| File | Type | Posted |
|---|---|---|
| T-AKE_CLASS_NOTICE_15_-_MAIN_DIESEL_GENERATOR_COUPLINGS.pdf | ||
| DOKU1G531W0013E_0_0_VULKAN_COUPLING.pdf | ||
| 0208_A_VULKAN_COUPLINGS_LINK_STABILIZER_INSTALL.pdf | ||
| USNS_MEDGAR_EVERS_AMEND_0004.docx | DOCX document | |
| MEDGAR_EVERS_MOD_0003.docx | DOCX document | |
| Question_Set__2_Question__4_Reference.pdf | ||
| Q&A_Set__2.docx | DOCX document | |
| Q&A_Set2_Question__3_Reference.pdf | ||
| MEDGAR_EVERS_ROH_DD_QUESTIONS_AND_ANSWERS.doc | DOC document | |
| USNS_MEDGAR_EVERS_AMEND_0002.docx | DOCX document | |
| USNS_MEDGAR_EVERS_ROH_DD_AMEND_0001.docx | DOCX document | |
| J-ATTACHMENTS_FBO.zip | ZIP file | |
| J-ATTACHMENT_6_FBO.zip | ZIP file | |
| N3220519R6010_USNS_MEDGAR_ROHDD_FINAL.docx | DOCX document | |
| J_-_14_Technical_Data_Non-Disclosure.docx | DOCX document | |
| SYNOPSIS_N3220519R6010_USNS_MEDGAR_EVERS.docx | DOCX document | |
| MEDGAR_EVERS_ROH_SOURCES_SOUGHT_2019.docx | DOCX document |
Show all 17
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Cat A Items
| CATEGORY “A” ITEMS | ||||||||||||
| GENERAL REQUIREMENT | PRIME Contractor | SUB Contractor | Govt Mandated Tech Rep / Sub | OTHER COSTS | TOTAL PRICE | |||||||
| ITEM NO. | TITLE CAT A ITEM | PRIME L/H | LABOR PRICE | MATERIAL PRICE | SUB L/H | LABOR PRICE | MATERIAL PRICE | Price | TOTAL LABOR HOURS | TOTAL MATERIAL | ||
| CATEGORY "A" | ||||||||||||
| 000 | GENERAL REQUIREMENTS | |||||||||||
| 001 | INTENT, SCOPE, GENERAL REQUIREMENTS AND DEFINITIONS | NSP | - 0 | |||||||||
| 002 | TECHNICAL AND MANUFACTURER’S REPRESENTATIVES | NSP | ||||||||||
| 003 | APPROACH, BERTH, AND MOORING REQUIREMENTS | NSP | ||||||||||
| 004 | TESTING AND QUALITY ASSURANCE | NSP | ||||||||||
| 005 | ELECTRICAL SAFETY PROCEDURE REQUIREMENTS | NSP | ||||||||||
| 006 | HEAVY WEATHER PLAN | NSP | ||||||||||
| 007 | COLD WEATHER PLAN | NSP | ||||||||||
| 024 | PHYSICAL SECURITY AT PRIVATE CONTRACTOR’S FACILITY | NSP | ||||||||||
| 010 | FURNISH OFFICE FOR OVERHAUL MANAGEMENT TEAM | |||||||||||
| 011 | FURNISH GENERAL SERVICES | - 0 | $ - 0 | $0 | ||||||||
| 012 | INFORMATION TECHNOLOGY SERVICES | - 0 | $ - 0 | $0 | ||||||||
| 013 | PROJECT PLANNING AND PRODUCTION STATUS MONITORING REPORT | - 0 | $ - 0 | $0 | ||||||||
| 014 | PREPARATION OF WEIGHT AND MOMENT REPORT | - 0 | $ - 0 | $0 | ||||||||
| 015 | INTEGRATED LOGISTICS AND GFM SUPPORT REQUIREMENTS | - 0 | $ - 0 | $0 | ||||||||
| 016 | FIRE PROTECTION AND SHIP'S SAFETY PROGRAM | - 0 | $ - 0 | $0 | ||||||||
| 017 | HANDLING SHIP'S STORES | - 0 | $ - 0 | $0 | ||||||||
| 018 | DELIVERY AND REDELIVERY OF VESSEL | - 0 | $ - 0 | $0 | ||||||||
| 019 | SHIPBOARD ACCESS AND SECURITY | - 0 | $ - 0 | $0 | ||||||||
| 020 | GAS FREE CERTIFICATES | - 0 | $ - 0 | $0 | ||||||||
| 021 | CLEAN AND GAS FREE TANKS, VOIDS, COFFERDAMS AND SPACES | - 0 | $ - 0 | $0 | ||||||||
| 022 | MACHINERY SPACE TURN-OVER, DOCK TRIALS AND SEA TRIALS | - 0 | $ - 0 | $0 | ||||||||
| 023 | HAZARDOUS WASTE DISPOSAL | - 0 | $ - 0 | $0 | ||||||||
| 100 | HULL STRUCTURES | |||||||||||
| 101 | Ballast Tank Zinc Renewal | |||||||||||
| 110 | Tank Sounding Tube Cap Repair | |||||||||||
| 121 | Blast and Coat Forepeak Ballast Tank | |||||||||||
| 150 | Replace Cargo Hold Grating Near Elevators Option 1 (T-ALT 388) | |||||||||||
| 160 | Forward Mast Preservation | |||||||||||
| 200 | MACHINERY, PROPULSION | |||||||||||
| 206 | Main Diesel Generator RENK Pedestal Bearing Inspection | - 0 | $ - 0 | $0 | ||||||||
| 207 | Propulsion Motor Pedestal Bearing Inspection | $ - 0 | ||||||||||
| 208 | Vulkan Couplings Link Install | $ - 0 | ||||||||||
| 300 | ELECTRICAL | |||||||||||
| 303 | HV-SS-E Switchboard Inspection and Cleaning | $ - 0 | ||||||||||
| 308 | GE Generator Stator Cable Replacement Support | $ - 0 | ||||||||||
| 325 | Emergency Diesel Generator (EDG) Control System Mod (T-ALT 406) | $ - 0 | ||||||||||
| 360 | OP4 Storerooms Lighting Upgrade (T-ALT 374) | $ - 0 | ||||||||||
| 400 | COMMUNICATION & NAVIGATIONAL AIDS | |||||||||||
| 402 | Antenna Maintenance | - 0 | $ - 0 | $0 | ||||||||
| 404 | OE-570 UHF SATCOM Antenna Maintenance | - 0 | $ - 0 | $0 | ||||||||
| 421 | Echo Depth Sounder Preventative Maintenance | $ - 0 | ||||||||||
| 422 | NAVMACSII Upgrade Industrial Support | - 0 | $ - 0 | $0 | ||||||||
| 500 | MACHINERY, AUXILIARY SYSTEMS | |||||||||||
| 501 | Main Machinery Room (MMR) Aqueous Film Forming Foam System Piping Replacement (T-ALT 394) | - 0 | $ - 0 | $0 | ||||||||
| 502 | Forward AFFF System Piping Replacement (T-ALT 394) | - 0 | $ - 0 | $0 | ||||||||
| 504 | Cargo Weapons Elevator Electric Motor Support | - 0 | $ - 0 | $0 | ||||||||
| 505 | MSD Discharge Pump (T-ALT 191) | - 0 | $ - 0 | $0 | ||||||||
| 517 | NO.2 and NO. 3 LTFW Cooler Cleaning and Inspection REV - | $ - 0 | ||||||||||
| 519 | NO. 1 LTFW Cooler Cleaning and Gasket Replacement REV A | - 0 | $ - 0 | $0 | ||||||||
| 565 | LTFW Cooler Seawater Piping Modifications (T-ALT 238) | - 0 | $ - 0 | $0 | ||||||||
| 569 | No. 1 and No. 2 Cargo Refrigeration Compressor Replacement and Overhaul | |||||||||||
| 600 | OUTFIT, FURNISHINGS AND HABITABILITY | |||||||||||
| 601 | Immersion Suit Testing | - 0 | $ - 0 | $0 | ||||||||
| 602 | SCBA Cylinder Hydrostatic Testing | - 0 | $ - 0 | $0 | ||||||||
| 606 | Flight Deck Non-Skid Renewal | - 0 | $ - 0 | $0 | ||||||||
| 624 | MSD/VCHT Coating and Renewal | $ - 0 | ||||||||||
| 630 | Medical Waste Drain Trap | $ - 0 | ||||||||||
| 641 | Stateroom Head Deck Renewal | $ - 0 | ||||||||||
| 800 | HEATING, VENTILATION, AND AIR CONDITIONING | |||||||||||
| 801 | Galley & Laundry Exhaust Duct Cleaning | $0.00 | ||||||||||
| 808 | AC790 Condensate Drain Modification (T-ALT 523) REV- | $0.00 | ||||||||||
| 841 | Main Deck Fan Room 2-66-8 Reinsulation | - 0 | $0.00 | $0 | ||||||||
| 900 | DRY-DOCKING AND UNDOCKING | |||||||||||
| 901 | Docking and Undocking | - 0 | $ - 0 | $0 | ||||||||
| 903 | Propeller Shaft and Stern Tube Inspection | - 0 | $ - 0 | $0 | ||||||||
| 904A | Stern Tube Seal Inspection | - 0 | $ - 0 | $0 | ||||||||
| 905A | Bow Thruster 2.5 Year Maintenance | - 0 | $ - 0 | $0 | ||||||||
| 908 | Renew Sea chest, Rope Guard, and Bow Thruster Zincs | - 0 | $ - 0 | $0 | ||||||||
| 911 | Inspect and Repair Cathodic Protection | - 0 | $ - 0 | $0 | ||||||||
| 912 | Shaft Grounding Maintenance | - 0 | $ - 0 | $0 | ||||||||
| 916 | Underwater Hull Cleaning & Painting (Spot Blast) | $ - 0 | ||||||||||
| 917 | Permanent Marking for RO Unit Seachest | $ - 0 | ||||||||||
| 941 | FW (Closed Loop) Stern Tube Lubrication Sys Install USNS Evers Specific (T-ALT 403) | $ - 0 | ||||||||||
| 1000 | UNREP GEAR | |||||||||||
| 1000 | Saddle Winch Motor Fan Shroud and Baffles Replacement | - 0 | $ - 0 | $0 | ||||||||
| 1002 | HP Air Relief Valve Testing | - 0 | $ - 0 | $0 | ||||||||
| TOTAL CAT "A" | $0.00 |