSURES: None.
3.0 does not describe the thickness, length, or size of the underdeck steel beam stiffeners.
Contractor will require the thickness, length, or size of each location.
Reference DWGs will be required to properly estimate these repairs.
Photos of each location would aid in the pricing of possible interferences.
7.2.1.1 States to: Crop out deteriorated steel as marked and as listed in 3.1 through 3.28. Steel plate and shapes are to be cropped back to sound material. For bidding purposes, approximately 1500 linear feet of steel plate to dealt with.
7.2.2 Installations
7.2.2.1 Replace steel removed in 7.2.1 with ABS Grade A or B Steel having a plate thickness equal to the original plate thickness as well as longitudinal/transverse structure as determined by MSC and ABS.
Contractor respectfully requests additional information, as noted above, for estimating purposes.
ANSWER: 1. Latest International Inspection LLC UT readings and recommended repair plan attached.
REQUEST FOR SPECIFICATION CLARIFICATION # 032
SPECIFICATION ITEM NO.: 0102
PARAGRAPH / SECTION NO: 2.0, 3.0, 3.25, 7.1.1, 7.1.2, 7.1.6, 7.2.1, 7.2.2
TITLE: 02 Level Underdeck Repair
QUESTION:
2.1
REFERENCES
2.1.1 ABS Rules for Building and Classing Steel Vessels, 2015
2.1.2 MSC PAINT HANDBOOK
2.2 ENCLOSURES: None.
3.0 does not describe the thickness, length, or size of the underdeck steel beam stiffeners.
Contractor will require the thickness, length, or size of each location.
Reference DWGs will be required to properly estimate these repairs.
Photos of each location would aid in the pricing of possible interferences.
7.2.1.1 States to: Crop out deteriorated steel as marked and as listed in 3.1 through 3.28. Steel plate and shapes are to be cropped back to sound material. For bidding purposes, approximately 1500 linear feet of steel plate to dealt with.
7.2.2 Installations
7.2.2.1 Replace steel removed in 7.2.1 with ABS Grade A or B Steel having a plate thickness equal to the original plate thickness as well as longitudinal/transverse structure as determined by MSC and ABS.
Contractor respectfully requests additional information, as noted above, for estimating purposes.
ANSWER: 1. Latest International Inspection LLC UT readings and recommended repair plan attached.
REQUEST FOR SPECIFICATION CLARIFICATION # 033
SPECIFICATION ITEM NO.:0103
PARAGRAPH / SECTION NO: 3.1, 3.2, 7.2.1.1, 7.2.2.1
TITLE: Passageway 03-59-2 Bulkhead and Coaming Repair
QUESTION:
3.0
LOCATION/DESCRIPTION/QUANTITY:
3.1 Coaming, ten (10) linear feet
3.2 Bulkhead, 10 square feet.
3.3 Quantities listed are considered estimates, within 10%.
7.2.1 Removals
7.2.1.1 Crop out deteriorated steel as listed in 3.1 through 3.2. Steel plate and shapes are to be cropped back to sound material. For bidding purposes, approximately 50 square feet of steel plate to dealt with.
For estimating purposes please designate the proposed required square feet to be replaced.
ANSWER: Work completed. WI 0103 Cancel.
REQUEST FOR SPECIFICATION CLARIFICATION # 034
SPECIFICATION ITEM NO.: 0104
PARAGRAPH / SECTION NO: 3.1, 7.2.1
TITLE: 8-123-2-W Sounding Tube Repair
QUESTION:
Title is singular.
3.1 Potable Water Tank 8-123-2-W sounding Tube, Carbo Steel ASTM A53 Type S
Is singular.
7.2.1 Provide and install new sounding tubes and fittings to replace the missing tubes identified in 3.1 in accordance with 2.1. – Is Plural.
Please advise how many sounding tubes to be addressed for this WI.
ANSWER: One (1) sounding tube.
REQUEST FOR SPECIFICATION CLARIFICATION # 035
SPECIFICATION ITEM NO.: 0105
PARAGRAPH / SECTION NO: 2.0, 3.0, 7.0, 7.1.1, 7.2.1, 7.2.1.1, 7.2.2, 7.2.3,
TITLE: Deck Drain Repairs
QUESTION:
2.0 REFERENCES:
Not helpful locating 3.0.
3.0
ITEM LOCATION/DECRIPTION/QUANTITY:
Not found in 2.0.
7.1.1 Note: Ward Room scullery false overhead requires marking prior to removal. Reinstallation requires new gaskets and fasteners which is CFM.
Not helpful as no work scope in that area.
7.2.1 Accomplish joint survey and un-obstructive flow test of the deck drains listed in 3.1 thru 3.5 and surrounding deck plate areas with the MSCREP and ABS Surveyor to determine root cause of improper drainage.
Is this the actual scope of work for this WI?
Accomplish repair in accordance with the approved repair plan in 7.2.1.1.
Not yet identified.
7.2.2 Replace all existing plastic pipe, piping joints and flanges with correct material specification in accordance with 2.1 thru 2.4.
Note: For bidding purposes, provide and replace 20 SQFT of deck plating, 250 LF of deck drain pipe. Any additional will be handle by a CCO
20 SQ' Deck Plating? Location(s) needed for estimating purposes.
250 LF of deck drain pipe need locations for estimating purposes.
ANSWER: Para 7.2.1 direct the KTR to accomplish a joint survey and un-obstructive flow test of the deck drains listed in 3.1 thru 3.5 and surrounding deck plate areas with the MSCREP and ABS Surveyor to determine root cause of improper drainage and submit a CFR for repair plan.
REQUEST FOR SPECIFICATION CLARIFICATION # 036
SPECIFICATION ITEM NO.: 0106
PARAGRAPH / SECTION NO: 2.1, 3.1, 3.1.1,
TITLE: CHT Tank NR6 Steel Repair (ABS)
QUESTION:
2.1
REFERENCES
2.1.1 ABS Rules for Building and Classing Steel Vessels, 2015
2.1.2 ABS Pub 87 SHIPBUILDING AND REPAIR QUALITY STANDARD FOR HULL STRUCTURES DURING CONSTRUCTION
2.2 ENCLOSURES: None.
3.1 All work is performed on the CHT Tank NR6 (4-142-4-W)
3.1.1 No. 6 CHT Tank, inboard vertical plate in the trough was holed.
3.2 Quantity: Approximately 250 square feet of steel
7.2.1.2 Crop out deteriorated steel as listed in 3.1. Steel plate and shapes are to be cropped back to sound material in accordance with 2.1.1 and 2.1.2. For bidding purposes, approximately 250 square Feet of steel plate to dealt with.
7.2.2 Installations
7.2.2.1 Replace steel removed in 7.2.1 with ABS Grade A or B Steel having a plate thickness equal to the original plate thickness as well as longitudinal/transverse structure as determined by MSC and ABS.
Please provide Reference DWG for No.6 CHT Tank NR6 4-142-4-W, inboard vertical plate in the trough.
Thickness, penetrations, Longs, and Transverse structure is required for estimating purposes.
ANSWER: Attached 2017 CHT Room 6 UT readings and drawing 4792142.
REQUEST FOR SPECIFICATION CLARIFICATION # 037
SPECIFICATION ITEM NO.: 0108
PARAGRAPH / SECTION NO1.1, 2.1, 3.1, 3.2.1, 3.3, 3.3.1, 3.3.2, 7.1,
TITLE: Removal of Cement and Deck Repair
QUESTION:
1.1 This item describes the requirement to remove cement and deck repair in 02N2 Frame 134-147
2.1 NAVSEA Dwg 111-4793135, 3rd Level Plating, Pillars and Girders
Title: Concrete & ALUM DK COVERING IN O2 N2 PRODUCER & TANK Rm 3Rd Dk FR 134 – 142 1/2
3.1 Location:
3.1.1 02N2 (3-139-0-Q and 3-136-1-Q)
3.2.1 Majority of the deck was covered by 2 inches of cement. 02N2 was removed but the majority of the cement remains.
How much Cement is to be removed?
DWG mentions 10 Cubic Yd.
3.3 Material:
3.3.1 (500 lbs.) ABS Grade A or B Steel Plate 10.2 lb. /sf (Deck Plating)
= 1/4" x 49Sq'.
Is Deck Steel or ALUM?
3.3.2 (500 lbs.) ABS Grade A or B Tee 5” x 4” x 5.75 lb. /ft. (Tee)
Does not match DWG
7.1.1 Remove all interference items necessary to accomplish the requirements of this Work Item. Mark, protect and properly store all interference items removed. Reinstall interference items and prove them operational when the requirements of this Work Item are complete.
3.2.1 States O2 N2 was removed. What other interferences will there be?
7.2.1 Contractor to remove cement identified in 3.2.1 in the location listed in 3.1.1.
There are a few different locations listed in this WI.
7.2.2 Upon completion of the removal of cement, accomplish mechanical cleaning of the deck and shell plating in 7.2.1, accomplish a structural inspection of the deck and hull plating with the MSCREP and ABS Surveyor to identify the extent of the structural repairs required using References 2.1 for guidance.
7.2.3.1 Accomplish a UT inspection of the deteriorated areas of the bulkhead, deck and shell plating as directed by the MSCREP and ABS Surveyor. For estimating purposes assume taking 100 Readings for this inspection
7.2.3 Submit a typed written report to the MSCREP listing the results of the inspection in 7.2.3. The report shall provide sketches that identify required repairs and includes a list of the required material.
7.2.4 Remove the deteriorated steel identified during the inspection in 7.2.3 using References 2.1 for guidance.
7.2.3 Must be accomplished prior to the accomplishment of 7.2.4
7.2.6 Fabricate replacement sections of wasted deck from ABS Grade A or B material to replace the sections removed in 7.2.5 to match existing material using References 2.1 for guidance.
7.2.3 Must be accomplished prior to the accomplishment of 7.2.6
7.2.7 Install the new sections of steel plate fabricated in 7.2.7 using References 2.1 for guidance.
7.2.3 Must be accomplished prior to the accomplishment of 7.2.7
7.2.8 Install and connect the equipment removed and retained in 7.2.1 using new hardware and gaskets in accordance with Reference 2.1.
7.2.1 Contractor to remove cement identified in 3.2.1 in the location listed in 3.1.1.
Contractor requests clarification of this WI as it is confusing in its current scope.
ANSWER: Work is complete. WI 0108 is cancel entirely.
REQUEST FOR SPECIFICATION CLARIFICATION # 038
SPECIFICATION ITEM NO.: 0109
PARAGRAPH / SECTION NO: 1.1,
TITLE: No.4 Mooring Station Gussets and Panama Chock
QUESTION:
1.1 This item describes the requirement to accomplish repairs to the No 3 and No 4 Mooring Station and Side Port Doors
2.0 REFERENCES:
2.1 845-4793438, General Plan
2.2 600-4793031, Mooring Rings and Recessed Mooring Bits 2.3 106-4791900 , 3RD Deck Plating, Pillars, and Girders Frame 47-86
2.4 100-4791858, Shell Plating Frame 38-86
2.5 Steel Structures Painting Council, Systems and Specifications, Volume 2.
3.1 Location:
3.1.1 No. 4 Mooring Station (2-74-8-Q)
3.2.1 Gussets under door in BHD 77 holed out, 12”X3” Gussets, Quantity: 2
3.2.2 Lower half of forward and aft of Panama Chocks are heavily wasted, forward: 41”X12”
Aft: 38”X12”
Provided References are not marked for repair areas and are not helpful.
1.1 Abstract location and 3.1.1differ in description/location.
7.2.1 Remove the deteriorated steel listed in 3.2.1 and 3.2.2 using References 2.1 through 2.4 for guidance.
Marked up DWG would be helpful along with photos
7.2.4 Install the new sections of gussets and Panama chock lower half forward and aft fabricated in 7.2.3 using References 2.1 through 2.4 for guidance.
Please identify on References 2.1 through 2.4
4793438_G shows nothing.
ANSWER: 1. Latest International Inspection LLC UT readings and recommended repair plan attached.
REQUEST FOR SPECIFICATION CLARIFICATION # 039
SPECIFICATION ITEM NO.: 0110
PARAGRAPH / SECTION NO: 1.1, 2.1.2, 3.1, 3.2, 7.2.1.1, 7.2.2.2,
TITLE: Fire Room Control Console Deck Repair
QUESTION:
1.1 This item describes the renewal of Fireroom Console Steel Plates and Beam Stiffeners.
Request clarification of locations & material.
2.1.2 NAVSEA DWG 603-4793073, Floor Plates and Gratings
Request clarification of locations & material.
3.1 Fireroom Console Deck (7-123-0-E)
3.2 Quantity: Approximately 1000 Linear Feet of steel plate.
Lineal feet might be the wrong designation, please clarify.
7.2.2.1 Crop out deteriorated steel as marked. Steel plate and shapes are to be cropped back to sound material in accordance with 2.1.1 thru 2.1.3. For bidding purposes, approximately 1000 linear feet of steel plate to dealt with.
DWGs Referenced are not marked.
Please provide References with identified work.
Lineal feet might be the wrong designation, please clarify.
7.2.2.2 Welding Procedures and installation details shall be in accordance with 2.1.1 thru 2.1.3 and are to be pre-approved by MSC and ABS.
May not apply if these are Floor Plates & Gratings as mentioned in References.
ANSWER: 1. Latest International Inspection LLC UT readings and recommended repair plan attached.
REQUEST FOR SPECIFICATION CLARIFICATION # 040
SPECIFICATION ITEM NO.:0111
PARAGRAPH / SECTION NO: 1.1, 2.1, 3.2.1, 7.1.1, 7.1.4, 7.2.1, 7.2.2, 7.2.3.1, 7.2.4, 7.2.7, 7.2.8
TITLE: Deck Repair (01-114-2-L)
QUESTION:
1.1 This item describes the requirement to repair the deck in 01-114-2-L
2.1 NAVSEA Dwg 111-4791970, 01 Level Deck Level Plating, Pillars and Girders
DWG does not detail the requirements
3.2.1 Holed deck in the 01-114-2-L Berthing leading to the Lagging Shop (1-114-2-Q) The hole is approximately 43”X2” with much of the material around are degraded.
Is there Deck Covering in this Berthing area?
7.1.1 Remove all interference items necessary to accomplish the requirements of this Work Item. Mark, protect and properly store all interference items.
Will Bunk removals be required for this Deck Repair?
7.1.4 Remove insulation / lagging required to accomplish the requirements of this Work Item. Upon completion of the repairs and when directed by the MSCREP install new insulation / lagging replace that removed to accomplish the requirements of this Work Item.
Will Lagging removals be required for this Under Deck Repair?
7.2.1 Disconnect and temporarily remove all equipment as required from 01-114-2-L Berthing to allow access to deteriorated areas using Reference 2.1 for guidance.
Please define remove "all equipment" as required.
7.2.2 Upon completion of the mechanical cleaning of the deck and shell plating in 7.2.1, accomplish a structural inspection of the deck and hull plating with the MSCREP and ABS Surveyor to identify the extent of the structural repairs required using References 2.1 for guidance.
Please identify the shell plating & hull plating referenced in 7.2.1
Neither is shown in 2.1.
7.2.3.1 Accomplish a UT inspection of the deteriorated areas of the bulkhead, deck and shell plating as directed by the MSCREP and ABS Surveyor. For estimating purposes assume taking 50 Readings for this inspection
Please identify where 50 Readings will be required on bulkhead & shell plating.
7.2.3 Submit a typed written report to the MSCREP listing the results of the inspection in 7.2.3. The report shall provide sketches that identify required repairs and includes a list of the required material.
7.2.4 Remove the deteriorated steel listed in 3.2.1 as identified during the inspection in 7.2.3 using References 2.1 for guidance.
7.2.4 Cannot be identified until 7.2.3 has been accomplished.
7.2.7 Install the new sections of steel plate fabricated in 7.2.7 using References 2.1 for guidance.
7.2.8 Install and connect the equipment removed and retained in 7.2.1 using new hardware and gaskets in accordance with Reference 2.1.
Reference 2.1 does not depict the repairs in this WI.
Please clarify the actual scope of work in this WI.
Can the DWG be marked up and photos provided?
ANSWER: Work complete at Rubber and Plastic Shop deck. WI 0111 cancel.
REQUEST FOR SPECIFICATION CLARIFICATION # 041
SPECIFICATION ITEM NO.0112
PARAGRAPH / SECTION NO: 1.1, 2.1.3, 3.1, 3.2, 7.1.1, 7.1.4, 7.2.1, 7.2.2
TITLE: DECON Station 1-145-2-L Deck Repair
QUESTION:
1.1 This item describes the renewal of DECON Station 1-145-2-L Deck.
2.1.3 114-4791914 (STRUCTURAL DETAILS & GENERAL NOTES)
A 60 Page document
DWG does not detail the requirements
3.1 All work is performed on the DECON Station 1-145-2-L FR 146 IWO the shower pans. The inboard longitudinal bulkhead coaming was excessively corroded FR 146 and the aft bulkhead was holed.
3.2 Quantity: Approximately 100 square feet of steel plate.
Does IWO the shower pans mean the repair is below the shower pans?
Is there a DWG that shows 100 square feet of these pans? St Frame 146?
Are you describing 100 square feet of BHD coaming? What thickness?
What would be the opposing spaces? Would there be Decking involved?
Can you provide a DWG of the actual work along with some pictures?
7.1.1 Remove all interference items necessary to accomplish the requirements of this Work Item. Mark, protect and properly store all interference items removed. Reinstall interference items and prove them operational when the requirements of this Work Item are complete.
Please identify these interferences and provide photos if possible.
7.1.4 Remove insulation / lagging required to accomplish the requirements of this Work Item. Upon completion of the repairs and when directed by the MSCREP install new insulation / lagging replace that removed to accomplish the requirements of this Work Item.
Will insulation/lagging be required for R&R?
7.2.1 Removals
a. Perform a joint survey with the MSCREP and ABS to mark up the deck area to be renewed prior to production, using the location listed in 3.1. Plans for steel removal (sketches or other supporting documents) shall be approved by the MSCREP and ABS prior to production.
b. Crop out deteriorated steel as marked. Steel plate and shapes are to be cropped back to sound material.
7.2.2 Installations
a. Replace steel removed in 7.2.1 with ABS Grade A or B Steel having a plate thickness equal to the original plate thickness as well as longitudinal/transverse structure as determined by MSC and ABS.
b. Installation is to comply with reference 2.1.1 through 2.1.3. The Contractor is responsible for verifying dimensions and arrangements prior to work. Note that the work will require some areas in adjacent spaces to be prepared and/or repaired after the work. Extend 6 inches into Spaces where plating has been removed next to the adjoining bulkhead.
7.2.1 Cannot be identified until 7.2.2 has been accomplished.
Please clarify the scope of work in this WI.
ANSWER:
- Revised WI 0112 attached to reflect 10 SQFT. Bulkhead is 0.25” plate.
· Interferences to be remove are shower stall and PRC.
REQUEST FOR SPECIFICATION CLARIFICATION # 042
SPECIFICATION ITEM NO.:0113
PARAGRAPH / SECTION NO: 1.1, 2.1.2, 3.1, 3.2, 7.1.1, 7.2.1, 7.2.2.1.
TITLE: NR1 LPAC Foundation Plate Repair
QUESTION:
1.1 This item describes the renewal of NR1 LPAC foundation plate
2.1.2 NAVSEA DWG 603-4793073, Floor Plates and Gratings
3.1 NR1 LPAC Foundation, Fireroom (7-123-0-E)
Please locate this Foundation using Piece Numbers or Details on the provided DWG.
3.2 Quantity: Approximately 400 Linear Feet of steel plate.
What size is 400 Lineal Feet of steel plate?
This WI mentions Foundation Work.
7.1.1 Remove all interference items necessary to accomplish the requirements of this Work Item. Mark, protect and properly store all interference items removed. Reinstall interference items and prove them operational when the requirements of this Work Item are complete.
Does the GOV't consider the NR1 LPAC an interference?
7.2.1 Removals
7.2.1.1Crop out deteriorated steel as marked. Steel plate and shapes are to be cropped back to sound material. For bidding purposes, approximately 400 linear feet of steel plate to dealt with.
2.1.2 NAVSEA DWG 603-4793073, Floor Plates and Gratings is not marked up for this repair.
7.2.2.1 Replace steel removed in 7.2.1 with ABS Grade A or B Steel having a plate thickness equal to the original plate thickness as well as longitudinal/transverse structure as determined by MSC and ABS and 2.1.2.
Please clarify the scope of work for WI 0113.
ANSWER: Work complete. WI 0113 cancel.
REQUEST FOR SPECIFICATION CLARIFICATION # 043
SPECIFICATION ITEM NO.: 0114
PARAGRAPH / SECTION NO: 1.1, 2.1, 3.1, 3.2, 7.1.1, 7.1.4, 7.2.1, 7.2.2.
TITLE: Store Room 3-110-0-A Steel Repairs
QUESTION:
1.1 This item describes the renewal of Store Room 3-110-0-A steel repairs.
2.1
REFERENCES
None that apply.
3.1 All work is performed on the Store Room 3-110-0-A, FR 114 at the No. 4 UDL SOC was in excessive corrosion in way of the fire main piping riser and stairway trunk.
3.2 Quantity: Approximately 500 square feet of steel plate.
Please identify this 500 Sq.' of steel plate. On a DWG that shows it marked up.
7.1.1 Remove all interference items necessary to accomplish the requirements of this Work Item. Mark, protect and properly store all interference items removed. Reinstall interference items and prove them operational when the requirements of this Work Item are complete.
Please identify the interferences mentioned in 7.1.1 and provide photos if possible.
7.1.4 Remove insulation / lagging required to accomplish the requirements of this Work Item. Upon completion of the repairs and when directed by the MSCREP install new insulation / lagging replace that removed to accomplish the requirements of this Work Item.
Please identify insulation & lagging requiring R&R for this WI. Photos would be appreciated.
7.2.1 Removals
c. Perform a joint survey with the MSCREP and ABS to mark up the deck area to be renewed prior to production, using the location listed in 3.1. Plans for steel removal (sketches or other supporting documents) shall be approved by the MSCREP and ABS prior to production.
d. Crop out deteriorated steel as marked. Steel plate and shapes are to be cropped back to sound material in accordance with 2.1.1 thru 2.1.4.
7.2.2 Installations
c. Replace steel removed in 7.2.1 with ABS Grade A or B Steel having a plate thickness equal to the original plate thickness as well as longitudinal/transverse structure as determined by MSC and ABS.
d. Installation is to comply with reference 2.1.1 thru 2.1.4. The Contractor is responsible for verifying dimensions and arrangements prior to work. Note that the work will require some areas in adjacent spaces to be prepared and/or repaired after the work. Extend 6 inches into Spaces where plating has been removed next to the adjoining bulkhead.
Scope of work for this WI cannot be identified until 7.2.1 has been accomplished.
Please clarify the scope of work for WI 0114.
ANSWER: 1. 2017 International Inspection LLC UT readings attached.
REQUEST FOR SPECIFICATION CLARIFICATION # 044
SPECIFICATION ITEM NO.: 0115
PARAGRAPH / SECTION NO: 1.1, 2.1, 3.1.1, 7.0, 7.1.1, 7.1.3, 7.2, 7.2.1, 7.2.1.1, 7.2.2, 7.2.3, 7.2.4, 7.2.5, & 7.2.6.
TITLE: Main Deck Frame 65-85 Overhead Repair
QUESTION:
1.1 This item describes the requirement to remove and replace approximately 640 square foot of severely corroded false overhead steel located in Main Deck Frame 65-85 Port and Starboard.
2.1 NAVSEA Dwg AS39-111-4791979, Main Deck House Boundary Frame 65-111
3.1.1 Main Deck Frame 65-85
3.3.1 (6,500 lbs.) ABS Grade A or B Steel Plate 10.2 lb. /sf (Bulkhead Plating)
Abstract identifies corroded false overhead steel 7.0
STATEMENT OF WORK REQUIRED:
7.1.1 Remove all interference items necessary to accomplish the requirements of this Work Item. Mark, protect and properly store all interference items removed. Reinstall interference items and prove them operational when the requirements of this Work Item are complete.
Please advise of visual interferences including Lights, vents, sprinklers, overhead storage, etc. Photos would be appreciated.
7.1.3 Remove insulation / lagging required to accomplish the requirements of this Work Item. Upon completion of the repairs and when directed by the MSCREP install new insulation / lagging replace that removed to accomplish the requirements of this Work Item.
Please advise if there is insulation behind false overhead.
7.2.
Structural:
7.2.1 Upon completion of the mechanical cleaning of the overhead plating in 3.3.1, accomplish a structural inspection of the bulkhead plating with the MSCREP and ABS Surveyor to identify the extent of the structural repairs required using References 2.1 for guidance.
There is no requirement for mechanical cleaning of overhead. Only replacement.
7.2.1.1 Accomplish a UT inspection of the deteriorated areas of the overhead and shell plating as directed by the MSCREP and ABS Surveyor. For estimating purposes assume taking 50 Readings for this inspection
There is no shell plating mentioned in this Work Scope.
7.2.2 Submit a typed written report to the MSCREP listing the results of the inspection in 7.2.1. The report shall provide sketches that identify required repairs and includes a list of the required material.
7.2.3 Remove the deteriorated steel listed in 3.3.1 as identified during the inspection in 7.2.1 using Reference 2.2 for guidance.
7.2.4 Chip and grind all surfaces flush and smooth in way of removals.
7.2.5 Fabricate replacement sections of plate from ABS Grade A or B material to replace the sections removed in 7.2.3 to match existing material using Reference 2.1 for guidance.
7.2.6 Install the new sections of steel plate fabricated in 7.2.5 using Reference 2.1 for guidance.
Please note that 7.2.6 has no scope until paragraphs 7.2.1.1, 7.2.2, 7.2.3, & 7.2.5 have been accomplished and MSC has decided on the scope of work.
Please clarify this WI.
ANSWER: WI 0115 cancel. Cover by WI 0101.
REQUEST FOR SPECIFICATION CLARIFICATION # 045
SPECIFICATION ITEM NO.: 0116
PARAGRAPH / SECTION NO: _1.1, 2.1, 3.1.1, 3.2, 3.3, 3.3.1, 7.0,
TITLE: Optical Shop Joiner BHD Repair
QUESTION:
1.1 This item describes the requirement to remove and replace approximately 120 square foot of severely corroded bulkhead steel located in 01-127-1-Q.
2.1 NAVSEA Dwg AS39-604-4793113 Joiner Bulkhead Details
Please provide DWG that includes actual location with photos if possible.
3.1.1 USN Optical Shop (01-127-1-Q)
3.2 Item Description:
120 Square Feet of joiner bulkhead has become detached due to corrosion
3.3 Material:
3.3.1 (1,000 lbs.) ABS Grade A or B Steel Plate 10.2 lb. /sf (Bulkhead Plating)
Please note: Item description states 120 Sq.' of joiner BHD and not steel plate.
7.0
STATEMENT OF WORK REQUIRED:
7.1 Arrangement/Outfitting:
7.1.1 Remove all interference items necessary to accomplish the requirements of this Work Item. Mark, protect and properly store all interference items removed. Reinstall interference items and prove them operational when the requirements of this Work Item are complete.
3.1.1 Does not show location of the 120 Sq.' of joiner BHD within Optical Shop. Please identify any possible interferences, doors, electrical, equipment, piping, valves, or anything in-way of the replacement of the 120 Sq.' of joiner BHD.
7.1.3 Remove insulation / lagging required to accomplish the requirements of this Work Item. Upon completion of the repairs and when directed by the MSCREP install new insulation / lagging replace that removed to accomplish the requirements…