Question_Set__2_Question__4_Reference.pdf
PDF 86 KB Posted
- Attached to
- Sources Sought EVERS Federal contract opportunity
- Solicitation number
- N32205-19-R-6010
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| T-AKE_CLASS_NOTICE_15_-_MAIN_DIESEL_GENERATOR_COUPLINGS.pdf | ||
| J_-_2_Category_A_Items_M.EVERS.xls | XLS spreadsheet | |
| DOKU1G531W0013E_0_0_VULKAN_COUPLING.pdf | ||
| 0208_A_VULKAN_COUPLINGS_LINK_STABILIZER_INSTALL.pdf | ||
| USNS_MEDGAR_EVERS_AMEND_0004.docx | DOCX document | |
| MEDGAR_EVERS_MOD_0003.docx | DOCX document | |
| Q&A_Set2_Question__3_Reference.pdf | ||
| Q&A_Set__2.docx | DOCX document | |
| MEDGAR_EVERS_ROH_DD_QUESTIONS_AND_ANSWERS.doc | DOC document | |
| USNS_MEDGAR_EVERS_AMEND_0002.docx | DOCX document | |
| USNS_MEDGAR_EVERS_ROH_DD_AMEND_0001.docx | DOCX document | |
| J-ATTACHMENTS_FBO.zip | ZIP file | |
| J-ATTACHMENT_6_FBO.zip | ZIP file | |
| N3220519R6010_USNS_MEDGAR_ROHDD_FINAL.docx | DOCX document | |
| J_-_14_Technical_Data_Non-Disclosure.docx | DOCX document | |
| SYNOPSIS_N3220519R6010_USNS_MEDGAR_EVERS.docx | DOCX document | |
| MEDGAR_EVERS_ROH_SOURCES_SOUGHT_2019.docx | DOCX document |
Show all 17
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MEDGAR EVERS
(T-AKE 13)
ELECTRICAL N32205-19-R-6010
ITEM NO. 0360 CATEGORY "A" 05/04/2019
OP 4 STOREROOMS LIGHTING UPGRADE
TALT 374
BIGDA
0360 - 1
1.0 ABSTRACT
This item describes the installation of upgraded light emitting diode (LED) lighting equipment in the OP 4 storerooms to provide sufficient illumination in which to work and to eliminate the shadows caused by grating structure.
2.0 REFERENCES
2.1 MSC Drawing 331-7488807, SRD: LIGHTING SYSTEM
BWD, ACCOMMODATIONS 01 AND 02 LEVELS(SRD REV L)
2.2 MSC Drawing 331-7488808, SRD: BWD, MACHINERY
SPACE LIGHTING
2.3 MSC Drawing 331-7488809, SRD: BWD, CARGO AND
MISCELLANEOUS SPACES LIGHTING
2.4 LLS360 HAZ CUT SHEET
3.0 ITEM LOCATION
3.1 LOCATION/QUANTITY/DESCRIPTION:
3.1.1 Location – The following six (6) OP 4
storerooms are affected in this modification:
01-42.5-1 01-44.5-1 01-46.5-2 01-41-2 2-77-2 2-77-01
3.1.2 Quantity – A total of 42 existing
fixtures are replaced with a total of 20 new fixtures.
3.2 Bill of Materials (Contractor Furnished):
joseph.fader Highlight
ELECTRICAL N32205-19-R-6010
ITEM NO. 0360 CATEGORY "A" 05/04/2019
OP 4 STOREROOMS LIGHTING UPGRADE
TALT 374
BIGDA
0360 - 2
3.2.1 Quantity: The Contractor shall provide
additional material such as miscellaneous fittings, busswork, cable hangers, fasteners, insulation, cable, etc. which are not included in the List of Materials, in order to install a fully functional system which meets the requirements of this specification.
4.0 GOVERNMENT_FURNISHED EQUIPMENT/MATERIAL/SERVICES:
4.1 Government Furnished Material
• 4.1.1 20 EA PART NO. LLS360-25-40-LV L.E.D.
Lighting Solutions.
5.0 NOTES:
5.1 The contractor and all subcontractors, regardless
of tier, must consult the General Technical Requirements (GTR) to determine applicability to this work item. In performance of this work item, the contractor and all subcontractors, regardless of tier, must comply with the requirements of all applicable GTRs, including, but not limited to, GTRs 1 through 7, 22, 24, 25, 26, 28, and 29.
5.2 The contractor and all subcontractors regardless
of tier are advised to review other work items under this contract, to determine their effect on the work required under this work item.
5.3 NOTE: All work is to be performed with equipment
designed to ensure these storerooms maintain their environmental ratings.
5.4 All Electrical work shall be performed in
accordance with ABS, USCG, UL, and IEEE.
5.5 All shipboard structure, hull insulation, sheathing, etc. damaged or disturbed by these
OP 4 STOREROOMS LIGHTING UPGRADE
0360 - 3 modifications shall be repaired similar to the original or surrounding materials. All disturbed surfaces shall be repaired utilizing approved methods maintaining the water tight, fire tight, or smoke tight integrity of the bulkheads, decks or equipment.
5.6 Minor deviations from the drawings are authorized
if appearance, function and strength are not impaired.
5.7 This ship contains High Voltage (HV) electrical
systems. The contractor and subcontractors shall obey all posted and verbal instructions regarding safety and exclusion from High Voltage areas. At no time shall a contractor or subcontractor approach, work on, or enter a High Voltage area without proper authorization.
5.8 THE USNS LEWIS AND CLARK CLASS ELECTRICAL COLOR
CODING DOES NOT FOLLOW CONSISTENT COLOR SCHEME. THE
SHIP IS KNOWN TO HAVE CURRENT CARRYING CONDUCTORS
COLORED GREEN, BLUE, BLACK AND WHITE. THE CONTRACTOR
SHALL ASSUME ALL ELECTRICAL CABLES ARE HOT UNTIL
TESTED OTHERWISE. THE CONTRACTOR SHALL TEST ALL
ELECTRICAL CABLES TO ENSURE THEY ARE DEAD PRIOR TO
WORKING ON THE ITEM.
6.0 QUALITY ASSURANCE REQUIREMENTS: All work performed
shall be to the satisfaction of the Port Engineer and Chief Engineer.
7.0 STATEMENT OF WORK REQUIRED
7.1 Arrangements/Outfitting: None additional
7.2 Structural: None additional
7.3 Mechanical/Fluids: None additional
OP 4 STOREROOMS LIGHTING UPGRADE
0360 - 4
7.4 Electronic – None additional
7.5 Electrical –
7.5.1 Removals: Remove all existing overhead
lighting fixtures using references 2.1 through 2.3 as guidance. The removed fixtures should be turned over to Ship’s Force for disposition. Retain the pre-punched mounting plates for possible reuse.
7.5.2 Install: Install new lighting
fixtures as follows:
(a) In Storeroom 01-42.5-1: Install 4-fixtures in the overhead above the aluminum grating, each centered in the space between access door and back bulkhead in a straight line and equally spaced between port and starboard space bulkheads
(b) In Storeroom 01-44.5-1: Install 4-fixtures in the overhead above the aluminum grating, each centered in the space between access door and back bulkhead in a straight line and equally spaced between port and starboard space bulkheads
(c) In Storeroom 01-46.5-2: Install 4-fixtures in the overhead above the aluminum grating, each centered in the space between access door and back bulkhead in a straight line and equally spaced between port and starboard space bulkheads
(d) In Storeroom 01-41-2: Install 4-fixtures in the overhead above the aluminum grating, each centered in the space between access door and back bulkhead in a straight line and equally
OP 4 STOREROOMS LIGHTING UPGRADE
0360 - 5 spaced between port and starboard space bulkheads
(e) Storeroom 2-77-2: Install 2- fixtures in the overhead above the aluminum grating, utilizing current lighting luminaire mounting bracket system. In the overhead above the aluminum grating, each centered between the access door bulkhead and the back bulkhead in a straight line and equally spaced between the other space’s bulkheads.
(f) In Storeroom 2-77-01: Install 2-fixtures in the overhead above the aluminum grating, each centered between the access door bulkhead and the back bulkhead in a straight line and equally spaced between the other space’s bulkheads.
7.6 Preparation of Drawings/Documentation –
The contractor shall red-line markup drawings of references 2.1 through 2.3 to reflect the new equipment/ arrangement details accomplished.
Submit Hard copy and Electronic (PDF) copy of red-line drawings to MSCREP.
7.7 Inspection/Test –
7.7.1 Perform an enclosure ground-safety
test. Resistance to ground (ship's structure) shall not exceed a value of 0.01 ohms when measured with a calibrated volt-ohm meter.
7.7.2 Operational test shall be performed
using a calibrated light meter as witnessed by the local Port Engineer and/or the ship’s chief engineer (CHENG). An acceptable light
OP 4 STOREROOMS LIGHTING UPGRADE
0360 - 6 output reading of a minimum of 10 FC at a distance of 30 inches above the deck with the ceiling gratings installed shall be provided. Room corners shall only require a 5 FC level due to inherent shadowing from the ceiling grates.
7.7 Painting –
Paint all disturbed surfaces to match surrounding surfaces.
7.8 Marking -
Ensure conductor (conductor tags) identification for all cables involved in the upgrade are present. In the appropriate lighting power distribution panels install nameplates, notices and markings for all modified lighting circuits.
7.9 Manufacturer Representative – None additional
8.0 GENERAL REQUIREMENTS: None additional