WWL B - QASP and PAP(5).docx
DOCX document 98 KB Posted
- Attached to
- World Wide Logistics Services Bridge Federal contract opportunity
- Solicitation number
- N32205-20-Q-0227
About this file
This document outlines a quality assurance surveillance plan and performance assessment plan for worldwide logistics services. Military Sealift Command intends to award a sole source bridge contract to the incumbent contractor to provide sustainment logistics, cargo load management, ordnance management, and supply chain management globally. Contractor performance will be reviewed quarterly based on quality, timeliness, and customer satisfaction metrics. The contractor must meet standards for over 25 required logistics and acquisition support services. Failure to meet deliverable deadlines may result in financial penalties up to $5,000 per month.
View the file
Other files for this federal contract opportunity
Show all 27
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
This is a performance-based contract, as defined in FAR Part 37.6. Contractor performance will be reviewed in accordance with the Quality Assurance Surveillance Plan (QASP) as follows:
The contractor's performance will be evaluated through the Contractor Performance Assessment Reporting System (CPARS). The CPARS evaluation is accomplished on an annual basis. The CPARS evaluation will be based on performance in whole or in part during the previous 12-month period, the primary government official responsible for the CPARS evaluation is the Contracting Officer's Representative (COR) for the contract. The COR may he assisted, as necessary, by other government individuals having information relevant to the quality of contractor performance.
Contractor performance will be evaluated in three general areas. A rating of Satisfactory or Unsatisfactory will be assigned to each area. These general areas are quality, timeliness and customer satisfaction. The items identified under each area represent the types of consideration to be addressed. They should not be considered an exclusive list. The degree of Government technical direction necessary to solve problems that arise during performance will be a consideration for each area. Improvements made in an area during the evaluation period will also be considered as will degradation in the overall quality of performance.
1.0 INTRODUCTION
The Contractor shall provide services required while minimizing long term carrying costs, infrastructure, and staff; and partnering with the Government to achieve lower total ownership costs for ships. At the same time, the Contractor must be capable of redirecting resources to meet MSC ship operational and logistics support surges.
2.0 IDENTIFICATION OF WORK TO BE PERFORMED:
The contractor shall provide Military Sealift Command (MSC) worldwide logistics services to support continued requirements for sustainment logistics, CMLS management, Combat Logistics Force (CLF) load management, ordnance management, and supply chain management.
3.0 ROLES AND RESPONSIBILITIES:
Contracting Officer - A person duly appointed with the authority to enter into contracts and make related determination and findings on behalf of the Government. Contracting Officers are designated via a written warrant which sets forth limitations of authority. The Contracting Officer is responsible for monitoring contract compliance, performing contract administration and resolving any differences between the observations documented by the Contracting Officer’s Representative (COR) and the contractor’s performance.
Contracting Officer Representative (COR) –The COR will be the Contracting Officer’s authorized representative to assist in administering the contract. The COR will be designated in the resulting contract and/or individual task orders as needed. The limitations of authority are contained in a written letter of designation. The
COR is the primary technically oriented representative assigned to monitor contract performance. The COR is responsible for providing technical direction to the contractor and will perform the final inspection and acceptance of all deliverables under the contract. The COR will also have the responsibility of performing periodic sampling and documenting customer feedback.
Alternate Contracting Officer’s Representative (ACOR) - An individual designated in writing by the PCO to act as their authorized representative to assist in administering the contract. The ACOR will be designated in the resulting contract. The limitations of authority are contained in a written letter of designation. The ACOR is the secondary technically oriented representative assigned to monitor contract performance. The ACOR’s responsibilities may mirror those of the COR in the COR’s absence.
Technical Point of Contact (TPOC) – An individual designated in writing by the COR authorized to monitor and review contractor compliance with individual task order requirements. The limitations of authority are contained in a written letter of designation. The TPOC is also assigned to monitor contract performance and provide feedback and input to the ACOR/COR.
4.0 METHODOLOGIES TO MONITOR PERFORMANCE:
In an effort to minimize the contract administration burden, simplified methods of surveillance techniques shall be used by the Government to evaluate contractor performance. The primary methods of surveillance are Customer Input / Feedback. Customer feedback may be obtained either from the results of the formal customer satisfaction surveys (included in this PAP) or from random customer complaints.
Customer complaints, to be considered valid, must set forth in writing the detailed nature of the complaint, and must be certified by the COR. The complaint will then be forwarded to the Contracting Officer for review. If the Contracting Officer determines that the complaint is valid, the Contractor will be formally notified in writing. The Contractor will have 5 business days to formulate a response detailing the actions taken to remedy the complaint filed.
6.0 DOCUMENTATION
The COR shall maintain copies of all reports, evaluations, recommendations and any actions related to the Government’s performance of the performance assessment function in the COR file for this contract. All records shall be maintained for the life of this contract.
1. ATTACHMENTS
Attachment 1 – Required Performance Metrics Attachment 2 – Performance Evaluation Survey
The following are MSC’s overall logistics performance goals:
Performance Goal
Efficient logistics data updates where the contractor achieves lower stabilized transaction cost and 10 working day cycle time for logistics update transactions
Accurate equipment configuration identification data with accuracy for all add, change, and delete transactions
Innovative use of technology to enhance transaction efficiency and accuracy of data, where the contractor stabilizes cost of fleet logistics data management, offsetting the cost of inflation; and achieves 2% per year reduction in data management and transaction costs, over and above inflation
Technically oriented, responsive and adaptive contract support where all MSC logistics mission support requirements are met, and the contractor adapts as necessary
Contractor services are performance based. Performance objectives are identified below, cross- referenced to each paragraph in the Performance Work Statement. The Government’s goal is to receive quality and timely services while total ownership cost is minimized. The Contractor is encouraged to introduce innovative techniques, using technology to enhanced accuracy or cycle times, and recommending elimination of non-value adding functions.
The following are the performance objectives for the services required:
| Performance Requirement (Required Service) |
| Performance Emphasis (Quality, Timeliness, and/or Cost) |
| Desired Results of Performance (Outcome) |
| Performance Standard |
| Acceptable Quality Level (AQL) |
| Performance Assessment (sampling method) |
| Actions to be taken if requirement not met |
Special Material Type Desk
| 2.1 Configuration items recorded in CMLS |
| Quality, Timeliness |
| Configuration items recorded Daily. Preliminary within one business day. Monitor daily for changes. |
| All Configuration items recorded in CMLS and monitored for changes. CMLS changes updated. |
| Standard is met 98% of the time |
| SME Statistical sampling of MSC database and Contractor- provided documentation |
| $500.00 for every deliverable |
(2) business days late up to a maximum of $5,000.00 per month after this point, the matter will be handled via appropriate administrative action by the Contracting Officer.
2.2 Updated records in CMLS
| Quality, Timeliness |
| Report of inventory status for all ships and warehouses updated in CMLS. |
| All transactions are accurately captured and imported monthly. |
| Standard is met 98% of the time |
| SME Statistical sampling of MSC database and Contractor- provided documentation |
| $500.00 for every deliverable |
(2) business days late up to a maximum of $5,000.00 per month after this point, the matter will be handled via appropriate administrative action by the Contracting Officer.
2.3 Order centrally managed special material in CMLS with associated FAR 8, sole source, and/or urgency documentation.
| Quality, Timeliness |
| Process, source, order, track, and expedite requisitions. |
Follow-up with status within two business days.
| Perform to COMSCINST 4490.2 (series) to meet N10 requirements of FAR Part 8 |
| Standard is met 98% of the time |
| SME statistical sampling of MSC database and Contractor- provided documentation |
| $500.00 for every deliverable |
(2) business days late up to a maximum of $5,000.00 per month after this point, the matter will be handled via appropriate administrative action by the Contracting Officer.
2.4 CMLS generated shipping documents.
| Quality, Timeliness |
| Report provided daily |
| Report provided on time, tracking the status of shipments and shipment requests. |
| Standard is met 98% of the time |
| SME Statistical sampling of MSC database and Contractor- provided documentation |
| $500.00 for every deliverable |
(2) business days late up to a maximum of $5,000.00 per month after this point, the matter will be handled via appropriate administrative action by the Contracting Officer.
2.5 Manage SLEP inventory records.
| Quality, Timeliness |
| Accurate Updated records in DHA MEDLOG database. |
| Reports produced and delivered in accordance with customer schedules |
| Reports produced and delivered on time with a 98% accuracy rate. |
| Statistical sampling of MSC database and Contractor- provided documentation |
| $500.00 for every deliverable |
(2) business days late up to a maximum of $5,000.00 per month after this point, the matter will be handled via appropriate administrative action by the Contracting Officer.
2.6 Report of equipment inventory
| Quality, Timeliness |
| Process the ship and ashore customer requirements in CMLS and the Financial System of Record (FSR). Provide feedback. |
| All requirements processed and feedback provided to the Subject Matter Expert (SME). |
| Reports produced and delivered on time with a 98% accuracy rate. |
| Statistical sampling of MSC database and Contractor- provided documentation. SME Feedback. |
| $500.00 for every deliverable |
(2) business days late up to a maximum of $5,000.00 per month after this point, the matter will be handled via appropriate administrative action by the Contracting Officer.
2.7 2.7.1 2.7.2 2.7.3 Report of Customer Requirements
| Quality, Timeliness |
| Prepare market research, performance work statements, and cost estimates for Government review/approval. |
| Accurate and Complete packages. |
| Reports produced and delivered on time with a 98% accuracy rate |
| SME Feedback on the review of packages. |
| $500.00 for every deliverable |
(2) business days late up to a maximum of $5,000.00 per month after this point, the matter will be handled via appropriate administrative action by the Contracting Officer.
2.8 Data analysis, recommendations, market research, PWS, and estimates for review/approval.
| Quality, Timeliness |
| Review historical information and develop draft PWS, and estimates for review/approval within 60 days. |
| All requirements on time. |
| Standard is met 98% of the time |
| Statistical sampling of MSC database and Contractor- provided documentation. SME Feedback. |
| $500.00 for every deliverable |
(2) business days late up to a maximum of $5,000.00 per month after this point, the matter will be handled via appropriate administrative action by the Contracting Officer.
2.9 Perform gas mask testing per JSMLT testing guide and provide completion report.
| Quality, Timeliness |
| Label all gas masks after testing. Perform routine maintenance on testing equipment, Monitor CMLS for masks that need testing and coordinate recall and replacement. Provide reports. Provide size testing to CIVMARS. |
| All requirements on time. |
Proper identification, Maintenance, labeling and testing performed.
Reports and Updated CMLS/FSR records.
| Standard is met 98% of the time |
| Statistical sampling of MSC database and Contractor- provided documentation. SME Feedback. |
| $500.00 for every deliverable |
(2) business days late up to a maximum of $5,000.00 per month after this point, the matter will be handled via appropriate administrative action by the Contracting Officer.
2.10 Provide Forecast Report
| Quality, Timeliness |
| Manage and update records. Coordinate return and replacement of RADIAC equipment. Reconcile records/reports with OM&S records and NAVSEA inventory reports. |
| All transaction are accurately captured and reconciled. |
| Standard is met 98% of the time |
| Statistical sampling of MSC database and Contractor- provided documentation. SME Feedback. |
| $500.00 for every deliverable |
(2) business days late up to a maximum of $5,000.00 per month after this point, the matter will be handled via appropriate administrative action by the Contracting Officer.
2.11 Monitor AMAL controlled substances.
| Quality, Timeliness |
| Accuracy of inventory and provide summary report. |
| All transaction are accurately captured and reported. |
| Standard is met 100% of the time |
| Statistical sampling of MSC database and Contractor- provided documentation. SME Feedback |
| $500.00 for every deliverable |
(2) business days late up to a maximum of $5,000.00 per month after this point, the matter will be handled via appropriate administrative action by the Contracting Officer.
2.12 Manage shelf-life and extensions. Coordinate with customers. Dispose of expired items. Maintain records.
| Quality, Timeliness |
| Accuracy of databases and reports. Timely response to customer questions. |
| Accuracy of databases and reports. Daily updates when material is processed. |
Customer response within 24 hours.
| Standard is met 98% of the time |
| Statistical sampling of MSC database and Contractor- provided documentation. SME Feedback |
| $500.00 for every deliverable |
(2) business days late up to a maximum of $5,000.00 per month after this point, the matter will be handled via appropriate administrative action by the Contracting Officer.
2.13 Controlled Substances Report
| Quality, Timeliness |
| Provide report of disposal recommendations. |
Ensure proper documentation accompanies all material.
Accuracy of documentation, databases and reports.
| Standard is met 98% of the time |
| Statistical sampling of MSC database and Contractor- provided documentation. SME Feedback |
| $500.00 for every deliverable |
(2) business days late up to a maximum of $5,000.00 per month after this point, the matter will be handled via appropriate administrative action by the Contracting Officer.
2.14 Configuration and kitting of ATFP/CBRD and medical equipment.
| Quality, Timeliness |
| Maintain configuration records, plan replacement schedules and prepare shipment requests. |
| Accuracy of documentation, databases and reports. |
| Standard is met 98% of the time |
| Statistical sampling of MSC database and Contractor- provided documentation. SME Feedback |
| $500.00 for every deliverable |
(2) business days late up to a maximum of $5,000.00 per month after this point, the matter will be handled via appropriate administrative action by the Contracting Officer.
2.15 Develop processes/flowcharts and provide recommendations.
| Quality, Timeliness |
| Identify areas of process improvement. Recommend draft QMS processes and flowcharts. |
| Provide recommendation’s in accordance with MSC QMS guidance. |
| QMS and flowcharts are within MSC QMS guidelines. |
| SME Feedback |
| $500.00 for every deliverable |
(2) business days late up to a maximum of $5,000.00 per month after this point, the matter will be handled via appropriate administrative action by the Contracting Officer.
Ships Acquisition Support
3.1.2 Monthly Status Reports
| Quality, Timeliness |
| Provide a report listing all specific tasks accomplished for the past month. |
| Provide an accurate report monthly capturing all tasks, deliverables and assessments. |
| Reports produced and delivered on time and complete, capturing all tasks and error free. |
| SME Feedback |
| $500.00 for every deliverable |
(2) business days late or incomplete up to a maximum of $5,000.00 per month after this point, the matter will be handled via appropriate administrative action by the Contracting Officer.
3.1.3 Quarterly ILSMT presentations for each program; required briefs, correspondence and point papers.
| Quality, Timeliness |
| Prepare logistics related presentations, briefing papers, correspondence, and point papers quarterly. |
| Accuracy of all logistics related presentations, briefing papers, correspondence, and point papers. |
| Reports produced and delivered on time and error free. |
| SME review of contractor work. Feedback to the COR |
| $500.00 for every deliverable |
(2) business days late up to a maximum of $5,000.00 per month after this point, the matter will be handled via appropriate administrative action by the Contracting Officer.
3.1.4 Trip Reports and meeting minutes.
| Quality |
| Contractor attendance and participation in maintenance planning meetings. |
Capture minutes and discussions.
Contractor attends and participates in meetings to obtain logistics information and schedule changes.
Govt staff receives timely, efficient, and effective contract support for requirements.
Customer Satisfaction Survey reports no more than 3 customer complaints per quarter.
| SME review of contractor work. Feedback to the COR |
| $500.00 for every deliverable |
(2) business days late up to a maximum of $5,000.00 per month after this point, the matter will be handled via appropriate administrative action by the Contracting Officer.
3.1.5 Report of feedback submitted and outstanding.
| Quality, Timeliness |
| Maintain metrics for feedbacks submitted and their processing times. |
| Metrics presented monthly |
| Standard is met 98% of the time. |
| SME review of contractor work. Feedback to the COR |
| $500.00 for every deliverable |
(2) business days late up to a maximum of $5,000.00 per month after this point, the matter will be handled via appropriate administrative action by the Contracting Officer.
3.1.6 Class baseline report
| Quality, Timeliness |
| Maintain class baseline comparisons, based on the shipbuilder data submissions to ensure all items are accounted for in the configuration baseline for the ships. |
| All items are accounted for in the configuration baseline for the ships |
| Report received the first working day of the quarter. |
Data 98% accurate.
| SME review of contractor work. Feedback to the COR. |
| $500.00 for every deliverable |
(2) business days late up to a maximum of $5,000.00 per month after this point, the matter will be handled via appropriate administrative action by the Contracting Officer.
3.1.7 Outfitting Monitoring & Risk Assessment Report
| Quality, Timeliness |
| Complete Outfitting Monitoring & Risk Assessment Workbooks for each new construction vessel. |
| Workbooks contain all Storeroom Items, Operating Space Items, General Use Consumables and Technical Manuals. |
| 1) First working day of the month; |
(2) 3 months prior to delivery of each ship; and
(3) then Weekly through delivery for each ship.
100% accurate and on time.
| SME review of contractor work. Feedback to the COR. |
| $500.00 for every deliverable |
(2) business days late up to a maximum of $5,000.00 per month after this point, the matter will be handled via appropriate administrative action by the Contracting Officer.
3.1.8 Report of feedback submitted to NAVSEALOGCEN, NSWC PHD, SPAWAR and the respective SUPSHIP
| Quality, Timeliness |
| Compile feedbacks submitted by customers. |
Reconcile all feedbacks.
| All feedbacks captured and reconciled. |
| Complete report within 5 days after the end of the month. |
| SME review of contractor work. Feedback to the COR. |
| $500.00 for every deliverable |
(2) business days late up to a maximum of $5,000.00 per month after this point, the matter will be handled via appropriate administrative action by the Contracting Officer.
3.1.9 Provisioning Report
| Quality, Timeliness |
| Review provisioning submittals and develop required provisioning. |
| Develop required provisioning report. |
| Within 5 days after the end of the month. |
| SME review of contractor work. Feedback to the COR. |
| $500.00 for every deliverable |
(2) business days late up to a maximum of $5,000.00 per month after this point, the matter will be handled via appropriate administrative action by the Contracting Officer.
T-EPF PRE-DELIVERY
3.2.1 Validation Plan
| Quality, Timeliness |
| Develop required plan two weeks after start of construction. |
| Plan provided to the SME |
| Two weeks after start of construction. |
| SME review of contractor work. Feedback to the COR. |
| $500.00 for every deliverable |
(2) business days late up to a maximum of $5,000.00 per month after this point, the matter will be handled via appropriate administrative action by the Contracting Officer.
3.2.1 Validation Report
| Quality, Timeliness |
| Complete a 50% shipboard equipment validation. Reconcile differences. Update MERLIN. |
| All transactions are accurately captured and updated into MERLIN weekly. |
| Standard is met 98% of the time. |
| SME review of contractor work. Feedback to the COR. |
| $500.00 for every deliverable |
(2) business days late up to a maximum of $5,000.00 per month after this point, the matter will be handled via appropriate administrative action by the Contracting Officer.
3.2.2 DRL Review Report
| Quality, Timeliness |
| Review data submittals for completeness and accuracy. |
Provide comments to SME.
| Provide review comments to the SME at least 2 days prior to each DRL Comment Period end date. |
| Quality and timeliness is met 98% of the time. |
| SME review of contractor work. Feedback to the COR. |
| $500.00 for every deliverable |
(2) business days late up to a maximum of $5,000.00 per month after this point, the matter will be handled via appropriate administrative action by the Contracting Officer.
3.2.3 Provisioning Package Review
| Quality, Timeliness |
| Review provisioning submittals from MERLIN data against available technical documentation, and provide review comments |
| Generate Feedback as required to document provisioning discrepancies discovered during review. |
| Quality and timeliness is met 98% of the time. |
| SME review of contractor work. Feedback to the COR. |
| $500.00 for every deliverable |
(2) business days late up to a maximum of $5,000.00 per month after this point, the matter will be handled via appropriate administrative action by the Contracting Officer.
3.2.4 System Drawing Review
| Quality, Timeliness |
| Compare system drawings against configuration baselines. |
Prepare reports on all identified discrepancies.
| All drawings and configuration baselines match. |
| Quality and timeliness is met 98% of the time. |
| SME review of contractor work. Feedback to the COR |
| $500.00 for every deliverable |
(2) business days late up to a maximum of $5,000.00 per month after this point, the matter will be handled via appropriate administrative action by the Contracting Officer.
3.2.5 Technical Manual Configuration Review
| Quality, Timeliness |
| Review Technical Manuals against the installed equipment information monthly. |
| Review the Logistics Support information of all Technical Manuals submitted by the shipbuilder |
| Quality and timeliness is met 98% of the time. |
| SME review of contractor work. Feedback to the COR |
| $500.00 for every deliverable |
(2) business days late up to a maximum of $5,000.00 per month after this point, the matter will be handled via appropriate administrative action by the Contracting Officer.
3.2.6 Ship's Provisioning Review
| Quality, Timeliness |
| Monitor the development of all provisioning data to include Allowance Parts Lists (APLs) and Allowance Equipage Lists (AELs) for the ship programs. |
Report issues.
| All issues captured and reported. |
| Quality and timeliness is met 98% of the time. |
| SME review of contractor work. Feedback to the COR |
| $500.00 for every deliverable |
(2) business days late up to a maximum of $5,000.00 per month after this point, the matter will be handled via appropriate administrative action by the Contracting Officer.
3.2.7 Hierarchical Structure Code Resolution Report
| Quality, Timeliness |
| Coordinate to resolve issues for the assignment of Hierarchical Structure Codes. |
| Capture issues weekly and report to the SME |
| Quality and timeliness is met 98% of the time. |
| SME review of contractor work. Feedback to the COR. |
| $500.00 for every deliverable |
(2) business days late up to a maximum of $5,000.00 per month after this point, the matter will be handled via appropriate administrative action by the Contracting Officer.
3.2.8 Valve marks and electrical symbol number review.
| Quality, Timeliness |
| Review ships configuration ensuring that Valve Marks and Electrical Symbol Numbers are properly assigned in the configuration baseline. |
| All Valve Marks and Electrical Symbol Numbers are properly assigned in the configuration baseline. |
| Quality and timeliness is met 98% of the time. |
| SME review of contractor work. Feedback to the COR. |
| $500.00 for every deliverable |
(2) business days late up to a maximum of $5,000.00 per month after this point, the matter will be handled via appropriate administrative action by the Contracting Officer.
3.2.9 Virtual Technical Library, Technical Manual Review and compilation.
| Quality, Timeliness |
| Review of Technical Manuals contained in the MSC Virtual Technical Library. Ensure all configuration items are represented. Obtain Technical Manuals for ships outfitting for Government Furnished Equipment and Material to ensure they are onboard the respective ships at the time of delivery. |
Review of Technical Manuals.
Ensure all configuration items are represented.
Technical Manuals for ships outfitting for Government Furnished Equipment and Material are onboard the respective ships at the time of delivery.
| Quality and timeliness is met 98% of the time. |
| SME review of contractor work. Feedback to the COR. |
| $500.00 for every deliverable |
(2) business days late up to a maximum of $5,000.00 per month after this point, the matter will be handled via appropriate administrative action by the Contracting Officer.
3.2.10 Coordinate GFM and Develop RICs
| Quality, Timeliness |
| Develop RICs for new Government Furnished items where there is no existing AEL or APL. Update existing non-standard RICs to reflect additional ship requirements. Provide a report with a summary of efforts. |
| All RICs are developed or updated. |
Provide accurate report.
| Quality and timeliness is met 98% of the time. |
| SME review of contractor work. Feedback to the COR. |
| $500.00 for every deliverable |
(2) business days late up to a maximum of $5,000.00 per month after this point, the matter will be handled via appropriate administrative action by the Contracting Officer.
3.2.11 Part procurement correction
| Quality, Timeliness |
| Research and update APL’s with current information so items can be procured globally |
| Updated APL’s with OEM information. |
| Quality and timeliness is met 98% of the time. |
| SME review of contractor work. Feedback to the COR.. |
| $500.00 for every deliverable |
(2) business days late up to a maximum of $5,000.00 per month after this point, the matter will be handled via appropriate administrative action by the Contracting Officer.
3.2.12 New construction data review
| Quality, Timeliness |
| Conduct MERLIN and MMS initialization and incremental data reviews. correct identified discrepancies prior to final data extraction. |
Ensure proper data is entered in CMLS and ShipCLIP.
Identify and correct data discrepancies in MERLIN.
Ensure proper data is entered in CMLS and ShipCLIP.
| Quality and timeliness is met 98% of the time. |
| SME review of contractor work. Feedback to the COR. |
| $500.00 for every deliverable |
(2) business days late up to a maximum of $5,000.00 per month after this point, the matter will be handled via appropriate administrative action by the Contracting Officer.
3.2.13 Technical documentation to configuration review.
| Quality, Timeliness |
| Validate Technical Manuals and Drawings contained in MERLIN against the Technical Manual and Drawings contained in PMS-ES, and work with NAVSEA to reconcile differences. |
Update MERLIN.
Validate Technical Manuals and Drawings contained in MERLIN.
Update MERLIN.
| Quality and timeliness is met 98% of the time. |
| SME review of contractor work. Feedback to the COR. |
| $500.00 for every deliverable |
(2) business days late up to a maximum of $5,000.00 per month after this point, the matter will be handled via appropriate administrative action by the Contracting Officer.
T-EPF DELIVERY
3.2.14 Bin Validation and Inventory Accuracy Report
| Quality, Timeliness |
| Participate in inventory validation & recording for bin validation and material load out. |
Verify the physical inventory accuracy.
| Perform a sampling of the inventory in each affected storeroom and Record discrepancies. |
| Quality and timeliness is met 98% of the time. |
| SME review of contractor work. Feedback to the COR. |
| $500.00 for every deliverable |
(2) business days late up to a maximum of $5,000.00 per month after this point, the matter will be handled via appropriate administrative action by the Contracting Officer.
3.2.15 Establish Ship's Technical Library
| Quality, Timeliness |
| Inventory, catalog, and stow 100% of available selected record drawings (SRD) and technical manuals (TM). Produce Ships Engineering Drawing (shipbuilder) and Technical Manual Inventory Naval Sea Systems Command (NAVSEA) Listings. Download drawings from PMS-ES needed for validation and HSC baseline. Rename data files to conform to MSC naming conventions. Screen for missing/updated TMs. |
| Inventory, catalog, and stow 100% of available SRD and TM’s. |
Produce Ships Engineering Drawing (shipbuilder) and TM Listings.
Download drawings from PMS-ES.
Rename data files to conform to MSC naming conventions.
Screen for missing/updated TMs and have them added.
| Quality and timeliness is met 98% of the time. |
| SME review of contractor work. Feedback to the COR. |
| $500.00 for every deliverable |
(2) business days late up to a maximum of $5,000.00 per month after this point, the matter will be handled via appropriate administrative action by the Contracting Officer.
3.2.16 Catalog of Ship's Test Reports
| Quality, Timeliness |
| Inventory and catalog all available Test Reports |
| Produce Test Report listings and provide digital files of Test Reports and Listing to the ship prior to delivery. |
| Quality and timeliness is met 98% of the time. |
| SME review of contractor work. Feedback to the COR. |
| $500.00 for every deliverable |
(2) business days late up to a maximum of $5,000.00 per month after this point, the matter will be handled via appropriate administrative action by the Contracting Officer.
3.2.17 Establish Ship's Navigational Library
| Quality, Timeliness |
| Fold, catalog, label and stow maps, publications, and charts onboard ship. |
Affix to each applicable document: Chart Number, Title, National Stock Number, and Revision.
| Fold, catalog, label and stow maps, publications, and charts onboard ship. |
| Quality and timeliness is met 98% of the time. |
| SME review of contractor work. Feedback to the COR. |
| $500.00 for every deliverable |
(2) business days late up to a maximum of $5,000.00 per month after this point, the matter will be handled via appropriate administrative action by the Contracting Officer.
3.2.18 Prepare Ship's Logistics Turn-Over Book
| Quality, Timeliness |
| Prepare Logistics Turnover Books and CDs. |
Participate in Turnover Conference.
All Logistics Turnover Books and CDs completed
Participate in Turnover Conference.
| Quality and timeliness is met 98% of the time. |
| SME review of contractor work. Feedback to the COR. |
| $500.00 for every deliverable |
(2) business days late up to a maximum of $5,000.00 per month after this point, the matter will be handled via appropriate administrative action by the Contracting Officer.
3.2.19 Relabeling Report.
| Quality, Timeliness |
| Develop, print, and affix labels to both locations and material within each individual ship's storage container. |
| Labels affixed to both locations and material within each individual ship's storage container. |
| Quality and timeliness is met 98% of the time. |
| SME review of contractor work. Feedback to the COR. |
| $500.00 for every deliverable |
(2) business days late up to a maximum of $5,000.00 per month after this point, the matter will be handled via appropriate administrative action by the Contracting Officer.
3.2.20 Signed crew acceptance memo/letter.
| Quality, Timeliness |
| Stencil characteristics on all material/equipment (e.g. life jackets, foul weather gear, etc.) that the shipbuilder did not stencil during construction. |
| All material/equipment (e.g. life jackets, foul weather gear, etc.) has been stenciled. |
| Quality and timeliness is met 98% of the time. |
| SME review of contractor work. Feedback to the COR. |
| $500.00 for every deliverable |
(2) business days late up to a maximum of $5,000.00 per month after this point, the matter will be handled via appropriate administrative action by the Contracting Officer.
3.3 T-ESB PRE-DELIVERY
3.3.1 DRL Review Report
| Quality, Timeliness |
| Review data submittals from PMS-ES for completeness and accuracy, and provide review comments to MSC N4 |
| Accuracy and review comments from data submittals from PMS-ES |
| Quality and timeliness is met 98% of the time. |
| SME review of contractor work. Feedback to the COR. |
| $500.00 for every deliverable |
(2) business days late up to a maximum of $5,000.00 per month after this point, the matter will be handled via appropriate administrative action by the Contracting Officer.
3.3.2 Provisioning Package Review
| Quality, Timeliness |
| Review provisioning submittals from MERLIN data against available technical documentation, and provide review comments. |
| Feedback as required to document provisioning discrepancies discovered during review. |
| Quality and timeliness is met 98% of the time. |
| SME review of contractor work. Feedback to the COR. |
| $500.00 for every deliverable |
(2) business days late up to a maximum of $5,000.00 per month after this point, the matter will be handled via appropriate administrative action by the Contracting Officer.
3.3.3 System Drawing Review
| Quality, Timeliness |
| Review system drawings against configuration baselines, ensure all items contained in the configuration are on the drawings and the items on the drawings are contained in the configuration. |
| Prepare reports on all identified discrepancies to the respective designated NAVSEA activity. |
| Quality and timeliness is met 98% of the time. |
| SME review of contractor work. Feedback to the COR. |
| $500.00 for every deliverable |
(2) business days late up to a maximum of $5,000.00 per month after this point, the matter will be handled via appropriate administrative action by the Contracting Officer.
3.3.4 Technical Manual Configuration Review
| Quality, Timeliness |
| Review Technical Manuals against the installed equipment information, to ensure the proper technical support is provided by the shipbuilder. |
Review the Logistics Support information of all Technical Manuals submitted by the shipbuilder as part of the MSC review team.
| Review all Technical Manuals for accuracy and completeness. |
| Quality and timeliness is met 98% of the time. |
| SME review of contractor work. Feedback to the COR. |
| $500.00 for every deliverable |
(2) business days late up to a maximum of $5,000.00 per month after this point, the matter will be handled via appropriate administrative action by the Contracting Officer.
3.3.5 Ship's Provisioning Review
| Quality |
| Monitor the development of all provisioning data to include Allowance Parts Lists (APLs) and Allowance Equipage Lists (AELs) for the ship programs |
| Ensure that provisioning is developed for all 101 and Specification Material provided by the shipbuilder. |
| Quality and timeliness is met 98% of the time. |
| SME review of contractor work. Feedback to the COR. |
| $500.00 for every deliverable |
(2) business days late up to a maximum of $5,000.00 per month after this point, the matter will be handled via appropriate administrative action by the Contracting Officer.
3.3.6 Hierarchical Structure Code Resolution Report
| Quality, Timeliness |
| Coordinate with the shipbuilder and/or respective SUPSHIP on resolving issues for the assignment of Hierarchical Structure Codes. |
| All issues with Hierarchical Structure Codes resolved. |
| Quality and timeliness is met 98% of the time. |
| SME review of contractor work. Feedback to the COR. |
| $500.00 for every deliverable |
(2) business days late up to a maximum of $5,000.00 per month after this point, the matter will be handled via appropriate administrative action by the Contracting Officer.
3.3.7 Valve Marks and Electrical Symbol Number Review
| Quality, Timeliness |
| Review ships configuration to ensure that Valve Marks and Electrical Symbol Numbers are properly assigned in the configuration baseline for all ships. |
| All Valve Marks and Electrical Symbol Numbers are properly assigned in the configuration baseline. |
| Quality and timeliness is met 98% of the time. |
| SME review of contractor work. Feedback to the COR. |
| $500.00 for every deliverable |
(2) business days late up to a maximum of $5,000.00 per month after this point, the matter will be handled via appropriate administrative action by the Contracting Officer.
3.3.8 Virtual Technical Library Technical Manual Review and Compilation
| Quality, Timeliness |
| Review of Technical Manuals contained in the MSC Virtual Technical Library to ensure all configuration items are represented. |
| Ensure Technical Manuals for ships outfitting for Government Furnished Equipment and Material are onboard the respective ships at the time of delivery. |
| Quality and timeliness is met 98% of the time. |
| SME review of contractor work. Feedback to the COR. |
| $500.00 for every deliverable |
(2) business days late up to a maximum of $5,000.00 per month after this point, the matter will be handled via appropriate administrative action by the Contracting Officer.
3.3.9 Coordinate GFM and Develop RICs
| Quality, Timeliness |
| Develop RICs for new Government Furnished items where there is no existing AEL or APL. Update existing non-standard RICs to reflect additional ship requirements. Provide a report with a summary of efforts. |
| All RICs are developed or updated. |
Provide accurate report.
| Quality and timeliness is met 98% of the time. |
| SME review of contractor work. Feedback to the COR. |
| $500.00 for every deliverable |
(2) business days late up to a maximum of $5,000.00 per month after this point, the matter will be handled via appropriate administrative action by the Contracting Officer.
3.3.10 Part Procurement Correction
| Quality, Timeliness, Cost |
| Research APL’s and Parts and update APLs accordingly so items can be procured globally. |
| All APL’s and parts are updated with the correct OEM information. |
| Quality, completeness and timeliness is met 98% of the time. |
| SME review of contractor work. Feedback to the COR. |
| $500.00 for every deliverable |
(2) business days late up to a maximum of $5,000.00 per month after this point, the matter will be handled via appropriate administrative action by the Contracting Officer.
3.3.11 New Construction Data Review
| Quality, Timeliness, Cost |
| MERLIN and MMS initialization and incremental data reviews. |
| Ensure outputs are reconciled prior to final delivery to MSC for CMLS/ ShipCLIP initialization. |
| Quality, completeness and timeliness is met 98% of the time. |
| SME review of contractor work. Feedback to the COR. |
| $500.00 for every deliverable |
(2) business days late up to a maximum of $5,000.00 per month after this point, the matter will be handled via appropriate administrative action by the Contracting Officer.
3.3.12 Technical Documentation to Configuration Review
| Quality |
| Validate Technical Manuals and Drawings contained in MERLIN against the Technical Manual and Drawing Indices contained in PMS-ES, resolve any issues. |
| Ensure MERLIN is updated with correct information. |
| Quality and timeliness is met 98% of the time. |
| SME review of contractor work. Feedback to the COR. |
| $500.00 for every deliverable |
(2) business days late up to a maximum of $5,000.00 per month after this point, the matter will be handled via appropriate administrative action by the Contracting Officer.
3.3.13 Bin Validation and Inventory Accuracy Report
| Quality, Timeliness |
| Participate in inventory validation & recording for bin validation and material load out. |
Verify the physical inventory accuracy.
| Perform a sampling of the inventory in each affected storeroom and Record discrepancies. |
| Quality and timeliness is met 98% of the time. |
| SME review of contractor work. Feedback to the COR. |
| $500.00 for every deliverable |
(2) business days late up to a maximum of $5,000.00 per month after this point, the matter will be handled via appropriate administrative action by the Contracting Officer.
3.3.14 Establish Ship's Technical Library
| Quality, Timeliness |
| Inventory, catalog, and stow 100% of available selected record drawings (SRD) and technical manuals (TM). Produce Ships Engineering Drawing (shipbuilder) and Technical Manual Inventory Naval Sea Systems Command (NAVSEA) Listings. Download drawings from PMS-ES needed for validation and HSC baseline. Rename data files to conform to MSC naming conventions. Screen for missing/updated TMs. |
| Inventory, catalog, and stow 100% of available SRD and TM’s. |
Produce Ships Engineering Drawing (shipbuilder) and TM Listings.
Download drawings from PMS-ES.
Rename data files to conform to MSC naming conventions.
Screen for missing/updated TMs and have them added.
| Quality and timeliness is met 98% of the time. |
| SME review of contractor work. Feedback to the COR. |
| $500.00 for every deliverable |
(2) business days late up to a maximum of $5,000.00 per month after this point, the matter will be handled via appropriate administrative action by the Contracting Officer.
3.3.15 Catalog of Ship's Test Reports
| Quality, Timeliness |
| Inventory and catalog all available Test Reports |
| Produce Test Report listings and provide digital files of Test Reports and Listing to the ship prior to delivery. |
| Quality and timeliness is met 98% of the time. |
| SME review of contractor work. Feedback to the COR. |
| $500.00 for every deliverable |
(2) business days late up to a maximum of $5,000.00 per month after this point, the matter will be handled via appropriate administrative action by the Contracting Officer.
3.3.16 Establish Ship's Navigational Library
| Quality, Timeliness |
| Fold, catalog, label and stow maps, publications, and charts onboard ship. |
Affix to each applicable document: Chart Number, Title, National Stock Number, and Revision.
| Fold, catalog, label and stow maps, publications, and charts onboard ship. |
| Quality and timeliness is met 98% of the time. |
| SME review of contractor work. Feedback to the COR. |
| $500.00 for every deliverable |
(2) business days late up to a maximum of $5,000.00 per month after this point, the matter will be handled via appropriate administrative action by the Contracting Officer.
3.3.17 Prepare Ship's Logistics Turn-Over Book
| Quality, Timeliness |
| Prepare Logistics Turnover Books and CDs. |
Participate in Turnover Conference.
All Logistics Turnover Books and CDs completed
Participate in Turnover Conference.
| Quality and timeliness is met 98% of the time. |
| SME review of contractor work. Feedback to the COR. |
| $500.00 for every deliverable |
(2) business days late up to a maximum of $5,000.00 per month after this point, the matter will be handled via appropriate administrative action by the Contracting Officer.
3.3.18 Relabeling Report.
| Quality, Timeliness |
| Develop, print, and affix labels to both locations and material within each individual ship's storage container. |
| Labels affixed to both locations and material within each individual ship's storage container. |
| Quality and timeliness is met 98% of the time. |
| SME review of contractor work. Feedback to the COR. |
| $500.00 for every deliverable |
(2) business days late up to a maximum of $5,000.00 per month after this point, the matter will be handled via appropriate administrative action by the Contracting Officer.
3.3.19 Signed crew acceptance memo/letter.
| Quality, Cost, Timeliness |
| Stencil characteristics on all material/equipment (e.g. life jackets, foul weather gear, etc.) that the shipbuilder did not stencil during construction. |
| Ensure all material/equipment (e.g. life jackets, foul weather gear, etc.) is stenciled. |
| Quality and timeliness is met 98% of the time. |
| SME review of contractor work. Feedback to the COR. |
| $500.00 for every deliverable |
(2) business days late up to a maximum of $5,000.00 per month after this point, the matter will be handled via appropriate administrative action by the Contracting Officer.
3.4 T-ATS PRE-DELIVERY
3.4.1
| Quality, Timeliness |
| Develop required plan two weeks after start of construction |
| Plan provided to the SME |
| Two weeks after start of construction. |
| SME review of contractor work. Feedback to the COR. |
| $500.00 for every deliverable |
(2) business days late up to a maximum of $5,000.00 per month after this point, the matter will be handled via appropriate administrative action by the Contracting Officer.
3.4.1 Validation Report
| Quality, Timeliness |
| Complete a 25% shipboard equipment validation. Reconcile differences. Update MERLIN. |
| All transactions are accurately captured and updated into MERLIN weekly. |
| Standard is met 98% of the time. |
| SME review of contractor work. Feedback to the COR. |
| $500.00 for every deliverable |
(2) business days late up to a maximum of $5,000.00 per month after this point, the matter will be handled via appropriate administrative action by the Contracting Officer.
| 3.4.2 DRL Review Report |
| Quality, Timeliness |
| Review data submittals for completeness and accuracy. |
Provide comments to SME.
| Provide review comments to the SME at least 2 days prior to each DRL Comment Period end date. |
| Quality and timeliness is met 98% of the time. |
| SME review of contractor work. Feedback to the COR. |
| $500.00 for every deliverable |
(2) business days late up to a maximum of $5,000.00 per month after this point, the matter will be handled via appropriate administrative action by the Contracting Officer.
3.4.3 Provisioning Review Report
| Quality, Timeliness |
| Review provisioning submittals from MERLIN data against available technical documentation, and provide review comments |
| Generate Feedback as required to document provisioning discrepancies discovered during review. |
| Quality and timeliness is met 98% of the time. |
| SME review of contractor work. Feedback to the COR. |
| $500.00 for every deliverable |
(2) business days late up to a maximum of $5,000.00 per month after this point, the matter will be handled via appropriate administrative action by the Contracting Officer.
3.4.4 Data Entry Progress Report
| Quality, Timeliness, Cost |
| Enter all received and developed data into the Acquisition Program of Record (APOR). |
Contact vendors and suppliers for pricing information.
Perform 100% equipment validations.
| Provide summary of efforts for all received and developed data. |
| Quality and timeliness is met 98% of the time. |
| SME review of contractor work. Feedback to the COR. |
| $500.00 for every deliverable |
(2) business days late up to a maximum of $5,000.00 per month after this point, the matter will be handled via appropriate administrative action by the Contracting Officer.
3.4.5 System Drawing Review
| Quality, Timeliness |
| Review system drawings against configuration baselines, ensure all items contained in the configuration are on the drawings and the items on the drawings are contained in the configuration. |
| Prepare reports on all identified discrepancies to the respective designated NAVSEA activity. |
| Quality and timeliness is met 98% of the time. |
| SME review of contractor work. Feedback to the COR. |
| $500.00 for every deliverable |
(2) business days late up to a maximum of $5,000.00 per month after this point, the matter will be handled via appropriate administrative action by the Contracting Officer.
3.4.6 Technical Manual Configuration Review
| Quality, Timeliness |
| Review Technical Manuals against the installed equipment information, to ensure the proper technical support is provided by the shipbuilder. |
Review the Logistics Support information of all Technical Manuals submitted by the shipbuilder as part of the MSC review team.
| Review all Technical Manuals for accuracy and completeness. |
| Quality and timeliness is met 98% of the time. |
| SME review of contractor work. Feedback to the COR. |
| $500.00 for every deliverable |
(2) business days late up to a maximum of $5,000.00 per month after this point, the matter will be handled via appropriate administrative action by the Contracting Officer.
3.4.7 Ship's Provisioning Review
| Quality, Timeliness |
| Monitor the development of all provisioning data to include Allowance Parts Lists (APLs) and Allowance Equipage Lists (AELs) for the ship programs |
| Ensure that provisioning is developed for all 101 and Specification Material provided by the shipbuilder. |
| Quality and timeliness is met 98% of the time. |
| SME review of contractor work. Feedback to the COR. |
| $500.00 for every deliverable |
(2) business days late up to a maximum of $5,000.00 per month after this point, the matter will be handled via appropriate administrative action by the Contracting Officer.
3.4.8 Valve Marks and Electrical Symbol Number Review
| Quality, Timeliness |
| Review ships configuration ensuring that Valve Marks and Electrical Symbol Numbers are properly assigned in the configuration baseline. |
| All Valve Marks and Electrical Symbol Numbers are properly assigned in the configuration baseline. |
| Quality and timeliness is met 98% of the time. |
| SME review of contractor work. Feedback to the COR. |
| $500.00 for every deliverable |
(2) business days late up to a maximum of $5,000.00 per month after this point, the matter will be handled via appropriate administrative action by the Contracting Officer.
3.4.9 Virtual Technical Library Technical Manual Review and Compilation
| Quality, Timeliness |
| Review of Technical Manuals contained in the MSC Virtual Technical Library to ensure all configuration items are represented. |
| Ensure Technical Manuals for ships outfitting for Government Furnished Equipment and Material are onboard the respective ships at the time of delivery. |
| Quality and timeliness is met 98% of the time. |
| SME review of contractor work. Feedback to the COR. |
| $500.00 for every deliverable |
(2) business days late up to a maximum of $5,000.00 per month after this point, the matter will be handled via appropriate administrative action by the Contracting Officer.
3.4.10 Coordinate GFM and Develop RICs
| Quality, Timeliness |
| Develop RICs for new Government Furnished items where there is no existing AEL or APL. Update existing non-standard RICs to reflect additional ship requirements. Provide a report with a summary of efforts. |
| All RICs are developed or updated. |
Provide the report.
| Quality and timeliness is met 98% of the time. |
| SME review of contractor work. Feedback to the COR. |
| $500.00 for every deliverable |
(2) business days late up to a maximum of $5,000.00 per month after this point, the matter will be handled via appropriate administrative action by the Contracting Officer.
3.4.11…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .