2_QASP MATRIX PAC Det B Enclosure (2).pdf

PDF 315 KB Posted

Attached to
Vertical Replenishment (VERTREP) Detachment Pacific Detachment B Federal contract opportunity
Solicitation number
N32205-21-R-4135
Issued by
Department of the Navy Military Sealift Command

About this file

This document contains a Quality Assurance Surveillance Plan (QASP) matrix and details for a solicitation seeking Vertical Replenishment Detachment Pacific Detachment B services. Key requirements include the contractor providing a two-helicopter detachment of like aircraft with a minimum of five pilots and three maintainers to deploy aboard Military Sealift Command ships conducting operations worldwide 365 days per year. The contractor must meet mission completion and availability rates of at least 90% on a monthly basis, with one aircraft package able to perform specified mission sets 95% of the time. Personnel manning levels ashore and when deployed must be at least 95% of required positions. The contractor shall provide all required deliverables on schedule and receive a satisfactory or higher score on an annual third-party inspection to ensure acceptable quality standards are met.

View the file

Other files for this federal contract opportunity

Other files attached to Vertical Replenishment (VERTREP) Detachment Pacific Detachment B, newest first.
File Type Posted
08_QUESTIONS AND ANSWERS -N32205-21-R-4135.pdf PDF
07_QUESTIONS AND ANSWERS -N32205-21-R-4135_v2.pdf PDF
10_DD FORM 254_2018_ver for N32205-21-C-2298.pdf PDF
06_QUESTIONS AND ANSWERS -N32205-21-R-4135.pdf PDF
06_QUESTIONS AND ANSWERS -N32205-21-R-4135.pdf PDF
AMENDMENT 0001 N32205-21-R-4135.pdf PDF
05_QUESTIONS AND ANSWERS -N32205-21-R-4135.pdf PDF
19_PAC_Det_B_Pricing Spreadsheet_v2.xlsx XLSX spreadsheet
04_QUESTIONS AND ANSWERS -N32205-21-R-4135.pdf PDF
03_QUESTIONS AND ANSWERS -N32205-21-R-4135.pdf PDF
02_QUESTIONS AND ANSWERS -N32205-21-R-4135.pdf PDF
7_PERFORMANCE QUESTIONNAIRE (V1.1, 7-23-13).pdf PDF
01_QUESTIONS AND ANSWERS -N32205-21-R-4135_01.pdf PDF
1_QUALITY ASSURANCE SURVEILLANCE PLAN.pdf PDF
6_Detachment Performance Plan_Det B.pdf PDF
7_PAST PERFORMANCE QUESTIONNAIRE_Redacted.pdf PDF
14_DD Form 1423 - CDRL_Qualifications.pdf PDF
18_Reporting Templates.pdf PDF
19_Pricing Spreadsheet.xlsx XLSX spreadsheet
17_DD Form 1423 - CDRL_Third Party Insp.pdf PDF
3_T-AKE Hangar specifications.pdf PDF
10_DD FORM 254 for N32205-21-C-2298.pdf PDF
11_DD Form 1423 - CDRL_Daily.pdf PDF
13_DD Form 1423 - CDRL_Personnel.pdf PDF
15_DD Form 1423 - CDRL_Semi.pdf PDF
16_DD Form 1423 - CDRL_SOP.pdf PDF
N32205-21-R-4135_SOLICITATION_DET_B_Redacted.pdf PDF
4_Primary-Logistics_Ports.pdf PDF
5_Reporting Templates.xlsx XLSX spreadsheet
8_GFP_Attachment_PAC Det B.xlsx XLSX spreadsheet
9_PAST PERFORMANCE DATA SHEET.pdf PDF
12_DD Form 1423 - CDRL_Monthly.pdf PDF
Show all 32

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Date: Enclosure (1)

QASP MATRIX

Contract: N32205-21-C-2298

Deliverable or

Service

Requirement

Measurement/Metric Performance

Standard

Acceptable

Quality

Level (AQL)

Method of

Surveillance

Rating

Notes

Para 5.6 Mission

Availability and

Accomplishment

Mission Completion

(MC) rate and

Availability

Mission Completion rate of the detachment and all missions met with response time prescribed in para 5.6.

90% Monthly Report and feedback report

Para 5.6.2 Special

Mission

Availability

Aircraft Mission

Package

At least one aircraft must be able to perform mission sets outlined in para 5.6.2.a through 5.6.2.i at all times.

95% Daily and monthly contractor reports.

Para 5.1 and

Section 11

Minimum

Personnel Required

Personnel manning ashore and deployed

Contractor has in place qualified personnel in positions outlined in para 11.1 through 11.7.

95% Daily and monthly contractor reports, site visits.

Section 19

Deliverables

Contractor Deliverables received

The contractor shall provide all complete and accurate deliverables to the government on prescribed schedule outlined in para 19.1 through 19.8.

90% All deliverables

Section 14 Annual Inspection The contractor shall complete an annual third party inspection and receive a composite SATISFACTORY score in all areas outlines in Para 14.2.

EXCEPTIONAL – 100%

SATISFACTORY – 85%

UNSATISFACTORY – 50%

80% Annual 3rd party

Inspection, monthly report, and site visit.

FAR 52.222-50

Annual Inspection Compliance with Combating Trafficking in Persons

100% Annual validation in conjunction with

COR Site visit

None prescribed Detachment and/or

Contractor action

Special performance or degradation. N/A Daily, monthly, quarterly, yearly reports and feedback reports

File details come from the government source that posted it. Updated .