Request for Spec Clarifications 8-13.docx
DOCX document 29 KB Posted
- Attached to
- USNS GRASP FY22 ROH/DD Federal contract opportunity
- Solicitation number
- N3220521R4216
About this file
This document contains clarification questions and answers related to a request for specification for repair and overhaul work on the USNS GRASP (T-ARS 51). The specification clarification requests and answers provide additional details on the scope of work items including exterior bulkhead preservation from levels 01-04, tow wire socket renewal which can be accomplished onboard, availability of ship's services power during the work, and serial numbers for an air dehydrator being serviced. The work is being conducted by the Military Sealift Command and pertains to the USNS GRASP FY22 ROH/DD opportunity. Clarification was sought on various sections of the specification to understand technical requirements, availability timelines and any potential impacts of ship operations on contractor work.
View the file
Other files for this federal contract opportunity
Show all 24
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
N3220521R4216
USNS GRASP (T-ARS 51)
REQUEST FOR SPECIFICATION CLARIFICATION #8
SPECIFICATION ITEM NO.: _103
PARAGRAPH / SECTION NO: 1.1 ENCLOSURES None
TITLE: 01-04 Level Exterior Bulkhead Preservation
QUESTION:
Please clarify the scope of work for this item and identify the surfaces that need to be recoated. Para 1.1 specifics Levels 01-04, but Para 3.1 specifies Levels 01-03.
ANSWER:
Section 3.1 is incorrect and work shall include bulkhead preservation from 01-04 LVLs. Work Item 0103 has been revised accordingly.
REQUEST FOR SPECIFICATION CLARIFICATION #9
SPECIFICATION ITEM NO.: 507________________
PARAGRAPH / SECTION NO: 3.1.1.a, 7.2.1, 7.2.2________________
TITLE: _ Tow Wire Socket Renew_______________
1. Naval Base San Diego, POP: 29 Feb–08 March 2020, is this correct?
1. After discussing the requirements of paragraph 7.2.1 & 7.2.2 with multiple wire distributors we have been informed that this cannot be performed the field.
0. The location and POP given in work item is incorrect and has been removed in attached revision of Work Item 0507.
0. Work in sections 7.2.1 & 7.2.2 can be accomplished onboard and has been accomplished in March 2020 at San Diego on the Port Tow Wire. MSC is open to alternative way to accomplish work if proposed.
REQUEST FOR SPECIFICATION CLARIFICATION #10
SPECIFICATION ITEM NO.: _102
PARAGRAPH / SECTION NO: 7.2.1 ENCLOSURES None
TITLE: Shore Power Riser Preservation
Will Ship’s Force be living onboard the vessel during the availability?
Ship’s force will not be living onboard for the majority of the availability.
REQUEST FOR SPECIFICATION CLARIFICATION #11
SPECIFICATION ITEM NO.: _102
PARAGRAPH / SECTION NO: 7.2.1 ENCLOSURES None
TITLE: Shore Power Riser Preservation
Will the reefers and ship’s services be in use during the availability and will this affect working periods for the Shore Power Riser Preservation?
Ship’s Service Power is expected to be operational for the majority of the availability to support auxiliary electrical and electronic systems required for ship’s force to accomplish work and monitoring. Ship’s reefers will not be operation while the ship is moved ashore and to support work on Work Item 0580. MSC advises contractors to schedule work being accomplished in Work Item 0102 to minimize impact of contractor and ship’s force work during the availability. MSC will not direct contractor to schedule work on alternative shifts but highly recommends a well-coordinated schedule for all parties to limit impacts. Additionally, MSC OMT will work with contactor with mitigating impacts to accomplish work.
REQUEST FOR SPECIFICATION CLARIFICATION #12
SPECIFICATION ITEM NO.: 501_________________
PARAGRAPH / SECTION NO: 2.2.1________________
TITLE: _ Miscellaneous Piping Repairs_______________
The designated repairs are for the Shaft Sealing Water Piping however, the photos in enclosure 2.2.1 are for entirely different systems.
Enclosure 2.2.1 is not included on Work Item 0501 Rev 2. Section 7.3.1 refers to Reference 2.1.2 for guidance.
REQUEST FOR SPECIFICATION CLARIFICATION #13
SPECIFICATION ITEM NO.: 505________________
PARAGRAPH / SECTION NO: 7.2.1________________
TITLE: _ HP AIR DEHYDRATOR SERVICE-4YR _______________
The OEM is requesting the serial number of the air dryer and what type of air system (i.e. start air, SS air, Medical, etc.) it services.
S/N on the whole skid: HP148.345.0911455 S/N on the stainless tank assembly: 1680911934
HP air feeds emergency shaft seals, start air and other auxiliary air system.
ATTACHMENT J - 8