SAC_AMENDMENT_7_FINAL.docx
DOCX document 39 KB Posted
- Attached to
- USNS SACAGAWEA ROH/DD Federal contract opportunity
- Solicitation number
- N3220519R6006
About this file
Amendment # 7
View the file
Other files for this federal contract opportunity
Show all 25
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
N3220519R6006
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION B - SUPPLIES OR SERVICES AND PRICES
The following have been modified:
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Category "A" Work Items (WIs)
FFP
Prepare for and accomplish the ROH/DD of the USNS SACAGAWEA (T-AKE 2) Total Category "A" WIs $_____________
Proposed unit price per KWh $_____ in accordance with (IAW) WI 011, 7.1.1.4
Proposed unit price per gallon of potable water $______ IAW WI 011, 7.1.3.2
Proposed unit price per gallon of distilled water $______ IAW WI 011, 7.1.4.2
Proposed unit price per gallon of bilge water removal $______ IAW WI 011, 7.1.18.7
Proposed unit price per crane usage $______ IAW WI 11, 7.9.1
Proposed Hazardous Waste handling fee rate IAW WI 023, 7.4.3 ______%
FOB: Destination
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
AGR and ODC
AGR
(15,000) man-hours @ $________ per man-hour = $_____________
ODC
Base $1,000,000.00
Proposed G&A Rate _______________% Subtotal: $_____________
Proposed Profit Rate _______________% Subtotal: $_____________
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Category "B" WI 0025
WI 0025 - Physical Security at Private Contractor's Facility in FPCON Bravo - Delta
Category B WIs are optional WIs and not required to be accomplished as part of this contract as awarded. The KO may require the contractor to perform the requirements of the optional Category B WIs by exercising the option via written notice to the contractor.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Category "B" WI 0030
WI 0030 - Continuation of Services
Category B WIs are optional WIs and not required to be accomplished as part of this contract as awarded. The KO may require the contractor to perform the requirements of the optional Category B WIs by exercising the option via written notice to the contractor.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Category "B" WI 0111
WI 0111 - FORWARD 02 DECK HOUSES CORROSION REMEDIATION AND PAINTING
Category B WIs are optional WIs and not required to be accomplished as part of this contract as awarded. The KO may require the contractor to perform the requirements of the optional Category B WIs by exercising the option via written notice to the contractor.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Category "B" WI 0607
WI 0607 - HANGAR DECK NON-SKID RENEWAL
Category B WIs are optional WIs and not required to be accomplished as part of this contract as awarded. The KO may require the contractor to perform the requirements of the optional Category B WIs by exercising the option via written notice to the contractor.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Category "B" WI 0618
WI 0618 - HOUSE 02 LEVEL DECK RENEWAL
Category B WIs are optional WIs and not required to be accomplished as part of this contract as awarded. The KO may require the contractor to perform the requirements of the optional Category B WIs by exercising the option via written notice to the contractor.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Category "B" WI 0619
WI 0619 - LIFEBOATS DAVITS AND WINCHES OVERHAUL
Category B WIs are optional WIs and not required to be accomplished as part of this contract as awarded. The KO may require the contractor to perform the requirements of the optional Category B WIs by exercising the option via written notice to the contractor.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Category "B" WI 0902
WI 0902 - DRYDOCKING UNDOCKING VESSEL
Category B WIs are optional WIs and not required to be accomplished as part of this contract as awarded. The KO may require the contractor to perform the requirements of the optional Category B WIs by exercising the option via written notice to the contractor.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Category "B" WI 0915
WI 0915 - BILGE KEEL REPAIRS
Category B WIs are optional WIs and not required to be accomplished as part of this contract as awarded. The KO may require the contractor to perform the requirements of the optional Category B WIs by exercising the option via written notice to the contractor.
NET AMT
TOTAL PROPOSED PRICE
TOTAL PROPOSED PRICE FOR CLINS 0001 THROUGH 0012 $______________
The contractor shall enter the total proposed price of all CLINs.
CLAUSES INCORPORATED BY FULL TEXT
PART I - THE SCHEDULE
Section B, Price Schedule, detailed information
CLIN 0001 –Attachment J-2 – Category “A” WIs provides a WI breakdown of CLIN 0001 pricing.
CLIN 0002: This CLIN contains the FBLR (e.g., G&A, overhead, profit, supervision, consumables, and/or support functions, etc.) and the ODC profit and G&A rate. These rates are used for pricing changes negotiated under the H-3 Clause - AGR and H-4 Clause ODC, for the duration of the contract. Changes are inherent to vessel repair contracts and should be expected by the Contractors. Additionally, this CLIN includes G&A and profit rates for ODC to be used for negotiating changes. These rates shall prevail even when the contract is extended/modified. The number of AGR man-hours and the ODC base amount are estimates that were generated for evaluation purposes. The actual amounts of man-hours and ODC may be used interchangeably under the contract which could result in a distribution and amount of man-hours and ODC that is either higher or lower than that stated in CLIN 0002. Any additional AGR or ODC required beyond the CLIN 0002 estimated amount shall be added through contract modification using the same AGR and ODC rates agreed upon at contract award. Any unused AGR or ODC will be de-obligated from the contract at the same AGR and ODC rates agreed upon at contract award. The contractor agrees that the number of man-hours included in its proposed price for such AGR shall include only direct production man-hours. For these purposes, direct production man-hours are for skilled labor at the Journeyman level expended in direct production as exemplified by the following functions:
| Abrasive cleaning/blasting | Tank cleaning | ||
| Welding | Machinists (inside and outside) | ||
| Burning | Brazing | ||
| Carpentry | Electrical work | ||
| Electronic work | Shipfitting | ||
| Lagging | Painting | ||
| Boilermaking | Pipefitting | ||
| Sheetmetal work | Engineering | ||
| Rigging | Staging/scaffolding | ||
| General labor | Fire Watch |
Direct production man-hours will not include those functions (whether charged directly or indirectly by the contractor’s accounting system) which are defined herein as support for production functions. Necessary support functions shall be considered to be included in the offeror's FBLR for direct production man-hours. Examples of support functions include:
| Testing | Quality Assurance | ||
| Planning | Cleaning (except tank cleaning) | ||
| Material handling & warehousing | Security | ||
| Surveying | Administration | ||
| Transportation | Purchasing staff | ||
| Lofting | Other indirect support | ||
| Supervision |
Consumable materials are goods used in the ordinary course of work performance such as office supplies, paper, rags, vehicle or equipment fuel costs, cleaning chemicals, disposable tools, welding rods, paint buckets, paint brushes, protective clothing, etc. that do not become an integral part of the repaired vessel. Consumable material shall be included in the contractor's FBLR and not separately priced.
The rates for profit and G&A on CLIN 0002 above shall be the same rates used by the contractor in its responses to the Request for CCO Proposals issued under this contract. The KO will apply these rates to the ODCs for each CCO when it is negotiated and settled.
The base cost, stated in this CLIN does not include the profit or G&A rates.
NOTE: This does not include any material cost for Category “A” WIs. The material cost for Category “A” WIs has been included under CLIN 0001.
CLINs 0003 through 0012 –Attachment J-3 – Category “B” WIs provides a WI breakdown of CLIN 0003 through 0012 pricing.
SECTION C - DESCRIPTIONS AND SPECIFICATIONS
The following have been modified:
C – 2 List of Standard WIs included for this solicitation:
CATEGORY A
| 0001 | INTENT, SCOPE, GENERAL CONDITION AND DEFINITIONS | |
| 0002 | TECHNICAL AND MANUFACTURER’S REPRESENTATIVES | |
| 0003 | APPROACH, BERTH AND MOORING REQUIREMENTS | |
| 0004 | TESTING AND QUALITY ASSURANCE | |
| 0005 | ELECTRICAL SAFETY PROCEDURE REQUIREMENTS | |
| 0006 | HEAVY WEATHER PLAN | |
| 0007 | COLD WEATHER PLAN | |
| 0010 | FURNISH OFFICE FOR OVERHAUL MANAGEMENT TEAM | |
| 0011 | FURNISH GENERAL SERVICES | |
| 0012 | INFORMATION TECHNOLOGY SERVICES | |
| 0013 | PROJECT PLANNING PRODUCTION STATUS MONITORING REPORTS | |
| 0014 | PREPARATION OF WEIGHT AND MOMENT REPORT | |
| 0015 | INTEGRATED LOGISTICS AND GFM SUPPORT REQUIREMENTS | |
| 0016 | FIRE PROTECTION AND SHIP'S SAFETY PROGRAM | |
| 0017 | HANDLING OF SHIP'S STORES | |
| 0018 | DELIVERY AND REDELIVERY OF THE VESSEL | |
| 0019 | SHIPBOARD ACCESS AND SECURITY | |
| 0020 | GAS FREE CERTIFICATES | |
| 0021 | CLEAN AND GAS FREE TANKS, VOIDE, COFFERDAMS AND SPACES | |
| 0022 | MACHINERY SPACE TURNOVER, DOCK TRIALS AND SEA TRIALS | |
| 0023 | HAZARDOUS WASTE DISPOSAL AT CONTRACTOR’S FACILITY | |
| 0024 | PHYSICAL SECURITY AT PRIVATE CONTRACTOR'S FACILITY | |
| 0101 | BALLAST TANK ZINC INSPECTION | |
| 0102 | OPEN, CLEAN AND INSPECT TANK VENT GOOSENECKS | |
| 0105 | DECK HOUSE CLEANING AND PAINTING(NEAR WHITE BLAST) | |
| 0106 | BOW FAIRLEAD ROLLER REPAIRS | |
| 0107 | STACK CRACKING REPAIRS, MODIFICATION (T-ALT 400) | |
| 0108 | TANK BOUNDARY TESTING AND STRUCTURAL SPECIAL SURVEY NO.3 | |
| 0109 | HULL GAUGING SURVEY SUPPORT, SPECIAL SURVEY NO. 3 | |
| 0113 | SALTWATER BALLAST TANKS PRESERVATION, SPOT REPAIRS AND LADDERS AND HANDRAIL REPAIRS | |
| 0114 | EXTERIOR DECK GRATING REPLACEMENT (T-ALT 457) | |
| 0115 | AFT HANGAR ROLLER DOOR DECK SILL REPAIRS | |
| 0116 | STACK CORROSSION REMEDIATION AND PAINTING | |
| 0201 | PROPULSION MOTOR AND COOLER CLEANING, INSPECTION AND MAINTENANCE | |
| 0202 | MAIN ENGINE FLUID FLEXIBLE CONNECTORS REPLACEMENT (5-YR) | |
| 0203 | MDE ANNUAL CONTROL/SAFETY INSPECTION AND TESTING | |
| 0204 | MDE TURBOCHARGERS CHARGE AIR COOLERS REPLACEMENT(1,2,3) AND MDE NO. 1 TURBOCHARGER CHARGE AIR COOLER CASING REPLACEMENT | |
| 0205 | MDG AUTOMATION AND PROPULSION CONTROL INSPECTION AND TESTING | |
| 0207 | PROPULSION MOTOR PEDESTAL BEARING INSPECTION (RENK) | |
| 0208 | MAIN DIESEL GENERATORS VULKAN COUPLINGS REPLACEMENT | |
| 0209 | MAIN DIESEL ENGINES CONE BEARINGS REPLACEMENT | |
| 0211 | LUBE OIL COOLERS CLEANING AND GASKETS REPLACEMENT | |
| 0212 | FUEL OIL COOLERS CLEANING AND GASKETS REPLACEMENT | |
| 0301 | MAIN GENERATORS AND PROPULSION CONTROL SYSTEM CLEANING AND | MAINTENANCE (5-YR) |
| 0302 | SHIPYARD INDUSTRIAL SUPPORT FOR AESS UPS REPLACEMENT (T-ALT 434) | |
| 0303 | HV-SS-E SWITCHBOARD INSPECTION AND CLEANING | |
| 0304 | THERMOGRAPHIC SURVEY AND INSPECTIONS | |
| 0305 | SHIPBOARD PLC SURVEY AND INSPECTIONS | |
| 0306 | DEAD-END CABLES INSPECTIONS AND REMOVALS | |
| 0307 | EMERGENCY SWBD CIRCUIT BREAKER REPLACEMENT(T-ALT 486) | |
| 0401 | BRIDGE EQUIPMENT ANNUAL SERVICE | |
| 0402 | ANTENNA PREVENTIVE MAINTENANCE | |
| 0403 | COMMUNICATIONS SYSTEM ANNUAL PREVENTIVE MAINTENANCE | |
| 0404 | OE-570/WSC ANTENNA SYSTEM MAINTENANCE | |
| 0405 | ECHO DEPTH SOUNDER PREVENTATIVE MAINTENANCE | |
| 0406 | ANTENNA RIGGING PHOTOS | |
| 0407 | NAVMACS UPGRADE AND ADNS SUPPORT(T-ALT 411 & T-ALT 454) | |
| 0409 | BRIDGE WIRING INSPECTION AND REPAIRS | |
| 0501 | FIREFIGHTING INSPECTIONS AND TESTING (5-YR) | |
| 0502 | SCBA ANNUAL TESTING, INSPECTION AND RECERTIFICATION | |
| 0503 | SCBA AIR COMPRESSOR AND REFILLING STATION INSPECTION AND | MAINTENANCE COMPRESSOR CYLINDERS HYDROSTATIC TESTING |
| 0504 | CARGO CRANES MAINTENANCE, RETESTING & ANNUAL INSPECTION (5-YR) | |
| 0505 | EMERGENCY DIESEL GENERATOR (EDG) TOP END OVERHAUL | |
| 0506 | EMERGENCY DIESEL GENERATOR (EDG) ANNUAL INSPECTION AND MAINTENANCE | |
| 0507 | EDG FLEXIBLE CONNECTIONS REPLACEMENT (5-YR) | |
| 0509 | DISTILLING PLANTS MAINTENANCE (5-YR) | |
| 0512 | ANCHOR WINDLASS PLANETARY GEAR AND BEARING REPLACEMENT AND ANNUAL INSPECTIONS (T-ALT 480) | |
| 0513 | SHIPBOARD GAGE, METERS AND INDICATORS CALIBRATIONS | |
| 0514 | RELIEF VALVES TESTING | |
| 0515 | OPEN AND INSPECT AIR RECEIVERS AND HP AIR FLASKS | |
| 0516 | SEWAGE SYSTEM PIPING CLEANING | |
| 0517 | FIREMAIN ISOLATION VALVE INSTALLATION (T-ALT 367) | |
| 0519 | LTFW COOLER CLEANING AND GASKET REPLACEMENT(T-ALT 426) | |
| 0520 | HTFW COOLER CLEANING AND GASKET REPLACEMENT(T-ALT 426) | |
| 0522 | STEERING GEAR MAINTENANCE (5-YR) | |
| 0523 | MACHINERY & CARGO OILY WATER SEPARATORS INSPECTION, CLEANING AND RECERTIFICATION | |
| 0524 | CENTRAL SEAWATER SYSTEM SPOOL REPAIRS (T-ALT 238) | |
| 0526 | MISCELLANEOUS PIPING REPLACEMENT AND REPAIRS | |
| 0528 | REVERSE OSMOSIS UNIT CLEANING INSPECTION AND MAINTENANCE | |
| 0529 | POTABLE WATER HEATERS OPEN AND INSPECTION | |
| 0530 | BRINE SYSTEM FLUSHING | |
| 0531 | LUBE OIL AND FUEL OIL PURIFIERS INSPECTION,TESTING AND GROOMING AND NO. 1 LUBE OIL PURIFIER BOWL OVERHAUL | |
| 0533 | CARGO PUMP ROOM AFFF PIPING REPLACEMENT (T-ALT 394) | |
| 0534 | MAIN MACHINERY ROOM AFFF PIPING REPLACEMENT (T-ALT 394) | |
| 0535 | AFT AFFF PIPING REPLACEMENT (T-ALT 279) | |
| 0536 | SHIPYARD MECHANICAL AND STRUCTURAL SUPPORT FOR CARGO WEAPONS ELEVATORS REPAIRS | |
| 0537 | MDE START AIR COMPRESSORS, SHIP’S SERVICE AIR COMPRESSORS AND | |
| EMERGENCY DIESEL AIR COMPRESSORS OVERHAULS | ||
| 0538 | POTABLE AND DISTILLING WATER TANKS PRESERVATION | |
| 0539 | MISCELLANEOUS VALVES REPAIRS | |
| 0601 | ACCOMMODATION LADDER INSPECTION AND LOAD TESTING (5-YR) | |
| 0602 | IMMERSION SUITS TESTING, INSPECTION AND RECERTIFICATION | |
| 0603 | LIFEBOATS MAINTENANCE, RECERTIFICATION AND FALLS RENEWAL (5-YR) | |
| 0604 | RESCUE BOAT MAINTENANCE, RECERTIFICATION AND FALLS RENEWAL (5-YR) | |
| 0605 | LIFERAFT ANNUAL RECERTIFICATION | |
| 0606 | FLIGHT DECK NON-SKID RENEWAL | |
| 0610 | GALLEY AND MSO EQUIPMENT TESTING AND CALIBRATION | |
| 0617 | HOUSE 01 LEVEL DECK RENEWAL | |
| 0801 | GALLEY AND LAUNDRY EXHAUST DUCT CLEANING | |
| 0802 | HVAC REFRIGERATION SYSTEMS OPERATION AND INSPECTION AND EXPANSION JOINTS INSTALLATION | |
| 0901 | DRY-DOCKING AND UNDOCKING VESSEL | |
| 0903 | PROPELLER SHAFT AND STERN TUBE INSPECTION | |
| 0904 | STERN TUBE SEAL INSPECTION AND OVERHAUL | |
| 0905 | BOW THRUSTER MAINTENANCE AND INSPECTION (5-YR) | |
| 0908 | RENEW SEACHEST, ROPE GUARD AND BOW THRUSTER ZINCS | |
| 0909 | ANCHOR AND ANCHOR CHAIN RANGING | |
| 0910 | OVERHAUL SEA VALVES | |
| 0911 | INSPECT AND REPAIR CATHODIC PROTECTION | |
| 0912 | SHAFT GROUNDING MAINTENANCE | |
| 0913 | WASTER PIECES RENEWAL | |
| 0914 | UNDERWATER HULL CLEANING AND PAINTING (SPOT BLAST) | |
| 0916 | RUDDER STOCK REMOVAL & INSPECTION & GLAND SEAL INSPECTION | |
| 0917 | FREEBOARD CLEANING AND PAINTING (NEAR WHITE BLAST) | |
| 0941 | FRESHWATER CLOSED LOOP STERN TUBE LUBRICATION SYSTEM INSTALLATION |
(T-ALT 403)
| 1001 | HOIST CHAINS REPLACEMENT AND SLIDING BLOCKS REPAIRS |
| 1002 | STATION 7 SLIDING PADEYE 50K STATIC LOAD TEST AND NO-LOAD OPERATIONAL TEST |
| 1008 | HELO DECK SAFETY NETS REFURBISHMENT REWIRING AND WEIGHT TESTING |
CATEGORY B
| 0025 | PHYSICAL SECURITY AT PRIVATE CONTRACTOR'S FACILITY IN FORCE PROTECTION CONDITIONS CHARLIE – DELTA |
| 0030 | CONTINUATION OF SERVICES |
| 0111 | FORWARD 02 DECK HOUSES CORROSION REMEDIATION, PRESERVATION AND PAINTING |
| 0607 | HANGAR DECK NON-SKID RENEWAL |
| 0618 | HOUSE 02 LEVEL DECK RENEWAL |
| 0619 | LIFEBOAT DAVITS AND WINCHES OVERHAUL |
| 0902 | DRY-DOCKING AND UNDOCKING |
| 0915 | BILGE KEEL REPAIRS |
(End of Summary of Changes) image1.wmf