CDRL WWL B080 3.5.3 System Drawing Review.pdf
PDF 667 KB Posted
- Attached to
- World Wide Logistics Services Bridge Federal contract opportunity
- Solicitation number
- N32205-20-Q-0227
About this file
This document contains a Contract Data Requirements List (CDRL) for a system drawing review to be performed under a contract with the Military Sealift Command. The CDRL requires the contractor to review system drawings against configuration baselines monthly to ensure all configured items are represented and vice versa. Discrepancy reports shall be submitted to the designated Naval Sea Systems Command activity. One completed system drawing review is expected to be delivered via email each month.
View the file
Other files for this federal contract opportunity
Show all 27
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DD FORM 1423-1, FEB 2001
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
PREVIOUS EDITION MAY BE USED.
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services and Communications Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP ________ TM _______ OTHER
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ
8. APP CODE
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
11. AS OF DATE
12. DATE OF FIRST SUBMISSION
13. DATE OF SUBSEQUENT
SUBMISSION
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
Draft Final
Reg Repro
15. TOTAL
16. REMARKS
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
Page of Pages
| 1_DATA_ITEM_NO: B081 |
| 2_TITLE_OF_DATA_ITEM: System Drawing Review |
| 3_SUBTITLE: |
| 4_AUTHORITY_Data_Acquisit: |
| 5_CONTRACT_REFERENCE: See block 16 |
| 6_REQUIRING_OFFICE: N49 |
| 7_DID_250_REQ: NO |
| 8_APP_CODE: N/A |
| DIST_STATEMENT: |
| 10_FREQUENCY: See Block 16 |
| 11_AS_OF_DATE: |
| 12_DATE_OF_FIRST_SUBMISSI: See Block 16 |
| 13_DATE_OF_SUBSEQUENT_SUB: See Block 16 |
| addressee1: COR |
| draft1: 1 |
| reg1: 1 |
| repro1: |
| addressee2: ACOR |
| draft2: 1 |
| reg2: 1 |
| repro2: |
| addressee3: N44A |
| draft3: 1 |
| reg3: 1 |
| repro3: |
| addressee4: |
| draft4: |
| reg4: |
| repro4: |
| addressee5: |
| draft5: |
| reg5: |
| repro5: |
| addressee6: |
| draft6: |
| reg6: |
| repro6: |
| addressee7: |
| draft7: |
| reg7: |
| repro7: |
| addressee8: |
| draft8: |
| reg8: |
| repro8: |
| addressee9: |
| draft9: |
| reg9: |
| repro9: |
| addressee10: |
| draft10: |
| reg10: |
| repro10: |
| addressee11: |
| draft11: |
| reg11: |
| repro11: |
| addressee12: |
| draft12: |
| reg12: |
| repro12: |
| addressee13: |
| draft13: |
| reg13: |
| repro13: |
| addressee14: |
| draft14: |
| reg14: |
| repro14: |
| addressee15: |
| draft15: |
| reg15: |
| repro15: |
| addressee16: |
| draft16: |
| reg16: |
| repro16: |
| addressee17: |
| draft17: |
| reg17: |
| repro17: |
| addressee18: |
| draft18: |
| reg18: |
| repro18: |
| addressee19: |
| draft19: |
| reg19: |
| repro19: |
| addressee20: |
| draft20: |
| reg20: |
| repro20: |
| addressee21: |
| draft21: |
| reg21: |
| repro21: |
| addressee22: |
| draft22: |
| reg22: |
| repro22: |
| addressee23: |
| draft23: |
| reg23: |
| repro23: |
| addressee24: |
| draft24: |
| reg24: |
| repro24: |
| addressee25: |
| draft25: |
| reg25: |
| repro25: |
| addressee26: |
| draft26: |
| reg26: |
| repro26: |
| addressee27: |
| draft27: |
| reg27: |
| repro27: |
| addressee28: |
| draft28: |
| reg28: |
| repro28: |
| addressee29: |
| draft29: |
| reg29: |
| repro29: |
| addressee30: |
| draft30: |
| reg30: |
| repro30: |
| addressee31: |
| draft31: |
| reg31: |
| repro31: |
| addressee32: |
| draft32: |
| reg32: |
| repro32: |
| addressee33: |
| draft33: |
| reg33: |
| repro33: |
| addressee34: |
| draft34: |
| reg34: |
| repro34: |
| addressee35: |
| draft35: |
| reg35: |
| repro35: |
| addressee36: |
| draft36: |
| reg36: |
| repro36: |
| addressee37: |
| draft37: |
| reg37: |
| repro37: |
| addressee38: |
| draft38: |
| reg38x: |
| repro38: |
| total_draft: 3 |
| total_repro: 0 |
| 16_REMARKS: (Block 5.) Applies to PARA 3.5.3 |
3.5.3 Review system drawings against configuration baselines to ensure that all items contained in the configuration are on the drawings and the items on the drawings are contained in the configuration. Prepare reports on all identified discrepancies to the respective designated NAVSEA activity.
(Block 10, 12 and 13.) Approximately 1 Complete System Drawing per month
MS Office via email.
| 17_PRICE_GROUP: | |
| ESTIMATED_TOTAL_PRICE: | |
| G_PREPARED_BY: James Funaro | |
| H_DATE: 3/18/2020 | |
| 1_APPROVED_BY: | |
| J_DATE: | |
| Page: 1 | |
| reg38t: 3 | |
| A_CONTRACT_LINE_ITEM_NO: 3.5.3 | |
| B_EXHIBIT: | |
| TDP: | |
| TM: | |
| OTHER: Management | |
| DSYSTEMITEM: MSC N4 | |
| E_CONTRACTPR_NO: | |
| FCONTRACTOR: | |
| of_pages: 1 | |
| Reset: | |
| 2020-03-13T12:49:59-0400 | |
| FUNARO.JAMES.F.1067519155 |
File details come from the government source that posted it. Updated .