J_-_2_Category_A_Items_MCLEAN.xls

XLS spreadsheet 55 KB Posted

Attached to
USNS WILLIAM MCLEAN ROH/DD Federal contract opportunity
Solicitation number
N32205-18-R-4258
Issued by
Department of the Navy Military Sealift Command

About this file

Revised J-2

View the file

Other files for this federal contract opportunity

Other files attached to USNS WILLIAM MCLEAN ROH/DD, newest first.
File Type Posted
AMENDMENT_0005-20181222124641.pdf PDF
Ref_1(5).zip ZIP file
Ref_1(3).zip ZIP file
Ref_1(4).zip ZIP file
Ref_1(2).zip ZIP file
Ref_2(2).zip ZIP file
Ref_2(3).zip ZIP file
Ref_2(1).zip ZIP file
Ref_1(1).zip ZIP file
Ref_2(4).zip ZIP file
0802_A_AUXILIARY_PRESTAGE_AREA_REFRIGERATION_INSTALLATION_(T-ALT_485)_Rev_10-3-18.doc DOC document
4258_A3.docx DOCX document
532-8499083_-LT_FW_Cooling_Sys_WMC.pdf PDF
N3220518R4258_AMENDMENT_0002.docx DOCX document
331-8495060_RelayLanternsExamRmTALT299_ABS_(2).pdf PDF
243-8498653_-_REV_1_26_JUNE_2018.pdf PDF
J_Attachments.zip ZIP file
N3220518R4258_FINAL_SOLICITATION.docx DOCX document
J-6_CDRLs.zip ZIP file
Show all 19

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Cat A Items

CATEGORY “A” ITEMS
GENERAL REQUIREMENTPRIME ContractorSUB ContractorGovt Mandated Tech Rep / SubOTHER COSTSTOTAL PRICE
ITEM NO.TITLE CAT A ITEMPRIME L/HLABOR PRICEMATERIAL PRICESUB L/HLABOR PRICEMATERIAL PRICEPriceTOTAL LABOR HOURSTOTAL MATERIAL
CATEGORY "A"
0000GENERAL REQUIREMENTS
0001Intent, Scope, General Requirements and DefinitionsNSPNSPNSPNSPNSPNSP- 0NSPNSP
0002Technical and Manufacturer RepresentativesNSPNSPNSPNSPNSPNSP- 0NSPNSP
0003Approach, Berth, and Mooring RequiremntsNSPNSPNSPNSPNSPNSP- 0NSPNSP
0004Testing and Quality AssuranceNSPNSPNSPNSPNSPNSP- 0NSPNSP
0005Electrical Safety Procedure RequirementsNSPNSPNSPNSPNSPNSP- 0NSPNSP
0006Heavy Weather PlanNSPNSPNSPNSPNSPNSP- 0NSPNSP
0007Cold Weather PlanNSPNSPNSPNSPNSPNSP- 0NSPNSP
0010Furnish Office for Overhaul Management Team (OMT)- 0$ - 0$0
0011Furnish General Services- 0$ - 0$0
0012Telephone Services- 0$ - 0$0
0013Project Planning and Production Status Monitoring Reports- 0$ - 0$0
0014Preparation of Weight and Moment Report- 0$ - 0$0
0015Integrated Logistics and GFM Support Requirements- 0$ - 0$0
0016Fire Protection and Ship's Safety Program- 0$ - 0$0
0017Handling Ship's Stores- 0$ - 0$0
0018Delivery and Re-Delivery of the Vessel- 0$ - 0$0
0019Shipboard Access and Security- 0$ - 0$0
0020Gas Free Certificates- 0$ - 0$0
0021Clean and Gas Free Tanks, Voids, Cofferdams & Space- 0$ - 0$0
0022Machinery Space Turn-Over, Dock Trials and Sea Trial- 0$ - 0$0
0023Hazardous Waste Disposal at a Contractor's Facility- 0$ - 0$0
0024Phyiscal Security at Private Contractor's FacilityNSPNSPNSPNSPNSPNSP- 0NSPNSP
100HULL STRUCTURE
102Open, Clean, and Inspect Goosenecks (CSI)- 0$ - 0$0
200MACHINERY, PROPULSION
211MDE No. 2 and No. 3 12K HR Maintenance- 0$ - 0$0
300ELECTRICAL
304Elec. Motor Maintenance (VR18-0019)- 0$ - 0$0
342Additional Bilge Alarms Installation
369Install Relay Lanterns in Examination Room
375Install Additional Alarm Columns- 0$ - 0$0
400COMMUNICATION AND NAVIGATIONAL AIDS
402Antenna System Preventive Maintenance- 0$ - 0$0
403Communication Systems Preventive Maintenance- 0$ - 0$0
404OE-570 WSC Antenna System Maintenance
405NAVMACSII Shipyard Industrial Assist- 0$ - 0$0
406Sound Powered Phone X1JG Mod- 0$ - 0$0
500MACHINERY, AUXILIARY SYSTEMS
503Cargo Crane Maintenance and Re-Certification- 0$ - 0$0
531HT FW Sea Water Piping Modification- 0$ - 0$0
532HT/LT Freshwater and Chill Water System Flush- 0$ - 0$0
600OUTFIT, FURNISHINGS AND HABITABILITY
606Flight Deck Non-Skid Renewal- 0$ - 0$0
624MSD/VCHT Tank Coating and Repair- 0$ - 0$0
800HEATING, VENTILATION, AND AIR CONDITIONING
801Galley and Laundry Exhaust Duct Cleaning (CSI)- 0$ - 0$0
802Auxiliary Prestage Area Refrigeration Installation
900DRY-DOCKING
901Dry-Docking and Undocking Vessel- 0$ - 0$0
903Propeller Shaft and Stern Tube Inspection- 0$ - 0$0
904AStern Tube Seal Inspection (SW System) (CSI)- 0$ - 0$0
905ABow Thruster Maintenance (CSI)- 0$ - 0$0
911Inspect and Repair Cathodic Protection (CSI)- 0$ - 0$0
912Shaft Grounding Maintenance (CSI)- 0$ - 0$0
916Underwater Hull Cleaning and Painting (Spot Blast)- 0$ - 0$0
941Fresh Water (Closed loop) Stern Tube Lubrication- 0$ - 0$0
952Bow Thruster Tunnel Grating Modification- 0$ - 0$0
1000UNREP GEAR
1002High Pressure Air Relief Valve Calibration- 0$ - 0$0
1003RAM Tensioner Accumulator HP Air Pipe Support Bracket Replacement- 0$ - 0$0
TOTAL CAT "A"$0.00

&LUSNS WILLIAM MCLEAN (T-AKE 12)&CCONTRACTOR PRICE BREAKDOWN

&"Arial,Bold"CATEGORY "A" ITEMS&RN32205-18-R-4258

&CATTACHMENT J-2

File details come from the government source that posted it.