Q4_1003_A_STATION_1_AND_2_ASD_ASSEMBLIES_REFURBISHMENT.doc

DOC document 114 KB Posted

Attached to
USNS SACAGAWEA ROH/DD Federal contract opportunity
Solicitation number
N3220519R6006
Issued by
Department of the Navy Military Sealift Command

About this file

Revised WI 1003

View the file

Other files for this federal contract opportunity

Other files attached to USNS SACAGAWEA ROH/DD, newest first.
File Type Posted
SAC_AMENDMENT_7_FINAL.docx DOCX document
SAC_AMENDMENT_6_FINAL.docx DOCX document
J_-_3_Category_B_Items_SAC_REV.xls XLS spreadsheet
J_-_2_Category_A_Items_SAC_REV.xls XLS spreadsheet
SAC_AMENDMENT_5_FINAL.docx DOCX document
Revised__J_-_3_Category_B_Items_SAC.xls XLS spreadsheet
N3220519R6006_AMENDMENT_P0004.docx DOCX document
SAC_AMENDMENT_3_FINAL.docx DOCX document
RFC_13_18.zip ZIP file
SAC_AMENDMENT_2_FINAL.docx DOCX document
Q11_NAVSEA_DWG_085-7488877.pdf PDF
Q8_8387094_Part2o3-.zip ZIP file
Q1_8494867_A_.pdf PDF
Q11_NAVSEA_DWG_100-7489052.pdf PDF
Q7_SGA_LIGHTSHIP.pdf PDF
Q8_8387094_Part1-.zip ZIP file
Q8_8387094_Part3o3-.zip ZIP file
Q5_0409_A_BRIDGE_WIRING_INSPECTION_AND_REPAIRS_AMEND_ONE.docx DOCX document
Q3_8498422_A_06June_2019.zip ZIP file
Q2_7488760_B.zip ZIP file
SAC_AMENDMENT_1_FINAL.docx DOCX document
Q8_TAKE_Tank_final-18-JS-058.pdf PDF
J_-_6_CDRL.zip ZIP file
N3220519R6006_FINAL.docx DOCX document
J_Attachments.zip ZIP file
Show all 25

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

USNS SACAGAWEA

(T-AKE 2)

UNREP GEAR

RFP NO. N32205-19-R-6006

6 JUN 2019

ITEM NO. 1003

Category “A” PHDNSWC/IGM/adt

STATION 1_AND_2_ASD_ASSEMBLIES_REFURBISHMENT-AMEND ONE

1.0

ABSTRACT:

1.1 This item describes the requirements to refurbish the Highline Winch Anti-Slack Device (ASD) assemblies.

2.0

REFERENCES/ENCLOSURES:

2.1 NAVSEA Tech Manual No. S9571-AR-MMA-010 Highline/Spanwire Air Clutch Anti-Slack Device MKS 6-11 and 14, MODS 0-2.

2.2 NAVSEA DWG 5210545, Standard Painting Procedures for UNREP Equipment.

2.3 NAVSHIP Tech Manual No. S9086-TK-STM-010/CH-571R4, Underway Replenishment Chapter 571

3.0

ITEM LOCATION/DESCRIPTION:

3.1

LOCATION/QUANTITY:

3.1.1 Location: Station 1 and 2

3.1.2 Quantity: 2

3.2

ITEM DESCRIPTION/MANUFACTURER'S DATA:

3.2.1 Bill of materials:

Contractor Furnished Material (CFM)

Part
Part No.
QTY
Screw,HexHd Cap,Grade 5, 1½-6UNC X 3¼” long
MS90725-309
8
Shroud, Bellows
4684679
2

Bolt, Mach, HexHd, ¾-10UNC X 9” long

Nut, Grade 5, 1-7/8-8UNC
Foundation Nuts
4
Bolt, HexHd, Grade 5 1-7/8-8UNC X TBD” long
Fitted Foundation Bolts
4
Bolt, HexHd, Grade 5 1-3/4-5UNC X TBD” long
Foundation Bolts
16
Nut, Grade 5, 1-3/4-5UNC
Foundation Nuts
16

4.0

GOVERNMENT FURNISHED EQUIPMENT/MATERIAL/SERVICES:

4.1

GOVERNMENT FURNISHED EQUIPMENT (GFE): NONE

4.2

GOVERNMENT FURNISHED MATERIALS (GFM):

FSC
NIIN
PART
PART NUMBER
QTY
UI
3010
01-137-9385
ACTUATOR,HYDRAULIC-
W01-358-6900
1
EA
4730
00-226-6771
ADAPTER,STRAIGHT,TU
5746867
4
EA
3110
00-453-6190
BEARING,ROLLER,NEEDLE
CYR-5-S
4
EA
3110
00-902-7288
BEARING,ROLLER,SELF
264X12022X7200
4
EA
3120
01-114-5832
BEARING,SLEEVE
FAF1216-12
12
EA
3120
01-138-9651
BEARING,SLEEVE
FAF1620-16
4
EA
3120
01-138-9652
BEARING,SLEEVE
40DU16
8
EA
3120
00-008-6088
BEARING,SLEEVE
40DU32
4
EA
5306
00-816-5270
BOLT,MACHINE
MS16208-102
32
EA
5306
00-543-5585
BOLT,MACHINE
MS16208-120
20
EA
5306
00-087-0790
BOLT,MACHINE
MS16208-140
12
EA
3110
00-245-9293
CONE AND ROLLERS,TA
NA456SW
2
EA
4730
00-172-0043
FITTING,LUBRICATION
MS15005-1
1
PG
4730
00-172-0045
FITTING,LUBRICATION
MS15005-3
1
PG
5310
00-050-6646
HEX NYLON LOCKNUT
MS17830-6C
4
EA
4720
01-386-3303
HOSE ASSEMBLY,NONME
K9190106020404C-12
2
AY
4720
01-386-3292
HOSE ASSEMBLY,NONME
K9190106020404C-16
2
AY
4720
01-145-9520
HOSE ASSEMBLY,NONME
9190606C-4-4-4-26
2
EA
4720
01-106-9034
HOSE ASSEMBLY,NONME
9190606C-4-4-4-8
2
EA
5305
01-477-2578
MACHINE SCREW AND N
6918896
4
EA
4730
01-165-5868
NIPPLE,PIPE
1/4FFF-3
2
EA
5310
00-595-7421
NUT,SELF-LOCKING,HE
MS17829-8C
32
EA
5310
00-241-6609
NUT,SELF-LOCKING,HE
MS17830-12C
6
EA
5310
00-411-4385
NUT,SELF-LOCKING,HE
MS17830-8C
8
EA
5331
01-385-3740
O-RING
2-144N1090-85
4
EA
5315
01-140-4870
PIN,SPRING
MS51987-422
4
EA
2040
01-111-8806
PLATE,CONNECTOR
4684671-1
2
EA
2040
01-111-8807
PLATE,CONNECTOR
4684671-2
2
EA
3950
01-247-9510
PLATE,SIDE
4684667-1
2
EA
3950
01-202-9647
PLATE,SIDE,PULLEY
4684667-2
2
EA
3120
01-253-9119
ROLLER,LINEAR-ROTAR
4684677
8
EA
5305
00-632-2777
SCREW,CAP,HEXAGON H
MS35307-358
64
EA
5305
00-847-1159
SCREW,CAP,HEXAGON H
MS35307-365
40
EA
5305
00-638-9837
SCREW,CAP,HEXAGON H
MS35307-366
8
EA
5305
00-021-3806
SCREW,CAP,HEXAGON H
MS35307-413
12
EA
5305
00-727-6804
SCREW,CAP,HEXAGON H
MS35307-414
12
EA
5305
01-274-2899
SCREW,CAP,SOCKET HE
MS21295-50
4
EA
5305
00-121-7972
SCREW,CAP,SOCKET HE
MS21295-63
16
EA
5305
00-914-3819
SCREW,SHOULDER
MS51975-10
8
EA
5330
01-118-2264
SEAL
8
EA
5330
01-124-9019
SEAL,PLAIN
11606SS
4
EA
5365
01-268-3694
SPACER,RING
4684690
4
EA
4730
01-248-5207
UNION,ROTATING,AIR-
17-058-056
2
EA

4.3

GOVERNMENT FURNISHED SERVICES (GFS):

4.3.1 Port Hueneme representative will provide technical support/guidance during the accomplishment of this work item.

5.0

NOTES:

5.1 The contractor and all subcontractors, regardless of tier must consult the General Technical Requirements (GTR) to determine applicability to this work item. In performance of this work item, the contractor and subcontractors regardless of tier must comply with the requirements of all applicable GTR’s including but not limited to GTR’s 1 through 7, 22, 23, 24, 27, 28 and 29.

5.2 The contractor and all subcontractors regardless of tier are advised to review other work items under this contract, including but not limited to Work Items 011, 013, 014 and 021, to determine their effect on the work required under this work item. Many of the definitions relating to performance of this work item are found in Work Item 001.

5.3 The following Contractor Furnished Material (CFM) list is provided for, but not limited to, accomplishment of this repair. Shipyard will provide the metal to replace the support brackets and foundation for cost estimating used 2,500 dollars just for the metal. The Contractor shall provide the exact quantities and additional material such as miscellaneous pipe fittings, elbows, caps, valves, pipe hangers, weld material, cable hangers, cable tags, busywork, etc., in order to install a fully functional system which meets the requirements of this specification.

6.0 QUALITY ASSURANCE REQUIREMENTS: None Additional

7.0

STATEMENT OF WORK REQUIRED:

7.1 Arrangement/Outfitting:

7.1.1 Any additional materials/parts required by the contractor to accomplish this work item not included in this specification shall be provided by the contractor and will be in accordance with Reference 2.1 and 2.2.

7.1.2 Foundation bolts will be provided by the contractor as follows: (Eight (8)) 1 ¾-5UNC Grade 5 bolts per station and (two (2)) fitted bolts of Grade 5 materials manufactured by the contractor.

7.2 Structural:

7.2.1 Any structural, weld build up and metal work required to bring the ASD foundations and ASD frames and body (ie shroud, cover, screen, patching, etc) will be provided by the contractor.

7.3 Mechanical/Fluids:

7.3.1 The contractor with ship’s force assistance will remove the wire rope from the stations and protect from damage.

7.3.2 Drain the oil from the ASD electric motor gear box.

7.3.3 Rig suitable lifting slings around the ASD assembly. Connect lifting slings to hoisting equipment. The ASD weights approximately 5,500 lbs.

7.3.4 Remove ASD foundation bolts, carefully hoist ASD assembly clear off foundation and convey to the shop.

7.3.5 Disassemble ASD assembly, including the fairlead sheave assembly in accordance with reference 2.1.

7.3.6 Disassemble adjustable sheave assembly and fairlead sheave assembly. (When reassembling adjustable sheave assembly, inform Port Hueneme representative for proper assembly procedure).

7.3.7 Clean by degreasing all ASD parts.

7.3.8 Remove bearings from sheave and thoroughly clean and polish sheave pins, inner shafts, outer shafts and bearing bores. Prove all grease passages open and free flowing.

7.3.9 Sandblast and mechanically clean interior and exterior surfaces of the body/housing, sheave housings, sheaves, plates, squeeze arm and shroud assembly to bare metal. Ensure that any open ports are plugged during sandblasting. Submit an as found condition report to MSCREP prior to priming and painting. Paint in accordance with reference 2.3. (Perform any metal work that is required to accomplish the work item).

7.3.10 Sandblast down to bare metal sheaves and visually inspect for defects. Employ 2 xs to 5x magnification as required to facilitate inspection. Sheaves with cracks greater in length than one half the materials at that location shall be considered defective and must be replaced. Smaller cracks shall be weld repaired to prevent further damage.

7.3.11 Remove ASD gear reducer and motor assembly, degrease and mechanically clean and preserved by painting. Separate gear motor from the gear reducer for motor work. Disassemble gear reducer, inspect, clean and reassemble using new bearings and seals.

7.3.12 Reassemble ASD assembly using new GFM furnished materials in accordance with reference 2.1

7.3.13 Convey ASD assembly from shop to ship.

7.3.14 Install ASD assembly on foundation using contractor provided eight (8) 1 3/4 x 5UNC, x grade 5 hex hd bolts and two (2) manufactured fitted bolts of grade 5 materials per station. Tighten bolts evenly and secure to a torque required in accordance with reference 2.1

7.3.15 Fill gear box with new gear oil and lubricate all bearing assembly in accordance with reference 2.1 lubrication charts.

7.3.16 Reinstall and slush winch wire rope upon completion of the work item.

7.4 Electrical:

7.4.1 Perform preliminary procedures in accordance with reference 2.1.

7.4.2 Disconnect gear box electric motor and blower electric motor electrical leads for removal of ASD from the foundation. Label and protect all leads.

7.4.3 Megger gearbox motor and blower motor and provide condition report to MSCREP.

7.4.4 Perform class “B” overhaul on the gear motor and fan motor by cleaning, dipping, baking, balancing and bearing replacement (motor bearing shall be provided by contractor) of the gear motor and fan motor.

7.4.5 Disassemble blower housing, perform preservation by mechanically blasting the casing, perform metal work as required to bring blower motor housing within specs.

7.4.6 Protect machine surfaces and mechanically clean, scale and or sandblast normally painted surface of the blower motor and gear reducer and motor assembly. Paint blower and gear reducer and motor assembly.

7.5 Electronics: None additional

7.6 Preparation of Drawings/Documentation: None additional

7.7 Inspection/Test:

7.7.1 Static load testing of the ASD will be perform in accordance with reference 2.1 and 2.3. Use dunnage to protect wire rope drum grooves, apply 50,000 pounds hoisting with crane hold for 10 Min.

Visually inspect winch. There shall be no evidence of structural damage or distortion to any part of the winch, foundation, or rigging system. (The structural integrity test may be waived if new bolts or inspected existing bolts are installed that meet the material specification required by the original equipment installation drawing.)

7.8 Painting:

7.8.1 Clean, prime and paint new and disturbed surfaces to match the surroundings.

7.8.2 Mechanically clean ASD foundation and surrounding area to bare metal and paint in accordance with reference 2.2., Pay close attention on the inside section of the foundations.

7.9 Marking: None Additional

7.10 Manufacturers Representative: None

8.0 GENERAL REQUIREMENTS: None 1003-1