2_QASP MATRIX PAC Det B Enclosure (2).pdf
PDF 315 KB Posted
- Attached to
- Vertical Replenishment (VERTREP) Detachment Pacific Detachment B Federal contract opportunity
- Solicitation number
- N32205-21-R-4135
About this file
This document contains a Quality Assurance Surveillance Plan (QASP) matrix and details for a solicitation seeking Vertical Replenishment Detachment Pacific Detachment B services. Key requirements include the contractor providing a two-helicopter detachment of like aircraft with a minimum of five pilots and three maintainers to deploy aboard Military Sealift Command ships conducting operations worldwide 365 days per year. The contractor must meet mission completion and availability rates of at least 90% on a monthly basis, with one aircraft package able to perform specified mission sets 95% of the time. Personnel manning levels ashore and when deployed must be at least 95% of required positions. The contractor shall provide all required deliverables on schedule and receive a satisfactory or higher score on an annual third-party inspection to ensure acceptable quality standards are met.
View the file
Other files for this federal contract opportunity
Show all 32
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Date: Enclosure (1)
QASP MATRIX
Contract: N32205-21-C-2298
Deliverable or
Service
Requirement
Measurement/Metric Performance
Standard
Acceptable
Quality
Level (AQL)
Method of
Surveillance
Rating
Notes
Para 5.6 Mission
Availability and
Accomplishment
Mission Completion
(MC) rate and
Availability
Mission Completion rate of the detachment and all missions met with response time prescribed in para 5.6.
90% Monthly Report and feedback report
Para 5.6.2 Special
Mission
Availability
Aircraft Mission
Package
At least one aircraft must be able to perform mission sets outlined in para 5.6.2.a through 5.6.2.i at all times.
95% Daily and monthly contractor reports.
Para 5.1 and
Section 11
Minimum
Personnel Required
Personnel manning ashore and deployed
Contractor has in place qualified personnel in positions outlined in para 11.1 through 11.7.
95% Daily and monthly contractor reports, site visits.
Section 19
Deliverables
Contractor Deliverables received
The contractor shall provide all complete and accurate deliverables to the government on prescribed schedule outlined in para 19.1 through 19.8.
90% All deliverables
Section 14 Annual Inspection The contractor shall complete an annual third party inspection and receive a composite SATISFACTORY score in all areas outlines in Para 14.2.
EXCEPTIONAL – 100%
SATISFACTORY – 85%
UNSATISFACTORY – 50%
80% Annual 3rd party
Inspection, monthly report, and site visit.
FAR 52.222-50
Annual Inspection Compliance with Combating Trafficking in Persons
100% Annual validation in conjunction with
COR Site visit
None prescribed Detachment and/or
Contractor action
Special performance or degradation. N/A Daily, monthly, quarterly, yearly reports and feedback reports
File details come from the government source that posted it. Updated .