SAC_AMENDMENT_1_FINAL.docx
DOCX document 34 KB Posted
- Attached to
- USNS SACAGAWEA ROH/DD Federal contract opportunity
- Solicitation number
- N3220519R6006
About this file
Amendment 1 RFC
View the file
Other files for this federal contract opportunity
Show all 25
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
N3220519R6006
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION B - SUPPLIES OR SERVICES AND PRICES
The following have been added by full text:
ANSWERS TO RFC
REQUEST FOR SPECIFICATION CLARIFICATION #1
SPECIFICATION ITEM NO.: ___0534________________
PARAGRAPH / SECTION NO:___2.1_________________
TITLE: ____MMR AFF Piping Replacement ____________
QUESTION:
Please provide MSC Drawing 555-8494867, Rev A, Contract Guidance Drawing, T-AKE 1 Class, MMR AFFF System Piping Replacement Modification.
ANSWER:
Please see attached; Q1_8494867_A_
REQUEST FOR SPECIFICATION CLARIFICATION #2
SPECIFICATION ITEM NO.: ___0535________________
PARAGRAPH / SECTION NO:___2.1_________________
TITLE: ____AFT AFFF Piping Replacement ____________
QUESTION:
Please provide NAVSEA Drawing 555-7488760, Rev. B, NASSCO Drawing 471-342-7154, SRD Foam Firefighting System Diagram.
Please see attached: Q2_7488760_B
REQUEST FOR SPECIFICATION CLARIFICATION #3
SPECIFICATION ITEM NO.: ___0941________________
PARAGRAPH / SECTION NO:___2.1_________________
TITLE: Freshwater Closed Loop Stern Tube Lubricatrion System
QUESTION:
Please provide MSC Drawing 530-8498422, Rev A, Fresh Water (Closed Loop) Stern Tube Lubrication System Installation Dated 13 June 2018.
MSC Drawing 530-8498422, Rev A, Fresh Water (Closed Loop) Stern Tube Lubrication System Installation is attached.
REQUEST FOR SPECIFICATION CLARIFICATION #4
SPECIFICATION ITEM NO.: ___1001 & 1003_______
PARAGRAPH / SECTION NO:____________________
TITLE: Hoist Chains Replacement and Sliding Block Repairs
QUESTION:
These items appear to be identical in work content. Please advise if this a duplication of effort.
ANSWER:
WI-1001 and WI-1003 are duplicates. Disregard WI-1003, dated 6 APR 2019.
Amended WI-1003, dated 6 JUN 2019 is attached.
REQUEST FOR SPECIFICATION CLARIFICATION #5
SPECIFICATION ITEM NO.: 401, 405 & 409
PARAGRAPH / SECTION NO.:
TITLE: MSC Required Technical Representatives
QUESTION:
The following comments/requests for additional information has been requested by Sperry. Please advise
I have attached the RFQ’s with questions to be asked to MSC highlighted in yellow.
1. 0409 Bridge wiring . Will need more information on what systems they want addressed. Stating inspect ALL bridge wiring could be a challenge. What systems?
1. 0405 Echo Sounder. I have highlighted questions for MSC in RFQ attached.
1. 0401 Bridge annuals.. This is also asking for an echo sounder groom in conjunction with 0405
ANSWER:
WI-0401 request Contractor to test and verify proper operation of the Echo Depth Sounder equipment as a part of the annual requirement.
WI-405 request Contractor to go into more detailed and complete system maintenance on the Echo Depth Sounder.
Highlighted section in Paragraph 7.4.1.
· Ans: Refurbishment of Echo Depth Sounder is required at dry-docking
Highlighted section in Paragraph 7.4.2.
· Ans: Correct. Only one (1) Echo Depth Sounder is onboard. No additional transducer has been installed.
WI-409 Will need more information on what systems they want addressed.
· Ans: See amended Work Item.
REQUEST FOR SPECIFICATION CLARIFICATION #6
SPECIFICATION ITEM NO.: 531
PARAGRAPH / SECTION NO.: All
TITLE: Lub Oil and Fuel Oil Purifiers
QUESTION:
The following comments/requests for additional information has been requested by the OEM (GEA Mechanical Equipment). Please advise
1. We must have the serial number for each separator to be able to issue a quote.
| NO.1 LO PURIFIER | S/N 9010-632 | |
| NO.2 LO PURIFIER | S/N 9010-634 | |
| NO.3 LO PURIFIER | S/N 9010-635 | |
| NO.4 LO PURIFIER | S/N 9010-636 | |
| NO.1 FUEL OIL PURIFIER | S/N 9011-776 | |
| NO.2 FUEL OIL PURIFIER | S/N 9011-775 |
REQUEST FOR SPECIFICATION CLARIFICATION #7
SPECIFICATION ITEM NO.: 014
PARAGRAPH / SECTION NO: N/A
TITLE: Weight Report
QUESTION:
Please provide the Latest Lightship Information
Please see attached on latest Lightship information. Doc name: SGA LIGHTSHIP
REQUEST FOR SPECIFICATION CLARIFICATION #8
SPECIFICATION ITEM NO.: 0941
PARAGRAPH / SECTION NO: 2.1
TITLE: Freshwater Closed Loop Stern Tube Lubrication System Installation
QUESTION:
Please provide the following references:
2.1.4 – Wartsila Drawing 18-JS-058
2.1.5 – MSC Drawing 320-8387094
ANSWER:
2.1.4 – Wartsila Drawing 18-JS-058 ATTACHED
2.1.5 – MSC Drawing 320-8387094 ATTACHED
REQUEST FOR SPECIFICATION CLARIFICATION #9
SPECIFICATION ITEM NO.: 0010
PARAGRAPH / SECTION NO: 7.4.1
TITLE: Furnish Office For Overhaul Management Team
QUESTION:
Paragraph states to configure the Administrative Assistant’s computer in accordance with this work item. This item does not provide that configuration. Please clarify?
Administrative Assistant’s computer should be configured same as Contracting Officer and Port Engineer’s to allow access to PENG.
REQUEST FOR SPECIFICATION CLARIFICATION #10
SPECIFICATION ITEM NO.: 0012
PARAGRAPH / SECTION NO: 7.2.2
TITLE: Information Technologies Services
QUESTION:
Paragraph indicates (2) computers for the Administrative Assistants. Work Item 0010 only requires One (1) Administrative Assistant. Please clarify?
Only one (1) computer is required for the Administrative Assistant, in sync with WI-010
REQUEST FOR SPECIFICATION CLARIFICATION #11
SPECIFICATION ITEM NO.: 0107
PARAGRAPH / SECTION NO: 2.1
TITLE: Stack Cracking Repair Modifications
QUESTION:
The References in Paragraphs 2.1.1 and 2.1.2 were not provided. Please provide these references?
See following
2.1.1 NASSCO DRAWING #471-321-1721, (NAVSEA DWG #100-7489052) – Bridge/Comm. Suite HQ Zone – Key Plan, Rev A
2.1.2 NASSCO DRAWING #471-321-7026, (NAVSEA DWG #085-7488877) – Scantling Plan - House, Rev J
The drawings requested are attached and provided for WI-107.
REQUEST FOR SPECIFICATION CLARIFICATION #12
SPECIFICATION ITEM NO.: 0501
PARAGRAPH / SECTION NO: 7.5.3
TITLE: Firefighting Inspections and Testing
QUESTION:
The paragraph states to Hydrostatically Test/Recharge/Refill Forty-eight (48) FM200 cylinders. Normally and in accordance with the CFR we are authorized to conduct a 5 year external visual inspection. This would save money. Does MSC concur with this recommendation?
MSC concurs.
(End of Summary of Changes) image1.wmf