This document provides answers to questions from potential offerors regarding solicitation N32205-21-R-4135 for Vertical Replenishment Detachment Pacific Detachment B. The solicitation requires offerors to provide a two-helicopter detachment of like aircraft, an optional unmanned aerial capability, all necessary support equipment and supplies, and a minimum staffing of five pilots and three maintainers. The detachment will deploy aboard Military Sealift Command ships conducting theater operations worldwide for 365 days per year. Mission requirements will adhere to all applicable Department of Defense, Department of the Navy, Federal Aviation Administration, Military Sealift Command, and theater policies and guidance. The answers clarify that final unmanned aerial vehicle specifications will be provided if that option is exercised; lifting equipment requirements allow for simultaneous handling of two lifting pendants; and contractor pilots do not need approval to build flight hours but do to use contract training hours in spare aircraft while deployed.

View the file

Other files

File Type Posted
08_QUESTIONS AND ANSWERS -N32205-21-R-4135.pdf PDF
07_QUESTIONS AND ANSWERS -N32205-21-R-4135_v2.pdf PDF
10_DD FORM 254_2018_ver for N32205-21-C-2298.pdf PDF
06_QUESTIONS AND ANSWERS -N32205-21-R-4135.pdf PDF
06_QUESTIONS AND ANSWERS -N32205-21-R-4135.pdf PDF
AMENDMENT 0001 N32205-21-R-4135.pdf PDF
05_QUESTIONS AND ANSWERS -N32205-21-R-4135.pdf PDF
19_PAC_Det_B_Pricing Spreadsheet_v2.xlsx XLSX spreadsheet
04_QUESTIONS AND ANSWERS -N32205-21-R-4135.pdf PDF
03_QUESTIONS AND ANSWERS -N32205-21-R-4135.pdf PDF
02_QUESTIONS AND ANSWERS -N32205-21-R-4135.pdf PDF
7_PERFORMANCE QUESTIONNAIRE (V1.1, 7-23-13).pdf PDF
7_PAST PERFORMANCE QUESTIONNAIRE_Redacted.pdf PDF
17_DD Form 1423 - CDRL_Third Party Insp.pdf PDF
12_DD Form 1423 - CDRL_Monthly.pdf PDF
9_PAST PERFORMANCE DATA SHEET.pdf PDF
1_QUALITY ASSURANCE SURVEILLANCE PLAN.pdf PDF
6_Detachment Performance Plan_Det B.pdf PDF
8_GFP_Attachment_PAC Det B.xlsx XLSX spreadsheet
5_Reporting Templates.xlsx XLSX spreadsheet
19_Pricing Spreadsheet.xlsx XLSX spreadsheet
14_DD Form 1423 - CDRL_Qualifications.pdf PDF
N32205-21-R-4135_SOLICITATION_DET_B_Redacted.pdf PDF
18_Reporting Templates.pdf PDF
4_Primary-Logistics_Ports.pdf PDF
13_DD Form 1423 - CDRL_Personnel.pdf PDF
11_DD Form 1423 - CDRL_Daily.pdf PDF
16_DD Form 1423 - CDRL_SOP.pdf PDF
3_T-AKE Hangar specifications.pdf PDF
15_DD Form 1423 - CDRL_Semi.pdf PDF
2_QASP MATRIX PAC Det B Enclosure (2).pdf PDF
10_DD FORM 254 for N32205-21-C-2298.pdf PDF
Show all 32

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MILITARY SEALIFT COMMAND

N32205-21-R-4135 (SOLICITATION)

QUESTIONS AND ANSWERS 01

The following are answers to questions received from potential offerors. The answers provide clarification only and DO NOT constitute an amendment to the solicitation.

No. Reference (Page/

Paragraph)

Question Answer

1 Draft PWS, 3.2.7 and 5.1

Will the Government please provide technical specifications for the UAV capability, such as maximum size, range, payload capacity, etc. with the final RFP release?

The final specifications of the UAV will be provided if the Government executes the option.

2 Draft PWS, 5.6.1(a)(f) and 7.7.8

PWS para. 5.6.1(a)(f) states that detachment aircraft shall be “capable of handling two Mk-105 pendants, and the lifting sling prescribed in para. 7.7.8 (not simultaneously).” PWS para 7.7.8 then states that “the system(s) shall be capable of simultaneously handling two

(2) Mk-105 pendants.”

Will the Government please clarify this requirement? If two Mk-105 pendants are to be handled simultaneously as stated in para. 7.7.8, will the Government please provide reference to the Navy publication that allows for more than one pendant on the hook at any time?

The “not simultaneously” clause in 5.6.1(f) means to exclude the ‘two Mk-105 pendants’ from ‘the lifting sling’, not the two Mk-105 pendants.

The use of two Mk-105 pendants simultaneously is a practice used by cargo handlers to expedite movement of light loads and retro load lifts.

3 Draft PWS, 7.7.8.g

“Minimum two 10ft single point extension pole for each airframe…” Is there an NSN or part number for reference that the Government can provide?

Sling pole compatibility is dependent on airframe. The Government requires airframe specific sling poles to be compatible with the capacity and geometry of the referenced lifting sling set.

4 Draft PWS, 7.7.8.f PWS para. 7.7.8.f states “The Contractor shall furnish the lifting equipment shown below, which shall be certified every two years or as determined by manufacturers required testing intervals. Contractor is required to

Each detachment will need to be assigned two unique sets of lifting gear. The Government will grant 30-days, with prior permission, for one set to be unavailable for routine scheduled maintenance.

provide a minimum of two (2) sets of its own lifting equipment.”

Are two sets of lifting equipment required on-hand with the Detachment at all times or will the Government allow for one set to be on-hand while the other set is inspected and certified?

5 Draft PWS, 13.9.3 Will the Government please clarify its intent in requiring COR approval for a Contractor to provide its designated contract pilots access to its own spare aircraft to accumulate proficiency flight hours?

Contractor pilots are do not require COR approval to accumulate flight hours in their spare aircraft. The contractor does need COR approval if they want to utilize the contract training hours allotted to their detachment to maintain mission critical qualifications while deployed in their spare aircraft.